Council archive · source document
Attachment E - Stormwater Management Report · MCU24/0112
Very large file (21.8 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
W
S
V
V
W
S
V
W
S
V
W
S
V
S
W
V
V
S
W
V
S
W
V
S
W
V
S
W
V
V
S
W
V
S
W
V
S
W
V
HILTON TERRACE
S
W
V
V
S
W
V
S
W
V
S
W
V
S
V
W
V
S
W
V
S
W
V
S
W
V
S
V
W
V
S
W
V
S
W
V
S
W
V
S
V
W
V
S
W
PRELIMINARY
V
EARTHWORKS PLAN
S
W
V
S
W
V
DESIGNED BRISBANE T 07 3852 4333 SURVEYOR DATUM DRAWING STATUS
E [email protected]
PROJECT
DRAWN
GOLD COAST T 07 5571 1599
CHECKED
E [email protected] LOCATION DRAWING NUMBER
SUNSHINE COAST T 07 5391 3777 USE FIGURED DIMENSIONS ONLY. DO NOT SCALE, IF A DISCREPANCY ARISES
E [email protected] CHECK WITH THE PROJECT ENGINEER AND/OR SUPERVISING AUTHORITY. DO NOT
APPROVED
WORK FROM REDUCED SCALE DRAWINGS (A1-A3 SIZE PAPER). COPYRIGHT OF ALL
For and on behalf of
NORTHERN NSW T 02 6674 8047
DRAWINGS & WORKS EXECUTED FROM THEM IS VESTED IN WESTERA PARTNERS TITLE
DATE E [email protected] SHEET NUMBER REVISION
WESTERA PARTNERS PTY. LTD. AND USE OF THERE FORE WITHOUT PERMISSION IS STRICTLY PROHIBITED! IT IS
www.westerapartners.com.au ABN 52 097 417 975 CENTRAL VICTORIA T 03 5441 0922 THE BUILDERS RESPONSIBILITY TO ENSURE ALL WORKS ARE CARRIED OUT WITH
No. DATE REVISIONS DES DRN CHK APD DOCUMENT CONTROL APPROVED E [email protected] DUE CARE AND DILIGENCE TO COMPLY WITH THE CONTRACT DOCUMENTS. CLIENT
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment E - Stormwater Management Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 21.8 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.