07/1993 - Op Works - landscaping, carparking, access, frontage works, stormwater, erosion & sediment control [As Published] · 142007.1993
INE@LOKW We Checklist - Applications Involving Land Development & Land Use Sections IDAS APPLICATION This checklist should be used for any IDAS application. Please check each of the following items before accepting an application at the counter. 1. APPLICATION FORMS ~ 7 - oo 7. 41 Form 1 Part A 1.1.1. Ensure that the form is fully compteted. 4 1.1.2 In the case of an MCU or Op Works below the high-water mark, owners consent is required. 1.1.2.1. If there are multiple owners, the consent of each owner is required. 1.1.2.2 — If the owner of the land is a company, either ACN No. or Company Seal required. 1.2. Form1 Part B-O Supporting Information 4.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-O are attached. 1.1.2.1. Ensure that each of Forms B-O which are attached are fully completed. 2. REFERRAL INFORMATION _ eee a ~ 2.1. Ensure that items 1-23 have been checked and/or completed with regard to referrals. Coy 3. ‘ ENVIRONMENTALLY RELEVANT ACTIVITIES =” 7 OTT SO 3.1. Ensure that Part G is completed if EPA referral is required. iI * 3.2 Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application fee is paid and recorded on the application. ‘4. \FORM 2’- REQUEST:TO.CHANGE APPROVAL . we an . “* 4.1. Ensure that items 1-28 have been checked and/or completed including information regarding applicant details and owners consent. LJ 5 PLANS. 5 7* wey we Bet 5.1 Ensure that at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational E Works) accompanies the application. In addition ensure that each set is complete. §.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is _ unbound. é.. SUPPORTING INFORMATION ~~ com ae meme Da Blo at 6.1 Ensure that at least 6 copies of any report accompanies the application (5 for Reconfiguration and Operational Works). If the application is accompanied by a covering letter, ensure that itis capable of reproduction. [-] 6.2 Inthe case of reports, ensure that 1 of the coples is in an A3 or A4 format and is unbound. 7 FEE Cte spe, me ee We etme om eae pa . eee ee ~~ ” : che 7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees, accompanies the application or has been paid. 7.2. Ensure that the fee which has been paid is recorded on the application form. Receiving Officer ES we ONE ITN cece tenteneees Date ...... BME PD voc. Having completed this form and accepted the a| trays:- ¢ Ifthe application is for a Material Change of Use exclusively ~AOP1's desk in the Land Use Section. ¢ Ifthe application is for an Material Change of Use & Reconfiguration - AOP1’s desk in the Land Use Section. « Ifthe application is for Operational Works (for parking, access, sewerage or drainage) exclusively - AOD2 in the Land Development Section. « In ail other circumstances — AOP1’s desk in the Land Use Section. Please DO NOT leave the application at the counter and DO NOT deliver the application to Records. ication, please deliver both to the following IDAS Application Receiving SEP! g:\ant\forms\application checklist.doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 33 pages
Page 2
3 > ' KAWANA BUILDING APRROVALS —s« Petsson Caving Genet Date 24.9.2007 Noosa Council PO Box 141 Tewantin Qld 4565 Dear Sir/Madam Application for operational works permit Type of Work: Duplex Site Address: al Grant St Noosa Property Description: Lot 9 SP 179879 On behalf of our client we would like to apply for an operational works permit for the above address. Please find attached form 1, Parts A & E, Idas checklist and 4 sets of Architectural, Hydraulics and Landscape plans. For any further information. please contact Peter Lusio on 0416260416. ‘eter Lusio BUILDING CERTIFIER, Accreditation # A927431 Suite 14, 21 Nicklin Way, Buddina Q 4575 Phone: 54440430 ¢ Fax: 54440429 ¢ Mob: 0416260416 [email protected]
Page 3
\
. \ * "| INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
« Form 1 Development Application
REE
Common defails
B
a.
The completion of all applicable questions on Part i
mandatory for all applications. Part A must be accompanied by the completed (OAS Assessment Checklist if”
parts of the Form as requited. ‘For more information on the parts of the Form refer to www ipa.qid.gov.du.
Any information requested i in the form may be provided ir Nan atlachiment to the appfication. For further’ information ‘bout completing the following details, tefer to Guide 1.
‘Description of, land -: Loe
Ail tand the subject of the app cation’ must be
identified. However, a’ description of the land is not!
in relation to a.mobile of temporary
tally Reteveiit Activity (ERA - :
identified by a per:
caf be obtained from fitte dour
if the fand ‘on which the development is ¢
proposed does ‘not have @ lot‘on plen description (i.e, :
the devekipiment is propased in a water body or
* watercourse) provide - .
(i) the bot’on plan: description for the
‘adjoining/adjacent land; or: .
{ti) GPS coordinates where there is no
adjoining/adjacent land (eg. in Moreton Bay).
Advice for completing Q7 - Q7 does not apply if the
devebpment is Wwithin’a water body c ‘or watercourse:
Advica fot completing 28 - Q8 apples if
development is within a’ocal goverment ered.
Note: Aréda below high water mark are not within a. .
focal Gavernménit’s area unless provided for under the
Local Government Act 1993. °°". | -
‘Advice for completing Q3- 03 apples i if
development ison sao port Kind or 6 strategic.
For. more, deals toler to Guige 14
1:
ol f 21 Grant Steet. Noosa Heads
~Streat addréss: frétuding house number, street name, suburbfocality name & postcode) {if applicable):
Ld
Lot on plan deséription (eg. Lal 423 on RP.4567)/ GPS cootdinates:
>] Lot 4 on SP 179879 _ |:
: The | above descrip en moe oe
elopmentis
proposed: or.
Ey {iii) the: watér body or watercourse,
6. Storey /level: 7.
[2 |
Lécal-govemment area in which the land is situated: (eg. Esk, Hervey Bay, Woocoo ele.) (if applicable),
Shop I tenancy number: Total area of land: (m? or ha):
[ 543 m2 |
~_ | Noosa Shire |
*: Port authority for the strategic port land or strategic port land tidal aréa on Which the
levelopment i is proposed: (eg. Port of, Brisbane, Port of Townsville} (if applicable)
Proposat details’ .
