Original source · versioned page text
2020-01-16 OM Agenda - Item 1 - Attachment 1 - Draft SEQ Koala Conservation Strategy 2019-2024
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
DRAFT South East Queensland Koala Conservation Strategy 2019–2024
A new code in the State Development Assessment mapping on their property to ensure developed areas
Provisions will be introduced to provide the criteria and water courses are excluded from the final map.
for assessing clearing of koala habitat areas that
A map amendment process will be provided to enable
are:
landholders to apply to have the map amended where
• outside of KPA anomalies exist. Unlike the previous process where
• for an extractive industry in a key resource area map amendments can only occur in conjunction with a
in a KPA. development application, map amendments can occur
at any time.
Updating the mapping and amending errors
The new koala habitat model provides for robust an
The new koala habitat model uses regional
repeatable analysis, allowing mapping to be updated on
ecosystem and high-value regrowth mapping
an annual basis. This will translate into more frequent
provided by the Queensland Herbarium.
updates of the koala conservation map.
Although the new koala habitat mapping is based
Locally refined koala habitat areas will be included
on the best available data, there may be some
in the new koala habitat map for a transitional period
circumstances where the mapping incorrectly
of two years, during which time the Queensland
identifies koala habitat. The Queensland
Government will work with local governments to
Government is encouraging landholders to validate
consider local biodiversity protections.
Proposed planning framework for areas mapped as a KPA:
Changes to: Existing provisions Proposed provisions
Types of controls for Koala assessable development areas/ Koala priority areas
koala habitat priority koala assessable development areas
Affect Contain planning controls (some SEQ local Contain planning controls (only
governments have PKADA/KADAs) Toowoomba has no KPA)
What’s prohibited Urban activity in non-urban area (open Clearing koala habitat
space, conservation zones, etc.)
What’s assessable Clearing koala habitat Development that would not result in
clearing of koala habitat areas
Assessment Local governments conduct development Local governments conduct development
assessment, in line with state and local assessment in line with new benchmarks
planning regulation within the Planning Regulation (develop-
ment not resulting in clearing only)
Offset recipient Local government Not applicable; clearing of koala habitat
areas prohibited
Proposed planning framework for areas outside of a KPA:
Changes to: Until 2019 Commencing in 2019
Types of controls for No specific koala habitat protection; general Specific controls for clearing koala
koala habitat controls for clearing habitat regardless of habitat
species
Assessment Local governments conduct development The state government conducts
assessment, the state considers impacts on development assessment in line with
Matters of State Environmental Significance updated State Development Assessment
only Provisions
Assessment framework Local government: avoid, minimise Avoid, minimise, offset
state: avoid, minimise, offset
Where the land is not a koala habitat area, no koala conservation controls are proposed to apply.
Page 19 |
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.