Environmental Management Plan Ozcare Noosa RACF 23/04/24 [OCR of page images] woollam CONSTRUCTIONS Environmental Management Plan Ozcare Noosa RACF 23/04/24 P/ WORKING TOGETHER TO BUILD LEGACIES
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 16 pages
Page 2
Contents
Introduction ........................................................................................................... 5
Objectives and Responsibilities ...................................................................... 9
Key Project Personnel ...................................................................................... 11
Environmental Management System .......................................................... 12
Woollam Management Systems Policy ...................................................... 13
Hazard / Risk Register .................................................................................... 14
Environmental Observation ........................................................................... 14
Training, Awareness and Competence ....................................................... 16
APPENDIX 1 - Environmental Management System Manual ............... 17
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 2 of 18
Page 3
Project Details
Project Name: Ozcare Noosa RACF
Project Address 80 Cooyar Street, Noosa Heads, QLD, 4567
Project Number: 1678B
Principal Contractor: Woollam Constructions
Principal Contractor ABN: 94 009 676 064
Principal Contractor Address: 71 Lytton Road
East Brisbane QLD 4169
Nominated QBCC Supervisor Bryan Ward
Client: Ozcare
Client Representative Name: Tony Barnett
Company: Ozcare
Contact details: [email protected]
07 3028 9004
Building Scope
Building Construction External Walls Material: Block, Metal Frame, Cladding
Internal Walls Material: Metal Frame, Plasterboard
Floors Material: Concrete, Ceramic Tile, Vinyl, Carpet
Ceilings Material: Plasterboard
Floor Areas Basement: N/A
Ground: 4560m2
Levels: Level 1 – 2580m2
Neighbouring Facilities N/A
Remote / Isolated Project No
Start Date Approx. 07/2024
Completion Date -
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 3 of 18
Page 4
Expected Completion Date Approx. 07/2027
Hours of Operation The construction works would generally be undertaken during standard
construction hours, being:
7:00 am to 6:30 pm Monday to Friday
7:00 am to 2:00 pm Saturdays
Non works on Sunday or Public Holidays
After hours contact details will be displayed on the Woollam site entry
banner located adjacent to the vehicle and/or pedestrian site access point.
Revision History
Revision Date Amendments Reviewed By
001 22/04/24 Initial Draft CStewart
Plan Approval
This plan will be reviewed and approved by the Project Manager, Site Manager, Site HSE Adviser / Regional
HSE Coordinator and HSEQT Manager before it can be implemented.
Role Name Signature Date
HSEQT Manager: Cameron Stewart
Project Manager: Bryan Ward
Site Manager: TBA
Site HSE Adviser TBA
Regional HSE TBA
Coordinator:
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 4 of 18
Page 5
Introduction
This document presents an Environmental Management Plan (EMP) by Woollam (the Contractor) in relation to
the Ozcare Noosa Residential Aged Care Facility. This EMP has been prepared to ensure that practical
measures are implemented for controlling and minimising environmental impacts, and to demonstrate
compliance with the Environmental Protection Act 1994, Environmental Protection Regulations 2019 and any
other relevant Acts, Regulations Standards and Codes.
This EMP for the construction project has been formulated with linkages to the Contractor’s Quality
Management System, and makes provision for:
• description of potential environmental impacts
• detail of impact control
• timetable for implementing control measures
• allocation of responsibilities for implementation; and
• monitoring and reporting.
The scope of the EMP covers the period from pre-construction through to post-construction activities.
Site Description and Layout
The location of the construction project is the existing Ozcare Noosa Heads Aged Care Facility located at 80 Cooyar
Street, Noosa Heads, QLD, 4567.
The facility covers approximately 2.5ha and is located in the southern extent of Noosa Heads. In general, the
facility occupies the majority of the site hosting numerous buildings, carparks, courtyards and maintenance
shed with only scattered mature tress present. Natural bushland is present within the northern corner and
lining the Western boundary of the site. The site is bordered by Girraween Nature Refuge and Noosa National
Park to the north and east, Council reserve land to the south and urban land uses comprised of government
and residential to the southwest and west.
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 5 of 18
Page 6
Access to the site is from Elenora Terrace off Cooyar Street.
