OPW16/0101 - Delegated Report

of 1

Text shows just the words. Original shows the document exactly as it was published.

1.	APPLICATION DETAILS

Application No:	OPW16/0101
Street Address:	28 Mossman Ct NOOSA HEADS  QLD  4567
Real Property Description:	Lot 150 N 21859
Planning Scheme:	The Noosa Plan (16 September 2013)

2.	DECISION DETAILS

The following type of approval has been issued:

Development Permit for Operational Works (Prescribed Tidal Works)

3.	RELEVANT PERIOD OF APPROVAL

The relevant period for this development approval is 2 years starting the day that this development approval takes effect.

4.	ASSESSMENT MANAGER CONDITIONS

Approved Plans
Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions.
Plan No.	Rev.	Plan/Document Name	Date
MC0416-001	B	Working Drawings Site Plan and Jetty Layout prepared by Grant Upton Building Design	30 May 2016
MC0416-002		Working Drawings Jetty Construction Details prepared by Grant Upton Building Design	April 2016
All structures associated with the jetty must be constructed wholly within the approved area
Structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall or rock wall
Structures must be designed and constructed such that they do not place additional vertical or lateral loads onto the existing revetment wall that may compromise the long term stability and/or durability of the wall.  Upon completion of works, a certification by RPEQ must be provided to Council in this regard.
All structures must have no detrimental effects on stormwater drains and/or easements.
A rigid handrail must be fitted on at least one side of the walkway.
No posts or vertical supports of the proposed jetty are to extend vertically from the structure unless they provide support for the handrail.
No boatlifting devices are to be attached or moored at the jetty structure for the purpose of elevating a vessel above the water without Council approval.
The jetty must be constructed in a manner to render the underside area vermin proof
There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level.
Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting.
The jetty is to be used for private purposes only with no commercial operations to be undertaken.
Boat repair activities are not permitted on site.
Wastewater and sullage must only be disposed of at approved pumpout facilities.
The mooring facility must not be utilised for live-aboard purposes.
Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009.
Certification by a Registered Professional Engineer of Queensland that states that the jetty is constructed in accordance with best practice methods and is structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works.  A final inspection and approval of the structure by Council’s Inspector is also required.  Please contact Council’s Planning Assessment Section (Development Audit & Response Officer 0428738563) to arrange the inspection.
This approval lapses where the construction of the jetty has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension.
After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans
All necessary State government approvals relating to this development must be obtained prior to any works commencing on the site

5.	REFERRAL AGENCIES

The referral agencies applicable to this application are:
Referral Status	Referral Agency and Address	Referral Trigger	Response

Concurrence	SARA @ DSDIP Mike Ahern Government Building 12 First Avenue MAROOCHYDORE	Schedule 7, Table 2, Item 15 Tidal works or Development in a Coastal Management District	The agency provided its response on 25 May 2016  (Reference No. SDA-0516-030590).  A copy of the response is attached.

6.	ADVISORY NOTES

The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions:

General Advisory Notes
Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works.  A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ.  The RPEQ bears full responsibility for all aspects of the engineering design.  Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent.
The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works.
Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time.
Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Sustainable Planning Act 2009 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees.

Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that:  “A person who carries out an activity must take all reasonable and practicable measures to ensure the activity does not harm Aboriginal cultural heritage.”   It is an offence to fail to comply with the duty of care.  Substantial monetary penalties may apply to individuals or corporations breaching this duty of care.  Injunctions may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to discuss any obligations under the ACH Act.

7.	PROPERTY NOTES

Not Applicable.

8.	PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

Not Applicable.

9.	FURTHER DEVELOPMENT PERMITS REQUIRED

Not Applicable
Note: do not include Plumbing and Drainage Work

10.	SELF ASSESSABLE CODES

Not Applicable.

11.	SUBMISSIONS

Not Applicable.

12.	REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not Applicable.

13.	RIGHTS OF APPEAL

You are entitled to appeal against this decision.  A copy of the relevant appeal provisions from the Sustainable Planning Act 2009 is attached.

During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval.  If Council agrees or agrees in part with the representations, a “negotiated decision notice” will be issued.  Only one “negotiated decision notice” may be given.  Taking this step will defer your appeal period, which will commence again from the start the day after you receive a “negotiated decision notice”.

14.	OTHER DETAILS

If you wish to obtain more information about Council’s decision, electronic copies are available on line at www.noosa.qld.gov.au, or at Council Offices.

END OF APPENDIX

Used in these records

About this file

File size
37 KB (small file)
File type
DOCX

No other editions are linked here.

Original file

Log in to download the original file

OPW16_0101 - Delegated Report.docx · 37 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.