: 10;
Existing use of the land: (eg. vacant, single house, shop eic)
provide tah lchinnt othe epson’ - [Vacant Land _ |
: . VU. id yartm ision,:ERA for aquaculture iit:
j]2 ponds with’a total area ” ha for which waistes aré released into waler SE ag be
S : : “| Dual Occupancy Units = Duplex. . |:
Other. applicable parts of Form 4 42. “Other parts of Form 1. comipleted as part of this application: (eg, Part'D,-Part Ftc) Co
Part A must aAvays be ‘accompanied by other : °
Sonne pat Rees Pos nlotgon about [ Part Band Form 4&2 - | A
when part of Fotrn 1 may apply refer'to Guide 1, le, Tee re 7 = a: a
Applicant detaits 43.” Applicant's name: SEE 5 Cone pasate Se
Clearly identity who is imaking the apptcation. The :
Ce to ai en, . [ M &J Exey — }. [ Mathew Exley ‘|
Whien signing and iodaing this application - - | 14.--Contact number: " : 16. Facsimile numbere-mail address:
The appicant ib fe the
Tewekatieincbetremtrate Sart 1144 T] peariiaa
manager, any relerral agency & the Chief Executive . ° : : [email protected]
here applicable fe hen a °
ee eed destegteamtace 147. Postal address! na a
the apotledint pany - a contaét
iste so, sa company - 8 contadt person | 14 Sunrise Ra Sunrise Hills. 4563 |
18. Signature: oe : od 19. Date: .
LZ 28/08/2007 |
Dann
a S
Page 4
\ INTEGRATED PLANNING ACT 1997
Part A, Version 2.4, 29 May 2006
Land owner's consent (if applicable)
Section 3.2. 1(3) of the IPA presegbes thet en
application must contain, or be supported by, the
vetitten consent of the land owmer/s, i the application
invohes:
@) a material change of use,
i). séconfiguration of a tot;
(i) work on land be bw high-water mark & not vathin a
canal es defined under the Coastal Protection and
Management Act 1995;0r,
(¥) work on rail odrridor fand defined under the
Transport Infrastructure Act 1994.
Section 3.8. 1(2\(2) of the IPA provides that
tandawner’s consent is not required for a mobile or
temporary ERA.
For more information refer to Guide 1
20.
Land owner's consent to the making of this application:
Name Signature ZZ Date
(i) Mathew Eexley 1 __| 2evosma7
(i) Joanne Exley AA KT 28/08/07
(iii) |
Zt
(iv)
(v)
Resource entitlement (i applicable) _
” Section 3.2.1(5) of the IPA requires evidence of
-Tesource entitlement be given for eppications that
: involve a Presanibed Sisip resource,
* Advice'for completing O21 & 22 :
Refer to scheduls-10 of the integrated Planning
* Regulation 1998 that prescribes the.nature of evidence
required by the State.in support of the beng ‘of this
“The information in (i) -,(v) is: mandatory if evidence is
“required under Q22 (ji) or (ii) shove.
-The official stamp of the Department of Natural
“Resources, Mines and Water is mandatory where the
pplication involves any water or riverine quarry
material under the Water Act 2000.
Section 3.2.1(5A) allows the resource manager to Imit
the time the évidence may be used: 023 (vi) must be
completed if the evidence is time Imited,
42h,
. This application’ Is accomparied by evidenc
23.
# a daté of evidence e = jicablay
4 Is the IDAS Assessmnie it Checklist completed and aiiached to this sie
Does this application involve a State resource prescribed under a regulation {other than involving
quarry material on State coastat land iunder the Coastal Protection and, Menagement Act 1995)?
BNO: 90 16024", : Ces: 90,0 022
ick applicable box}
development application may: proceed in the absence allocation of, or
entitlément to, ther FesOUrce = go fo Q23 | oo :
Evideriée of the resource ‘entitlement
(i) - Resource enlitlement/ = details
(ii) Hane cease fear
(ii) fastest es
iv)’. Signature of delegated officer
“wip Official stamp of the sepaitnent
-administering the resource i :
applicable) .. :
(v) Date: oe sr
& YES
EANO =the ‘aSsesstient manager may refuse to accep
: grounds that the application has not beeti properly made.
Plan drawings j rapt
An rappication Should be adcompatiied by details ®
. Support ‘the proposal & enable the. assessment’
manager, referral agencies and any person viewing
the appication during public scrutmy or public
‘nolification to understand the Scope of the proposal
and.any potenti impact.
25, "Plang/drawingsireports aécompanying this application:
Date
Plan/ Drawing / Report Number Title
(i) 10f4 Site Plan 27/08/07
(ii) 20f4 Floor Plan 27/08/07
(ili) 30f4 Elevations A - B 27/08/07
{iv) 40f4 Elevations B - C 27/08/07
P LEASE NOTE: The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable i information required by Part A
and any other relevant part of Form 1.
OFFICE USE ONLY (applicable to assessment manager ’s)
fee 2672 | peeves ileofey wns (PD Knee ne] nomsens | O71 49 3
Notification of Engagement of Private Certifier (Optional format) (/
To.
| Date ofengagement:, f /
Accreditation Number:
Council. | have been engaged as the private certifier for the building work referred to in this apptication.
Name:
Signature:
Page 5
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
Operational &/or building work
_—
oe
assessable against a local government's planning scheme =<
Completion of ail question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed engineering plans for subdivisional works and conceptual design plans for engineering & building work when the application does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.
Nature of the application 4. This ication is for (tick one (1) or both if applicable)
A development permit authorises reliminary approval - provide details of the type of work eg. roadwork, stormwater, water and sewerage
development to occur, while a preliminary inteenen’ app P ip * . , ag
approval is a step in the approval process 7 — *
and does not authorise development to occur. Landscaping, Civil works, Stormwater, Landscaping, etc
The types of work that are assessable against!
a planning scheme are determined by the AND / OR
scheme for a particular local govemment and a . . en
will vary wrote the State. 8 [X Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
. infrastructure, etc
To determine the types of work that are
assessable under a particular planning
scheme, contact the relevant local .
govemment. 2. Are the works subsequent to a previous development approval?
