Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118

of 17

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
Expected Completion Date                Approx. 07/2027

Hours of Operation                      The construction works would generally be undertaken during standard
                                        construction hours, being:
                                                    7:00 am to 6:30 pm Monday to Friday
                                                    7:00 am to 2:00 pm Saturdays
                                                    Non works on Sunday or Public Holidays
                                        After hours contact details will be displayed on the Woollam site entry
                                        banner located adjacent to the vehicle and/or pedestrian site access point.



                                                       Revision History

      Revision           Date                               Amendments                                       Reviewed By

      001             22/04/24       Initial Draft                                                       CStewart




   Plan Approval
   This plan will be reviewed and approved by the Project Manager, Site Manager, Site HSE Adviser / Regional
   HSE Coordinator and HSEQT Manager before it can be implemented.



               Role                                  Name                             Signature                        Date

      HSEQT Manager:                 Cameron Stewart


      Project Manager:               Bryan Ward


      Site Manager:                  TBA


      Site HSE Adviser               TBA


      Regional HSE                   TBA
      Coordinator:




    Document ID: WC ENV 002      Revision: 011       Date: 20/02/2024        Owner: HSEQT Manager
               Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.

                                                                                       Environmental Management Plan / Page 4 of 18

Used in these records

About this file

File size
427 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdf · 427 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.