Council archive · source document
08/0858 - Approved Plans [As Published] · 142008.858
Plans and drawings: the text below has words only, no drawings.
Fu DUPLEX DEVELOPMENT. HILL STREET, SUNSHINE BEACH. FOR VASTERBY Pty. Ltd. TN DE X., DWG No. DESCRIPTION os11 - LOCALITY PLAN & INDEX 0511 — ALLOTMENT LAYOUT PLAN 0511 - LAYOUT AND ALIGNMENT PLAN O511 — EARTHWORKS PLAN 0511 — STORMWATER DRAINAGE LAYOUT PLAN 0511 — DRIVEWAY-LONGITUDINAL AND CROSS SECTIONS 0511 - STORMWATER DRAINAGE CALCULATION TABLES osi1 - STORMWATER DRAINAGE LONGITUDINAL SECTIONS ost - EROSION AND SEDIMENTATION CONTROL PLAN LOCALITY PLAN Sunshine Coast Regional! Council Development Permit Operational Works No: OE CREE. RECOMMENDED FOR APPROVAL Under no circut y the Plan & Specifications be departed from within the written approval of Council. PLANS APPROVED Date: LIP. LOCE. vcueesacenneceseeneeereeeagaeeageggamansageget Signature: oc cascerenseseneecteneesntectnnactnnnnnnenr eet eet Delegated Authorising Olficer PRELIMINAGY APPROVAL ONLY- NOT FoR contmyttwas LEVEL DATUM: TEMP BENCH MARK ]O€SGNED SEWER MANHOLE LID ox Be OCU DORE GLb ae DUPLEX DEVELOPMENT meee renee | Fae” (07h Sats ons C: HILL STREEy < SUNSHINE. BEACH Od Email: [email protected] Earl Covington & Associates LOCALITY PLAN AND INDEX. 7 ADDITIONAL DRAWINGS eT oo er PRD Da Lf Cxfrl ps OSS [Se Gf BOS. PEW si | Se crecics ceccues pneu a Bit wr 00 maren uo nee nia sor ver DRAMING NUAIGER 0511-01-01 W:\Job Files\051 1\Drawings\0511_rev0_080514.dwg
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 10 pages
Page 2
: Sunshine Coast Regional Council
Development Permi Operationat Works No: LE. BEE
\eodieae FOR APPROVAL
LEVEL DATUM: TEMP BENCH MARK]°S®? rimary, School T
DUPLEX DEVELOPMEN'
CALE C y Phone 5443 for VASTERBY Pty. Ltd.
DESONED 82 Pi SLD ase = I for VASTE! Sie a,
s MANHOLE. LID oro {87} S443 7005 ington & Associates ALLOTMENT LAYOUT =
or RLM ° " re Btoit \[email protected] Earl Covi ig MENT UAT
Si m RL.40.15: <7 Email: 2 os - —
APPROVED: i le Oe Gomer ¢ Rowan pr Go, & Wt Wr
ZL > BFEF | M08 5 ost1 | @ ie e DRAWING
ORIGINAL ISSUE ater poo ee 4 DATE TRMOT i peaae NUMBER
REVISION REDNED, COPED SNOUT AOR,
W:\ob Files\051 1\Drawings\0511_rev0_080514.dwg
Page 3
“
“ PAT. MUL
“4
|S
Development Per
Under
”
LINS PARK.” »
”
rishine Coas Aegional C
no
Signature: ...--
Dele
mit OSrational Works No: .
trom within the writen appr
gated uthorising Officer
No
KX
s
¥
+
PERED. Fit #RA
FVELY TQ, SUIT
a
of
>
PRELIMINARM APPAOTAL onl -
BASEMENT
CARPARK
we
Kae
on
0
TE DRIV SECTION
a
Y
or
—? (OTH vanes 5
.6m—5.5m ©
N.T.S.
CONCRETE NOTES
1.THE SUBGRADE BENEATH THE CONCRETE PAVEMENT
SHALL BE WELL COMPACTED SO AS TO PROVIDE NO
VISIBLE MOVEMENT<WHEN PROOF ROLLED WITH A FULLY
LOADED WATER TRUCK,
2.CONCRETE PAVEMENTS TO BE N32 GRADE WITH F72
MESH.
3.MINIMUM COVER TO BE SQmm,
4.TRANSVERSE CONTRACTION JOINTS SHALL BE PROVIDED AT
A MAXIMUM SPACING OF 12.0m AND ON ONE = SIDE OF
ORAINAGE PITS.
S5.TRANSVERSE CONTROL JOINTS SHALL BE PROVIDED AT A
MAXIMUM SPACING OF 6.0m.
