GENERAL NOTES (2) GOOD TEXTURE AND STRUCTURE FOR SELECTED USE
(3) ACCEPTABLE CONDUCTIVITY AND PH LEVELS FOR SPECIFIED PLANTS WARRANTIES
NOTE: THIS LANDSCAPE PLAN MUST BE READ IN CONJUNCTION WITH THE APPROPRIATE STATUTORY APPROVALS AND AUSTRALIAN · INSTALLATION · WARRANTIES OR GUARANTEES SPECIFIED SHALL NAME THE PRINCIPAL AS WARRANTEE. REGISTER WITH MANUFACTURERS AS
STANDARDS. (1) CULTIVATE GARDEN AND TURF AREAS 150MM DEEP. NECESSARY. RETAIN COPIES DELIVERED WITH AND COMPONENTS AND EQUIPMENT TO THE PRINCIPAL.
(2) INSTALL AMELIORATED SITE TOPSOILS OR APPROVED IMPORTED TOPSOIL THAT COMPLIES WITH MRTS 16 TO PLANTING AREAS · WARRANTIES AND/OR GUARANTEES TO BE SUBMITTED TO THE SUPERINTENDENT FOR TRANSMISSION TO THE PRINCIPAL
GENERAL IF AMELIORATED SITE TOPSOIL IS NOT AVAILABLE. WITHIN FOURTEEN (14) DAYS AFTER PRACTICAL COMPLETION.
· FOR MORE DETAIL REFER TO THE PROJECT ARCHITECT'S AND ENGINEER'S DRAWINGS. (3) FOR PODIUM AREAS APPLY HYDORCELL 40% PODIUM MIX. · COMMENCE WARRANTY PERIODS AT PRACTICAL COMPLETION OR AT ACCEPTANCE OF INSTALLATION, IF ACCEPTANCE IS NOT
CONCURRENT WITH PRACTICAL COMPLETION.
· PLANTING SHOWN REFLECTS THE DESIGN INTENT, EXACT NUMBERS AND LOCATIONS WILL REQUIRE CONFIRMATION ON SITE BY · IF INSTALLATION IS NOT BY MANUFACTURER AND PRODUCT WARRANTY IS CONDITIONAL ON THE MANUFACTURER'S APPROVAL
THE SUPERINTENDENT. ANY CHANGES TO BE MADE TO THE LANDSCAPE PLAN MUST BE APPROVED BY THE LANDSCAPE CONCRETE OF THE INSTALLER, SUBMIT THE MANUFACTURER'S WRITTEN APPROVAL OF THE INSTALLING FIRM.
ARCHITECT AND SUPERINTENDENT. · REFER TO FINISHES SCHEDULE AND ENGINEER'S AND ARCHITECT'S PLANS RESPECTIVELY.
CERTIFICATIONS SUNSHINE COAST
· ALL LANDSCAPE PLANS PRESENTED ASSUME THAT ALL BASE AND SURVEY INFORMATION IS ACCURATE AND TO SCALE. THE MULCH · PROVIDE AS2013:2105, MRTS 16 TOPSOIL, MULCH, AND TURF CERTIFICATIONS TO SUPERINTENDENT AND LANDSCAPE
Level 1, 24 Duporth Avenue
CONTRACTOR SHALL CHECK LANDSCAPE PLANS PRESENTED FOR ANY DISCREPANCIES WITH THE EXISTING SITE CONDITIONS · ALL MULCH PROPOSED TO BE USED ON SITE SHALL BE FREE OF DELETERIOUS MATERIALS AND FOREIGN MATTER INCLUDING ARCHITECT PRIOR TO PRACTICAL COMPLETION.
