Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

08/0122 - Modification to Alternative Sitting Provisions [As Published] · 172008.122

of 42

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

(TEGRATED PLANIONG ACT 1997 OAS Astasameni Chockfst, Version 21.0, 3 September 2007

SECTION 4 secton 4 must 20 completed when the applcaton seoks approval to cany out aperations) work,

 
 

 

ts any of the proposed operadonal work assessable under a planning scheme?
No = (Go fo Guashon 4 2 betow
Yes = (Complete Part E 0! 10AS Agelisolle For 1 ond Quastens 511-44 & below

 
  
  

 
 

 

  
 

1s any part of the promises within 100m of a Siate-controlled road, or part of a future State-controhed road?
@ No
Tfno, fs the pmposed operational work for ing or excavating listed in Integrated Plamung Reguiation 1998, schedule 5 and
(oes it exnced tha threshosd?

 
    

No.
9 ‘Yes - This epplication must be refered tp the Depertment of Hein Roads (DMR) 8s Concurrence AganCy.
C Yes
Nye, Is al of tie proposed operational work associated wih the folowing?
© Amaterial change of use that ls assessable under the planing scheme Ono Oves

© Reconfiguiing a Jol thst does not incraase the total number of lots and dows not fn (Oye
increase the total cumber of lots abutting the State-controtad saad

110 to ether or batt - Answer (a) - (¢) O00
(@) iy fo pops pean wor ssid wh rest aS conte ae?
No

Yes - mis epptication must be referred 10 the Deparimard of Main Roads (MR) as Coneurennon Aparcy.

(b) ts any of the proposad operational work for fling or excavation?

O Wo
D ves .
tyes, is the operational work proposed in a future State-conitrolied road defined by route?
No + This apaication must be refered to the Daparimart of Main Roads {OMR) as Advice Agency.
Yes Thi agpicatio mus! be referred (0 the Department of Main Roads (MR) as Concurrence Apancy,

{¢) Cons any of the proposes oparational work invive the redirection or nensification of ste storwvaler from tho tand,
through a pipe wih a cross-sectional area great than 62Scrr? Sat directa stormwates to a State-controlied road?
O
O Yes

I yas, fs tha oparationat work proposed in @ future State-controdied road defined by route?
1D) No~ This apptcerian must ba setorred fo tho Departmant of Mah Roos (O4R} a1 Advice Agency.
[1 Yea This apateation must bo referred (0 Lio Deparment of Main Roads (DR) as Conciarence Agency.

 

 

 

 

Verion 21.0 bee 2007

Tocal govertment area listed" in Stata Planning Poly 202: Planning and Managing

 

(tyes, isthe niturad ground aval of any poi where work ia being carted oul less than 20m AHD?

Ko
Yea

ttyes, dogs the proposed operational work involve the futlowing?

¢ Excavating mom than 1,000m? of sof or sedtiment at or below Sm AHD On Ove

«Filing the premisee with 1,000m? or more of mati with an average dapth of sm C] Wo () Yes
cn Land, sail or sadiment st or below Sm AHO

{yes 1 etther or both 2 applcation must to be fered i fox Department of Natur! Resoutces art Watar (NRW) at Actice Agenty

aN
1g Pare Whe ore nate a ae and sui & id Snot Stink “edie

   

 

1a ary of the proposed operational work for fllng or excavation?
$a No
O Yes

Ayes, ls the filing or excavation associated with reconfiguring 8 lot?

Q yes

1 Naw Answer bet (0) and 0} Dctone

(a) ls any part of the premises subject to en easement in favour of a distribution entity or anemission entty under
the Electricity Act 19947

 

 

No
Yes
tyes, is any of the oparatonal work proposed Ip be located in any part of the easement?
No
‘Yas = This application must be calorred vo tho andy at Advice Agoncy,
(0) Is anyof the operational work proposed In be Inoztad within 0m of a substation ai under the Electriaty Act 19047
CO wo
CJ Yos + This appication must be refered fo the entty responsible dor ine substation as Advica Agency.

Iasi? tate 4

ls any part cf the premises subject to an easernert in favour cf the holder of Pipeline Licance Number 4 issued under tho
Potrolsum Act 1923 for the construction or operation of the Moonie tp Brésbane strategic pipeline under that Act?

 

 

 

 

  
  
  
 
  
 
 

DG Yes
tyes, is any of the proposed operations! work for fing, excavation, compaction, dling, boring or piping, nok associaked
‘with mcontiguring a lot?

QO Wo
QO Yes
tyes, is any of the operational work propocad 10 be located in any part of the easement?

No
‘Yes - This application must be setorred 10 the foence nokler 36 Advice Agency.

Pak dae 7

 

 

 

‘rundun, Bowen, Grshare, Broadsound, Burdebary, Burdekin, Guke, Gumed, Cabo, Caima, Callan, Cacuret a, Cardwal, Carpantata, Cook, Caclota, Doug,
Fay, Gacatoee, Cont Coast, Honey Bay, Kinckacca, ist, otrsinee, Uegitone, Logee, Mackay, Marcocky, Meryonrougn, tam Vike, Momigton, Hoots, Pra
Rivers, Redeid, Raciland, Rockhartoton, Sara, Thynngena, Tro, Taras, Towrsvbe, Whitsatay,

-%-

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0122 - Modification to Alternative Sitting Provisions [As Published].pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.