&.THE METHOD OF CONCRETE CURING SHALL GENERALLY BE
IN ACCORDANCE WITH THE REQUIREMENTS OF MRS 11.70
AND SHALL BE APPROVED BY THE SUPERINTENDANT PRIOR
TO CONSTRUCTION COMMENCING.
J.CONCRETE TESTING REQUIREMENTS SHALL GENERALLY BE
(N ACCORDANCE WITH THE REQUIREMENTS OF MRS114.70.
B.LAPS SHALL BE SUCH THAT THE TWO OUTERMOST WIRES
OF ONE SHEET OF FABRIC OVERLAP WITH THE
OUTERMOST WIRE OF THE SHEET BEING OVERLAPPED.
9.LAPPED PORTIONS SHALL BE TIED WITH WIRE AT A
MAXIMUM SPACING OF 500mm.
10.REINFORCEMENT MESH SHALL BE SUPPORTED ON CHAIRS
IN A REGULAR GRID NOT EXCEEDING 1.0m.
CONCRETE THICKNESS TABLE
USE THICKNESS
Residential Access 125
aa Sa Rgsidential 150
Add 15mm _to the above
if CBR < 5
Dowels to be 24mm dig.
Grade 250R estes! bars
450 long ond placed
at 300mm centres,
CONTRACTION JOINT—(CJ
amid LEGEND \ i Scale 1:3
map «EXIST ROWER LINE AND POLE \
ay Ee EXIST TEMSTRA LINE AND PIT
CURVE SETOUT DATA —;—Bte— EXIST SEWER UNE AND SEWERAGE MANHOLE »> Saw cut depth 0.3t
1/2 ANGLE | 1/4 ANGLE | 1/8 ANGLE | 1/16 ANG! wee hg. EXIST WATER aan AND HYDRANT “
DETL] RADIUS ANGLE TANGENT) SECANT| ARC cuoRD OFFSET cHorD OFFSET CHORD OFrser cHoRD OFFSET — - EXIST KERB & CHANNEL 4 N ae ~
1 7.75) 62" 18 3°| 4.68| 1.30] 8.42| 4.01| 1.11 2.08] 0.28! 1.05] 0.07] 0.52| 0.02 s “ .. : _
2__{ 135.00] 5°57" 46"| 4.66| 0.08 9.32| 4.661 0.08] 2.33| 0.02] 1.16] 0.00] 0.58] 0.00 & SURVEY CONTROL STAQON \ < \sced crack
3 4.50| 77 21° 28"| 3.60/ 1.26| 6.07] 2.81] 0.98] 1.49] 0.25] 0.75] 0.06) 0.38) 0.01 a a
4 10,75] #5* 30° 43"| “9.94 "s.89[ 16.04] 7.30] 2.85] 3.92| 0.74| 1.99] 0.18] 1.00 9.04 —-D__D____NEW STORMWATER PIPE . : TRANSVERSE CONTROL JOINT—(TCJ)
5 2.25| 62° 16’ 55' 1.36| 0.38| 2.44] 1.16[ 0.32] 0,60] 0.08| 0.30] 0.02] 0.15! 0.00 :
6 18.00| 12° 40° 13"| 200 o.11] 3.98] 1.98] 0.11} 0.99] 0.02] 0.49} 0.00} 0.25! 0.00 Scale 1:5
wo 1 2 3 4 LEVEL DATUM: TEMP. BENCH MARK[OS? ku 82 Primary School Court DUPLEX DEVELOPMENT
SEWER MANHOLE LID OREN peed for VASTERBY Pty. Ltd
SCALE (m KM Phone (07) 5443 2400 * :
RL.40.158 Prone {07 2443 F005 HILL STREET - SUNSHINE BEACH
Ei WATER WL 0! CHECKED PCG Emait: [email protected] LAYOUT PLAN, AND DRIVEWAY DETAIL
A STO! re ‘APPROVED > y FRE No. "Tas OSUNENT COPYRIGHT & THEE PROPERTY GF DRAWING NUMGER O12
No. REVISION ey | OATE | GAD Far. Fo ttt LE CBF "4465. osi) POS Cored oo tues wenuT Ga 0511-01-03. LL c
W-\Job Files\051 1\Drawings\051 1_rev0_080514.dwg
my
Page 4
oN AREA OF EXCAVATION
(APPROXIMATELY 560m3)
as RECOMMENDED FOR APPROVAL
P velopment Permit Operational Works No: GE COSE.
Under t
from within the written approval of Council.
PLANS APPROVED
Name: ath LEK. pesesseasenansesvnnessnsenees
Signature: ...... A200 vanes
Delegated Author Olticer
Peetiminty AlRaYRL ONLY — NOT Fed Crsnenctions
NOT TO ‘LEVEL DATUM: TEMP_BENCH MARK
SCALE eee por Ptr VASTERBY Ply. Lid.
