Cambooya Pty Ltd
BH2
Photograph 3: Looking approximately north over the centre of the site from the western corer of the existing
building.
4.0 METHODOLOGY
Our investigation and assessment included the following:
A review of geological and landslide hazard overlay plans.
Subsurface investigation at two borehole locations.
A slope stability risk assessment in accordance with the Australian Geomechanics Society (AGS)
Guidelines for Landslide Risk Management (March 2007).
4.1 Fieldwork
Fieldwork was carried out on 9 February 2023. The subsurface investigation comprised two boreholes
(designated BH1 and BH2). Borehole BH1 was drilled with a 4WD-mounted auger rig to 6 m below ground
level (BGL), and borehole BH2 was hand-augered to 1.6 m BGL.
Dynamic cone penetrometer (DCP) testing was undertaken adjacent to/within the boreholes to assess soil
consistency/density.
The borehole locations are shown on Figure 1 in Appendix A, and Reports of Boreholes are presented in
Appendix B, together with explanatory notes. The ground conditions are discussed in Section 5.2.
The fieldwork was carried out by a geotechnical engineer from Core who logged subsurface conditions in
accordance with AS1726-2017 Geotechnical site investigations.
J001873-001-R-Rev1 Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.