CNo (1 YES - provide details of all previous approvals (eg. file references)
3. _ Is the subdivision for a canal estate?
No CJ YES
Portable Long Service Leave levy (if |4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
ficable)
app m3 i ) . , (11 YES - complete 05
Prior to issuing a development permit for the
works, the assessment manager is required EX] NO - 05, 6 87 co not apply
by law to ‘sight’ an approved form, issued by
Qleave, which signifies that the PLSLtevy |5. Has the PLSL levy been paid?
has been paid. oO YES — completeas
XK NO ~ the applicable levy must be paid before a development permit can be given for the works
6. How much was paid?
[Na
7. Whatis the receipt number of the payment?
[Na
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information
requested by Part A and any other relevant part of Form 1.
OFFICE USE ONLY {applicable to assessment manager}
DATE RECEIVED
REFERENCE
NUMBERIS
Page 6
INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004 () Is a PLSL levy applicable in this instance? NO LD YES - complete ari (ii) Has the approved form (issued by QLeave and which signifies that the PLSL levy has been paid) been sighted by the assessment manager / private certifier at the time of lodgement of this application? KI No (YES - provide receipt details below [
Page 7
. INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Form 1 Development Application
IDAS Assessment
Checklist
(Formerly the “Referrals Checklist”)
IMPORTANT NOTE FOR ALL APPLICANTS:
1. This checkist was formerly referred to as the "Referrals Checklist’. Some of the ‘Guides’ to using the IDAS Apptication Forms continue to refer to this document as the
“Referrals Checklist’. The name of this checklist was changed from 25 Juty 2005 to more accurately describe its function.
2. Under the IPA and IDAS framework, an application may require assessment by the local Council and/or certain Queensland State entities (e.g. Environmental Protection
Agency, Dept. of Natural Resources and Water, Queensland Heritage Counci etc.).
3. This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
determine the assessment manager" for the application.
‘Therefore, the completion of all questions in section 4 of this checklist is mandatory for all applications (other than those requiring the completion of Parts A & B only).
tis the responsibility of the applicant to accurately complete this checklist.
Section 2 is mandatory only if the proposed development is located in any part of a wild river area declared under the Wild Rivers Act 2005.
Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referral agency for the application.
The assessment manager for the application will rely on the information provided in this checklist (as well as any material lodged in support of the application) to identify
any applicable referral agencies for the application In the Acknowledgement Notice. The assessment manager will also rely on this information when identifying if the
application triggers referral coordination’.
9. Toassist you in answering the following questions a series of guides are available free from the IPA website www.ipa.qld.gov.au. Guide 25 explains the role of the IDAS
Assassment Checklist in the IDAS application process, and its relationship to the Form 1 development application.
10. Any other parts of Form 4 that this checklist requires to be completed are available from the Council or the applicable State entity, or can be downloaded free from
www. ipa.qid.gov.au.
11. Section 3 provides advice about the referrals that can be required for applications for building work assessable against the Building Regulation 2006,
CN O OS
~ SECTION 1 - STATE ASSESSMENT (completion mandatory)
Note: The folowing State assessment triggers apply to development other than for building work assessable against the Building Regulation 3 2006.
Environmentally relevant activity 1. The application involves: (tick applicable box/es)
For more information refer to Guide 4. (11(i)_ an environmentally relevant activity (ERA) for which a code for environmental compliance
the oprcaton requres vsssessmentby he. a, ~ has not been made - complete Part G of Form 1
administering authority?. O (ii) a mobile or temporary ERA for which a code of environmental compliance has not been
if an entity, other than the administering made - complete Part G of Form 1
authority, Is the assessment manager for the OX] (iii) none of the above
application, the administering authority is a
concurrence agency for the application In relation’
to this matter.
Note: An application involving ERA 19 and/or 20
will also require completion of Part K7 of Form 4
for approval where an allocation under the Water]
Act 2000 is required.
Continued overeat
PLEASE NOTE: The assessment manager may refuse to accept an application, which, at the time of lodgement, fails to provide the
completed IDAS Assessment Checklist (if applicable).
OFFICE USE ONLY (appticabie to assessment manager)
DATE RECEIVED” REFERENCE NUMBERIS
1 The assessment manager is responsible for assessing and deciding an IDAS application. The assessment manager for an application is prescribed in schedule 8A of the IPA.
2. For additional information refer to Guide 6 ‘Does my application trigger the referral coordination process?"
3. The ‘administering authority’ may be either the Environmentat Protection Agency, the relevant local government {for a devolved ERA} or the Queensland Department of Primary Industries and
Fisheries (for a delegated ERA).
Page 1
Page 8
‘
~ INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
State-controfied road matters 2. The application involves: (tick applicable box/es)
For more Information refer to Guide 3, [1 (i) development on tand contiguous’ to a State controlled road and for -
Unless you answered "none of the above” to Q2, . . .
the application triggers referral to the Department KI (a) material change of use assessable against the planning scheme;
of Main Roads (DMR) as a referral agency.
nfiguri fot un! -
incon DMR wi be an C0 (b) reconfiguring a fot unless
agency, while in other circumstances DMR wit « the total number of lots is not increased; and
be a concurrence agency. « the total number of lots abutting the State-controlled road is not increased;
Schele 2 of the F Reautation wil . tyou t Oo operational work (not associated with a material change of use assessable against the
concurrence agency for the application. planning scheme or reconfiguring a lot mentioned in (b) above)—
associated with access to a State-controlled road; or
© for filling or excavation; or
e involving the redirection or intensification of site stormwater from the land, through a
pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
State-controlled road.
