132010.811.02 Delegated Report

of 1

Text shows just the words. Original shows the document exactly as it was published.

DELEGATED REPORT
PLANNING

REQUEST TO EXTEND RELEVANT PERIOD

Application No:	132010.811.02
	
Author:	Jack Lewis - Development Planner

APPLICATION DETAILS
Application Number:	132010.811.02
Applicant:	Altum Constructions
Request Received Date:	07/04/2014
Original Approval Type:	Development Permit for Material Change of Use - Multiple Housing Type 2 Duplex
Number of Submissions for Original Application:	Not Applicable

PROPERTY DETAILS
Property Address:	20 (access easement) & 22 Tristania Dr MARCUS BEACH
RP Description:	Lot 84 M 11112
Land Area:	708m2
Existing Use of Land:	Vacant

STATUTORY DETAILS
Planning Scheme:	The Noosa Plan (16 September 2013)
Strategic Plan Designation:	Urban Footprint
Planning Locality:	Eastern Beaches Semi Attached Housing
Planning Zone:	
Assessment Type:	Extension to Relevant Period

PROPOSAL:
The applicant seeks a 2 year extension of the relevant period of a Development Permit for Material Change of Use for a Duplex Dwelling at 22 Tristania Dr Marcus Beach.

The applicant requests an extension of 2 years for the following reasons:

	Poor economic conditions have made it uneconomic to start the development.

BACKGROUND:
On 27 October 2010, Council approved 2 separate applications for a Material Change of Use for Multiple Housing Type 2 (Duplex). The duplexes shared a reciprocal access arrangement. Both approvals are to expire on 27 October 2014.

Works have not yet commenced on the site.

STATUTORY PROCESS:
In accordance with Section 388 of the Sustainable Planning Act 2009, in deciding a request to extend the relevant period, the assessment manager must only have regard to:

(a)	the consistency of the approval, including its conditions, with current laws and policies        applying to the development, including, for example, the amount and type of infrastructure contributions, or infrastructure charges payable under an infrastructure charges schedule;
(b)	the community’s current awareness of the development approval; and
(c)	whether, if the request were refused-
(i)	further rights to make a submission may be available for a further development application; and
(ii)	the likely extent to which those rights may be exercised; and
(d)	the views of any concurrence agency for the approval…

ASSESSMENT:Note: Provide an assessment of the proposal, including an assessment of whether the proposed changes comply with the planning scheme provisions that were in effect at the time the original application was made, with appropriate weight given to the current planning scheme provisions (refer to SPA).  Also, your assessment must look at the degree of change from the first, original approval, not just the difference between the current proposal and the last change that was done.  The assessment must also consider the submissions that were made during the original application
Consistency with Current Planning Scheme & State Policies/Regulations
State Regulatory Provisions
The site is within the Koala Assessable Development Area of the relevant SPRP, however the development is for committed development and does not propose to remove any koala habitat food trees.

State Planning Policy
The site is not affected by any of the mapped State Interests within the State Planning Policy.

The Noosa Plan
The development was code assessable under The Noosa Plan and is compliant with all the key technical provisions of the scheme. No changes have been made to the Scheme since the original approval in 2010 and is still consistent with The Noosa Plan.

Infrastructure Charges
Under the provisions of the existing approval, infrastructure contributions have not been required for the following relevant networks:

Stormwater
Transport

These networks are now applicable to the proposed development, with an infrastructure agreement required to secure the additional charges for these networks so that the approval remains consistent with current laws and policies applying to the development. These charges are additional to the infrastructure contributions and/or charges required under the provisions of the existing approval.

The applicant has agreed to enter into an infrastructure agreement. The executed infrastructure agreement will be attached to the decision notice for this request.

Community’s Current Awareness of the Development, Rights to Submit and Likelihood of Further Submissions
The original application was code assessable and was not publically notified.

Concurrence Agencies
DERM were a concurrence agency for the application (UXO matters). The applicant indicates they provided the agency with a copy of the requested extension. No correspondence was received from the agency within 20 days and is considered they have no concerns with the extension.

RECOMMENDATION

APPROVED - It is recommended that the Relevant Period for 132010.811.02 is extended for a period of 2 years and will expire on 25 October 2016

Amend condition 6 to read as follows:

The Development Permit for a material change of use lapses if the use has not happened by 25 October 2016, unless an application to extend the currency is approved by Council.

[word/footer1.xml]
FM1517s/4-22/06/2013

Used in these records

About this file

File size
27 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

132010.811.02 Delegated Report.docx · 27 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.