OR OTHER DRAWINGS PRESENTED PRIOR TO ANY CONSTRUCTION WORK TAKING PLACE. IF DISCREPANCIES DO OCCUR THESE ANTHROPOGENIC WASTE, ROCK, SOIL, SEDIMENT CONTAMINATION, WEEDS AND STICKS. Maroochydore QLD 4558
SHALL BE HIGHLIGHTED AT ONCE TO THE SUPERINTENDENT PRIOR TO ANY CONSTRUCTION WORK TAKING PLACE. DIMENSIONS · MULCH GARDEN AREAS 100MM DEEP SETTLED, KEEPING 50MM CLEAR OF PLANT STEMS, TO ENSURE SITE WATER DELIVERABLES T + 61 7 5499 6188
TAKE PRECEDENCE. CONSERVATION REQUIREMENTS ARE ACHIEVED. · WARRANTIES
· TWO QUICK COUPLER KEYS
THE CONTRACTOR SHALL: GENERAL PLANTING · IRRIGATION SYSTEM AS-BUILT PLANS IN .DWG AND PDF FORMATS AND MAINTENANCE MANUAL © Place Design Group Pty Ltd A.C.N. 082 370 063
· INSTALL SILT CONTROL AND VEGETATION PROTECTION FENCING AS REQUIRED. · PLANT STOCK IS TO BE APPROVED BY CONTRACTOR AND QUALIFIED ARBORIST PRIOR TO ACCEPTANCE OF DELIVERY.
All information displayed, transmitted or carried within this drawing is
· REMOVE ALL UNWANTED MATERIAL FROM LANDSCAPE WORK AREA. · FOR DEEP PLANTING AREAS, EXCAVATE GARDEN AREAS TO A DEPTH OF 300MM, CULTIVATE SUBGRADE TO A DEPTH OF 150MM SOURCES protected by Copyright and Intellectual Property laws.
· CONFIRM ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION. AND TREAT AS PER SOILS TESTING RESULTS. · SURVEY - PROVIDED BY CLIENT The information contained in this document is confidential.
Recipients of this document are prohibited from disclosing the information
· SEEK INSTRUCTION FROM SUPERINTENDENT WHERE LEVEL DISCREPANCIES, SPECIFICATION SUBSTITUTIONS AND POOR SOIL · INSTALL AMELIORATED SITE TOPSOIL OR SPECIFIED TOPSOIL 300MM DEEP, SETTLED, AND MULCH AS SPECIFIED. · CIVIL ENGINEERING - PROVIDED BY CLIENT herein to any person without the written consent of Place Design Group.
STRUCTURE OCCURS. · NO SYNTHETIC, GRANULAR BLENDED FERTILISERS TO BE USED ON SITE. SLOW RELEASE ORGANIC TREE TABLETS SHALL BE · ARCHITECTURE - DBI Annotated dimensions take precedence over any measures of scale.
Verify all dimensions on site prior to construction.
USED AT ESTABLISHMENT. · ELECTRICAL ENGINEERING - PROVIDED BY CLIENT This drawing may display with permission a combination of specialist and
SERVICES · ALL PLANTINGS SHALL INCORPORATE THE INCLUSION OF A SLOW RELEASE NATIVE PLANT FERTILIZER (AS PER · HYDRAULICS - PROVIDED BY CLIENT other consultant(s) input and linework.
Nominated specialist and consultant information contained within this
· THE CONTRACTOR SHALL CONFIRM THE LOCATION OF ALL SERVICES WITH RELEVANT AUTHORITIES PRIOR TO PLANTING AND MANUFACTURERS SPECIFICATION) AND THE USE OF A SOIL MOISTURE RETENTION ADDITIVE (AS PER MANUFACTURERS document is referenced from their supplied documentation and is
EXCAVATION. SPECIFICATION), PLACED ADJACENT THE PLANT ROOT BALL AT THE TIME OF PLANTING. contained in this document as indicative only and not for construction or
certification purposes.
· TREES >25 LITRE BAGS ARE TO BE CERTIFIED BY A QUALIFIED ARBORIST AS AS2013:2105 COMPLIANT PRIOR TO DELIVERY TO
DRAINAGE SITE. QUALIFIED ARBORIST TO SELECT AS2013:2105 COMPLIANT TREES AT NURSERY AND CHECK ON DELIVERY TO SITE.
PROJECT
· SURFACE PIT LEVEL FLUSH WITH ADJACENT FINISHED SURFACE LEVELS. ENSURE POSITIVE OVERLAND DRAINAGE FLOW TO ALL FURNISH CERTIFICATION TO SUPERINTENDENT AND LANDSCAPE ARCHITECT PRIOR TO PRACTICAL COMPLETION.