ECRED dg Email: [email protected] Earl Covington €: & Associates HILL STREET — SUNSHINE BEACH
ORIGINAL ISSUE SEPROED Zz mE EK aanoe ‘conesaeTING EARTHWORKS PLAN
: CGE i Be Goce & AScorscrs bre UD. owt Se,
CAD REF. Life LIS *F | E108 9 SF tctoen, COPED OF USED SUNGUT Amenatry © Ocirs WO ACH 112 S07 187 DRANG KUMEER 0511-01~04 | 0
W-\Job Files\051 1\Drawings\051 1_rev0_080514.dwg
Page 5
oan
STORMWATER SETOUT TABLE
Pit No. Easting Northing
1/A | 1023.707 3010.070
2/4 |1009.134 2998,048
3/A& |1009.442 2993.464
4/A |1032.872 2992.437
5/A |1033.463 2984.206
6/A |1034.592 2968.475
7/4 |1035.308 2958,361
B/A |1044.884 2958.106
AUSDRAIN ENVIROSUMP WITH HEAVY
DUTY TRAFFICABLE GRATE OR APPROVED
EQUIVALENT.
D. RL.40.158
m
300x300 GRATED a
INLET DRAIN.
00°o»
oe =
TOTAL C. MEN
A= A1+A2= 155m>
B= BI+B2= 155m
2x3000 LITRE WATER TANKS
INSTALLED 'N ACCORDANCE WITH
COUNCIL'S PLANNING SCHEME
POLICY 22—WATER TANKS. 150 ¢
OVERFLOW. 1.40.1. ALL ROOF
SURFACES FOR EACH UNIT TO BE
DRAINED INTO THEIR RESPECTIVE
TANKS.
TANK OVERFLOW CONNECTION
REFER TO HYDRAULIC <o |
ENGINEERING DRAWINGS
2.7m x 2.7m x 500mm
ROCK SPALLS.
ALL PIPE WORK TO
BE ATTACHED TO
INTERNAL WALL IN
BASEMENT CARPARK
DEEP
#150 uPVC PIPE
2x45" BENDS
THROUGH WALL
TOP OF PIT TO BE SET
TO FLOOR LEVELS IN 5/A
ARCHITECT DRAWINGS [| { YY _ _iu.=:
z6P
2.7m x 2.7m x 0.5m DEEP. LAYER
OF 75mm ROCK SPALLS TO: CAPTURE
AND INFILTRATE STORMWATER RUNOFF
FROM DRIVEWAY. ROCK SPALLS TO BE
WRAPPED IN A14 GEOFABRIC. PROVIDE
=
Setout Point
ae & | A
Chamber
GRATED PIT, CATCHPIT & MH - SETOUT
UNLESS OTHERWISE SHOWN
A COLLAR OF CONCRETE AROUND THE
TOP OF THE PIT TO ALLOW A
540x540 GALVANISED GRATE TO BE
DROPPED IN. THE COLLAR SHOULD BE
SET INTO A RE-INFORCED CONCRETE
SLAB SO THERE IS NO ACTUAL «
WEIGHT ON THE PIT (TSELF.
TELLAM 300x300 CONCRETE CHANNE
ORAIN WITH MEDIUM DUTY BOX
GRATE. IL. 37.45
#150 uPVC |PIPE
oF
i
1
i
i
|
\
i
Pod
i =
WAG
UNE 174-274. ENVIROSUMP, | 9
REALIGI OF S10 eR PIPES
- a= Se ra
SCALE (m) RL.40.158 sm] hone (073 HILL STREET — SUNSHINE BEACH
Fox
CED 7 Emall; [email protected]
DATE | CAD REF, ND PS Gyfl-LE OOF [7 5. PIE We 0511 OE OAD Gk USED RIVCUT NATO
TS DOCM & CoPrmGHT & Te PROPEIGY OF
STORMWATER LAYOUT PLAN
GRANTING NUMGER 0511-01-05 | p
W:.\Job Files\051 1\Drawings\0511_rev1_080627.dwg
Page 6
cat ®
Sunshine Coact Daninnst A.
- w a.
aging
Development Permit Or-rauionai Works No: LAC. OG6E
@
& 3 RECOMMENDED FOR APPROVAL
8
a $9 Cee te Oe ttre tne eeeneens
RL39.56 RL39.25 a aires may the Plan & Speciticetons be departed
sd.98
.36
J
Ma eumnaty AsPtaiaL OnRy — Alor FoR. eva raverie
RL39.56 Fs RL37.63 : — 200%
RL39.04 $ sits
34.00 r
CROSS SECTIONS.
§
Natural Surface
Design Surface x é q
“> q
RL39.15. o RL37.75 - Buk.
