Log in to see the plans as drawn4 Maintenance
Task Frequency Frequency Maintenance Requirements
Establishment Period (2- 5yrs) Post Establishment
Item / Maintenance Objective All green roofs require higher levels of maintenance in the first 2-5 years of establishment until colonization has occurred and the vegetation has
Maintenance check point: Flood roof to check for any leaks / One off.: After waterproof membrane n/a stabilized. Based on existing exemplary green roof projects, green roofs are not set and forget. It takes time to get plants, irrigation and maintenance
weaknesses in the membrane. has been installed - prior to installing right and adjustments will be inevitable.
remaining components.
1. Irrigation Ensure automatic irrigation is suffi- 2-3 x per week during dry periods As required during extended dry Once plants are installed on the roof regular monitoring of all components and plants is essential.
cient to maintain substrate moisture (June - Dec) (varies according to rain- periods ( approx. June - Nov)
levels for optimum plant growth. fall / temperatures )
“Extensive green roofs require maintenance for first 2 years to ensure vegetation has stabilised and there are no competing weeds. Beyond the first 2
2. General maintenance (i.e Pruning / Maintain substrate levels, especially 2 x per year Minimal - as required
years, maintenance is minimal and may only be required once or twice annually.” Green Roof Design Resource Manual. p. 3.1
weeding) on sloping areas and top dress
where needed.
Remove weeds by hand. The maintenance contractor must be clear about the maintenance objectives and their capacity to complete this with the available resources. The
Prune shrubs and grasses to main- proposed design must be fully evaluated in terms of the maintenance it will entail.
tain dense leafy form.
Remove waste plant material.
A key challenge for maintaining the green roof is ensuring that plants are getting enough water for the desired level of growth, while also avoiding water
3. Pest control Inspect for signs of pest or disease 4 x per year (quarterly) Minimal - as required
logging in the soil. Table 1 shows the annual rainfall for the Noosa area where dry periods extend from June through to November.
and treat only as required.
4. Fertilising / Monitoring of plant Apply slow release complete fertilis- 2 x per year (6 monthly) At the be- Minimal - as required Refer to Figure 5 for a preliminary maintenance regime.
nutrition er to ensure adequate nutrient levels ginning of Spring prior to high rainfall
for plants, in accordance with soil period and 6 months later.
scientiest recommendations.
Maintain a log of fertiliser additions Fertilising
and records of pH levels before and
after fertilising.
“Fertilising can be a useful method for increasing the rate of spread of pioneer dune-stabilising plants over bare areas”. QLD Govt. Environmental
5. Plant evaluation / renewal to improve Replace dead plants and infill plant As required
Protection Agency. Natural coastal dune systems typically have low levels of plant nutrients however fetiliser applications will be necessary to provide
planting design to maintain dense cover
desirable nutrient levels for establishment of plants once pre-planted trays are installed on the roof.
6. Maintain irrigation system Manually test and inspect irrigation Weekly during dry periods / monthly at
system and make seasonal adjust- other times
ments. Check: Broad leaved herbaceous dune plants such as Ipomoea pes-caprae and Spinifex sericeus require fertiliser containing predominantly nitrogen. A natural
- volume of water delivered slow release fertiliser containing Ammonium nitrate, 34% N, is the preferred form of use for coastal native species. QLD Govt. Environmental Protection
- frequency Agency. Specific product specification and application rates will need to be determined by soil scientist.
- substrate moisture content
Fertiliser levels need to be monitored and altered accordingly to allow for inconsistent growth of plants due to varying shade levels and leaching of
7. Maintain non vegetated zones and Remove vegetation from perimeter 4 x per year 2 x per year
waterproofing zones and around other equipment
nutrients from the substrate during high rainfall periods.
and fixtures.
Inspect flashings over waterproofing
membrane terminations, wall fabric
for damage.
Conduct leak detection of water-
proofing if possible.
8. Maintain drainage Remove dirt, litter and other depos- 4 x per year 2 x per year
its from roof drains and gabion cage
intercept drains to ensure they are
clear and functioning
Figure 5- Preliminary Maintenance Regime
Green Roof Proposal
Date : 24.09.2014
Hasler Residence, Seaview Terrace A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.