PITS AND THAT NO PONDING OCCURS AROUND THE PIT. ALIGN ALL PITS SQUARE WITH TO PATHS, PAVEMENT PATTERNS, KERBS, · DO NOT INSTALL TREES WITHIN:
WALLS AND ALIKE. - 1M OF UNDERGROUND SERVICES 66 PEREGIAN ESPLANADE
IF REQUIRED: - 1.5 OF SEWERS, HORIZONTALLY AND VERTICALLY
· INSTALL CONTINUOUS SUB-SURFACE DRAINAGE SYSTEM TO LOCATIONS AND LEVELS AS INDICATED ON PLANS. SUB-SOIL - 3M OF DRIVEWAY CROSSOVERS
PEREGIAN BEACH
DRAINS SHALL INCORPORATE A TRENCH WITH A GEOTEXTILE LINING, DRAINAGE GRAVEL BACKFILL MATERIAL AND A 100MM - 4M OF STREET LIGHTS AND POWER POLES
SLOTTED AG-PIPE TO THE FOLLOWING SPECIFICATION; - 5M OF BUS STOPS - DEPARTURE SIDE CLIENT
- 15M OF BUS STOPS - ARRIVAL SIDE
IRRIGATION - IF INSTALLED · WHERE DIFFERENT GROUNDCOVERS ARE PLANTED IN MASSES, TRIANGULARLY SPACE THEM EQUIDISTANT PER SPECIES AND
· THE PROJECT IRRIGATION SYSTEM IS A 'DESIGN + BUILD' SYSTEM. PLANT THEM IN ODD NUMBERED GROUPS DAVRUS DEVELOPMENTS
· IRRIGATION SYSTEM TO BE INSTALLED TO APPROPRIATE STANDARDS AND BY A SUITABLY QUALIFIED PERSON AND HAVE A OF 5, 7, AND 9 PER SPECIES.
MINIMUM 12 MONTH WARRANTY. ALL CONTROL CABLES TO BE HOUSED WITHIN CONDUIT.
· CONDUCT PRESSURE AND FLOW TESTS PRIOR TO DESIGNING SYSTEM TO ENSURE SYSTEM'S ADEQUACY. TURF AREAS NOTES
· SYSTEM TO HAVE: AN AUTOMATIC CONTROLLER (LOCATION TO BE CONFIRMED WITH OWNER) WITH A LOCKABLE STAINLESS · EXCAVATE TURF AREAS TO A DEPTH OF 150MM, CULTIVATE SUBGRADE TO A DEPTH OF 150MM AND TREAT AS PER SOILS
ALL MEMBER SIZES, CONNECTIONS, FOOTINGS ETC
STEEL CASE, RAIN SENSOR, BACKFLOW PREVENTER AS PER LOCAL COUNCIL STANDARDS WITH LOCKABLE CAGE ENCLOSURE, TESTING RESULTS. ARE TO BE CONFIRMED BY AN ENGINEER. SIZES
ISOLATION VALVES, PRESSURE REGULATOR(S) AS REQUIRED, QUICK COUPLERS VALVE FOR EACH LARGE AREA 50LM BETWEEN · INSTALL 150MM OF AMELIORATED SITE TOPSOIL OR IMPORTED TOPSOIL AS SPECIFIED. NOMINATED ARE INDICATIVE OF FINAL APPEARANCE
VALVES, QUICK COUPLER VALVE KEYS, INDEPENDENT VALVES FOR TURF AND DRIP RESPECTIVELY, CHECK VALVES, VALVE · FINISHED TURF GRADES/CONTOURS TO BE GENERALLY SMOOTH, COORDINATE ON SITE WITH SUPERINTENDENT AND ENSURE REQUIRED. CONTRACTOR IS TO PROVIDE SHOP
BOXES (BLACK PLASTIC), LOOPED MAINLINE, THRUST BLOCKS (IF NECESSARY), LATERAL LINES FOR TURF, FITTINGS AS LEVELS ARE APPROVED PRIOR TO TURFING. DRAWINGS FOR APPROVAL BEFORE COMMENCING
REQUIRED, OVERHEAD ADJUSTABLE SPRAY ROTORS WITH SWING JOINTS AND HEAD TO HEAD COVERAGE FOR TURF (DO NOT · TURF LAID ON LOW SIDE OF HARD SURFACES SHALL BE 20MM BELOW ADJACENT HARD SURFACE TO NOT IMPEDE STORM CONSTRUCTION.
