2003/221132
62. Certification is required from a qualified stormwater engineer/scientist that the stormwater
management treatment train in the approved stormwater management plan and associated
design drawings has been installed on site in accordance with the approved stormwater
management plan and is functioning as designed. This certification is to be provided to the
Council prior to the endorsement of survey plans, or prior to Council accepting the devices ‘on
maintenance’.
63. All stormwater drainage lines including private drainage lines (also known as inter-allotment
drainage lines) or as otherwise approved by Council’s Manager of Land Development shall be
inspected by closed circuit television (CCTV) at the completion of all works and immediately
prior to acceptance ‘On Maintenance’.
A report of the CCTV inspection, including photographic records (which includes photos &
video recordings burnt onto a CD) of the inspection shall be submitted to the Council for
approval. Any defects or substandard works shall be recorded and accurately illustrated on
the drainage plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the
applicants expense with a further CCTV inspection arranged once the rectification works have
been completed.
To this extent all CCTV inspections, including any additional inspections necessary following
defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
incurred by Council in reviewing the CCTV inspection results shall also be borne by the
applicant.
Acid Sulphate Soils Management Plan
64. An Acid Sulfate Soils (ASS) Management Plan must be provided for any excavation works
undertaken in areas of the site below 5m AHD. The Management Plan must outline all
proposed ASS investigation and management procedures, which are to be undertaken in
accordance with State Planning Policy 2/02 "Planning and Managing Development Involving
Acid Sulfate Soils".
Reconfiguration Plans
65. The Lot Reconfiguration for the residential areas will be in accordance with the following Plans
by PMM Group and as may be amended by these conditions:
65.1. Proposed Reconfiguration Lake Doonella Ref: 6812-60B dated 1 March 2004 Sheets 1
to 4; and
65.2. Proposed Reconfiguration Lake Doonella Community Title Lots Ref: 6812-62 dated 2
March 2004.
Staging
66. The staging of the Lot Reconfiguration for the residential areas will be in accordance with the
Plan titled “Construction Staging Plan” by RPS Australia East Pty Ltd - Reference 6812-61N
and dated 19 January 2009.
General
67. Security in the form of a cash bond or trading bank guarantee to the sum of $400,000 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for Operational Works. The cash bond or trading bank guarantee will be
reduced to $100,000 upon completion of all construction works (except building construction)
and the balance returned after the completion of the water quality monitoring and
management plan requirements.
Plan Sealing and Easements
68. For the purpose of these conditions, the following definitions apply: -
68.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be
endorsed by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
Page 13 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
No other editions are linked here.