LC (ii) development on land not contiguous to a State-controlled road and -
(1 (a) material change of use —
* assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule;
(CJ (b) reconfiguring a lot for a purpose mentioned in schedule 5 of the IP regulation
and exceeding the thresholds set by that schedule;
[1 (c) operational work (not associated with a material change of use assessable against the
planning scheme or reconfiguring a fot mentioned in (b) above)—
« assessable against the local government's planning scheme; and
mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that schedule.
EK (iii) none of the above
Clearing vegetation 3. The application involves: (tick applicable box/es)
For more information refer to Guide 12. Oo (i) material change of use -
Unless answered “none of the above” to Q3, . .
the appreatin requires assessment by the (a) assessable against the planning scheme;
Pannen ot Natal Resoures and Water (b) on alot containing -
ifan agency other than NRW is the assessment * acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for the application, NRW is a ; « ifthere is no property map of assessable vegetation for the lot - remnant vegetation;
onurence agency fr the application In relation (c)_ where the existing use of the land is a rural or environmental use; and
ifyou ticked Q3() oF (I), your application requires {d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
feferrat to NRW for assessment regardless of C(ii) reconfiguring a lot -
whether vegetation clearing is proposed or not. .
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assessable vegetation or, if there is no property map of assessable vegetation for
the lot, remnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares or larger;
(c) where 2 or more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
Didi) operational work -
(a) for the clearing of native vegetation where the vegetation clearing is made
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in (i) or reconfiguring a lot mentioned in {ii) - complete Part J of
Form?
(iv) none of the above.
Strategic port land 4, The application involves:
1 vey) te en wish [1 (i) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
you i} - the relevant Por Authonty is the
assessment manager for the application, Act) - complete Part lof Form 1
Ifyou ticked (i) Queensland Transport Is a (1 (ii) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency for the application. TI Act for the strategic port !and - complete Part! of Form 1
LX] (iii) none of the above
4 Land contiguous to a State-contolted road is defined in schedule 14 of the IP Regulation to mean tand - if part of the land is within 100m of the State-controlted road; or that Is pari of a future State-
controlled road.
Page 2
Page 9
INTEGRATED PLANNING ACT 1997
Acid sulfate soils 5.
For more information refer to Guide 10,
Unless you answered “none of the above" to Q5,
the application requires assessment by
Department of Natural Resources and Water
(NRW).
if an agency ofher than NRWis the assessment
manager fer the applicaton, NRW is an advice
agency for the application in relation to this
matter.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves development on land situated in an identified§ local government area
and where the surface of the land is: (tick applicable box)
LC (i) below 20m AHDS and the development will involve the excavation of 1000m? or more of
soil or sediment at or betow 5m AHD, or
(1 (ii) at or below 5m AHD and the development will involve filling the site with 1000m3 or more
of material
&] (iii) none of the above
Major hazard facilities or possible 6.
major hazard facilities
For more information refer to Guide 17.
Ifyou answered “YES” to Q6, the appfication
requires assessment by the Department of
Ememency Services (DES).
Hfan agency other than DES |s the assessment
manager for the application, DES Is a
concurrence agency for the application in
relation to this matter.
Water related development under the | 7,
Water Act 2000
For more information about items (a) ~ (f}, refer
to Guide 15. For more Information about item
(9), refer to Guide 14 Does my application
involve assessment of a referable dam?
Unless you answered "none of the above” to Q7,
the application requires assessment by the
Department of Natural Resources and Water
(NRW).
ifan agency other than NRW Is the assessment
manager for the application, NRW is a
concurrence agency for the application in
elation to this matter.
Does the application involve a material change of use for a major hazard facility or possible
Major hazard facility as defined under the Dangerous Goods Safety Management Act 2001?
ENO
[CI YES - complete Part L of Form 1
The application involves:
(1 (i) operational work, for taking or interfering with water under the Water Act 2000, that is:
{tick applicable box/es)
[J (a) in a watercourse, lake or spring, (eg. @ pump, gravity diversion, stream re-direction, weir or
dam) - complete Part Kz, Ks, Ks, Ke, or Ks of Form 1 whichever is applicable,
(J (b) for an artesian bore anywhere in the State, no matter what the use - complete Part
K; of Form 7;
for a subartesian bore, in declared subartesian area’, or in a certain area covered
by a water resource plan, for use for purposes other than stock and/or domestic
Use - complete Part K: of Form 1;
(J (¢) for a subartesian bore, in certain declared subartesian areas, for use for stock
and/or domestic purposes - complete Par K: of Form 1;
C1 (e) for taking overland flow water in certain areas covered by a water resource plan
- complete Part Ks of Form 1,
C1 (f) for interfering with overland flow water in a drainage and embankment area -
complete Part Kioof Form 1
(2 (g) for constructing a referable dam® or works that will increase the storage capacity
of a referable dam by more than 10% - complete Part Ks of Form 1; OF
EX) (ii) none of the above.
Removal of quarry material froma | 8,
watercourse
For more information refer to Guide 16.
Ifyou answered "YES’ to Q8, the application
requires assessment by the Department of
Natural Resources and Water (NRW).
(fan agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in
relation to this matter.
Note: Part G of Form 1 is required to be
completed as the activity of removing query
material from a watercourse is also an
Environmentally Relevant Activity (ERA).
Does the application involve development for the removal of quarry material from a watercourse®
requiring an allocation notice under the Water Act 2000?
NO
(71 YES - complete Parts Kr and G of Form 1
5 The identified local government areas are: Aurukun, Gowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Burnett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook,
Cooloola, Dounglas, Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrooke, Isis, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Mornington, Noosa, Pine Rivers,
Redcliffe, Redland, Rockhampton, Sarina, Thuringowa, Tiaro, Torres, Townsville, Whitsunday.
Austratian Height Datum (AHD).
Referable dam is defined under the Water Act 2000,
Watercourse is defined in sch 10 of the IPA.
OOH
The declared ground water areas are listed in Guide 13 Development in @ declared catchment area.
Page 3
Page 10
«INTEGRATED PLANNING ACT 1997
Operational! work that is tidal work or
work in coastal management district
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Unless you answered “nane of the above" to Q9,
the application requires assessment by the
Environmental Protection Agency (EPA).
