Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2021-06-08 P&E Agenda - Item 7 - Attachment 1 - Noosa Bushland Reserve Strategic Fire Management Plan 2021

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
5.2    Reserve groupings
Once assessments of the ‘on-reserve’ and ‘neighbour’ risk categories are completed for all reserves
they are grouped into Priorities of Very high, High, Medium or Low priority to further inform
management actions. Final management actions will be subject to existing individual Fire
Management Plans and on-ground inspections for each the reserves.

Examples are shown below in Table 6.

 Priority                           General criteria                  Examples
 1 Very high                        Very high BPI, very high          Symplocus Environmental
 Risk rating 70-100                 biodiversity score, very high     Reserve
 4 reserves                         risk interface with
                                    development
 2 High                             High BPI, high biodiversity       Alyxia Nature Refuge
 Risk rating 40-69                  score, high risk interface with
 56 reserves                        development

 2 Medium                           Medium BPI, medium                Frogmouth Lane Bushland
 Risk rating 20-39                  biodiversity score, moderate      Reserve
 75 reserves                        risk interface with
                                    development
 3 Low                              Medium BPI, low biodiversity      Six Mile Creek Bushland
 Risk rating 0-19                   score, low risk interface with    Reserve
 43 reserves                        development

Table 6. An example of grouping Bushland Reserve into groups to help determine management priorities.
This is shown graphically below.




DRAFT Noosa Bushland Reserve Strategic Fire Management Plan                                     Page 16
Log in to download the original file

2021-06-08 P&E Agenda - Item 7 - Attachment 1 - Noosa Bushland Reserve Strategic Fire Management Plan 2021(PDF, 3MB).pdf · 3.3 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.