SUPERSEDED - Decision Notice - MCU22 0145 & OPW22 0212 [As Published] · MCU22/0145
Community Management Statement
24. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
25. Where titles are created for the units, unit 3 must be contained on a separate lot and must
be provided with separate services. Unit 3 must not be consolidated with any other unit
without the prior written consent of Council.
ENGINEERING
External Works
26. Henderson Street must be upgraded for the length of its frontage to the subject site. The
works must include widening of the existing footpath to 2 metres.
Condition 26 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Site Access and Driveways
27. A sealed access driveway must be provided from Henderson Street to all parking and
manoeuvring areas of the development. The access must be generally in accordance with
the approved plans.
Car Parking
28. A minimum of 5 covered car parking spaces must be provided and made available for
carparking at all times. The car parking must be generally in accordance with the approved
plans and include in particular dimensions, crossfalls and gradients in accordance with
Australian Standard AS/NZS2890.1:2004 - Parking Facilities.
29. All vehicles must enter and exit the site in a forward gear.
30. Directional signage must be provided to direct visitors to the car parking spaces provided in
the basement.
Pedestrian and Bicycle Facilities
31. Pedestrian and bicycle facilities must be provided for the development. The works must
include widening of the existing footpath to 2 metres.
Condition 31 is imposed pursuant to s128 of the Planning Act 2016 being necessary trunk
infrastructure identified by Council’s LGIP to service the development.
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be generally in accordance with the approved plans.
Services
33. Reticulated electricity and telecommunication services must be provided to each lot/unit in
accordance with the standards and requirements of the relevant service provider.
34. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
35. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Page 6 of 18
Document Set ID: 22549607
Version: 4, Version Date: 22/08/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Decision Notice - MCU22 0145 & OPW22 0212 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 218 KB (small file)
- File type
No other editions are linked here.