Table 7.1: Surveyed Peak Hour Traffic Generation – Keperra TTS
Gen. Rate
Existing
Peak Hour Period (veh / Total Trips Trips IN Trips OUT
Area
100m2 )
Weekday AM 1.76 37 62% 26 38% 16
Weekday PM 2,384 m2 1.47 35 49% 17 51% 18
Saturday AM 3.23 77 49% 38 51% 39
Application of the surveyed generation rates identified in Table 7.1 above to the proposed development results
in the estimated peak hour traffic generation summarised in Table 7.2.
Table 7.2: Estimated Peak Hour Development Traffic Generation
Proposed
Peak Hour Period Gen. Rate Total Trips Trips IN Trips OUT
Area
Weekday AM 1.76 18 62% 11 38% 7
Weekday PM 1,001 m2 1.47 15 49% 7 51% 8
Saturday AM 3.23 32 49% 16 51% 16
7.4.2 Directional Distribution
The directional distribution of above identified additional development traffic is based on the apparent
distribution of traffic to and from the existing Bunnings development as per the traffic movement survey.
The resulting traffic volumes associated with the proposed development are shown in Appendix C.
7.5 Site Accesses Analysis
The existing northern Bunnings site access and the two proposed site accesses have been analysed using SIDRA
9 analysis software for the estimated 10-year design horizon (2034) peak hour volumes with inclusion of the
proposed developments traffic demands. All three site accesses were analysed as a ‘network’ to enable the
potential interaction between the accesses to be modelled and assessed.
Detailed analysis outputs are included in Appendix D and the results are summarised as follows.
7.5.1 Existing Bunnings Northern Access
Table 7.3 summarises the analysis results. The analysis indicates that all movements at the site access would
operate with ample spare capacity and very good performance. Importantly, the 95th queue length on the
right turn into the access would not exceed 1 vehicle. This means that shared use of the right turn lane with
the proposed entry-only access is acceptable and would not adversely impact the performance of either
access.
Site: Hardware & Trade Supplies Development – 178 Eumundi Noosa Rd, Noosaville QLD
Reference: 21BRT0226
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Traffic Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.