@ Page 2 Item 4: Please provide preliminary stormwater design demonstrating the collection and discharge of stormwater not result in a net increase in stormwater runoff from the site. Should the design utilise council's stormwater drainage facility near the southeast comer of the site, please provide evidence from a suitable qualified person that the facility has the capacity to cater for any additional stormwater. Applicant's Response to Item 1: A preliminary stormwater plan prepared by SCG Consulting Engineers is attached. The supply of this additional information completes the applicant's response to Council's above request for additional information in relation to this development application. It is requested that the Sunshine Coast Regiona! Council completes its assessment of the above application as soon as possible now that the decision making period has commenced under the integrated Planning Act 1997, Yours sincerely ACO FOW Nadine Gorton Senior Planner martoo consulting pty. Itd. Enclosed: Andrew Bock Architecture Plans numbered - D08, F041, F02, F03, F04, FO5, F06 - 4 Copies SCG Preliminary Stormwater Design- DA D03 - 4 copies
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/1867 - Response to Information Request [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.0 MB (small file)
- File type
No other editions are linked here.