OVER-SPRAY ONTO PAVED AREAS), AND DRIP LINES AND EMITTERS FOR GARDENS. WATER FLOW. ALL WATER PROOF MEMBRANES, HYDRAULIC
· INSTALL UPVC CONDUITS, 2X∅ OF PIPE USED, UNDER ALL HARD SURFACES PRIOR TO HARD SURFACE CONSTRUCTION. EXTEND · SUPPLY AND LAY TURF AS INDICATED ON THE DRAWINGS. FITTINGS, ELECTRICAL / LIGHTING FITTINGS AND
ENDS OF CONDUITS 300MM BEYOND SURFACE, CAP (DO NOT GLUE CAPS TO CONDUITS) AND INSTALL SURVEY PEG AT END FOR · WATER TURF IN WELL AND REFER TO SUPPLIERS MAINTENANCE REQUIREMENT FOR ESTABLISHMENT. REINFORCED CONCRETE STRUCTURES ETC TO
REFERENCE. · APPLY WATER TO MAINTAIN SOIL MOISTURE UNTIL ESTABLISHED DURING MAINTENANCE PERIODS TO MAINTAIN VIBRANT GREEN ENGINEERS, ARCHITECTS, HYDRAULIC ENGINEERS,
· ALL VALVE BOXES TO BE LOCATED IN GARDENS, 300MM FROM AND PERPENDICULAR TO PATHS AND NOT IN TURF OR SWALES. TURF COLOUR AND HEALTH. ELECTRICAL ENGINEERS DETAILS AND
SPECIFICATIONS.
· ALL MAINLINES TO HAVE 450MM OF COVER AND LATERAL LINES 300MM. SIZES NOMINATED ARE INDICATIVE OF FINAL
· ALIGN ALL MAINLINES AND LATERAL LINES 1000MM FROM TREES AND IN CLOSE APPROXIMATION TO NEW PATHS AS POSSIBLE. MAINTENANCE TASKS APPEARANCE REQUIRED
· TURF AREAS TO BE IRRIGATED WITH POP-UP ROTORS / SPRINKLERS (HUNTER AND TORO). · LANDSCAPE CONSTRUCTION CONTRACTOR TO MAINTAIN WHOLE OF LANDSCAPE WORKS FOR ESTABLISHMENT PERIOD OF 13
DO NOT IRRIGATE ROAD RESERVE AREAS. WEEKS AND HAND OVER TO OWNER ONCE COMPLETED.
· SET TURF ROTORS / POP-UP SPRINKLES 300MM FROM KERB AND GUTTERS. · THE FOLLOWING TASKS ARE TO BE ACTIONED DURING ESTABLISHMENT AND IN PERPETUITY;
· FOR PRACTICAL COMPLETION ENSURE WHOLE SYSTEM IS OPERATIONAL.
· CONTRACTOR TO PROVIDE 'AS-BUILT' CAD DRAWING OF SYSTEM / DESIGN IN .DWG AND PDF TO OWNER AND A LAMINATED COPY IRRIGATION AND WATERING
IN CONTROLLER DOOR FOR REFERENCE WHEN APPLYING FOR PRACTICAL COMPLETION CLEARLY SHOWING MAIN-LINE RUNS · EVERY DAY FOR THE FIRST TWO WEEKS (UNLESS IT RAINS ADEQUATELY)
AND SIZES, VALVE TYPES / STATION NUMBERS / DESIGNED PRESSURE AT VALVE, AND LOCATIONS. · EVERY 2-3 DAYS DURING THE BALANCE OF THE ESTABLISHMENT PERIOD OR AS NEEDED IF HOT AND DRY (UNLESS IT RAINS
ADEQUATELY).