23,93 50,00
Ry
Py
x a
RL39.22 RL39.06 Kt
2q.00 a.24
in_ Surface BS
RL39.36 RL39.23 ft
Natural Surface 10.00 44.00
CHAINAGE CROSS SECTIONS.
Alignment Octalls
B=152°41'S1" 8=90°23'58" B=175°54"41"
Seale Horizontal 1:200 Verllcat 1:20
LONGITDINAL SECT
2 On O68 08 1 DESIGNED DUPLEX DEVELOPMENT
A? LEVEL Datum: TEMP BENCH Manik | © XM | (inoocrtbone et, asse for VASTERBY Pty. Ltd.
co VERT, SCALE ,(m), RL 40 158 KM Phone 2 S445 2400 . wen . HILL STREET - SUNSHINE BEACH
SS earrean ERE D7 | Emoti: [email protected] Eari Covington C & Associates DRIVEWAY-LONGITUDINAL AND CROSS SECTIONS
[3 {—___ RENUWBERED PLAN SET Iu] 0570) HORIZ, SCALE (m = = + CONSULTING WnUCERS sole
Z so oat Ta ee hes ee aoe (i = | Ree ee Oncaea 0611-01-08 Ls
W:\Job Files\0511\Drawings\0511_rev0_080514.dwg
Page 7
\4 9
LOCATIO’ = =
N SUB—CATCHMENT RUNOFF INLET DESIGN DRAIN DESIGN . PART FULL DESIGN LEVELS #
A o Qa La oT Om] Os T Opt ts Vit i i Vp
® s = |x El
a
wn = E 4 z|2 |g ali . . a
3 3 Be g Bg g e & 8 = z a — y s 3 5 <= 2 8 3 . 4 rg 2 oy 2 |g 8 g 8 a . 4 lz 3 2 s
z}z] & | ge || 2 ls) = S8iés| z 2 Esa lag] » |S|8] So! 821. 28/8 5 | w Iselssle #28 S\S.|5 \seiG | 8) 2 8 |8= e\2 |= sh} S
z|s|2 | $e 8) 5 ls) 2 [Sele 5 S euesages) E |£/5| gigs a/<| 2 tele \2/2/ 8 Seleeleges gs &§ z SelegiSeled) Bl o |eeS ~| 2/2 |a]4| [s3) 8
s| 8 z ( o| #iTols Hel S| =| o fkleclezls = So =) a) lxS\a & Ing|FS/SS/5 5 & Peleg =e lez 2 iE elEa s|& = = 8
a 3 a 2) 3 jay] 2 lsd 415] = |ss/Es/2=|22) 4 23 2.) | =] S$ |sz|S 5 S\aw St os" 3 gS |=E “|S ayes) 2 ee] = & |Z -[ ut [SR] 8
B16 | 8 | 36 2/8 les] 2 |sdids| 3/8/23 ee\Seig-(e2| 2 [3 |e | 88 lee] s| 2/2 (83,3\ 2/8 |S ESEEZ= 63 6S 3 g Jebledledlealga & eSlEs| 8 [2 | = [23| 6 | 51 # [be] &
10 | 8/A B/A 1 % on im a ha vs V/s = Vs VASA min [mm/h ha | i/s | 7s | i/s [i/s | m| % | mm| m/s] min ™m m m mix{mlomim/s| m{ m[ m| mi mi m
. . 6 . PP 8 a 5.00 | 223 |0.013| 14 B }9.700) 2.44 | 150(U)}0.43 | 0.16 Qg 0.008 Qo 0.008 4,00 }0.094] 0.17 |0.016 3}40.01240,10' 140.101 319
100 5 . . De 150 1.009} 1.00 |0.094) 160,053] 1.35 40.11
to 7/s 5.00 1.00 0.015 4 5.00 | 321 |0.016 {bipe fibw= Grate a2 50 1.62) HIRT’ 32: Yo2/2qDe 0.05 H/Do Upsirpam HSL 40/108 below oitiet Hote ea
flow 8.91 end flow 6.6 Ipe pby 44 M13
10 | 7A Tn 2 downstream pipe gr fp to |1
E 5.00 0.015 2.50 pp | 8 5.16 | 221 2B :
100 . 16 10,000 0.62 | 150(U)0.85 | 0.17 Qg 0.008 Go 0.016 Do 150 0.075 2.05 [0.075] 0.66 |0.066' ly9.876)59.881 [59.951 fs9.956K0.190
to 6/A 5.00 0.015 5.16 | 318 (Ripe tipw= stat ober ofab 0.82) Gas Angle 0 fs9.814139.814 i
Du/Do 1.00 Qg/Qo 0.50 K 1.51
10 | 6a $/Do 1.52 cor 0.54 Ku 2.05 Kw
100 een 12 MH 219 2B 16 hs.60d 0.54 | 150(U)o.85 | 0.26 0.161 4.39 [0.161| 0.66 [0.104 Ke.o85e.4aclse.607| _(59.607h9.960
315 (Ripe fibw= Sim upstr flows) — K0.77)} f58.89989.3421
0 Ft
it tein 12 WH 215 28 16 [8.300] 0.60 ssoctboas 0.14 Qo 0.016 Do 150 0.012 0.37 |0.014] 0.66 {0.055] Ise.eg9so.s509.342] (9.344n9.590
