L.11                   WATER QUALITY AND DRAINAGE CODE
 Performance Outcomes                         Acceptable Outcomes                Response

 General Requirements

 Stormwater drainage design

 PO1                                          AO1                                AO1 Complies

 The development and its                      A stormwater management plan       Refer to Appendix F & G for
 stormwater management system                 is prepared consistent with PSP6   further detail.
 is planned and designed having               Engineering Design Standards -
 regard to:                                   Roads, drainage and earthworks.

     a) the natural features of the
        site;
     b) the need to avoid impacts
        and potential risks to
        ecologically important
        areas;
     c) the likely effectiveness of
        erosion and sediment
        control and stormwater
        drainage measures during
        rainfall events during and
        post construction; and
     d) the need to protect
        environmental values and
        water quality of receiving
        waters both during and
        post construction.

PO2                                           AO2.1                              AO2.1 Complies

 Stormwater drainage                          Stormwater drainage planning,      Refer to Appendix F & G for
 infrastructure is planned,                   design and construction is in      further detail.
 designed and constructed to:                 accordance with PSP6
                                              Engineering Design Standards -
      a) incorporate allowance for
                                              Roads, drainage and earthworks
         increased flood risk and
                                              and the latest version of the
         tidal inundation through
                                              Queensland Urban Drainage
         pipework as a result of
                                              Design Manual.
         cilmate change and sea
         level rise;                          AO2.2                              AO2.2 Complies
      b) ensure the development
         is adequately drained;               The stormwater drainage system     Refer to Appendix F & G for
         and                                  connects to a lawful point of      further detail.
      c) ensure stormwater is                 discharge in accordance with
         managed and lawfully                 PSP6 Engineering Design
         discharged without                   Standards - Roads, drainage and
         altering stormwater                  earthworks.




URBIS
FINAL TOWN PLANNING REPORT - 47 GOODCHAP STREET                                                                  115
                                                                                   PLANNING SCHEME CODE ASSESSMENT

Log in to download the original (Appendix L - Code Assessment.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.