Attachment F - Engineering Package · MCU22/0171
8 6.0 STORMWATER AND DRAINAGE 6.1 Lawful Point of Discharge The development does not propose to significantly alter the existing site drainage arrangements. Roof catchments and surface runoff will report to an internal network of pipes discharging to kerb and channel in Gympie Tce. A small portion of the site will discharge to the rear as surface runoff but this will be minimal. Both scenarios offer a lawful point of discharge. 6.2 Stormwater Quantity The proposed development does not increase impervious areas from that of the previous developed site and is therefore not expected to generate an increase in peak flows. The site is serviced by kerb and channel and an underground stormwater network in close proximity to the site. It is not considered that on site detention of stormwater be a requirement accordingly. The site is also located at the bottom of a wider catchment and any detention of peak flows would likely cause discharge from the site to coincide with flows from higher in the catchment. 6.3 Stormwater Quality and Reuse Noosa Plan 2020 9.4.8 Water Quality and Drainage Code AO6.2 suggests that the development is required to meet water quality objectives. State Planning Policy Appendix 2 Table B however excluded sites with areas of less than 2500m2. As such no stormwater quality devices (biofiltration or similar) are proposed. However, if it is determined that water quality treatment is a requirement, there is sufficient space within the front landscaped area to install a conventional biofiltration basin (1.5% catchment). There is adequate level differential between the existing kerb invert and proposed internal surface levels to provide for extended detention and depth of filter media should this be a requirement. This could be explored further as part of a future Operational Works development application. Noosa Plan 2020 9.4.6 Sustainable Building Code AO2.1 determines that a minimum 3kL rainwater storage be provided for each dwelling for reuse. Rainwater tank location is not currently shown on the Engineering Drawings, however sufficient space exists within the front driveway and parking area to install underground tanks as required. Further details will be provided as part of a future Operational Works development application. 7.0 CONCLUSION Based on all the information available it is considered that the proposed Dual Occupancy development at 128 Gympie Tce Noosaville can be readily undertaken with no significant engineering constraints. The proposal achieves general compliance with The Noosa Plan 2020 and other relevant standards and codes and is recommended for approval.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment F - Engineering Package.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.