Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Reference Documents - MCU23 0070

of 73

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (15.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

SITE BASED STORMWATER MANAGEMENT PLAN


Proposed Development at
36 & 38 DUKE STREET, SUNSHINE BEACH
for
Cambooya Pty Ltd


M3024E_DA1_SBSMP –Revision B
September 2023

JFP Urban Consultants Pty Ltd
Prepared by: C. Blair
Approved by: A. Fraser



  Revision        Date                       Details           Prepared By           Approved By
     A        20/04/2023      For Authority Submission       CB (RPEQ 19190)        AF (RPEQ 5691)
     B        18/09/2023      Information Request Response   CB (RPEQ 19190)        AF (RPEQ 5691)




SITE BASED STORMWATER MANAGEMENT PLAN – Revision B                   36 & 38 DUKE STREET, SUNSHINE BEACH
Log in to download the original file

Reference Documents - MCU23 0070.pdf · 15.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.