Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Attachment D - Traffic Response · MCU22/0051

of 86

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (15.0 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Original PDF page 55, section 1. The text section number identifies this passage in the reader.

MOVEMENT SUMMARY
     Site: 9 [S2_SAT (Site Folder: 2034 Project Case)]                                      Network: N101 [2034 SAT
                                                                                           (Network Folder: General)]
Gateway Drive / Proposed Entry Site Access
2034 Saturday Peak Hour (1000-1100)
Site Category: (None)
Give-Way (Two-Way)


 Vehicle Movement Performance
 Mov   Turn     DEMAND     ARRIVAL          Deg.     Aver. Level of      95% BACK OF        Prop. Effective Aver. No. Aver.
 ID              FLOWS      FLOWS           Satn     Delay Service          QUEUE            Que      Stop Cycles Speed
             [ Total HV ] [ Total HV ]                                  [ Veh.  Dist ]                Rate
             veh/h      % veh/h %            v/c       sec                veh     m                                   km/h
 South: Gateway Drive (S)
 2      T1      168    4.0    168 4.0      0.086       0.0   LOS A       0.0       0.0       0.00      0.00     0.00    60.0
 3      R2      15     10.0   15 10.0      0.010       2.4   LOS A       0.0       0.3       0.29      0.46     0.29    51.3
 Approach       183    4.5    183 4.5      0.086       0.2      NA       0.0       0.3       0.02      0.04     0.02    53.2

 North: Gateway Drive (N)
 7      L2       2     10.0    2   10.0    0.089       2.7   LOS A       0.0       0.0       0.00      0.01     0.00    56.0
 8      T1      175    2.0    175 2.0      0.089       0.0   LOS A       0.0       0.0       0.00      0.01     0.00    59.0
 Approach       177    2.1    177 2.1      0.089       0.0      NA       0.0       0.0       0.00      0.01     0.00    58.4

 All Vehicles   360    3.3    360 3.3      0.089       0.1      NA       0.0       0.3       0.01      0.02     0.01    55.1
Site Level of Service (LOS) Method: Delay (SIDRA). Site LOS Method is specified in the Network Data dialog (Network tab).
Vehicle movement LOS values are based on average delay per movement.
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is
not a good LOS measure due to zero delays associated with major road movements.
Delay Model: SIDRA Standard (Geometric Delay is included).
Gap-Acceptance Capacity: SIDRA Standard (Akçelik M3D).
HV (%) values are calculated for All Movement Classes of All Heavy Vehicle Model Designation.



SIDRA INTERSECTION 9.0 | Copyright © 2000-2020 Akcelik and Associates Pty Ltd | sidrasolutions.com
Organisation: TTM CONSULTING PTY LTD | Licence: NETWORK / Enterprise | Processed: Wednesday, 8 March 2023 9:06:04 PM
Project: L:\Synergy\Projects\21BRT\21BRT0226 Bunnings Noosaville\6 - Analysis\2-RFI\21BRT0226_SA01_C.sip9

Used in these records

About this file

File size
15.0 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment D - Traffic Response.pdf · 15.0 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.