Council archive · source document
2012164200_C400_0 · OPW13/0463
\\ ae _ “\X JES LEGEND
EXTERNAL CATCHMENT 0.3 Ha NOTE
/ , 7. REFER TO STRUCTURAL DRAWINGS FOR DETAILED PROPOSED SOAKAGE PIT - REFER TO
«OV 89.68
ae an INTERACTION OF DRAINAGE PIT AND STRUCTURAL ELEMENTS STRUCTURAL AND HYDRAULIC DRAWINGS FOR
2. _ CONTRACTOR SHALL UNDERTAKE ALL WORKS IN PROXIMITY TO DETAILED INTERACTION OF DRAINAGE PIT
EXISTING SERVICES AND INFRASTRUCTURE IN ACCORDANCE AND STRUCTURAL ELEMENTS
WITH THE RELEVANT UTILITY/AUTHORITY POLICIES AND
PROCEDURES PROPOSED CARPARK
Oo 0 PROPOSED STRUCTURAL ELEMENTS - REFER
oOo g TO STRUCTURAL DRAWINGS FOR DETAILS
sw—————_ PROPOSED STORMWATER PIPE
LOT BOUNDARY ——
EXISTING FOOTPATH PROPOSED DETENTION AREA FOR MINOR FLOW
GIRRAWEEN COURT |
aA |
R.L. 32.5 |
EXISTING SURFACE |
DATUM RL. 32.0 |
SECTION
VER SCALE 1:10(A1) \ = _/
HOR SCALE 1:100 (A1)
MAINTAINING PERMEABILITY OF SITE SOILS OVERLAND FLOW AND STORMWATER DISCHARGE
THE CONTRACTOR MUST READ AND BE FAMILIAR WITH THE STORMWATER MANAGEMENT PLAN (BLIGH . _ THE SITE SEEKS TO AVOID THE GENERATION OF STORMWATER RUNOFF BY AVOIDING, TO THE EXTENT
TANNER PTY LTD, SITE BASED STORMWATER MANAGEMENT PLAN, JOB NO. 2012.167.600, 8 AUGUST PRACTICABLE, ANY GROUND LEVEL IMPERVIOUS AREAS.
2012), WHICH CONTAINS IMPORTANT INFORMATION ON THE PURPOSE AND INTENT OF THE 2. | THE OCCURRENCES AND MAGNITUDE OF SURFACE RUNOFF EVENTS FROM THE SITE ARE REDUCED
STORMWATER MANAGEMENT STRATEGY FOR THE SITE. AS A RESULT OF RETENTION OF PERVIOUS SURFACES, AND THE DETENTION, INFILTRATION AND
2. PRIOR TO WORKS COMMENCING, CONTRACTOR MUST UNDERTAKE INFILTRATION RATE TESTING IN REUSE OF RUNOFF.
ACCORDANCE WITH AS1547-200, APPENDIX 4.1F. AT 8 LOCATIONS ACROSS THE WORKS SITE, AT 3. PREDEVELOPMENT SURFACE RUNOFF IS ESTIMATED AT 1.8 ML/YR, REDUCING TO 1.3 MLIYR POST
LOCATIONS OUTSIDE THE BUILDING ENVELOPES AND NOT WITHIN THE VEGETATION PROTECTION DEVELOPMENT. PEAK DISCHARGE IS EXPECTED TO REDUCE FROM 270 L/S TO 220 L/S.
ZONES. POST-CONSTRUCTION INFILTRATION RATE TESTS ARE TO BE UNDERTAKEN AT THOSE 4. THESE ESTIMATES ARE CONSERVATIVE AS THEY DO NOT ACCOUNT FOR THE LANDSCAPE
LOCATIONS, AND RESULTS ARE TO BE WITHIN 25% OF EXISTING RATES. RESULTS ARE TO BE DEPRESSION AT THE FRONT OF THE SITE.
SUBMITTED TO THE SUPERINTENDENT. 5. SHEET FLOW ACROSS THE FOOTPATH IN THE LOT FRONTAGE IS EXPECTED TO BE RARE AND OF
3. THE NATURAL INFILTRATION RATE OF THE SITE IS TO BE MAINTAINED IN ALL LOCATIONS. THIS IS SHORT DURATION, AS THE SITE SOILS HAVE AN INFILTRATION RATE OF 170 MM/HR WHICH IS GREATER
IMPORTANT TO SUPPORT THE STORMWATER MANAGEMENT STRATEGY FOR THE SITE. THE ONLY THAN THE 100YR ARI 26 MIN RAINFALL INTENSITY OF 163 MM/HR. FOR A FLOW OF 220 L/S, THE FLOW
EXCEPTIONS TO THIS ARE: DEPTH SHOULD TO NOT EXCEED A DEPTH OF 0.05 M, VELOCITY OF 0.3 M/S OR VELOCITY DEPTH
Ook a. BUILDING FOOTINGS PRODUCT OF 0.01 M/S. BASED ON QUDM2013, THE LIKELIHOOD OF THIS IS CONSIDERED ‘POSSIBLE’
La m /’ b. BUILDINGS WHICH ARE SLAB-ON GROUND CONSTRUCTION. AND THE CONSEQUENCE IS CONSIDERED ‘VERY MINOR’, LEADING TO A LOW RISK RATING. THE RISK
| 26K 4, c. THE CONCRETE CROSSOVER AND THE DISABLED CAPRPARKING BAY AND ITS CONCRETE WILL BE LOWER THAN EXISTING CONDITIONS.
