Environmental
Management
Plan

Ozcare Noosa
RACF


23/04/24


[OCR of page images]
woollam

CONSTRUCTIONS

Environmental
Management
Plan

Ozcare Noosa

RACF

23/04/24

P/ WORKING TOGETHER
TO BUILD LEGACIES

 
Full text of the other 16 pages

Page 2

Contents
Introduction ........................................................................................................... 5
Objectives and Responsibilities ...................................................................... 9
Key Project Personnel ...................................................................................... 11
Environmental Management System .......................................................... 12
Woollam Management Systems Policy ...................................................... 13
Hazard / Risk Register .................................................................................... 14
Environmental Observation ........................................................................... 14
Training, Awareness and Competence ....................................................... 16
APPENDIX 1 - Environmental Management System Manual ............... 17




 Document ID: WC ENV 002            Revision: 011         Date: 20/02/2024            Owner: HSEQT Manager
               Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                                 Environmental Management Plan / Page 2 of 18

Page 3

                                                      Project Details

Project Name:                           Ozcare Noosa RACF

Project Address                         80 Cooyar Street, Noosa Heads, QLD, 4567

Project Number:                         1678B

Principal Contractor:                    Woollam Constructions

Principal Contractor ABN:                94 009 676 064

Principal Contractor Address:            71 Lytton Road
                                         East Brisbane QLD 4169

Nominated QBCC Supervisor                Bryan Ward

Client:                                 Ozcare

    Client Representative                Name: Tony Barnett

                                         Company: Ozcare

                                         Contact details: [email protected]
                                                             07 3028 9004

 Building Scope

 Building Construction                   External Walls Material: Block, Metal Frame, Cladding

                                         Internal Walls Material: Metal Frame, Plasterboard

                                         Floors Material: Concrete, Ceramic Tile, Vinyl, Carpet

                                         Ceilings Material: Plasterboard

 Floor Areas                             Basement: N/A

                                         Ground: 4560m2

                                         Levels: Level 1 – 2580m2

Neighbouring Facilities                  N/A

Remote / Isolated Project                No

Start Date                               Approx. 07/2024

Completion Date                          -


    Document ID: WC ENV 002       Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
                Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                        Environmental Management Plan / Page 3 of 18

Page 4

Expected Completion Date                Approx. 07/2027

Hours of Operation                      The construction works would generally be undertaken during standard
                                        construction hours, being:
                                                    7:00 am to 6:30 pm Monday to Friday
                                                    7:00 am to 2:00 pm Saturdays
                                                    Non works on Sunday or Public Holidays
                                        After hours contact details will be displayed on the Woollam site entry
                                        banner located adjacent to the vehicle and/or pedestrian site access point.



                                                       Revision History

      Revision           Date                               Amendments                                       Reviewed By

      001             22/04/24       Initial Draft                                                       CStewart




   Plan Approval
   This plan will be reviewed and approved by the Project Manager, Site Manager, Site HSE Adviser / Regional
   HSE Coordinator and HSEQT Manager before it can be implemented.



               Role                                  Name                             Signature                        Date

      HSEQT Manager:                 Cameron Stewart


      Project Manager:               Bryan Ward


      Site Manager:                  TBA


      Site HSE Adviser               TBA


      Regional HSE                   TBA
      Coordinator:




    Document ID: WC ENV 002      Revision: 011       Date: 20/02/2024        Owner: HSEQT Manager
               Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                       Environmental Management Plan / Page 4 of 18

Page 5

Introduction
This document presents an Environmental Management Plan (EMP) by Woollam (the Contractor) in relation to
the Ozcare Noosa Residential Aged Care Facility. This EMP has been prepared to ensure that practical
measures are implemented for controlling and minimising environmental impacts, and to demonstrate
compliance with the Environmental Protection Act 1994, Environmental Protection Regulations 2019 and any
other relevant Acts, Regulations Standards and Codes.
This EMP for the construction project has been formulated with linkages to the Contractor’s Quality
Management System, and makes provision for:
    •    description of potential environmental impacts
    •    detail of impact control
    •    timetable for implementing control measures
    •    allocation of responsibilities for implementation; and
    •    monitoring and reporting.
The scope of the EMP covers the period from pre-construction through to post-construction activities.




