Plan:
Pages referring to Correct pages 4, 8, 11, 19, 23, 24, 25, 26, 30 and 33 in accordance
the Fire with the conditions of approval for the Fire Management Plan.
Management Plan:
Sediment and Erosion Control
45. Detailed staged Sediment and Erosion Control Plans are to be prepared for the site and shall
be prepared to the reasonable satisfaction of Council and in accordance with the Institution of
Engineers Australia ‘Engineering Guidelines for Queensland Soil and Sediment Control’ (June
1996) and in particular using Checklist No. 3 from that document. The sediment and erosion
control plans shall cover all development on site (during the construction, establishment and
operational phases) including rehabilitation and remediation.
46. The Sediment and Erosion Control Plans will deal with the staging of the development
generally in accordance with WBM’s Report ‘Lensworth Lake Doonella – Stormwater and
Water Quality Management Plan – Version 2, Revision 3’ of 30/3/03.
47. The Sediment and Erosion Control Plans shall also include the Public Open Space area and
shall:
47.1. Identify existing erosion problems, and
47.2. Specify appropriate remedial treatments.
48. The residential precincts shall be designed to incorporate, within their boundaries all the
necessary sediment and erosion control devices.
Stormwater Management Plan
49. A Stormwater Management Plan for the site including revegetation and remediation of all
water treatment areas including swales and bioretention systems shall be prepared to the
reasonable satisfaction of Council. The Stormwater Management Plan shall be generally in
accordance with WBM’s Report of 30/3/03.
50. The developer shall comply with the Stormwater Management Plan and the operational stage
components of the Stormwater Management Plan shall be referenced in the community
management statements for all group housing developments over the site.
51. Key water quality objectives to be reflected in the Stormwater Management Plan are the
protection of aquatic ecosystems in the site gullies, Cranks Creek and the eastern creek and
within the receiving waters of Lake Doonella and the Noosa River, as well as primary contact
recreational standards within the receiving waters. Appropriate water quality standards to be
adopted are those as specified by Brisbane City Council (in conjunction with the South East
Queensland Regional Water Quality Management Strategy).
52. Stormwater Management - MUSIC modelling; Prior to the completion of the final stormwater
management plan and the civil design drawings for operational works, any stormwater
management assessments utilising the CRC for catchment hydrology's MUSIC modelling
system must be corrected for a possible error in the assessment of bio-retention system
efficiencies and performance in removal of nutrients, as recently notified by the CRC.
Empirical calculations such as the Brisbane City Council spreadsheet method shall be use to
adjust the MUSIC model and to demonstrate that realistic removal efficiencies are being used.
Alternatively, once a 'patch' is available from the CRC, this corrected version of the software
can be used, but, again, cross checking with empirical calculations is required. The error in
the bioretention routine will result in the need for additional water quality treatment measures.
Initial assessments indicate that MUSIC is over predicting removal by as much as twice what
should be occurring.’
Page 11 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
No other editions are linked here.