GRADES · ONCE A WEEK THERE AFTER.
· SITE SHALL BE POSITIVELY DRAINED, I.E. NO PONDING AREAS, 2% MINIMUM TO PITS OR LEGALLY SHEET FLOWING OFF-SITE.
· MULCHED GARDEN BED AREAS SHOULD NOT EXCEED A 1:3 GRADE AND TURF AREAS SHOULD NOT EXCEED A 1:4 GRADE. TURF MOWING FOR APPROVAL
· FINAL GRADE EXISTING TOP 100MM AND TRIM TO +/-10MM TO ACHIEVE PLAN LEVELS. · FIRST MOW - ONCE AFTER 10 DAYS IF THERE IS RAPID GROWTH OR 14 DAYS AFTER INSTALLATION.
· MOWING THEREAFTER - ONCE A WEEK DURING SUMMER, ONCE EVERY TWO WEEKS IN SPRING AND AUTUMN, AND ONCE A
MONTH IN WINTER OR AS REQUIRED IF THERE IS A LOT OF GROWTH OR AS DESIRED. ISSUE CODE ISSUE DESCRIPTION BY CHK DATE
TOPSOIL 02 CA OPERATIONAL WORKS AM FV 27-06-2024
TURF TRIMMING 03 CA IR RESPONSE AM FV 18-09-2024
THE INTENT OF THE SPECIFICATIONS IS TO ENSURE THAT SITE SOILS ARE TESTED AND AMELIORATED, AND IMPORTED SOILS MEET · AS REQUIRED. MAINTAIN 5MM GAP BETWEEN TURF AND HARD SURFACES. 04 CA IR RESPONSE AM FV 31-01-2024
REQUIREMENTS, TO ENSURE FITNESS-FOR-PURPOSE FOR THE SPECIFIED USE. THIS SPECIFICATION OF TOPSOIL FOR 05 CA IR RESPONSE PA FV 23-10-2025
HORTICULTURAL PURPOSES IS TO BE ADOPTED FOR THE CONSTRUCTION OF ASSETS REQUIRING THE UTILIZATION OF ON-SITE WON TURF AERATION AND TOPDRESSING
TOPSOIL (NATURAL, AMELIORATED NATURAL SOILS AND/OR BLENDED SOIL PRODUCTS) AND/OR IMPORTATION OF TOPSOIL. · AS REQUIRED - TYPICAL TIMING IS END OF OCTOBER (SPRING) AND END OF FEBRUARY (AUTUMN).
· ON-SITE WON TOPSOIL · AERATE 100MM DEEP, 50MM O.C. WITH 16MM TINE (CORER).
(1) IT IS RECOGNIZED THAT TOPSOIL IS A VALUABLE RESOURCE AND NEEDS TO BE PROTECTED, RETAINED AND REUSED · COLLECT PLUGS AND DISPOSE ENSURING THEY DO NOT GET REINCORPORATED INTO HOLES. TOPDRESS WITH TURF TOPSOIL
WHENEVER POSSIBLE. NOMINATED IN FINISHES SCHEDULE - BRUSH TOPSOIL IN WITH BROOM.
(2) LOCAL SOILS MUST BE CONSIDERED IN INTERPRETING THE SOIL TEST RESULTS TO ENSURE SOIL CONDITIONS SUPPORT THE
LOCAL FLORA TO ENSURE FLORA DIVERSITY IS SUPPORTED. IRRIGATION SYSTEM RUN TIMES
(3) COLLECT TOPSOIL AND SUBSOIL SAMPLE(S) AS/ TRANSPORT AND MAINROADS SPECIFICATION MRTS16 JULY 2017. HAVE TESTED · SET TIMER TO RUN IRRIGATION SYSTEM SHORTLY AFTER DAWN.