The construction works are being completed in four stages, with all works stages, site facilities etc covering a
total area of approximately 18,500 m2. Works include the staged demolition of existing single storey
structures and the construction of new two storey residential buildings and single storey admin and service
areas.
The government and residential areas are not directly adjacent the work areas and we foresee minimal to nil
impact on these locations. Access to the main site areas is via the fire trail which is to the rear of the facility
and backs onto the National Park. All demolition and construction activities and access/egress are proposed to
be via the fire trail for all stages of work.
Figure 1 shows the proposed site access and site layout.
FIGURE 1 – PROPOSED SITE LAYOUT PLAN
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 6 of 18
Page 7
Construction activities
The construction project is in an existing facility with several stages of work. The project involves the following
stages of work at the approximate timing.
Project Phases J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Site establishment
Early Works
Enabling Works
Stage 1
Stage 2
Stage 3
Stage 4
All stages of work in the project involve the following activities.
• Demolition
• Site preparation and excavation work
• Trenching for storm water and sewerage
• Trenching for electrical and fire services
• Placement of steel reinforcement
• Concrete footings, internal and external floor slabs and paths
• Erection and dismantling of formwork
• Scaffolding
• Structural steelwork
• Roof sheeting and associated roof plumbing
• Brick Veneer external walls with steel frame
• Brick cavity partitions with steel framing above lined with plasterboard
• Aluminium framed windows and doors
• Insulation to walls & roof
• Cabinetwork and joinery
• Tiling, toppings and rendering
• Painting both internal and external
• Installation of plumbing services, fixtures and fittings
• Installation of electrical services and fittings
• Installation of mechanical services and fittings
• Installation of Vinyl and carpet floor coverings
• External paving, landscaping and landscape structures
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 7 of 18
Page 8
General Environmental Impacts
The internal and external impacts and aspects that have been identified for this specific project, with particular
relevance to environmental management, are addressed in more detail in the Hazard / Risk Register.
Some of these contextual issues identified include:
Element Existing Conditions and Key Issues
Air Quality Local air quality is considered good due to the bushland setting of the site.
While construction vehicles and open excavations have potential to cause localised
dust nuisance.
Fauna and Flora Works require the removal of some native vegetation or construction in close
proximity to it.
Construction activities and vehicle movements have the potential to spread noxious
weed infestations.
Greenhouse Gases The materials, fuel and electricity used during the works result in the emission of
greenhouse gasses, contributing to climate change.
Landscape and Visual Construction will occur mainly in urbanised areas with residential and commercial
Amenity properties in close proximity.
Noise and Vibration All activities have the potential to generate nuisance noise and vibration that may
impact on the amenity of local residents and businesses.
Resource Use and The project has the potential to produce large quantities of waste, including waste soil
Waste and slurry from non-destructive digging that depletes limited landfill space.
Water - Groundwater Groundwater indicated on the Geotech Report across most of the site ranging from
0.4m to 1.4m down. No contamination identified.
Groundwater drawdown has the potential to cause land subsidence, affect tree and
other vegetation growth or change the flow and distribution of local contamination
plumes.
Water – Surface Water Rainfall during earthworks has the potential to cause erosion and suspension of
sediment in runoff to stormwater and waterways.
Spills of fuel, oil and other materials have the potential to contaminate water.
Opportunity – if you have a sediment basin use the captured water for dust
suppression during civil works.
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 8 of 18
Page 9
Objectives and Responsibilities
OTHER
When RECORDS
Actions required to achieve Responsible
Issue Objective actions will
Objective Person Records
be taken
location
Vehicles and Exhaust emissions are No vehicles or plant producing excessive Site Manager Immediately Mobile Plant
plant minimised exhaust emissions will be used. Checklists,
Task Observations
Emergencies All environmental All environmental incidents will be Site Manager Immediately 3.4.7 EMS
Incident incidents are reported to reported to the Principal’s Representative
Reporting the Regional HSE Advisor immediately.
Emergencies Spills are contained, Emergency procedures to handle spills Site Manager Immediately 2. Risk Register EMP
Spills damage to the eco- including oil and chemicals will be
system minimised and established before delivery begins.
rectification organised.
