Council archive · source document
Engineering Services Assessment · MCU15/0122
Attached to the e-mail MCU15/0122 Development Application - Engineering Services Assessment Email 5 of 5.
Very large file (10.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 48, section 1. The text section number identifies this passage in the reader.
Mains Cable Plan N
W E
S
212
.0
c3:M1-1200 1200 PIUT (AA) c9:M901-1000 100/0.40 CPFUT
c5:M1-2400 2400/0.40 CPIUT (BA) AC BC
c3002:AA-B6/1-12 12F/- SMOF FNPE
c3003:CE-AG/1-60 60F/- SMOF FNPEHJ/STD (BB) AB BB
BB2
AA
1xP32 SUBDUCTS
AA1
(AA)
1xP32 SUBDUCTS (BB) P100 OC OPTUS 3762M02 12/2024
BB1
AA BA
OC OPTUS 3831M01 03/2025 (BB2)
1xP28 SUBDUCTS (BB) P100CE
c3002:AA-AG/1-24 24F/- SMOF FNPEHJ/STD (BB1)
c9:M1-900 1200/0.40 CPIUT (BC)
100DEAD
c9:M1001-1200
B6
Health Care Aust
100.0
8
1.2
---
2.0
c9:M901-1000 100/0.40 CPFUT (AA)
OC OPTUS 3831M01 43.0 c3002:AA-B6/1-12 12F/- SMOF FNPEHJ (AA)
BREAKOUT AA
AA1 DIST (AA)
P100 1xP32 SUBDUCTS
OC OPTUS 3762M02 12/2024
(AA)
(AA1)
VAL
AA
AA3AA2
AA4AA1
P100
4xP32 SUBDUCTS (AA)
OC OPTUS 3831M01 03/2025(AA1)
CR
226
.0
0m 10m 20m 30m 40m 50m 60m
AC BC
AB BB
AB1 BB2
Sequence Number: 46281465
BB1
For all Telstra DBYD plan enquiries - AA BA
email - [email protected]
P100CE
For urgent onsite contact only - ph 1800 653 935 (bus hrs) CAUTION: Fibre optic and/ or major network present
TELSTRA CORPORATION LIMITED A.C.N. 051 775 556
in plot area. Please read the Duty of Care and
contact Telstra Plan Services should you require
Generated On 24/06/2015 11:10:42 any assistance.
WARNING - Due to the nature of Telstra underground plant and the age of some cables and records, it is impossible to ascertain the precise location of all Telstra plant from Telstra's plans. The accuracy and/or
completeness of the information supplied can not be guaranteed as property boundaries, depths and other natural landscape features may change over time, and accordingly the plans are indicative only.
Telstra does not warrant or hold out that its plans are accurate and accepts no responsibility for any inaccuracy shown on the plans.
It is your responsibility to locate Telstra's underground plant by careful hand pot-holing prior to any excavation in the vicinity and to exercise due care during that excavation.
Please read and understand the information supplied in the duty of care statement attached with the Telstra plans. TELSTRA WILL SEEK COMPENSATION FOR LOSS CAUSED BY DAMAGE TO ITS PLANT.
Telstra plans and information supplied are valid for 60 days from the date of issue. If this timeframe has elapsed, please reapply for plans.
Page 2 of 2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Engineering Services Assessment.pdfRelated documentApplication case desk ↗
About this file
- File size
- 10.3 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.