BY A NATA CERTIFIED LAB FOR HORTICULTURAL SUITABILITY, I.E. PLANTING TREES AND TURF. FURNISH TEST RESULTS TO
LANDSCAPE ARCHITECT. IRRIGATION SYSTEM MAINTENANCE
(4) AMELIORATE SUBGRADE AND SITE TOPSOILS PER TESTING RESULTS. · TURF - CHECK DAILY IF SYSTEM IS RUN TO ENSURE THAT THERE IS NO OVER SPRAY ONTO PATHS OR HARD SURFACES AND
(5) ALL SOIL STOCKPILES ARE TO BE MAINTAINED TO CONTROL WEEDS ROUTINELY AND GUARD AGAINST DISPERSION BY WIND OR ADJUST HEADS AS REQUIRED.
WATER. STOCKPILES SHALL BE LIMITED TO A MAXIMUM HEIGHT OF 2M AND MAY REQUIRE COVERING OR RETAINING. · CHECK HEAD TO HEAD COVERAGE, IF LACKING CHECK HEAD AND NOZZLE AS REQUIRED.
STOCKPILES ARE NOT PERMITTED WITHIN CLOSE PROXIMITY TO RESIDENTIAL PROPERTIES · GARDENS - CHECK DRIP SYSTEM FOR LEAKS ONCE A MONTH AND TO ENSURE ALL EMITTERS ARE FUNCTIONING. CLEAN
· COMPLIANCE EMITTERS AS REQUIRED
TOPSOIL MUST BE:
(1) FREE OF BUILDING DEBRIS. ADDITIONAL MAINTENANCE TASKS PRE - Preliminary | CA - Council Approval | T - Tender | CON - Construction
(2) CONTAIN NO MORE THAN 5% BY WEIGHT OF PARTICLES >20MM AND NO PARTICLES SIZED >50MM. · WEED REMOVAL AND WICK WIPING: AS REQUIRED TO REDUCE COMPETITION AND SEEDING. DRAWING TITLE
(3) IMPORTED TOPSOIL MUST BE FREE OF VIABLE PLANT PROPAGULES (WEED SEEDS, RHIZOMES ETC.) AS PER APPENDIX L OF AS · PLANT REPLACEMENT: IMMEDIATELY REPLACE PLANTS THAT DIE OR FAIL TO THRIVE, ARE DAMAGED OR STOLEN, WITH PLANTS
4419-2018. OF THE SAME SPECIES AND OF SIMILAR SIZE AND QUALITY UNLESS OTHERWISE SPECIFIED.
(4) SITE WON TOPSOIL CAN HAVE PLANT PROPAGULES WITHIN IT. THEREFORE, A WEED CONTROL PROGRAM, TO REDUCE THE · STAKES AND GUYS: ADJUST AND/OR REPLACE STAKES AND TIES WHERE REQUIRED. REMOVE STAKING AND GUYING WHEN
WEED RISKS, MUST BE ESTABLISHED. SITE WON MATERIAL MUST NOT CONTAIN ANY STATE PROHIBITED WEED SEED OR PLANT INSTRUCTED BY THE SUPERINTENDENT. GENERAL NOTES
FRAGMENTS · RE-MULCHING: AS REQUIRED TO MAINTAIN A CONSISTENT DEPTH, 100MM SETTLED, UNTIL PLANTS ARE ESTABLISHED.
· SAMPLING AND ANALYSIS · TRIM / PRUNE PLANTS TO REMOVE DEAD, DYING AND DISEASED GROWTH AND FOR CHARACTER AND FORM AS REQUIRED.
(1) SAMPLING OF SOILS MUST ENSURE REPRESENTATIVENESS. TOPSOIL AND / OR SUBSOIL SAMPLING SHALL FOLLOW THE MONITORING: PROVIDE A MONTHLY REPORT ON COMPLETED TASKS.
DESIGN : FV
REQUIREMENTS OF AS 4419-2018.
· GENERALLY SOIL TO BE USED SHALL COMPLY WITH THE FOLLOWING SPECIFICATION; DOCUMENT : AM
(1) FRIABLE AND FREE DRAINING SANDY LOAM NOOSA COUNCIL PROJECT : 230578
APPROVED PLAN
MCU24/0083.01 & OPW24/0093.01
10 MARCH 2026 DRAWING NUMBER REVISION
230578-001 05
Document Set ID: 24349399
Version: 1, Version Date: 02/12/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.