Han agency other than EPA Is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
Local goverment Is the assessment manager
for all prescribed tidal work.
9.
{DAS Assessment Checklist, Version 20, 2 April 2007
The application involves operational work that is: ( tick the applicable box/es)
CA (i) _ tidal work as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is not prescribed tidal work ~ complete Part M of Form 1; or
Ci) tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; of
D1 iii) carried out within a coastal management district under the Coastal Act and for - complete
Part M of Form 1 if any box/es (a) fo (i) below are ticked.
(1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
other than those works in tidal water} where the development has been determined not
to be assessable against the Water Act 2000 ;
(J (b) constructing a canal’? intended to be connected to tidal waters;
(1 (c) constructing an artificial waterway;
[1 (d) reclaiming land under tidal water;
[1 (e) disposing of dredge spoil or other solid waste material in tidal water;
CO (f) interfering with quarry material on State coastal land above high-water mark;
(1) (g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(J (h)_ removing or interfering with coastal dunes on land, other than State coastal fand,
that is in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
BX] (iv) none of the above.
Operational work below high water
mark
For more information refer to Guide 18. For
more information about prescribed tidal work in
local government tidal areas refer to Guide 24.
Uniess you answered “none of the above” to
Q10, the application triggers referral to
sla im
Qld) as a concurrence agency.
Local government is the assessment manager
for all prescribed tidal work,
10. The application involves operational work that is: (tick the applicable box/es)
C1 (i) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
Coastal Act} that is not prescribed tidal work - complete Part M of Form 1; or
( (ii) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; or
DL (ii) carried out within a coastal management district'5 under the Coastal Act and for -
[J (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Mof Form f;
(1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
C1 (c) constructing a canal’, if the canal is associated with reconfiguring a lot - complete
Part M of Form 7;
(iv) none of the above.
Coastal management
For more information refer to Guide 18,
Unless you answered “none of the above” to
Q11, the application requires assessment by the
Environmental Protection Agency (EPA).
Hf an agency other than EPA is the assessment
manager for the application, EPA is a
concurrence agency for the application in
relation to this matter.
11.
The application involves: (tick the applicable box/es)
Ci(i) a material change of use assessable under a planning scheme involving operational
work carried out completely or partly in a coastal management district's
C(ii) a material change of use assessable under a planning scheme involving building
work, carried out completely or partly in a coastal management district that is -
« the construction of a new premises with a GFA'® of at least 1000m2
e the enlargement of the GFA of existing premises by more than 1000m2
Dili) reconfiguring a fot assessable under schedule 8 of the IPA where the land is situated
completely or partly in a coastal management district
(iv) reconfiguring a Iot'’ assessable under schedule 8 of the IPA and in connection with
the construction of a canal'? — complete Part M of Form 1
El(v)_ none of the above
10 Tidal work is defined in sch 10 of the IPA.
11 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
12 Canat means canal as defined under the Coastal Protection and Management Act 1995
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the PA and means a coastal management district under the Coastal Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act
16 GFA Is defined in sch 14 of the IPA to mean the gross floor area, For a definition of how to calculated GFA, go to the planning scheme against which the apptication is being assessed.
17 Under 117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operationd works te construct the artificial waterway.
Page 4
Page 11
* INTEGRATED PLANNING ACT 1997
Development within the limits of a
port
For more information refer to Guide 18. For
information about prescribed fidal work refer to
Guide 24.
Hf you answered “YES” to Q12, the application
triggers referral to the Port Authority.
The Port Authority is a concurrence agency if the
development is -
« within 200m of a shipping channel or an enty
and exit shipping corridor for the port
® within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoal
grounds;
® within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994.
in all other situation the Port Authority is an
advice agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?
INO
(71 YES — complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work
Marinas
For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.
if you answered “YES” to Q13, the application
triggers referral to Queenstand Fire and Rescue
13.
Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?
{INO
(C1 YES - complete Part M of Farm 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work
For further information refer to Guide 19.
Ifyou answered “YES” to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.
Unless you answered “none of the above” to
Q15(b), the application involves referral to the
Environmental Protection Agency as an advice
agency for the application
Service as an advice agency. .
~ Tidal works In strategic port land tidal] 14, Does the application involve tidal works within a strategic port land tidal area®?
areas NO
For more infarmation refer to Guide 18, oO YES - complete Part M of Form 1
Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage 15. Does the application involve development in a heritage registered place as defined under the
Queensland Heritage Act 1992?
Kx] NO
(1 YES - complete Part C of Form 1
15(b)The application involves: (tick applicable boxes)
(i) a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;
(A (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
EX] (iii) none of the above.
Declared catchment areas
For more information, Including a list of the
declared catchment areas within Queenstand,
refer to Guide 13.
Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Ri Water
(NRW).
If an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in
elation to this matter.
16.
The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)
&] (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
L(t) none of the above
18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
49. Marina is defined in the Transport Operations (Maritime Pollution) Requtation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.
Page 5
Page 12
«INTEGRATED PLANNING ACT 1997
Contaminated land
Appiications invoNing material change of use
and/ or reconfiguring a lot may trigger this
referral.
For more information refer to Guide 5.
Unless you answered “none of the above” to
Q17, the application requires assessment by the
Environmental Protection Agency (EPA). If an
agency other than EPA Is the assessment
manager for the application, EPA will be a
concurrence agency for the application in
relation to this matter.
17.
IDAS Assessment Checklist, Version 20, 2 April 2007
The application involves: (tick the applicable box/es)
1 (i)_ reconfiguring a fot for which all of part of the premises are ~
(a) premises mentioned in the IPA, schedule 8, part 1, table 2 ~
« item 5, including the exemption otherwise provided for by paragraph (d);
« item 6, including the exemption otherwise provided for by paragraph (e); or
« item 7, including the exemption otherwise provided for a mining activity or petroleum
activity; or
(b) in an area for which an area management advice has been given for unexploded
ordnance - complete Part N of Form 1
LD (ii) a material change of use -
{a) made assessable under the IPA, schedule 8, part 1, table 2, items 5 to 7; or
(b} assessable against the planning scheme and if all or part of the premises is in an area
for which an area management advice has been given for unexploded ordnance -
complete Part N of Form 7
EX (iii) none of the above
Electricity infrastructure
For more information refer to schedule 2of the IP.