Site Description and Layout
The location of the construction project is the existing Ozcare Noosa Heads Aged Care Facility located at 80 Cooyar
Street, Noosa Heads, QLD, 4567.
The facility covers approximately 2.5ha and is located in the southern extent of Noosa Heads. In general, the
facility occupies the majority of the site hosting numerous buildings, carparks, courtyards and maintenance
shed with only scattered mature tress present. Natural bushland is present within the northern corner and
lining the Western boundary of the site. The site is bordered by Girraween Nature Refuge and Noosa National
Park to the north and east, Council reserve land to the south and urban land uses comprised of government
and residential to the southwest and west.




 Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                    Environmental Management Plan / Page 5 of 18

Page 6

Access to the site is from Elenora Terrace off Cooyar Street.
The construction works are being completed in four stages, with all works stages, site facilities etc covering a
total area of approximately 18,500 m2. Works include the staged demolition of existing single storey
structures and the construction of new two storey residential buildings and single storey admin and service
areas.
The government and residential areas are not directly adjacent the work areas and we foresee minimal to nil
impact on these locations. Access to the main site areas is via the fire trail which is to the rear of the facility
and backs onto the National Park. All demolition and construction activities and access/egress are proposed to
be via the fire trail for all stages of work.
Figure 1 shows the proposed site access and site layout.


FIGURE 1 – PROPOSED SITE LAYOUT PLAN




 Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                    Environmental Management Plan / Page 6 of 18

Page 7

Construction activities
The construction project is in an existing facility with several stages of work. The project involves the following
stages of work at the approximate timing.


 Project Phases       J J A S O N D J F M A M J     J A S O N D J F M A M J     J A S O N D J F M A M J     J A S O N D


 Site establishment
 Early Works
 Enabling Works
 Stage 1
 Stage 2
 Stage 3
 Stage 4



All stages of work in the project involve the following activities.


                  •    Demolition
                  •    Site preparation and excavation work
                  •    Trenching for storm water and sewerage
                  •    Trenching for electrical and fire services
                  •    Placement of steel reinforcement
                  •    Concrete footings, internal and external floor slabs and paths
                  •    Erection and dismantling of formwork
                  •    Scaffolding
                  •    Structural steelwork
                  •    Roof sheeting and associated roof plumbing
                  •    Brick Veneer external walls with steel frame
                  •    Brick cavity partitions with steel framing above lined with plasterboard
                  •    Aluminium framed windows and doors
                  •    Insulation to walls & roof
                  •    Cabinetwork and joinery
                  •    Tiling, toppings and rendering
                  •    Painting both internal and external
                  •    Installation of plumbing services, fixtures and fittings
                  •    Installation of electrical services and fittings
                  •    Installation of mechanical services and fittings
                  •    Installation of Vinyl and carpet floor coverings
                  •    External paving, landscaping and landscape structures




 Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                    Environmental Management Plan / Page 7 of 18

Page 8

General Environmental Impacts
The internal and external impacts and aspects that have been identified for this specific project, with particular
relevance to environmental management, are addressed in more detail in the Hazard / Risk Register.
Some of these contextual issues identified include:
         Element                                             Existing Conditions and Key Issues

  Air Quality                    Local air quality is considered good due to the bushland setting of the site.
                                 While construction vehicles and open excavations have potential to cause localised
                                 dust nuisance.
  Fauna and Flora                Works require the removal of some native vegetation or construction in close
                                 proximity to it.
                                 Construction activities and vehicle movements have the potential to spread noxious
                                 weed infestations.
  Greenhouse Gases               The materials, fuel and electricity used during the works result in the emission of
                                 greenhouse gasses, contributing to climate change.
  Landscape and Visual           Construction will occur mainly in urbanised areas with residential and commercial
  Amenity                        properties in close proximity.
  Noise and Vibration            All activities have the potential to generate nuisance noise and vibration that may
                                 impact on the amenity of local residents and businesses.
  Resource Use and               The project has the potential to produce large quantities of waste, including waste soil
  Waste                          and slurry from non-destructive digging that depletes limited landfill space.
  Water - Groundwater            Groundwater indicated on the Geotech Report across most of the site ranging from
                                 0.4m to 1.4m down. No contamination identified.
                                 Groundwater drawdown has the potential to cause land subsidence, affect tree and
                                 other vegetation growth or change the flow and distribution of local contamination
                                 plumes.
  Water – Surface Water          Rainfall during earthworks has the potential to cause erosion and suspension of
                                 sediment in runoff to stormwater and waterways.
                                 Spills of fuel, oil and other materials have the potential to contaminate water.
                                 Opportunity – if you have a sediment basin use the captured water for dust
                                 suppression during civil works.




 Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                    Environmental Management Plan / Page 8 of 18

Page 9

          Objectives and Responsibilities
                                                                                                                                              OTHER
                                                                                                                           When              RECORDS
                                                        Actions required to achieve                  Responsible
    Issue                  Objective                                                                                    actions will
                                                                 Objective                             Person                                 Records
                                                                                                                         be taken
                                                                                                                                              location

Vehicles and        Exhaust emissions are            No vehicles or plant producing excessive        Site Manager       Immediately      Mobile Plant
plant               minimised                        exhaust emissions will be used.                                                     Checklists,
                                                                                                                                         Task Observations

Emergencies         All environmental                All environmental incidents will be             Site Manager       Immediately      3.4.7 EMS
Incident            incidents are reported to        reported to the Principal’s Representative
Reporting           the Regional HSE Advisor         immediately.

Emergencies         Spills are contained,            Emergency procedures to handle spills           Site Manager       Immediately      2. Risk Register EMP
Spills              damage to the eco-               including oil and chemicals will be
                    system minimised and             established before delivery begins.
                    rectification organised.

Other               Damage to the eco-               Emergency procedures to handle other            Site Manager       Immediately      3.4.7 EMS
environmental       system from                      foreseeable environmental emergencies
emergencies         environmental                    will be established.
                    emergencies is minimised.

Compliance          Compliance with                  Rectify any environmental breaches              Site Manager       Rectified as     Audit Reports
Audit               environmental                    identified within the time frame specified in                      soon as
                    requirements and, if             the audit.                                                         possible after
                    breaches are detected,                                                                              notification
                    rectification of defects.

Noise               Minimal detrimental              Adherence to EPA, Council and other noise       Site Manager       Continual        2. Risk Register EMP
                    impact                           limits will be mandatory.                                          Monitoring
                                                     Equipment will be kept in good repair and
                                                     condition.
                                                     Woollam will contact, co-operate and
                                                     coordinate with neighbouring facility
                                                     operators.

Waste Quantity      Where possible minimize          If possible, development and                    Contractor to do   Ongoing          Daily Site Reports
of materials        quantity of waste                implementation of a strategy to reduce the      this work in
                    materials generated              quantity of waste generated as a                accordance with
                                                     consequence of the Contract                     EPA
                                                                                                     requirements
                                                                                                     and in
                                                                                                     conjunction with
                                                                                                     Woollam

Waste Disposal      Appropriate and lawful           Identify lawful places for disposal of all      Civil Contractor   As required      2. Risk Register EMP
                    disposal of waste                types of waste generated as a consequence       contracted to do
                    associated with the              of the Contract.                                this work in                        Waste Reports
                    Contract including:                                                              accordance with
                                                     Ensure that no waste from the site is           EPA
                    - Packaging materials’           conveyed to or deposited at any place that      requirements
                    - Replaced or redundant          cannot lawfully be used as a waste facility
                      parts or materials             for that waste.
                    - Chemicals
                    - Oils and grease from           Record, for all waste, the method and
                      machinery                      location of disposal, and whether or not

             Document ID: WC ENV 002            Revision: 011      Date: 20/02/2024           Owner: HSEQT Manager
                        Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                                        Environmental Management Plan / Page 9 of 18

Page 10

                      - Paints and solvents          that location was a place that could lawfully
                        including the cleaning       be used as a waste facility for that waste.
                        of equipment, tools
                        and brushes.                 Submit to the Principal’s Representative
                      - Cleaning materials and       reports, including the record of waste
                        rags                         disposal and method and location of
                      - Trade Waste                  disposal; and immediate reports of the
                      - Materials unsuitable         details of any waste from the site which has
                        for re-use; and              been conveyed or deposited at any place
                      - Other waste                  that cannot lawfully be used as a waste
                                                     facility for that waste.



