                                                                                                       2103-21744 SRA




        limited to the areas identified in Figure 2-1 of Dog Beach Sand
        Nourishment project: Marine Plant Monitoring Plan prepared by BMT
        dated 29 June 2021, reference R.A10342.002.00.Marine Plant
        MP.docx, as amended in red by SARA, being:
            i.   the permanent removal of 244.2 m2 of dead marine wood
           ii.   the temporary disturbance of 45.9 m2 of subtidal detritus.
11.     (a) Monitoring of impacts to marine plants must be undertaken                   As stated in the Marine
            generally in accordance with Dog Beach Sand Nourishment                     Plant Monitoring Plan
            project: Marine Plant Monitoring Plan prepared by BMT dated 29
            June 2021, reference R.A10342.002.00.Marine Plant MP.docx,
            as amended in red by SARA.

        (b) Monitoring reports must be submitted to
            [email protected] in accordance with Table 2-1 of the
            Dog Beach Sand Nourishment project: Marine Plant Monitoring
            Plan.
12.     The works must only be conducted between April and September to                 For the duration of the
        minimise the impacts on fish spawning and the flowering and fruiting            works
        of marine plants.
13.     Enter into an agreed delivery arrangement to deliver an                         Prior to commencing
        environmental offset in accordance with the Environmental Offsets               any works that impact
        Act 2014 to counterbalance the significant residual impacts on the              on the marine plants
        matter of state environmental significance being 244.2 m2 of marine
        plants.
14.     Provide written notice to [email protected], when the                (a)
        development authorised under this approval:                                     At least 5 business
                                                                                        days but no greater
        (a) will start                                                                  than 20 business days
                                                                                        prior to the
        (b) when it has been completed.                                                 commencement of the
                                                                                        works
        These notices must state referral response reference 2103-21744
        SRA.
                                                                                        (b)
                                                                                        Within 20 business
                                                                                        days of the completion
                                                                                        of the fisheries
                                                                                        development works
15.     Spoil is managed to prevent acid soil development.                              At all times
16.     This fisheries development (as defined by the Fisheries Act 1994)               At all times
        constitutes a place that is required to be open for inspection by an
        inspector at all times, pursuant to section 145 of the Fisheries Act
        1994.
17.     Marine plants that are temporarily removed, damaged or destroyed                Within 5 years of
        by this development must be restored to pre-disturbance condition.              removal, damage or
                                                                                        destruction of the
        Note: Marine plants are matters of State environmental significance under       marine plants
        the Environmental Offsets Act 2014. Due to the claims that restoration will
        occur made in this development application these have not been included in
        a significant residual impact for the purpose of calculating an environmental



State Assessment and Referral Agency                                                                     Page 7 of 12

Used in these records

About this file

File size
339 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2103-21744 SRA - Response with conditions.pdf · 339 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.