Regulation.
Unless you answered “none of the above" to
Q18, the application triggers referral to the
agency to which the easements granted in
favour of as advice agency.
18.
The application involves: (tick the applicable boxes)
reconfiguring a lot where any part of the lot is —
subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994 and the easement is for a transmission grid or supply network under
that Act; or
« situated within 100m of a substation site;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring alotif- == — ~
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the easement is for a transmission
grid or supply network under that Act; and
« any structure or work that is the natural and ordinary consequence of the use is, or will be,
located wholly or partly in the easement;
a material change of use, assessable against a planning scheme and not associated
with reconfiguring a lot if any part of the premises is situated within 100m of a substation
site;
operational work that is filling or excavation assessable against the planning scheme,
not associated with reconfiguring a lot, if -
any part of the premises is subject to an easement in favour of a distribution entity or
transmission entity under the Electricity Act 1994 and the work is located wholly or partly in
the easement;
e the work is located wholly or partly within 10m of a substation site;
Ed (v)_ none of the above.
2 il)
OH tiv)
Land designated for community
infrastructure
Applications involving development on fand
designated for community infrastructure may
trigger this referral,
For more Information refer to schedule 2 of the
IP Regulation.
\f you answered "YES" to Q19, the application
tequires assessment by the chief executive of
the department administering the Act authorising
the development for the designated purpose.
lf an agency other than the designator is the
assessment manager for the application, the
designating agency will be a concurrence
agency for the application in relation to this
matter.
Does the application involve development assessable against the planning scheme and on land
designated for community infrastructure?
(i) intended to be supplied by a public sector entity; and
(ii) on land not owned by or on behalf of the State; and
(iii) other than development -
(a) for the designated purpose; or
(b) carried out by, or on behalf of, the designator.
NO
CO yYes
Page 6
Page 13
. INTEGRATED PLANNING ACT 1997
SEQ Regional Pian
For more information refer to schedule 2 of the
IP Requiation,
Refer to Chapter 2, part 5A and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Reguiatory Provisions for relevant
definitions.
Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).
IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick appiicable box/es) -
1 (i) a material change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
OD (i) anurban activity -
(2 inan area included in a structure plan where the IPA, section 3.1.6
applies;
(J) in an area not included in a structure plan where -
the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
« the gross floor area (GFA) on the premises will exceed 10,000m2; or
« impact assessment is required under the relevant planning scheme
C (ii) intensive animal husbandry, or
(4 (iii) residential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
O (i) anurban activity and not specified in section 2.4(2); or
OO (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rurat Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for ~
CH{i) an urban activity and not specified in section 2.10(2);
(9 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
( (il) intensive animal husbandry
(sii) reconfiguring a fot-
On land in a Major Development Area in the Urban Footprint that is:
(a) not included in a structure plan; and
(b) not specified in section 3.1(2).
EX] (iii) none of the above
Fisheries matters
For more information refer to schedule 2of the [P
Regulation,
Unless you answered "none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(OPIBF).
If an agency other than DPI8F is the assessment!
manager far the application, DPI8F is a
concurrence agency for the application in
relation to items {i) - {iv) and an advice agency
in relation to itern (v).
21. The application involves: (tick the applicable box/es)
L1(i) anassessable material change of use for aquaculture - complete Part O1 of Form 1;
Ci) assessable operational work that is the construction or raising of a waterway barrier -
complete Part O3 of Form 1;
C1 (iii) assessable operational work completely or partly within a declared fish habitat area-
complete Part O2 of Form 1;
Ci (iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
(Jv) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
Ed] (vi) none of the above.
Page 7
Page 14
* INTEGRATED PLANNING ACT 1987
* Integration of land use and public
transport
For more information refer to Guide 23, schedule
8A of the IPA, & schedule 2 of the IP Requlation.
Unless you answered “none of the above’, the
application tiggers referral to QT as a
conourrence agency.
IDAS Assessment Checklist, Version 20, 2 April 2007
22. The application involves: (tick the applicable box/es)—
UL (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
O (ii) reconfiguring a fot—
(C1) _ ontand that is completely or partly within a public transport corridor, and the
total number of lots increases;
[1 (b) _ on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
[J (©) onland that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
(1 (@) for a residential purpose within the 25 ANEF contour for an airport;
(Ce) for a residential purpose resulting in 100 or more allotments.
O (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
(1 {@) is completely or partly within a public transport corridor or a future public
transport corridor;
[1 (b) _ will result in work that encroaches into an airport's operational airspace.
(iv) none of the above.
Railway safety and efficiency
For more information refer to Guide 23, schedule
8A of the IPA & schedule 2 of the IP Regulation.
Unless you answered “none of the above’, the
application triggers referral to QT as a
concurrence agency.
Moonie to Brisbane pipeline
For more information refer to schedute 2of the IP
Regulation.
Unless you answered “none of the above’, the
application triggers referral to the holder of
pipeline licence No 1 issued under the Petroleum
Act 1923, currently Santos QNT Pty Ltd, for
advice.
_|23. The application involves: (tick the applicable box/es)—
CL (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
schedule.
LD (ii) reconfiguring a fot—
(a) onland that is completely or partly within a future public transport corridor,
future railway land or a railway tunnel easement;
[1 (b) on land that is within 400m of a Citytrain passenger railway station or a future
Citytrain passenger railway station, and the total site area is 5000m? or
greater;
(ce) onland that abuts rail corridor land, commercial corridor land or future railway
land, and the total number of lots increases;
Cd) ontand that abuts rail corridor land, commercial corridor land or future railway
Oe)
land and an easement abutting the corridor or future railway land is created;
on land that is completely or partly within 100m of, and abutting an approach
to, a railway level crossing, and the total number of lots increases;
C1 (f) for a residential purpose resulting in 100 or more allotments.
(iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, involving extracting, excavating or filling greater than 50m, on land that—
(a) _ is completely or partly within rail corridor land or commercial corridor land, and
the work is not for rail transport infrastructure or other rail infrastructure;
(1 (b) _ is completely or partly within future railway land, or a railway tunnel easement,
(J () abuts rail corridor land, commercial corridor land or future railway land, and
the work is within 25m of the railway boundary.
EX (iv) none of the above.
24, The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
C1 (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
CO (ii) reconfiguring a lot
LD (ili) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
LX (iv) none of the above.
Page 8
Page 15
INTEGRATED PLANNING ACT 1997
Koala habitat area
For more information, refer to Guide 26 and
schedule 2 of the |P Requtation.
Unless you answered “none of the above’, the
application requires referral to the Envisonmental
Protection Agency as a concurrence agency.
Wild river area
For more information, refer to Guide 27
Hyou answered YES to Q26, you must also
complete section 2 of this checklist. This will
enable you to determine if your application can
proceed in a wild river area and which referral
agency will assess your application against the
Wild Rivers Code, or if the propased
development is “prohibited” in a wild river area.
Note: Development can be ‘prohibited’ in a wild
fiver area because the application cannot be
accepted by the assessment manager.
IDAS Assessment Checklist, Version 20, 2 April 2007
25. The application involves: (tick the applicable box/es)—
(1 () a material change of use of premises in a koala conservation area or koala
sustainability area made assessable under a planning scheme, that is not for a domestic
activity and will result in -
C1) (a) clearing of native vegetation over an area greater than 2500m?;
[) (b) anew building and any reasonably associated structure with a total footprint
greater than 1000m?;
(1 (c) an extension to an existing building and any reasonably associated structure if
the extension has a total footprint greater than 1000m?,
(J (4) extracting gravel, rock or sand from an area greater than 5000m?;
[J (e) excavating or filling an area greater than 5000m?;
(additional traffic in a koala conservation area or koala sustainability area,
between 6p.m. on a day and 6a.m. on the following day.
D1 (i) reconfiguring a fot in a koala conservation area or koala sustainability area that will
result in -
(J (a) an increased number of lots;
CJ (b) clearing of native vegetation over an area greater than 2500m?.
0 (ill) operational work in a koala conservation area or koala sustainability area made
assessable under Schedule 8, Part 1, Table 4, items 1A to 1G (not associated with
reconfiguring a lot mentioned in (ii) above) that will result in the clearing of native vegetation
over an area greater than 2500m2.
C (iv) operational work in a’Koala conservation area or koala sustainability area made
assessable under a planning scheme (not associated with a material change of use
mentioned in (i) or reconfiguring a lot mentioned in {ii) above) that is not for a domestic activity
and will result in - ~
CJ (a) clearing of native vegetation over an area greater than 2500m?;
(CO (b) extracting gravel, rock or sand from an area greater than 5000m?;
[J (c) excavating or filling an area greater than 5000m?.
EX] (v) none of the above.
26. Does the application involve development in a wild river area declared under the Wild Rivers Act
2005?
KINO
Dyes
Preliminary Approval
Ifyou answered YES ta Q27, the application
triggers referral to the Department of Local
Govemment, Planning, Sport and Recreation as
an advice agency.
27. Does the application involve a development for which preliminary approval is sought under
Section 3.1.6 of the Integrated Planning Act 1997?
KINO
(Yes
Wetlands
Domestic activity means the construction or use
of a single residence on a lot and any reasonably|
associated building or structure. Examples of a
building or structure that could be reasonably
associated with a single residence include:
caretaker's residence, granny flat, building or
structure used for a home business.
Note: Wetland is defined in the Integrated
Planning Regutation 1998.
Unless you answered “none of the above” to
Q28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application.
28. The application involves: (tick the applicable boxes) -
CI(i) — amaterial change of use, other than for a domestic activity, assessable against the
planning scheme that is in or within 100m of a wetland;
CU (ii) reconfiguring a lot -
In or within 100m of a wetland that will result in
C1 (a) more than 10 lots being created: or
Lo (b) lots less than 5 hectares;
{1 (ill) none of the above
Page 9
Page 16
~ INTEGRATED PLANNING ACT 1997
Conservation Estate
Urban purposes is defined in the Iniegrated
Planning Act 1997 as ‘pusposes for which land is
used in cities or towns, including residential,
industrial, sporting, recreation and commercial
purposes, but not including environmental,
conservation, rural, natural or wildemess area
purposes”,
Unfess you answered “none of the above” to
Q28, the application involves referral to the
Environmental Protection Agency as an advice
agency for the application. .
(DAS Assessment Checklist, Version 20, 2 April 2007
29. The application involves: (tick the applicable box/es)—
C1 (i) a material change of use for urban purposes thatis in or within 100m of any of the
following -
Ci {a} a protected area, forest reserve, critical habitat or area of major interest under
the Nature Conservation Act 1992;;
[1] (b) a State forest or timber reserve under the Forestry Act 1959;
(C)(c) amarine park under the Marine Parks Act 2004;
(CJ (d) a recreation area under the Recreation Area Management Act 1988;
{_](e) a world heritage area listed under the World Heritage Convention;
CI (f) Brisbane forest park under the Brisbane Forest Park Act 1977.
(1 (i) reconfiguring a lot if -
C1 (a) any part of the lot is situated in, or within 100m of, any of the following -
(i) — aprotected area, forest reserve, critical habitat or area of major
interest under the Nature Conservation Act 1992;
LJ (ii) a State forest or timber reserve under the Forestry Act 1959;
C1 (iii) a marine park under the Marine Parks Act 2004:
(CI(iv) arecreation area under the Recreation Area Management Act 1988;
(Jv) _ aworld heritage area listed under the World Heritage Convention;
Brisbane forest park under the Brisbane Forest Park Act 1977; and
(J (b) the reconfiguration involves more than 10 lots being created, or any lot
resulting from the reconfiguring is less than 5ha;
£1] (iii) none of the above.
