Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published) · MCU23/0007
Sustainability
6. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving devices
and rainwater harvesting.
Performance Bond Agreement
7. An applicant for a development application may make an agreement with an assessment
manager, referral agency or other person to establish the responsibilities, or secure the
performance, of a party to the agreement about a development condition.
Erosion and Sediment Control
8. An erosion and sediment control plan must be submitted with the Operational Works application.
The erosion and sediment control plan must be prepared by a suitably qualified person (RPEQ /
CPESC) and be designed in accordance with Planning Scheme Policy 6 – Engineering Design
Standards and the International Erosion Control Association’s Best Practice Erosion and
Sediment Control.
Infrastructure Charges
9. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution” made
pursuant to the planning legislation and regulations current at the time of issue. For further
information, please refer to: https://www.noosa.qld.gov.au/Planning-and-
Development/Development-tools-and-guidelines/Infrastructure-Charges
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Works Stormwater, Earthworks, External Works,
Works Carparking, Landscaping & Access
Development Permit for Building Works All building work.
11. SUBMISSIONS
There were 1 properly made submissions about the application. In accordance with the Planning Act
2016, the name, address and electronic address of the principal submitter for each properly made
submission is provided and attached.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If Council
agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one
negotiated decision notice may be given.
Page 12 of 22
Document Set ID: 25255015
Version: 5, Version Date: 22/10/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Council Meeting Decision - MCU23 0007 & RAL23 0001 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.