Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Minor Change Report - 51983.3225.24 (As Published)

of 45

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

               100. Removal of building materials containing asbestos must be undertaken by a licensed
                    asbestos removalist.
               101. Asbestos removal work (Section 466) of the Work Health and Safety Regulation 2011
                    requires a licensed asbestos removalist to give notice to Workplace Health and Safety
                    Queensland (WHSQ) of licensed asbestos removal work at least five days before the work
                    commences. Notification must be made using Form 65: Notification of licensed asbestos
                    removal work, demolition work or emergency demolition.
               102. All building materials containing asbestos products are wrapped and disposed of in
                    accordance with the Public Health Regulation 2006 and the Environmental Protection
                    Regulation 2008.
                      Note: Asbestos is a Regulated Waste. The Department of Environment & Science licenses
                      businesses that transport asbestos waste, and landfills that accept this waste.
                      General
               103. Infrastructure including reticulated water, sewerage, stormwater, and electricity must be
                    protected from damage and made safe to the standard required by the regulatory authority.
               104. Any damage to footpaths, street plantings, natural vegetation/trees, kerb and channel,
                    bridges or roadways at the removal/demolition site must be repaired or reinstated to at least
                    pre-existing conditions.
                      Plumbing and Drainage
               105. It is a requirement of the ‘Standard Plumbing and Drainage Regulation 2019’ that at
                    demolition of a building, the existing sanitary drain upstream from the connection point for a
                    service provider’s sewerage system must be sealed water tight. This work is deemed as
                    notifiable Work and must be carried out by a suitably licenced plumber who must submit an
                    As Constructed plan and Form 4 (Notifiable Works Form) to the QBCC (Queensland Building
                    Construction Commission) within 10 days of completing the work.




                                                                                                   Page 45 of 45

Document Set ID: 24243915
Version: 17, Version Date: 03/07/2026

Used in these records

About this file

File size
2.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Report - 51983.3225.24 (As Published).pdf · 2.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.