310 (Ripe fib = Sum ut in flows) 0.81) CHART 50 Du/Do1.00 alpha 0 38.849/39.275)
K'w 0.05 Vu 0.90 WSE 0.01
a T Ku 0.31 Kw 0.37
io ibs 1532 wu 213 27 16 bs. 0.50 | 150(t)0.85 | 0.40 Qo 0.016 Do 150 0.086 2.12 [0.078) 0.66 [0.158 bs.849[39.20989.275, 39.28789.370
308 (tipe tipw= Sim flows) — (0.74) CHART 50 Du/Dol.00 alpha 88 f8.729189.051 ~
K’w 0.30 Vu 0.90 WSE 0.08
10 [ Ku 1.79 Kw 2.12
100 oan 12 WH 208 27 16 1.600] 0.54 150(U)0.85 | 0.08 Qo 0.016 Do 150 10.065 2.12 |0,078] 0.66 |0.031 38.729)58.9B6)59.051 [39,06489.829
301 {Ripe tlpw= yy n flows) — K0.76)| CHART 50 0u/D01.00 alpha 88 138.704158.95:
K'w 0,30 Vu 0.90 WSE 0.08
10 Ku 1.79 Kw 2.12
100 inn 42 MH 208 2 16 [8.900 0.53 mses 0.31 Qo 0.016 Do 225 0.003 2.16 [0.013] 0.06 0.012 bs.791{38.952188.955 hs.96589.752
299 (Pipe fipw= Sim upstr flows) 1.02)| CHART 50 0u/000.67 alpha 50 [38.69 1[58.9:
K'w 0.26 Yu 0.90 WSE 0.01
Wb FUN STHDrainogey FC Ku 0.47 Kw 2.16
Project Fle: 0511.0CD CALCULATIONS TABLE
Sunshine Coast Regional Council
Development Permit Operational Works No: feck. e
RECOMMENDED FOR APPROVAL
cations be departed
Signature: =~
Delegated Author
PREUMINARY APPeDVAL ONLY - Ney fod concrevorion)
LEVEL, DATUM: TEMP-BENCH MARK DESIRED yy a2 School Court DUPLEX DEVELOPMENT
MAN ORE ———] Be BE De
RL.40,158 Ove UP Ju Fe or 5443 aan ° A eT ecy ee SUNSHINE. BEACH
ER .g | Emeil: oA
as HUAN TL TP 7 | Email: [email protected] Earl Covington & Associates STORMWATER CALCULATION TABLES
APPROVED: * FILE No. 7S DOSEN & COMRGHT & he Rmopoay CONSULTING cy WAUOERS
cs RESON FL Aa OSS. O25F VBE. Se ee eee acme ea uz cor er _| ne MASE 0511-01-07
W:Job Files\0511\Drawings\051 1_rev1_080627.dwg
sae ee
Page 8
! thane ‘
7 .
STRUCTURE
NAME << <x << < < <t << <<
= S = a 9 > 3 S
—d
a
fy bE = bt H] a 5
ot ahi = alu ol} alu alu 2 4
STRUCTURE ols as Sz ols als als as §, 3 yo
DESCRIPTION qo ge gS Be Bs a aS alg 8 |
ae BZ n£7 Be ae i. ge 3s Bh
a= ae ee / 2 4% ae az 2 se
GL|FLoor |
fC
4 “YT .
SE as
PIPE ATTACHED
TO BASEMENT
INTERNAL WALL ‘
* a
BASEMENT . &
CARPARK u
i
PIPE SIZEmm (Class) 150(U) 150(\N) 150(U) 150(U) 150(U) 350(U). 225(U)
PIPE GRADE _% 2.44% 0.62: 0.54% 0.60% 0.50% 0.54% 0.53%
PIPE SLOPE 1 In X 40.33 T61. 183.52 166.00 198,54 183.99 789.00
FULL PIPE FLOW VELOCITY (m/s) 0.43 0.85 0.85 0.85 0.85 0.85 0,35
PART FULL FLOW VELOCITY (m/s) 1.35
DATUM RL $5.0
waTER LeveL g g 5 x, 8 al 3 z :
IN STRUCTURE g 8 a % a a] 8 3B Sunshine Coast Regional Council
HYDRAULIC sig 8/3 8 3/8 ag B/8 3/5 3 ‘
GRADE LEVEL g 3 a 3 z 3 3 a g a 3 3 3 8 8 Devetopment Permit Qperat i. Wi xs No; ae CBSE. <
; v
(comers), 0.008 0.016 0.016 0.016 0.016 . 0.016 0.016 RECOMMEND © () FOR APPROVAL
1 ACStENDER
PIPE CAPACITY 0,030 0.015 0.014 0.015 0.014 0.014 0.047 stances may the Plan & Speciticauuns be departed
AT GRADE (Cumecs) opraval of Council.
