Construction activities
The construction project is in an existing facility with several stages of work. The project involves the following
stages of work at the approximate timing.
Project Phases J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D
Site establishment
Early Works
Enabling Works
Stage 1
Stage 2
Stage 3
Stage 4
All stages of work in the project involve the following activities.
• Demolition
• Site preparation and excavation work
• Trenching for storm water and sewerage
• Trenching for electrical and fire services
• Placement of steel reinforcement
• Concrete footings, internal and external floor slabs and paths
• Erection and dismantling of formwork
• Scaffolding
• Structural steelwork
• Roof sheeting and associated roof plumbing
• Brick Veneer external walls with steel frame
• Brick cavity partitions with steel framing above lined with plasterboard
• Aluminium framed windows and doors
• Insulation to walls & roof
• Cabinetwork and joinery
• Tiling, toppings and rendering
• Painting both internal and external
• Installation of plumbing services, fixtures and fittings
• Installation of electrical services and fittings
• Installation of mechanical services and fittings
• Installation of Vinyl and carpet floor coverings
• External paving, landscaping and landscape structures
Document ID: WC ENV 002 Revision: 011 Date: 20/02/2024 Owner: HSEQT Manager
Document uncontrolled if printed – Refer to Woollam Quality Management System to ensure current revision.
Environmental Management Plan / Page 7 of 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Environmental Management Plan Ozcare Noosa RACF 23-04-24 STP24-0253 Application for Operational Works Fire Trail - 80 Cooyar Street Noosa Heads - Copy.pdfRelated documentApplication case desk ↗
About this file
- File size
- 427 KB (small file)
- File type
No other editions are linked here.