Other Damage to the eco- Emergency procedures to handle other Site Manager Immediately 3.4.7 EMS
environmental system from foreseeable environmental emergencies
emergencies environmental will be established.
emergencies is minimised.
Compliance Compliance with Rectify any environmental breaches Site Manager Rectified as Audit Reports
Audit environmental identified within the time frame specified in soon as
requirements and, if the audit. possible after
breaches are detected, notification
rectification of defects.
Noise Minimal detrimental Adherence to EPA, Council and other noise Site Manager Continual 2. Risk Register EMP
impact limits will be mandatory. Monitoring
Equipment will be kept in good repair and
condition.
Woollam will contact, co-operate and
coordinate with neighbouring facility
operators.
Waste Quantity Where possible minimize If possible, development and Contractor to do Ongoing Daily Site Reports
of materials quantity of waste implementation of a strategy to reduce the this work in
materials generated quantity of waste generated as a accordance with
consequence of the Contract EPA
requirements
and in
conjunction with
Woollam
Waste Disposal Appropriate and lawful Identify lawful places for disposal of all Civil Contractor As required 2. Risk Register EMP
disposal of waste types of waste generated as a consequence contracted to do
associated with the of the Contract. this work in Waste Reports
Contract including: accordance with
Ensure that no waste from the site is EPA
- Packaging materials’ conveyed to or deposited at any place that requirements
- Replaced or redundant cannot lawfully be used as a waste facility
parts or materials for that waste.
- Chemicals
- Oils and grease from Record, for all waste, the method and
machinery location of disposal, and whether or not
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 9 of 18
Page 10
- Paints and solvents that location was a place that could lawfully
including the cleaning be used as a waste facility for that waste.
of equipment, tools
and brushes. Submit to the Principal’s Representative
- Cleaning materials and reports, including the record of waste
rags disposal and method and location of
- Trade Waste disposal; and immediate reports of the
- Materials unsuitable details of any waste from the site which has
for re-use; and been conveyed or deposited at any place
- Other waste that cannot lawfully be used as a waste
facility for that waste.
Records Sufficient records to This EMP and modifications to suit this Site Manager Continual 3.4.5 EMS
demonstrate appropriate Contract will be submitted to Principal’s
environmental Representative
management.
The EMP will be updated as required.
Notifications and Fines
from the EPA and the Appropriate progress and other reports will
resulting Corrective be submitted to the Principal’s
Action Representative
The Principal’s Representative will be
notified of all EPA action and Fines from the
EPA and the resulting Corrective Action
All records will be securely filed using an
effective document retrieval system.
Vehicle Access Damage to the All vehicles and plant will access the site Site Manager Site Specific Site Specific
ecosystems on Site is along designated routes Induction Induction Records
minimised Contractors Training
Traffic Flow Plan
Parking of Damage to the All vehicles and plant will park in Site Manager Site Specific Site Specific
vehicles and ecosystems on site is designated areas Induction Induction Records
plant minimised Contractors Training
Traffic Flow Plan
Movements of Damage to the All pedestrian materials and equipment Site Manager Site Specific Site Specific
pedestrians, ecosystems on site is movement from and to vehicles will be Induction Induction Records
materials and minimised along approved access routes Contractors Training
equipment Traffic Flow Plan
Wash down of Storm water is not Vehicles and plant will be washed down Site Manager Site Specific Induction Records
vehicles and polluted by residues from only in areas approved by the Principal’s Induction
plant wash down Representative for this purpose Contractors Training Site Specific
Induction
Traffic Flow Plan
Reinstatement Re-instatement of Relevant areas of Site will be cleaned and Site Manager Immediately 2. Risk Register EMP
damaged eco-systems to re-instated
their previous conditions Landscaping
Contractor
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 10 of 18
Page 11
Key Project Personnel
Project Contact Name 24hr Contact Number
Regional Manager Mitch Perry Insert number
Project Manager Bryan Ward Insert number
Contract Administrator Ben Luck Insert number
Site Manager Insert name Insert number
Site Foreman Richard Robazza Insert number
Site HSE Advisor Insert name Insert number
Regional HSE Co-ordinator Insert name Insert number
HSEQT Manager Insert name Insert number
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 11 of 18
Page 12
Environmental Management
System
Refer separate Environmental Management System Manual – Appendix 1.