DEPTH TO INVERT 8 28 a|8 z\3 Bis ae gis 8
o alo a|- 8} ola al= -l- 3
INVERT LEVEL g als 2/8 212 212 BIg SIR 8
OF DRAIN 3 als aie 8/8 a\8 a|s 38 8
DESIGN SURFACE = s & & 5 8 & & Signature:
LEVEL < < 3 ” 8 -” = ” Qeleuated Av*hortsing Otficer
ROAD CHAINAGE .
(Offset) PRELIPINARY APTROTAL ofely - Net FOR CommTiotion)
g g 8 8 3 3] oS 2
RUNNING CHAINAGE &| 9.700] 10.000 15.600 w| 8300 & 23.800 | 4608 18.900 2
PUIG TuesVOSTTDranapa\re Dratn\ ost; T20xF Sade Hak Te SOV Tn
LINE Project File: 0511.PCD A
vets «09S 25 : DESGNED 82 Primary School Court | Cee OY bt bide
; & t 1 , SEWER MANHOLE LID DRIER 07) 5443. 24 for VA - Ltd.
tan RL40.158 am | Foe"* (G7) 43 Foes . ¢::3. : HILL STREET — SUNSHINE BEACH
UOKF-Ux. eM ole Before Reduction PERE Hy Email: [email protected] Earl Covington Associates STORMWATER DRAINAGE LONGITUDINAL SECTIONS
GI WAL = = . CoGTT CONSULTING %, MARAGERS DRAWING _ _
No. a GY | CATE | CAD REF. APPROVED Po CMR CLS ADF [OES LF FUE Ws 0511 Be Seek OS PU, 6 ET ew ACH. 112 507 187 MMR 0511-01-08 | A
WJob Files\051 1\Drawings\0511_rev1_080627.dwg
OOOO OO TT
Page 9
1. EROSION AND SEDIMENT CONTROL DEVICES SHALL BE INSTALLED GENERALLY IN
ACCORDANCE WITH THESE DRAWINGS PRIOR TO THE COMMENCEMENT OF EARTHWORKS,
UNLESS THE SUPERINTENDENT APPROVES AN ALTERNATIVE PROPOSAL IN WRITING.
2. ADDITIONAL EROSION AND SEDIMENT CONTROLS SHALL BE INSTALLED AS NECESSARY
DURING CONSTRUCTION.
3.ALL EROSION AND SEDIMENT CONTROL DEVICES SHALL BE MAINTAINED UNTIL THE SITE
(S STABILISED,
4.PERMANENT COVERAGE OF DISTURBED AREAS WITH TOPSOIL AND TURF, HYDROMULCH
OR MULCH (AND JUTE MATTING IF REQUIRED)
IS TO BE UNDERTAKEN AT THE EARLIEST PRACTICAL TIME. (NOTE: TOPSOIL THICKNESS
TO BE A MINIMUM OF 100mm).
5.1N ORDER TO PREVENT EROSION FROM CONCENTRATED FLOW PATHS THE
CONTRACTOR SHALL FOLLOW TRE FOLLOWING SITE PROTECTION PRINCIPLES
§ SANDBAGS ARE TO BE PLACED AT 20m CENTRES IN CONCENTRATED DRAINAGE
PATHS AND ALONG SEDIMENT FENCES.
6.THE UNDERGROUND DRAINAGE SYSTEM INCLUDING ALL PITS AND PIPES SHALL 8€
CLEANED OF SEDIMENT PRIOR TO ON—MAINTENANCE
J.UNLESS OTHERWISE APPROVED BY THE SUPERINTENDENT ALL TEMPORARY EROISION
AND SEDIMENT CONTROL MEASURES SHALL BE REMOVED AT THE COMPLETION OF
CONSTRUCTION.
LEGEND.
SEDIMENT CONTROL FENCING. 1 wr rAp~nAnAnrAW-
WITHIN PIT TO ACT AS
STABILISED
DISTURBED AREA a «|
USE A24 BIDUM GEOFABRIC
~N
|
GEOTEXTILE FILTER
FABRIC
ON GRADE KERB INLET SEDIMENT TRAP.
