Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Engineering Services Assessment · MCU15/0122

Attached to the e-mail MCU15/0122 Development Application - Engineering Services Assessment Email 5 of 5.

of 57

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (10.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 40, section 1. The text section number identifies this passage in the reader.

Within the Shire Business Centre site, as shown
on Map SBC—
a) run-off treatment occurs within the site ; and
b) drainage lines are only used for final polishing of
run-off.


Town water supply connections                         S8.1 A suitable backflow prevention device is       R08 Not applicable.
O8                                                    installed to protect the potable water within the
Backflow devices or similar systems ensure water reticulated water supply in accordance with
reuse facilities have no impact on the quality of the AS/NZS 3500:2003 Plumbing and Drainage.
town mains water.


Use of natural treatments and systems                  Use of natural treatments and systems             R09 Refer Site Based Stormwater Management Plan
O9                                                     O9                                                    prepared by Morgan Consulting Engineers
Natural treatment strategies, including grass swales Natural treatment strategies, including grass
and bio-retention systems, vegetated filtration strips swales and bio-retention systems, vegetated
and gross pollutant traps, are used wherever filtration strips and gross pollutant traps, are used
practicable;                                           wherever practicable;
AND                                                    AND
O10                                                    O10
Within the Shire Business Centre, as shown on Map Within the Shire Business Centre, as shown on
SBC— where necessary, drainage lines are Map SBC— where necessary, drainage lines are
ecologically enhanced to ensure that the water quality ecologically enhanced to ensure that the water
polishing functions are of high standard.              quality polishing functions are of high standard.

Used in these records

About this file

File size
10.3 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Engineering Services Assessment.pdf · 10.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.