LATE RFI Attachment 1 - Amended Proposal Plans
Original PDF page 11, section 2. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn9.0
10
TEL
verify locations of services before commencement of work. The
FSL 109.85
FSL 109.80
FSL 109.85
TP
Existing Recalim Pit A Recalim Pit B1 B
0
GWD GWD GWD Builder/Contractor shall not work near these services without personal
Seating Area Vac Bay 1
ESWD
Power + GWD GWD GWD GWD GWD GWD GWD GWD
FS
FS GWD GWD GWD GWD GWD GWD GWD GWD
ES
L1 supervision or the written permission of the Relevant Authority.
L
Light Pole
10
09
TEL
.05 1
9.8
9.6
Existing STW 9. All pipes laid underground in landscaped areas are to be a MIN of 400mm
10
GWD
GWD
2,000 Litre Silt Pit
0
EW
Side Entry Pit 6
9.9 to the invert level & shall be MIN 100mm Ø UNO.
10
GWD
ES
Silt Pit RL Top: 109.75
GWD
10. Water service pipework sizes shown as nominal bore. Any alternatives
TEL
STW
ESWD ESWD P.S. Pre cast concrete silt pit complete .89 7
GWD
Existing STW
GWD
10
9 9.9 used must be equal or exceed those shown.
Junction Pit with H.D. grated cover. 10
11. The Builder is to ensure that all services Contractors co-ordinate together
GWD
Vac Island
ES
GWD
TEL
TP 108.99 FS before commencing to determine the correct construction sequence.
ESWD
2 L
EW
GWD
GWD
8.9 10 12. The Contractor is to provide 'As Constructed' documents to the
Existing 10 9.0
5
GWD
E
ES
Elec Pit Superintendent on completion of the contract.
TEL
13. The Contractor shall allow for the supply of all labour, materials & plant
TP GWD
GWD
GWD
.0 0
5
9.7
E
ESWD
09
necessary for the installation, testing & commissioning of the works as
10
L1
W
Recalim Pit C Recalim Pit B2
ES
C
FSL 109.85
FSL 109.80
FSL 109.85
TEL
FS R
Existing Elec
Auto Bay 2 described on the drawings & in the specification. The works shall be
GWD GWD GWD GWD
Vac Bay 2
EW
Substation
D
GWD GWD GWD W
complete with full allowance for all minor & incidental items required
Take
W
C
R
G
FS
Existing B3 conc kerb though not specifically mentioned or detailed. The Contractor shall also
ES
L1
ESWD
Existing Away 2,000 Litre Silt Pit
RCW
09
Existing aallow for all work required to make good.
.50
.75 Telecom
.68
W
10 Silt Pit RL Top: 109.75
Phone Food & Drink
C
8.6 See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.