Records               Sufficient records to          This EMP and modifications to suit this          Site Manager       Continual        3.4.5 EMS
                      demonstrate appropriate        Contract will be submitted to Principal’s
                      environmental                  Representative
                      management.
                                                     The EMP will be updated as required.
                      Notifications and Fines
                      from the EPA and the           Appropriate progress and other reports will
                      resulting Corrective           be submitted to the Principal’s
                      Action                         Representative
                                                     The Principal’s Representative will be
                                                     notified of all EPA action and Fines from the
                                                     EPA and the resulting Corrective Action
                                                     All records will be securely filed using an
                                                     effective document retrieval system.

Vehicle Access        Damage to the                  All vehicles and plant will access the site      Site Manager       Site Specific    Site Specific
                      ecosystems on Site is          along designated routes                                             Induction        Induction Records
                      minimised                                                                       Contractors        Training
                                                                                                                                          Traffic Flow Plan

Parking of            Damage to the                  All vehicles and plant will park in              Site Manager       Site Specific    Site Specific
vehicles and          ecosystems on site is          designated areas                                                    Induction        Induction Records
plant                 minimised                                                                       Contractors        Training
                                                                                                                                          Traffic Flow Plan



Movements of          Damage to the                  All pedestrian materials and equipment           Site Manager       Site Specific    Site Specific
pedestrians,          ecosystems on site is          movement from and to vehicles will be                               Induction        Induction Records
materials and         minimised                      along approved access routes                     Contractors        Training
equipment                                                                                                                                 Traffic Flow Plan



Wash down of          Storm water is not             Vehicles and plant will be washed down           Site Manager       Site Specific    Induction Records
vehicles and          polluted by residues from      only in areas approved by the Principal’s                           Induction
plant                 wash down                      Representative for this purpose                  Contractors        Training         Site Specific
                                                                                                                                          Induction
                                                                                                                                          Traffic Flow Plan

Reinstatement         Re-instatement of              Relevant areas of Site will be cleaned and       Site Manager       Immediately      2. Risk Register EMP
                      damaged eco-systems to         re-instated
                      their previous conditions                                                       Landscaping
                                                                                                      Contractor




               Document ID: WC ENV 002          Revision: 011       Date: 20/02/2024             Owner: HSEQT Manager
                          Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                                        Environmental Management Plan / Page 10 of 18

Page 11

Key Project Personnel
        Project Contact                                    Name                           24hr Contact Number

Regional Manager                             Mitch Perry                              Insert number

Project Manager                              Bryan Ward                               Insert number

Contract Administrator                       Ben Luck                                 Insert number

Site Manager                                 Insert name                              Insert number

Site Foreman                                 Richard Robazza                          Insert number

Site HSE Advisor                             Insert name                              Insert number

Regional HSE Co-ordinator                    Insert name                              Insert number

HSEQT Manager                                Insert name                              Insert number




Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
           Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                  Environmental Management Plan / Page 11 of 18

Page 12

Environmental Management
System
Refer separate Environmental Management System Manual – Appendix 1.




 Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                   Environmental Management Plan / Page 12 of 18

Page 13

Woollam Management Systems
Policy




Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
           Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                  Environmental Management Plan / Page 13 of 18

Page 14

Hazard / Risk Register
The Hazard / Risk Register is a list of the hazards/risks that Woollam has identified arising from the
contracted/agreed work activities from previous similar projects. These hazards are risk rated and are
reviewed at least annually, and during the preparation of the project specific Environmental Management
Plan.
During the Project Start Up Meeting, site specific controls will be added and generic hazards/risks or proposed
control measures that are not relevant will be removed. Controls should only be added to the site-specific
controls list if they are to be used.
Site Managers are encouraged to consult the risk register to assist with controls to be implemented and to
amend, alter and add to the risk register if new site-specific hazards/risks are identified. Any changes to the
Risk Register including design changes should be communicated to the workers via a Toolbox Talk.



