Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

Minor Change Attachment 3 Traffic Engineering Advice

of 12

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Traffic Generation
We are of the opinion that the net change in traffic demands as a result of the Proposed Development
will be minor when compared with the traffic impacts previously assessed in the Revised Traffic Report
(September 2019). The Proposed Development traffic demands are also noted to be significantly lower
than traffic generation of the Masters development proposed in the Previous Approval (MCU12/0051).

The Proposed Development is not expected to result in an increase in traffic to the site, compared to the
Revised Traffic Reporting or the Previous Approval.

As part of the Previous Approval, Council specified traffic generation rates to be adopted for the
assessment for the Home Improvement Store and Retail Business (Type 4) Showroom Uses, as
summarised in Table 4. The RTA and/or the RMS Guide to Traffic Generating Developments (GTGD) rates
were adopted for the other proposed on-site uses.

Table 4 Adopted Trip Generation Rates
                           Saturday Noon Thursday PM
          Land Use                                                                                                      Units                 Source
                             Peak Hour    Peak Hour
Home Improvement Store                                                                                     Trips per 100m2 of total           Noosa
                                7.64         3.45
    (Previous Approval)                                                                                            use area                   Council
  Retail Business (Type 4)                                                                                 Trips per 100m2 of total          Specified
                                4.0          2.5
         Showroom                                                                                                  use area                    Rate
  Entertainment (Type 2)
                                                                                                           Trips per 100m2 of total         RTA GTGD
Recreation, amusement &           9           9
                                                                                                                   use area                   2002
            fitness
     Industrial Business
           (Type 2)                                                                                        Trips per 100m2 of total         RMS GTGD
                                0.52         0.56
      Business Park and                                                                                            use area                   2013
       Industrial Uses
   Commercial Business                                                                                     Trips per 100m2 of total         RMS GTGD
                                  -          1.2
       (Type 1) Office                                                                                             use area                   2013
 Entertainment and Dining
          Business                                                                                         Trips per 100m2 of total         RTA GTGD
                                  5           5
 (Type 1) Food & Beverage                                                                                          use area                   2002
      Café / Restaurant


The office uses on-site are not expected to generate significant peak hour vehicle trips on the weekend.
The adopted office use weekday PM generation rate is consistent with both the GTGD and traffic
generation data compiled by DTMR (Traffic Generation Data – 2006-2018).

The food uses on-site are expected to provide an ancillary function and therefore are not expected to
generate significant vehicle trips during the adjacent road peaks, the adopted rate is sourced from the
RTA GTGD rates for café / restaurant uses.

For the industrial uses, we conservatively adopted the weekday AM peak generation as outlined in RMS
GTGD rates for the Saturday Noon peak hour.




\\FILE\Projects\BLU0517\01\3. Deliverables\2. Letters\2.MinorChange\MinorChange2019_20 Hofmann Drive, Noosaville.docx   Cambray Consulting Pty Ltd | Page 6
Log in to download the original file

Minor Change Attachment 3 Traffic Engineering Advice.pdf · 1.6 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.