Council archive · source document
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published] · 132003.221132.7
Plans and drawings: the text below has words only, no drawings.
2003/221132
35. Each residential allotment that includes Private Open Space, or abuts Public or Private Open
Space shall be provided with a 20 – 25 mm water connection and garden tap, located within 2
m of the Open Space area. Each tap shall have a permanently attached 20 m long garden
hose and hose reel. The installation and maintenance of these requirements shall be the
responsibility of future residents, with the requirements included within the Residential Design
Guidelines.
36. For the Forest Cluster Precinct, 20 – 25 mm water connections and garden taps shall be
provided at a maximum spacing of 40 m along its common boundaries with Open Space
areas. Each tap shall have a permanently attached 20 m long garden hose and hose reel.
Other Bushfire Protection Measures
37. Lots 91 to 94 and 106 to 111 shall be totally cleared of all existing trees, shrubs and woody
understorey plants prior to building commencing on these Lots. Grasses, sedges and small
herbaceous plants shall be retained.
38. The Fire Management Plan for the Development Area shall include the requirement that a
Bushfire Information Kit will be provided to all purchasers of allotments on the site. The
Bushfire Information Kit will be submitted to Council with the Survey Plan for Stage A of the
development.
39. Burning of rubbish, cleared vegetation, surplus materials, etc., on the site is prohibited.
Other
40. Access easements through the Conservation Residential Precincts ‘building envelopes’ to the
Private Open Space boundaries are not required.
Flora And Fauna Management Plan
41. The development shall be undertaken in accordance with the Flora and Fauna Management
Plan prepared by James Warren & Associates Pty Ltd and dated December 2004 and as may
be amended by these conditions. An amended flora and Fauna Management Plan
incorporating the required amendments shall be lodged for approval prior to issue of a
Development Permit for Operational Works
42. The following corrections and amendments shall be incorporated into the Flora and Fauna
Management Plan:
Page 3; Last Add the following to the end of the paragraph:
paragraph: ‘A suitably qualified and experienced Ecologist or Environmental
Scientist will be engaged by the Developer to implement the
requirements or the Flora and Fauna Management Plan and monitor
the Contractor’s compliance with the Flora and Fauna Management
Plan and the Environmental Management Plan. The Site Ecologist
will provide information for the monthly Environmental Compliance
Reports for Council.’
Page 6; Section Add the following to the end of the sentence:
3.2.3: …… ‘ , except for the construction of the approved sewer main and
pedestrian pathway.’
Page 6; Section Add the following to the end of the sentence:
3.2.4: …… ‘ , except for the construction of the approved sewer main and
pedestrian pathway.’
Page 8; Section Delete the first sentence and replace with:
3.3.1: ‘Erosion and sediment control works shall be undertaken in
accordance with the approved Environmental Management Plan and
all other approved Erosion and Sediment control Plans.’
Page 11; Section Add the following to the end of the second sentence:
Page 9 of 27
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - Change to an Existing Approval (Construction Staging Plan) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 123 KB (small file)
- File type
No other editions are linked here.