PHS % ato of Y SURROUND WHICH WILL HAVE IMPERMEABLE SURFACES. 6. THE REQUIREMENT FOR A LAWFUL POINT OF DISCHARGE IS MET BY AVOIDING ANY INCREASE IN
be PERMEABLE > = / 4. THE CONTRACTOR IS TO SUBMIT DETAILED WORK METHOD STATEMENTS TO THE SUPERINTENDENT STORMWATER DISCHARGE, AND ALLOWING ANY OVERLAND FLOWS TO PASS ACROSS THE
CARPARK A206 Wy) FOR APPROVAL THAT CLEARLY DOCUMENT HOW THE INFILTRATION RATE OF SITE SOILS WILL BE ALLOTMENT FRONTAGE AS SHEET FLOW INTO THE ROAD RESERVE AS IT DOES IN ITS CURRENT,
NH 722 7 PRESERVED. THIS WILL INCLUDE DETAILS ABOUT: UNDEVELOPED STATE. NO FORMAL CONNECTION TO THE PIPED DRAINAGE SYSTEM, NOR KERB AND
ESR ae 2/4 a. HOW THE SITE WILL BE ACCESSED AND HOW POTENTIAL COMPACTION FROM VEHICLE AND CHANNEL DRAINAGE SYSTEM, IS NECESSARY.
Reo G oS F/, PLANT MOVEMENT WILL BE MANAGED
wa k Lo / b. HOW THE INFILTRATION SYSTEMS BENEATH BUILDINGS WILL BE CONSTRUCTED, AND
| | Qo) PROTECTED FROM CONSTRUCTION DEBRIS
EXISTING DEPRESSION | zEeZ c. HOW LIQUID, SLURRY AND FINE PARTICULAR MATERIALS WILL BE HANDLED
: | =56 d. RECTIFICATION MEASURES TO RESTORE PRE-DEVELOPMENT INFILTRATION RATES WHERE
TO BE MAINTAINED ; : * en aeS NECESSARY
ne EE: Eo m = ;
py | , PERMEABLE 14 B
\ | : U
900x900 FIELD INLET PIT (REFER TO ACCESS ROAD Oo om
Pee tO Be CONE IRNED ON Site 5 Sat See , << PROPOSED STRUCTURAL ELEMENT -
— / REFER TO STRUCTURAL DRAWINGS
ENSURE CAPTURE OF ANY FLOWS THAT FOR DETAILS
MAY EXIT SITE. APPROX $.L32.403 __|
we lob
EXISTING SERVICES TO BE LOCATED 1IN2 '
PRIOR TO WORKS COMMENCING AND __ \ BATTER MAX SOAKAGE PIT AREA'S
DESIGN LEVELS AND ALIGNMENT OF _—=—~ - - PROPOSED ROOF] MIN REQUIRED SOAKAGE
STORMWATER PIPE TO BE CONFIRMED BUILDING NAME AREA(m?) AREA\(m?) (MIN 10%)
WITH SUPERINTENDENT °
NT ye
@225 RCP cuss 2 RETREAT a7 a7 NOTE
4. THIS DRAWING TO BE READ IN CONJUNCTION
oo ee AMENITIES 69 6.9 WITH STANDARD NOTES ON C001
D.S.LL 31.360 EXISTING FOOTPATHTO KNOWLEDGE 209 992 2. THIS DRAWING TO BE READ IN CONJUNCTION
y BE REINSTATED TO SCRC oO , WITH ALL OTHER CONSULTANTS DRAWINGS
STANDARDS, ONCE Lr SOUND 95 9.5
STORMWATER PIPE LAID wt ——————— eee
32.75 ___STORMWATER PIPE LAI == / . EAT 100 10 SCALE110 0 01 02 03 04m
——————— eee
—__— NO FILTER CLOTH TO L_ GRAVEL DRAINAGE - TO BE 2-5mm SUPPORT 221 22.1
— _ ~ GIRRAWEEN Coun! RT | BE USED TO BASE OR CLEAN, WASHED NO FINES GRAVEL SCALE 1:25 0 500 000mm
ap ee COVERED WALKWAY 169 16.9 LLiptiviirity
gze oe ee eo SIDES OF TRENCH SCALEMI00 0 423 in
FFA. ”)0|.lUCOt™ CREATE 351 35.1 Lp ty
TYPICAL DRAINAGE TRENCH SECTION
SCALE 1:200 0 2 4 6 8m
SCALE 1:25 |
REV DATE DESCRIPTION DESIGN DRAWN CHECKED APPROVED RPEQ PROJECT DRAWING TITLE SCALES
0 09-10-2013 CONSTRUCTION ISSUE PS PS CR CR NOOSA FLC STORMWATER LAYOUT PLAN 1:250 @ At
CONSULTING ENGINEERS
Le LOCATION 2 GIRRAWEEN COURT, SUNSHINE BEACH, QLD | *®CHITECT JOB NO
FULTON TROTTER 2012.164.200
LEVEL 9, 269 WICKHAM STREET, PO BOX 612
FORTITUDE VALLEY QLD 4006 AUSTRALIA CLIENT ASSOCIATE CONSULTANT DRAWING NO REVISION
T 07 32518555 —_- F 07 3251 8599 FULTON TROTTER C400 0
ALL RIGHTS RESERVED. THIS WORK IS COPYRIGHT AND CANNOT BE REPRODUCED IN ANY FORM OR BY ANY MEANS (GRAPHIC, ELECTRICAL OR MECHANICAL, INCLUDING PHOTOCOPYING) WITHOUT THE WRITTEN PERMISSION OF BLIGH TANNER. ANY LICENCE, EXPRESS OR IMPLIED, TO USE THIS DOCUMENT FOR ANY PURPOSE WHATSOEVER IS RESTRICTED TO THE TERMS OF AGREEMENT OR IMPLIED AGREEMENT BETWEEN BLIGH TANNER AND THE INSTRUCTING PARTY
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2012164200_C400_0Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.