Skip to the record
Search everything, all in one place.

Council archive · source document

Attachment E - Stormwater Management Report · MCU24/0112

of 54

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (21.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.

5    CO N CLU S IO N


This SWMP outlines how stormwater runoff from the site will be managed in order to not adversely
impact the receiving environment.
The proposed lawful point of discharge for the development shall be the existing stormwater
infrastructure on Hilton Tce, with a connection proposed into the existing manhole. New on-site
stormwater infrastructure shall be constructed to collect stormwater runoff and direct it to the lawful
point of discharge. Stormwater detention is not considered to be required as the proposed
development's final impervious area is considered in line with existing conditions, and as a result of the
proposed development, it is unlikely to increase the runoff to such an extent that the downstream
drainage cannot cater for the site.

Stormwater quality treatment is proposed to be managed on-site to achieve the water quality objectives
through treatment from ATLAN filter cartridges in the treatment tank. MUSIC modelling has been
undertaken to demonstrate runoff from the development site achieves the water quality pollution load
reduction targets of the State Planning Policy.

Further refinement of the proposed stormwater management measures is recommended at the detailed
design phase to ensure coordination with the final architectural layout.

By implementing the proposed stormwater management system, and providing adequate maintenance,
the downstream environment and neighbouring properties will not experience any adverse deterioration
of water quality as a result of the proposed development.




                                                                                                        9

Used in these records

About this file

File size
21.8 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment E - Stormwater Management Report.pdf · 21.8 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.