Original source · versioned page text
OPW14/0197 Approved Plans Part 1 (7317 & PF)
The original of this document is very large (13.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn -
NOOSA COUNCIL
APPROVED PLANS
OPW14/0197 3 OCT 2014
[OCR of page images]
Doonella Noosa - Stages CI-CG
loosay | a GM P-caerties Ply Lid yiWork 1g Fi as4uteCADIL - Landscape:7317 L Vegetation Clearing Management Plan.dwg
@ 7317 Beckmans Read, N
ege
| an x
TREE TO BE REMOVED:
Trees to be removed to
allow for earthworks.
services and allotment
construction
TREE TO BE RETAINED:
Trees exlernal lo sile
baundary to be retained
Adjoins drawing 7317 L 05
(04, Vegetation Clearing & Management Plan
Scale 1:200 @ At
INDICATIVE STOCKPILES:
Locations lo be conlirmed al
Council Pre-Star, mesting.
Locations lo be determined
based on proximity to open spacey,
2h for future uses
tation Clearing & Fauna Management Plan
m=
* TSS ae = An
oe Se
Chey
oN
im
TREE TO BE REMOVED:
Trees to be removed to
allow for earthworks,
services and allolnent
constr
io)
re eae
Ai
Ss
TREE TO BE REMOVED:
Trees lo be removed wilhin
open space areas due to
‘stormwater infrastructure
.
yo
i
ction
age ae
ee i Nee
Reig ee Nie
re
pee
‘ |\\ “SS c: NOUN ;
7 Trees lo be removed within
7 open space areas due to
Uf
7
/
/ fi
ce
l
eS]
NOTES:
1 drawings proviciod
ing Engineers
FARTHWORKS Fill:
Refer to Fngineering drawings provided
oy Browns Consulting Enninesrs
INDICATIVE STOCKPILES:
Lonetions to be cantirmed at Council
Pra-Start meat nq
VEHICLE ACCESS POINTS:
Locations to be confirmed at Counsil
Pra-Start mest ng
SERVICES
SEWER:
t—- Conf mm with Surveyors, DBYD. and
Engi
8
ps ors, DBYD, an
kr
s ITE CONTOURS:
Refer si yawings fa deal
ROADS AND SERVICES:
Refer Frginnerirg drawings for detail
Fngineers and/ or clearing contrartors to
prepare sediment and erosion coniral
measures to cnsurc no movement of matorial
off site and minimal movernent or sile.
Refer to Existing Tree Plot Schedule provided
by RPS Group for detailed list of trees
including number, Botanical name, girth,
spread. height and determination of removal,
investigation or retention.
STAGE BOUNDARY:
Engineers
TREE TO BE REMOVED:
stormwater infrastructure
/
Installed to areas in accordance with
Public Open Space Management Plan.
Refer datail for specifications.
----- LjeZ_
As provided by
Browns Consulting
NOOSA COUNCIL
APPROVED PLANS
OPW14/0197 3 OCT 2014
o sa unders Saunders Havill Group Pty Utd ASN 24144 972 949
h ill . addrece 9 Thompson St Bowen Hills 0 4006
avi phone (Q7) 3251 3444 «mall [email protected]
‘Company ‘company
@ surveying @ town planning # urban design # environmental management # landscape architecture me es:
group
web wwnw.saundershavillcom fax (07) 3251 9455
CLIEN I: @landscape architecture
QM Properties DRAWING:
Clearing & Fauna Management
PROJEGT:
Doonella Noosa Plan (Sheet 4)
Stages C168 DATE: June 14 CHECKED: TL
Beale o 25 °2 5m GUENI Reb: 7317 DRAWN: FW.
1:250G@)A1
1500003 bee} foenwnene: 7317 L 06 CFMP B
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.