SILT SCREEN UNTIL SITE IS
-—---4
|
4 USE A24 BIDUM GEOFABRIC
WITHIN PIT TO ACT AS
“A
\4 \
SILT SCREEN UNTIL SITE IS
“STABILISED
*,
3
8
DIRECT_RUN' (NTO PIT
DURING CONSTRUCTION
|
|
USE A24 BIOUM GEOFABRIC
WITHIN PIT TO ACT AS
SILT SCREEN) UNTIL SITE tS
20°
th
>
Pp
MS
x)
of Ddveloge
\ %
Ye
\
¢ ¢€
>
an
egal
Lyn Operatianal wog®e LE. _PESB.
SH PSAAMENDED FOE Q>rovat
Y/ 4 ASE
YAinder no cumstances
Ainder no Ci ©" of Council.
A trom within the we
PLANS APPROVED
Date: ..
SEDIMENT CONTROL DEVICE DETAILS. | ‘ : ne _ i
* ° Signature: .. Ace Crore
. ‘ Delegated Authorising Officer
TyeTION)
School TEE REL Aer eva SIAL — Ret POR Fons
NOT TO : SD] ee pn ot Court DUPLEX DEVELOPMENT
SEWER MANHOLE LID aR ———~ ° z 3 :
SCALE RL.40.158 mM Prone (07 eaas Sou8 ; eS vat! vas z BY Ph So,
REVS PRMD PERE 5.7 | emai: [email protected] Earl Covington & Associates EROSION AND SEDIMENTATION CONTROL PLAN
7 CONSULTING waves
a CRIGNAL ISSUE Gy | cate | _caO Fer. LL ao ELS WAZZA [OE SASS 515 Eee ee af a SEMENATON =
W:\Job Files\051 1\Drawings\051 1_rev0_080514.dwg
Pye a
Page 10
- LEGEND
1ooOmm deep Chunky
Pine Bark mulch
10O mm deep 20-49O0mm
River Peboies
(8 VIO hed
spaced evenly
+hrough rear
planting areas
1 EUC sum
: ale re eK, °
. s
I 2 . 5
oe : le] jo © b
4 SYZ cas
1 ELAret
: 4 DIA bre
+
es a
Somos $e 200
Pavers to match Terrace pavers
Surrounded by |oOmm deep
20-40mm River Pebbles
>
{3 SYZnar
lpg oe
2S5°Z bus
OH ore
4VI0 hed
Spaced ewanly
1 BRA cee
Wer Pebble
Garden Edging
APARTMENT 2
‘
\ \ \
\ \ | Driveway
\ \
\ | , PAT MULLIN:
\ \ PARK
3,SyYZdus ,
oO
SU VIO hed
poted evenly
ore
4 Dik ore4,
1 ELA ret th
J SYZcast—
5 DiAbret
1 EUCsum
24 VlO hed
spaced evenly
Terrace at j ree i Terrace.
| ) \
== GV\Ohed
1 r ~ Spaced evenly 4
} yu Gy,
“Uy
Y
APARTMENT 1
2. BRA ace.
2.6 DiAbre
Ex ting
+
cory moia
in term edhia
a
through cear ° J ‘s
P lan 1G ar eaa5§ ‘ TT ¥. od
‘ Ag Suigting
1 ElAret ss 8 +
= : = : — 2 4 ° Te! Corymbra
: {2 SNZ nar SUNS RT a \. Fintona
REGIONAL COUNCI a. ee
PLANS APPROVED ear aads's River Pebble
Gardan Edging
OP, UHAKS 08/0859,
PRELIMINARY -NOT FoR CONSTRUCTION
Rev.| Date Description SCALE 1: 100 : CLIENT Vasterby Pty Ltd File No. 104/08
we PUA Landform Landform Design Consultants — f consuitaa Bork Design Architects PLAN Ne.
PO Box 1452 NOOSA HEADS Qld 4567 | ME LANDSCAPE PLAN for 08-501/1
- puanKit~ 6DLA Phone (07) 5448.1480 Hill Street Duplex - Sunshine Beach
Cendscape Wetatecs OE SE Os E-mail: [email protected] Sheet 1 of 2 _ sheets Ri
a
Page 11
NOTES
The following notes are to be read in conjunction with Noosa Council's Landscaping Guidelines, Planning
Scheme Policy PSP1.
EXISTING SERVICES
The contractor shall determine the location of all services on site. Positions of those services shown on the “
drawings are indicative only. é . ' .
