Council archive · source document
Attachment D - Traffic Response · MCU22/0051
Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Original PDF page 38, section 1. The text section number identifies this passage in the reader.
ABOVE
DING
BUIL 8500
TROLLEY BAY
NB168
Prime mover and semi-trailer (19 m)
EXISTING BUNNINGS SITE
SUBJECT SITE
RAMP UP
(PROPOSED BULK TRADE YARD)
Prime mover and semi-trailer (19 m)
4.56 %
LANDSCAPED FALL
RAILING FENCE ENCLOSURE
2.28 %
BIO-RETENTION BASIN
CUSTOMER
ENTRY/EXIT
GATEWA
) Prime mover and semi-trailer (19 m)
iler (19 m
er and semi-tra
Prime mov
E
IV
DR
AY
EW
G AT
DIRECTOR
DAVID GRUMMITT RPEQ 19356
APPROVED 8 Mar 2023
SCALE PROJECT PROJECT NUMBER ORIGINAL SIZE
0 5 10 15 20 25m
TTM CONSULTING PTY LTD BUNNINGS NOOSAVILLE - BULK TRADE YARD 21BRT0226 A3
ABN 65 010 868 621 DRAWING TITLE DRAWING NUMBER REVISION
SCALE 1:500 AT ORIGINAL SIZE
LEVEL 8, 369 Ann Street, BRISBANE QLD 4000
NORTH CLIENT P.O. BOX 12015, BRISBANE QLD 4003 21BRT0226-03 B
EXTERNAL ROAD WORKS & VEHICULAR SITE ACCESS
B 08-03-23 UPDATED DEVELOPMENT PLAN DG DG DG
BUNNINGS GROUP LTD T: (07) 3327 9500 F: (07) 3327 9501 VEHICLE SWEPT PATH ANALYSIS - 19m ARTICULATED VEHICLE DATE SHEET
A 16-03-22 ORIGINAL ISSUE DG DG DG E: [email protected] W: www.ttmgroup.com.au 8 Mar 2023 2 OF 3
REV. DATE AMENDMENT DESCRIPTION DRAWN CHECKED APPROVED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment D - Traffic Response.pdfRelated documentApplication case desk ↗
About this file
- File size
- 15.0 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.