Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy · OPW24/0118
Plans and drawings: the text below has words only, no drawings.
Expected Completion Date Approx. 07/2027
Hours of Operation The construction works would generally be undertaken during standard
construction hours, being:
7:00 am to 6:30 pm Monday to Friday
7:00 am to 2:00 pm Saturdays
Non works on Sunday or Public Holidays
After hours contact details will be displayed on the Woollam site entry
banner located adjacent to the vehicle and/or pedestrian site access point.
Revision History
Revision Date Amendments Reviewed By
001 22/04/24 Initial Draft CStewart
Plan Approval
This plan will be reviewed and approved by the Project Manager, Site Manager, Site HSE Adviser / Regional
HSE Coordinator and HSEQT Manager before it can be implemented.
Role Name Signature Date
HSEQT Manager: Cameron Stewart
Project Manager: Bryan Ward
Site Manager: TBA
Site HSE Adviser TBA
Regional HSE TBA
Coordinator:
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 4 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 427 KB (small file)
- File type
No other editions are linked here.