} PLANT SCHEDULE - Hill Street Duplex, Sunshine Beach
EXISTING VEGETATION f
A firmly erected protection barrier shall be placed below the canopy drip line of existing trees and vegetation in
the road reserve and Pat Mullins Park where they are adjacent to the construction site. Clearly visible signage
shall denote that these are ‘Tree & Vegetation Preservation Areas’. All reasonable precaution shall be taken to
: Mature :
protect retained vegetation from damage throughout the construction and landscape works. There shall be no Code Botanical Name Common Name Ht-Wdth Spacing Pot Size Qty
filling, excavation or trenching within the Tree & Vegetation Preservation Areas. Concrete slurry and waste . { (m) (ccs)
disposal, stockpiling, vehicle parking and machine manoeuvring shall be in approved locations away from
existing vegetation. -
PREPARATION OF PLANTING AREAS Trees :
1. Eradicate all weeds and grass from planting area. "
2. Strip and stockpile any useable topsoil. BRAace Brachychiton acerifolius Flame Tree 10x3 - 100L 3
3. Box out to minimum 300mm to accommodate topsoil and mulch. - CORcit Corymbia citriodora Lemon Scented Gum 10x3 - 100L 1
4. Cultivate planting area subgrade to minimum 200mm depth to maximize soil drainage. ELAret Elaeocarpus reticulatus Pink Flowering 5-6 x 2 - 100L 4
e 5. To prevent waterlogging, install sub-surface drainage system where subsoils are impervious. ‘Prima Donna’ Blue Berry Ash
. 68. Supply and spread 200mm depth of humus-enriched sandy loam topsoil, incorporating any stockpiled s ‘Summer Red’ 4x3 - 400L 3
topsoil. Finish 100mm below paved areas to allow for depth of mulch. EUCsum Eucalyptu
7. Mulch planting areas with 100mm minimum depth of Chunky Pine Bark mulch or 20-40mm River
Pebbles where indicated on drawing. Shrubs
MATERIALS : BANspi Banksia spinulosa Hairpin Banksia 2x 1.5 1.2m 25L 3
Imported topsoil shall comply with AS4419 and shall not contain chemicals that will result in contamination of SYZbus Syzygium australe Scrub Chery 3x 1.5 45L 12
land (e.g. heavy metal, hydrocarbons, pesticides etc.) Soils must not contain fire ants or nesting materials. ‘Bush Christmas’
Mulch shall be free from soil, clay, dust, weeds, roots, sticks, rubbish, vermin, insects, pests, fungus, disease SYZcas Syzygium ev ‘Cascade’ Cascade Lilly) Pilly 3x15 45L 14
ard other deleterious material. It shall be free from matter toxic to plant growth. sYZnar Syzygium australe Columnar Scrub 6x1.5 4.2m 45L 25
PLANTING ‘ Narrow Leaf
Plants shail be container grown, well formed, pest and disease free, hardened nursery stock true to species or '
cultivar required. Root balls shall fill containers without binding and plants shall show active healthy growth. Groundcover
Pruning, budding or grafting scars shall be clean arid well calloused. Plants to be thoroughl waterad in tueir ,
containers prior to planting. ¥ DiAbre Dianella caerulea ‘Breeze’ Flax Lily 0.6 x 0.6 600mm 140mm at
Plants to be installed in locations and at spacings indicated on the drawings. Plants located on slopes or VlOhed Viola hederacea Native Violet 0.2 x - 140mm
embankments shall be installed at an angle of 90° to the slope. Planting holes shail be excavated to a width-of \ suckering
twice the diameter of the root ball of the plant anc to a minimum depth of 100mm deeper than the height of the
ox: container. Holes to be filled with water and allowed to drain prior to instailing plants. Total: 192
later crystals shall be incorporated in wet planting soil. Refer to manufacturers recommendations for cot size . |
of plants in sandy soil. : j
Slow release fertilizer with low Phosphorous formulation (‘(Osmocote' or similar) shall be placed in the planting . ini 2m high with well developed straight trunks
hole at half the hole depth around the root ball in accordance with the manufacturer's recommended rate of Note: All trees to be minimum 9 | P g
application.
Staking or guying shall only be provided where necessary to protect plant from strong wind or accidental . {
damage.
IRRIGATION SUNSHINE COAST \
Micro-irrigation system to be installed in all planting areas in accordance with manufactuzer's REGIONAL COUNCIL
recommendations. PLANS APPROVED
OP,WORKS 9B/OBSH
Peeciminaky - Not FOR Con Srey ction)
Rev.| Date Description SNE ; CUENT _Vasterby Pty Ltd File No. 104/08
ORAWN PALA Lan d orm Landform Design Consultants CONSULTANT Bark Design Architects PLAN No.
wn gee PO Box 1452 NOOSA HEADS Qld 4567 | TE LANDSCAPE PLAN for 08-501/2
Hill Street Duplex — Sunshine Beac
heehee PATON G.O.LA Phone (07) 5448.1480 woe maz Sheet' 2 rf 2 sheets
Landscape Architects on WE 16. 6.08 ce paiq@ia coitnau { | REV.
Used in these records
08/0858 - Approved Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.5 MB (small file)
- File type
No other editions are linked here.