Supporting Documents
Hazard / Risk Register Sec 2 WHSMP




Environmental Observation
The Environmental Observation form shall be completed by Directors, Regional Managers, HSEQT Manger,
Project Managers, Site Managers, Leading Hands and Site HSE Advisors to monitor and evaluate the
effectiveness of implemented control measures regarding the environment.
Environmental Task Observations to be conducted on a regular basis in conjunction with the Weekly Safety
and Environmental Inspection.
Wherever possible, Contract Partners should be involved in the environmental observation process. When this
does occur add the name of the participating person to the task observation form.
When completing the environmental observation, the following points should be taken into account:



 Waste                                        Noise                                         Dust
 •    Is waste being managed                  •    Do plant and equipment have              •     Are dust mitigation
      appropriately?                               appropriate noise suppression                  processes in place?
 •    Is there adequate number of                  devices?                                 •     Are they controlling and
      skips? Are they located                 •    Is noisy equipment placed away                 dust concerns?
      appropriately?                               from noise sensitive areas?
                                              •    Are hours being worked in line
                                                   with the requirements of the
                                                   EMP?




 Document ID: WC ENV 002      Revision: 011       Date: 20/02/2024        Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                   Environmental Management Plan / Page 14 of 18

Page 15

 Fumes                                        Sediment Controls                             Fire Control
 •    Is plant, equipment or                  •    Are silt fences intact and               •     Have hot work permits
      substance being used creating                appropriate?                                   been issued?
      fumes?                                  •    Are silt traps appropriate for           •     Is there an appropriate fire
 •    Is there adequate and                        water runoff?                                  extinguisher present?
      appropriate ventilation of                                                            •     Are combustible materials
      work area?                                                                                  disposed of regularly?



 Hazardous Substances                                                      Traffic and Parking
 •   Do all hazardous substances have a current SDS?                       • Are workers parking appropriately?
 •   Is a spill kit available?                                             • Is there a traffic management plan? Is it
 •   Are hazardous substances stored correctly?                              being implemented correctly?

Outcomes of the discussions with workers should be recorded.
Risks and opportunities (a more effective environmental control, etc) should also be recorded.
Any follow up actions required should be documented including a description of who is to complete the action
and when it must be completed by. Once the corrective action is complete it should be signed off.
If there are no corrective actions or after all corrective actions are completed than the person conducting the
observation should sign off and date at the bottom of the form.
All completed Environmental Observation Forms are to either be completed, scanned and kept in the project
folder or completed on Procore.
As available in Procore:




 Document ID: WC ENV 002      Revision: 011       Date: 20/02/2024        Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                   Environmental Management Plan / Page 15 of 18

Page 16

Training, Awareness and
Competence
Site Managers/Leading Hands will receive training in the use of this management plan using the Environmental
Management Plan Training Program at the commencement of each project. Evidence will be recorded on the
Environmental Management Plan Training Program Questionnaire and saved in the EMP for the Project. The
Training Register will be updated each time this training is undertaken. Alternatively, the information will be
recorded on the HR training system ELMO.
Additional environmental training, if deemed necessary, shall be given to all employees and Contract Partners
in conjunction with the Site-Specific Induction. The objective of the training will be to make all employees
aware of and have an understanding of the Environmental Management Plan and Woollam environmental
operating guidelines.
Relevant employees involved in the use of machinery and materials on site shall be trained in practices for
minimising environmental problems, including noise, dust, water quality, waste and contamination. The Site
Manager shall be responsible for ensuring that relevant site personnel receive safety and environmental
training where required. Records shall be maintained of employees and subcontractors who have received this
safety and environmental training.

                           Environmental Management Plan Induction Record

       Name                     Position                         Role                      Signature                    Date




*Ensure training module on Woollam Connect has been completed.


 Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
            Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                   Environmental Management Plan / Page 16 of 18

Page 17

APPENDIX 1 - Environmental
Management System Manual




Document ID: WC ENV 002      Revision: 011      Date: 20/02/2024         Owner: HSEQT Manager
           Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                  Environmental Management Plan / Page 17 of 18

Used in these records

About this file

File size
427 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 427 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.