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 12 of 18
Page 13
Woollam Management Systems
Policy
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 13 of 18
Page 14
Hazard / Risk Register
The Hazard / Risk Register is a list of the hazards/risks that Woollam has identified arising from the
contracted/agreed work activities from previous similar projects. These hazards are risk rated and are
reviewed at least annually, and during the preparation of the project specific Environmental Management
Plan.
During the Project Start Up Meeting, site specific controls will be added and generic hazards/risks or proposed
control measures that are not relevant will be removed. Controls should only be added to the site-specific
controls list if they are to be used.
Site Managers are encouraged to consult the risk register to assist with controls to be implemented and to
amend, alter and add to the risk register if new site-specific hazards/risks are identified. Any changes to the
Risk Register including design changes should be communicated to the workers via a Toolbox Talk.
Supporting Documents
Hazard / Risk Register Sec 2 WHSMP
Environmental Observation
The Environmental Observation form shall be completed by Directors, Regional Managers, HSEQT Manger,
Project Managers, Site Managers, Leading Hands and Site HSE Advisors to monitor and evaluate the
effectiveness of implemented control measures regarding the environment.
Environmental Task Observations to be conducted on a regular basis in conjunction with the Weekly Safety
and Environmental Inspection.
Wherever possible, Contract Partners should be involved in the environmental observation process. When this
does occur add the name of the participating person to the task observation form.
When completing the environmental observation, the following points should be taken into account:
Waste Noise Dust
• Is waste being managed • Do plant and equipment have • Are dust mitigation
appropriately? appropriate noise suppression processes in place?
• Is there adequate number of devices? • Are they controlling and
skips? Are they located • Is noisy equipment placed away dust concerns?
appropriately? from noise sensitive areas?
• Are hours being worked in line
with the requirements of the
EMP?
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 14 of 18
Page 15
Fumes Sediment Controls Fire Control
• Is plant, equipment or • Are silt fences intact and • Have hot work permits
substance being used creating appropriate? been issued?
fumes? • Are silt traps appropriate for • Is there an appropriate fire
• Is there adequate and water runoff? extinguisher present?
appropriate ventilation of • Are combustible materials
work area? disposed of regularly?
Hazardous Substances Traffic and Parking
• Do all hazardous substances have a current SDS? • Are workers parking appropriately?
• Is a spill kit available? • Is there a traffic management plan? Is it
• Are hazardous substances stored correctly? being implemented correctly?
Outcomes of the discussions with workers should be recorded.
Risks and opportunities (a more effective environmental control, etc) should also be recorded.
Any follow up actions required should be documented including a description of who is to complete the action
and when it must be completed by. Once the corrective action is complete it should be signed off.
If there are no corrective actions or after all corrective actions are completed than the person conducting the
observation should sign off and date at the bottom of the form.
All completed Environmental Observation Forms are to either be completed, scanned and kept in the project
folder or completed on Procore.
As available in Procore:
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 15 of 18
Page 16
Training, Awareness and
Competence
Site Managers/Leading Hands will receive training in the use of this management plan using the Environmental
Management Plan Training Program at the commencement of each project. Evidence will be recorded on the
Environmental Management Plan Training Program Questionnaire and saved in the EMP for the Project. The
Training Register will be updated each time this training is undertaken. Alternatively, the information will be
recorded on the HR training system ELMO.
Additional environmental training, if deemed necessary, shall be given to all employees and Contract Partners
in conjunction with the Site-Specific Induction. The objective of the training will be to make all employees
aware of and have an understanding of the Environmental Management Plan and Woollam environmental
operating guidelines.
Relevant employees involved in the use of machinery and materials on site shall be trained in practices for
minimising environmental problems, including noise, dust, water quality, waste and contamination. The Site
Manager shall be responsible for ensuring that relevant site personnel receive safety and environmental
training where required. Records shall be maintained of employees and subcontractors who have received this
safety and environmental training.
Environmental Management Plan Induction Record
Name Position Role Signature Date
*Ensure training module on Woollam Connect has been completed.
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 16 of 18
Page 17
APPENDIX 1 - Environmental
Management System Manual
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 17 of 18
Used in these records
Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 427 KB (small file)
- File type
No other editions are linked here.