Council archive · source document
06/0823 - Applicant's Response to Information Request including Attachments [As Published] · 132006.823
Very large file (42.4 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
35. The operational details of the restaurant and conference facilities have yet to be finalised, however the following can be confirmed: 36. 36. 37. 37. 38. 38. 35.1 35.2 35.3 The restaurant will operate independently of the conference facility. However it is noted that if a large conference group required the private use of the restaurant, this may able to be accommodated. The conference attendees are served morning tea either inside the conference area itself, or outside on the conference area overflow deck. Further, as mentioned previously in Item 35.1, the restaurant area may be requested to cater for large conference groups. Demountable petitions are proposed between the conference overflow area and the outdoor dining area to enable the conference space to remain a flexible as possible. Please provide details regarding the functionality of the restaurant. It is noted that there is no direct access between the kitchen and restaurant storage area located in the basement. This oversight has now been addressed and a stair access is provided between the kitchen and basement storage area. Please refer to the amended plans for additional details. Please provide details regarding any noise reduction methods proposed between the conference area and surrounding accommodation units and restaurant seating. It is considered that some units contained within Building | (N) and C (D) may be effected by noise resulting from either the conference area or restaurant facility. These units wilt incorporate noise attenuation measures as required. Should Council require additional treatment conditions may be recommended accordingly. Please provide a comparison of the proposal and CAS with regard to the floor areas of the:~ 38.1 Conference Facility; 38.2 Restaurant; 38.3 Residential; 38.4 Health Spa; 38.5 Reception/Foyer/Lobby; and 38.6 Shop. Following is a table summarising the comparative use areas of the current proposal to the CAS: Use - - CAS “Current Proposal Conference Internal 629.8m? 423.2m Total 1105.3m? 1039m? Restaurant Kitchen 239.6m 210m? Page 20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0823 - Applicant's Response to Information Request including Attachments [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.