Referral Agency Response - Planning RAP25/0002
Revetment Wall / Flood Storage
10. All works within the 4.5m setback from the revetment wall must be carried out generally
in accordance with Linday Consulting’s Operational Works Flood Storage Calcs (24-
0346-C12 and C13, Rev. B) dated 13 August 2024.
11. All works for the purpose of increasing available flood storage must be located within
the 4.5m setback from the revetment wall.
12. Certification of the completed works within the 4.5m setback from the revetment wall
must be submitted to Council within 3 months of the completion of the works. The
certification must be prepared by a RPEQ (Registered Professional Engineer of
Queensland) and state that the works:
a. have not reduced the amount of available flood storage within the 4.5m setback from
the revetment wall;
b. have not negatively impacted the stability of the revetment wall or negatively
impacted the associated membrane;
c. have not reduced the available flood storage within the lot from the profile as
described in The Noosa Plan 2020 – Low Density Residential Zone Code; and
d. meet the relevant conditions of this approval.
Damage to Services and Assets
13. All structures must have no detrimental effects on stormwater drains and/or easements.
14. Any damage caused to existing services and assets as a result of the development
works must be repaired at no cost to the asset owner at the following times:
a. where the damage would cause a hazard to pedestrian or vehicle safety,
immediately; or
b. where otherwise, upon completion of the works associated with the development.
Any repair work which proposes to alter the alignment or level of existing services and
assets must first be referred to the relevant service authority for approval.
5. REASONS FOR REFERRAL AGENCY’S DECISION
The proposal is subject to specific built form parameters outlined in The Noosa Plan (25
September 2020).
6. REFERENCE DOCUMENT
Plan No. Rev. Plan/Document Name Date
24-0346- B Operational Works Bulk Earthworks 13 August 2024
C4
Prepared by Lindsay Consulting
24-0346- B Operational Works Flood Storage Calcs 13 August 2024
C12
Prepared by Lindsay Consulting
24-0346- B Operational Works Flood Storage Calcs 13 August 2024
C13
Prepared by Lindsay Consulting
Page 4 of 5
Document Set ID: 23674310
Version: 3, Version Date: 04/04/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Referral Agency Response - Planning RAP25/0002Related documentApplication case desk ↗
About this file
- File size
- 108 KB (small file)
- File type
No other editions are linked here.