69. 69. The CAS allowance of a 3 metre buffer was incorporated in order to restrict peoples access to the water edge. This area has been now been re-designed, and therefore the provision of a 3 metre setback is no longer a requirement. Pedestrians will be restricted to a timber boardwalk and viewing deck constructed to provide adjacent access and viewing opportunities without damaging the habitat surrounds. It is also noted that the position of Building B (C) will itself block direct human access to the waters edge. Building B (C) will also provide the desired shading to this area. This shading will inhibit the growth of plant species already established in a small area of the pond bank, but this area will be replanted with more shade-tolerant species. It is noted that the proposal maintains a 3 metre vertical separation between the habitat area and nearby Villas. Attachment 23 includes sketches and sections of this area. Please provide a copy of the Freshwater Habitat — Landscape Sketch showing the proposed relative location of C Block. This plan shall ensure that all vegetation shown on the landscape sketch is maintained in its original location with at least a 3 metre setback from any vegetation to the closest edge of any projection from the C Block. It is noted that it may be necessary to relocate C Block to achieve this setback. Please refer to Attachment 23 which includes sketches and sections of the Freshwater Habitat including the relative location of Building B (C). It is noted that the CAS did not require a 3 metre building setback from the Freshwater Habitat, however the proposed development still maintains a 3 metre vertical separation. Creek k 70. 70. Please provide plans showing the 10 metre setback from the centreline of the creek. These plans shall show details ensuring that there is no encroachment into the 10 metre creek Setback zone. It is noted that this requires that no construction works can occur in this 10 metre setback, for example no batters, no excavations, no pipelines, no silt fences or sediment controls, no diversion drains, no stormwater outlets, no foundations, no retaining walls, no access for construction etc. are permitted within the 10 metre setback. This may require certain buildings to be setback further from the creek to ensure construction activities can be excluded from this area. Please provide plans showing all infrastructure and buildings Proposed along the creekline and the setbacks achieved from these works. The amended plans detail the 10 metre setback from the centreline of the creek. The larger buildings fronting this buffer area have been redesigned and repositioned so as to achieve a an even greater setback. The building setbacks are summaries as follows: + Building F — Building fagade interfaces with 10 metre buffer zone + Building G ~ Setback a minimum of 1 metre from 10 metre buffer zone * Building H - Setback 2 metres from 10 metre buffer zone + Building | - Setback 6 metres from 10 metre buffer zone Page 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0823 - Applicant's Response to Information Request including Attachments [As Published]Related documentApplication case desk ↗
About this file
- File size
- 42.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.