Council archive · source document
Decision Notice - 010.2008.00000056.001 [As Published] · 142008.56
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2008/56 Date of Decision: 7 February 2008
1. APPLICANT DETAILS
Name: CBD Settlers Cove Pty Ltd
Postal address: PO Box 1923
NOOSA HEADS QLD 4567
Phone no: 5448 0186 Fax no: 5448 0286
2. PROPERTY DESCRIPTION
Street address: 1 Serenity Close Noosa Heads
Real property Lot 603 SP 188270
description:
3. OWNER DETAILS
Name: CBD Settlers Cove Pty Ltd
Postal address: PO Box 1923
NOOSA HEADS QLD 4567
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Operational Works Operational Works - Landscaping No Yes
(Road Reserve)
6. DECISION DETAILS
Council decided to approve the application and grant a Development Permit, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.
8. SUBMISSIONS
Not Applicable.
9. CONDITIONS
The approval is subject to conditions. Noosa Council’s conditions are attached.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 5 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 6 10. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Nil 11. RIGHTS OF APPEAL Rights of appeal in relation to this application are attached. 12. ASSESSMENT MANAGER Name: Noosa Council Signature: Date: 7/02/08 MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124343\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 6
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
1. The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
approved plan of Development. The approved plans are titled Serenity Close Streetscape Improvement
Strategy and numbered SK/01 and SK/02 prepared by CBD Settlers Cove and dated DEC. 2007 and may
be amended by these conditions.
2. All manholes, inspection pits and grates are to be raised to finish surface level and kept free of cover and
be visible at all times to ensure prompt access in case of emergency.
3. The landscape construction is to be implemented in accordance with the approved landscape plan,
planting schedule and horticultural industry best practices.
4. The existing street trees (Peltophorum pterocarpum) indicated in the approved plans are to be retained.
5. Prior to the commencement of construction, all trees nominated for retention on the approved landscape
plans shall be cordoned off with protective barricade fencing to prevent impact from stock piling of soils or
materials, parked cars and machinery.
6. All trees are to be planted a minimum of 1 metre from all underground services.
7. All boulders are to be securely placed to avoid any movement.
8. Mounding is to have a finished level that is equal to or less than the mounding height that currently exists
on site.
9. The type of construction material to be used for the ‘path crossover’ shown in drawing number SK/02 is
required to be submitted to the Manager of Land Use and approved by Council, prior to works
commencing.
10. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot” fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways.
11. Council’s Construction Technical Officer – Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre-start” meeting regarding the landscaping works.
12. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the landscaping works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
landscaping works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed within 10 business days of the completion of construction works
or, alternatively, the Applicant may request that Council carry out the rectification work at the Applicant’s
cost, such cost being paid by the Applicant to the Council within 10 business days of the completion of
construction works.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid within 10 business days of the completion of construction works.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124343\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 6
13. Prior to acceptance of landscaping works "On Maintenance", the lodgement of satisfactory “As
Constructed” records shall be submitted to Council. Transparent copies of the design plans showing “As
Constructed” details are required for Council’s records. Such copies will be required prior to works being
accepted “On Maintenance”, where applicable. Requirements for “As Constructed” information are
detailed in Council’s Engineering Design Standards Manual.
14. The Applicant is required to maintain the works until they are accepted “Off Maintenance”, which will be 3
years after Council accepts the works “On Maintenance”.
15. These works are also to be in compliance with any relevant conditions or management plans approved
with Development Permit No. 23118DA.
16. This Development Permit lapses if the development has not happened by 6 February 2010, unless
application to extend the currency is approved by Council.
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124343\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 6
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to
against the part of the approval that represents the
development applications
concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
(2) The appeal must be started within 20 business approval resulted from a development application
(superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day
if it were an application under a superseded planning
the decision notice or negotiated decision notice is
scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the
mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the
against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact
started at any time after the last day the decision on
assessment and code assessment, appeal rights for
the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124343\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 6
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
MSOffice c:\docume~1\shesse\locals~1\temp\bcl technologies\easypdf 5\@bcl@ec124343\@[email protected]
Used in these records
Decision Notice - 010.2008.00000056.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 26 KB (small file)
- File type
No other editions are linked here.