LATE RFI Attachment 1 - Amended Proposal Plans
Original PDF page 3, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn50"
Drainage = 41.6 %
150mm high Conc Kerb
Pit STAFF STAFF Roof Outline Over Hatched area indicated Therefore, the proposed development will have a 35.4 %
reduction (650 M2 of impermeable area less than the existing
STAFF
36.19M, 262 ° 01' Bike Rail
upper level Plant Room
4100 11200 site) in overall site stormwater discharge due to the proposed
roofed area.
Disabled
Bin Area
underground 2 No. 20,000L Stormwater retention tanks and
OPAL STREET
Wash Bay 1
3000
WC AUTO BAY large roofed area connecting into these tanks.
Existing Silt Pit 12,000 MIN
ENTRY Painted lines define extent # "Effective Site Area"- the overall site area excluding the
DIAMOND LANE
2 x Stop Holding Tank
Valves of waiting car parks or traffic Council 'Road' dedication area and 'Footpath' allocation.
9200 10250
lane markings, typical.
* All site areas listed with an " * " are based on the Effective
Roof Outline Over
(BITUMEN SEALED ROAD)
1800 2700 Directional arrows & text depicts Site Area as described above.
Existing Spoon Drain
MIN traffic flow for vehicles entering
2400
1985
New Sewer $
This figure represents the actual contributory Effective
the various car wash areas. S
9250
Man Hole Site Area that will be discharged from the site (ie: only the
Roof Outline Over
2000 driveway hardstand area) since all roofed areas will be
B Road
Site Boundary
connected to the oversized (double capacity) underground
Roof Outline Over 7 Wash Bay 2 Widening water tanks and this rainwater will be used in the car
Drainage Shaded area indicates washing process. Therefore this rainwater cannot enter
Silt Pit extent of the Car Wash into the Stormwater system and hence it is excluded from
Pit
main building roofed areas. all Stormwater calculations and the Post Development
4900 17000 impervious contributory area. This represents an ~35%
2300 11200 3500 improvement (reduction) in site stormwater discharge
EXIT Drainage Post-development.
Pit Dog Dog
17490
6250 Wash 1 Wash 2 E
Driveway
Dog Wash Unit
15000 1000
Existing Edge of Bitum
ENTRY ONLY
1000
Super Bay 1
Strip Drain
Roof Outline Over
Landscaping
Roof Outline Over
7500
New driveway to be installed as per Council
Standard Drawings for Commercial driveway. Silt Pit
K erb
igh Conc
New Sewer 150 mm h
en
S
Road Centreline
Man Hole
Standard approved "No Entry" sign to face
NO ENTRY
roadway, with "Exit" Sign to face carwash.
Signs to be placed on the same sign post
12450
Driveway each side of the driveway.
LEFT TURN
ONLY
Roof Outline Over
2.1M high Colorbond or
Existing Table Drain
A Drainage
timber slat Fence & 7 Pit
Shaded areas indicates site
700
Super Bay 2
Roof Outline Over
Swing Gates to Bin Area.
Landscaping.
0
Drainage
Connect to existing STW Pit Drainage
Pit Silt Pit
pipe via new Access
5800
Chamber Pit in Existing Drainage
Water Shaded area indicates approx. Pit
accordance with Council Bin Area Landscaping extent of retaining wall.
Meter
Standard drawings.
W 150mm high Conc Kerb
Existing STW Spel Basin- Stormwater 1200
1200
1200 Landscaping
Side Entry Pit Quality Treatment Area
New 2.0M MIN wide E
Existing Sewer Conc Footpath- in 150mm high Conc Kerb
Man Hole- TBC Shaded area indicates approx.
accordance with
PROPOSED
2000
2000
SW Pedestrian Link Footpath extent of retaining wall.
Council standard
Existing STW
STW Junction Pit details
Existing
TP 108.32 Telecom
Pit Existing Brick Fence ~1.5M high Site Boundary 50.286M, 171° 59' Existing Brick Fence ~1.5M high Existing Brick Fence ~1.5M high
Existing
Sign 16300 19400 ~14600
CAR WASH
Existing Spoon Drain
Bitumen Car Parking
Existing
STW
Kerb
Existing
Light Pole
No. 5 Existing
Light Pole
LAYOUT PLAN
Adaptor
LOT 2 ON SP 248165
SCALE 1 : 100
Building roof lines updated & extended. Take-away outlet window/doors, © TMC Building Design Group 2023
E dimensions, Site Areas & Drainage pits updated. Additional Reclaim Pit added. 10-05-2023 © Design Copyright
External Footpath updated to be 2.0M MIN wide in Opal + Elm Street.
ISSUED FOR PLANNING APPROVAL AT: 34 (LOT 4, 5 & 6) ELM STREET,
D Issued For DA Planning Approval 29-9-2022
These drawings may not be copied in whole
PROPOSED CAR WASH +
NORTH
or in part without the written consent of TMC
COOROY, QLD, 4563
C Issued For Noosa Council Pre-Lodgement Meeting 2 5-07-2021 Building Design Group. Any changes
proposed by the Client, Council or the
NOT TO BE USED FOR CONSTRUCTION PURPOSES
TAKE AWAY FOOD & See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.