From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-22 14:20.
From the archive 23537 DA - Material Change of Use Special Facilities Resort Complex North Shore. File date in the archive: 2026-10-27 01:48.
& Cardna MBK 1.0 OUTCOMES Cardno MBK was commissioned to undertake a comprehensive assessment of the various infrastructure components required to adequately service the proposed Noosa North Shore Eco-Tourism Portal. Given the sensitive nature of the site, there was a requirement for full integration of the proposed development within the site’s physical and. environmental constrainis. Given these constraints, innovative and best practice techniques were adopted for the development of infrastructure systems to meet the environmental goals of the Noosa North Shore Eco-Tourism Portal. Below is a summary of the outcomes of each specific infrastructure component. Soils and Geology Geciechnical testing was conducted and confirmed the existing soil conditions. it was concluded that the geology of the area will not have an adverse impact on the Proposed type of development and ihe associated construction methodologies. Traffic The likely traffic generation and potential impacts from the proposed Noosa North Shore Eco- Tourism Portal are strongly affected by the unique development type and the access restriction caused by the Noosa River ferry. All external traffic management will involve a crossing of the Noosa River on the existing ferry service. The ferry in this particular instance will continue to convey traffic at the same raie, regardless of the traffic generated by visitors to the Noosa North Shore Eco-Tourism Portal. Therefore the expected increase in traffic generation will be “contained” at the ferry site and will not have an adverse impact in traffic management and intersection movements within the Noosa North Shore Eco-Tourism Portal. It is intended that suitable speed control measures shail be incorporated into the approach areas of the Maximillian Road and Beach Road intersection along both frontages and the West Visitor Precinct for distances of approximately 300 m from the intersection. The traffic numbers forecasted are not likely to create peak period probiems on the Noosa North Shore. Peak periods will occur as at present around holidays, long weekends and other associated peak times. The rate of arrivals and departures will be controlled by the ferry occupancy, ioading and crossing times and will therefore convey the same rate of traffic generation. It is therefore considered that although the expected increase in numbers of trips will have an impaci_on traffic volumes and intersection movements in Tewantin and on the Noosa North Shore that this effect will be manageable ‘and acceptabie. Sewerage Infrastructure A preliminary design for the proposed sewerage system was developed to adequately service the proposed development and meet the environmental goals of the Noosa North Shore Eco- Tourism Portal. PETRAC LAND HOLDINGS P/L, Noosa North Shore Eco-Tourism Portal September 2003 LA7296-03\Repor\FINAL REPORT - 18Sept03.dec Commercial in Confidence Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
000A88A4.115.tifRelated documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
- TIF
No other editions are linked here.