Page 10
Page 17
~ INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
SECTION 2- ASSESSMENT IN A WILD RIVER AREA
(completion mandatory if the proposed development is located in a wild river area)
Wild River Area
It the responsibility of the applicant to
determine if the development Is proposed in
a wild river area,
Information about wild river areas Including the
geographical location and position of
management areas in relation to properties, can
be accessed by contacting the Department of
Natural Resources and Water (NRW), accessing
the department's website www.niw.ald.gov.au or
contacting the department by email on:
wild [email protected]
Note on Referrals
Referrats for development in a wid river area
(other than for agriculturat activities and animal
husbandry activities) are not changed from the
existing referral arrangements.
Notes on development assessable
against the Wild Rivers Code
For Information regarding development in a wild
fiver area, see the relevant wild river declaration
and Guide 27, The relevant wild river
declaration will provide information regarding
which types of development must be assessed
against the Wild Rivers Code, and In some
cases which types of development are exempt
from wild river requirements.
The notes on development assessable against
the Wild Rivers Code in this section of the
checklist provide some guidance however this
may vary between wild river areas. The relevant
declaration will provide the information applying
to each wild river area,
Applications for some new developments will not
be accepted if the proposed development is in a
high preservation area (HPA). Most applications
for development activities which may be made
including these in a preservation area (PA), must
be assessed against and must comply with the
Wild Rivers Code where indicated In a relevant
wild river dectaration.
Which wild river area is the development proposed in?
The proposed development is to be located in: (tick the applicable box/es)
(_J i) a high preservation area (HPA);
oO ii) a preservation area (PA) ;
(_J ili) a wild river floodplain management area (FMA);
C iv) a wild river nominated waterway;
(J w) a designated urban area (DUA).
Environmentally relevant activities
(ERAs) in a designated urban area
\fyou answered YES, your application for an
ERA is exempt from any wild river requirements
and provided there are no other aspects of this
development that require assessment against
wild rivers, you do not need to complete the
temaining questions in Section 2.
{f you answered NO to Q2, please complete the
temaining questions in Section 2.
Does the proposed development only involve any of the following environmentally relevant
activities (ERAs) in a designated urban area (as mapped in the relevant wild river declaration)?
i) An ERA 28 or ERA 14; or
ii) Alevel 2 ERA except ERA 1, 2, 3, 4, 20, 22 or 59.
] NO O YES (ensure you have completed Part G of Form 1)
Clearing native vegetation
If YES, there are a limited number of purposes.
for which an application to clear native
vegetation may be accepted in a HPA. See
Gulde 27 for a Iist of retevant purposes for
which an application may be made In a HPA.
IF YES and you ticked Q4 box i) the application
may be made and is assessable against the Wid
Rivers Code. if YES and you ticked Q4 box ii)
the application will not be accepted.
Note: If clearing native vegetation is ina PA,
there are no wild river requirements and
provided there are no other aspects of this
development where wild river requirements
apply, do nat complete the remaining questions
in Section 2.
Is the application operational work for clearing native vegetation in a HPA?
no [1] YES (ensure you have completed Part J of Form 1)
\f YES, is the clearing?
CJ i) clearing regrowth (as defined in the Vegetation Management Act 1999) in a registered
area of agriculture in a HPA (see Guide 27); or
(J ii) in a HPA outside a registered area of agriculture?
Page 11
Page 18
* INTEGRATED PLANNING ACT 1997
” Works in tidal! areas, coastal
management districts and fish habitat
areas
Hf you answered YES to QS, and ticked any
‘boxes in 06), your application is required to be
assessed against and must comply with the Wid
Rivers Code.
lfyou answered YES to 5 and ticked box i) in
Q6, your application is required to be referred to
the EPA.
Note: if specified works are proposed in a focal
government area, itis prescribed tidal work — the
relevant local government will be the
assessment manager with the EPA as a
concurence agency
Ifyou answered YES to Q5, and ticked box @) or
iii) in Q6, your application requires referral to
OPIF.
If you answered NO to O5 and ticked box i) in
Q6, the application will not be accepted.
Hfyou answered NO to Q§, ticked box fi) in Q6
and the development is necessary to instafl
authorised works or infrastructure where a
development permit is not required, or if a
required permit fs held, the application must be
assessed against and must comply with the Wild
Rivers Code. Applications for purposes other
than specified works or as described above will
not be accepted.
If you answered NO at Q6 and ticked box iii) in
Q6, the application may be made if the works are
inaPA. These applications must be assessed
against and must comply with the Wild Rivers
Code. The application will not be accepted if the
development is proposed to be located in a HPA.
For more information about specified works refer
to Guide 27,
Residential, commercial or industrial
development
Ifyou answered YES to Q7, your application is
Not subject to wild river requirements. Provided
there are no other aspects of this development
that require assessment against the relevant wild | g
river declaration or Wild Rivers Code, you do not
need to complete the remaining questions in
Section 2,
Ifyou answered NO to Q7 and ticked either box
i) or ii) in Q8, the assessing agency is the
Televant local goverment. The application must
be assessed agamst and must comply with the
Wild Rivers Code.
IDAS Assessment Checklist, Version 20, 2 April 2007
ls the development for specified works? (see definition in the Wild Rivers Act 2005 and Guide 27-
Development in a wild river area)
dine) LI Yes
The application is for one or more of the following:
(£1 i) Operational works that is tidal works or works in a coastal management district (ensure you
have completed Part M and/or Part P of Form 1); OF
(J ii) Operational works for the removal, destruction or damage of marine plants (ensure you have
completed Part Oz of Form 1); OF
C] iii) Building or operational works in a fish habitat area (ensure you have completed Part O2 of Form 1).
ls the application for residential, commercial or industrial development in a designated urban
area?
LJNno &l ves
If NO, does the application for residential, commercial or industrial development involve:
CO i) a material change of use made assessable in a local government planning scheme
{ensure you have completed Part D of Form 1); or
(_J ii) operational works associated with reconfiguring a lot (ensure you have completed Part F
of Form 1).
Animat husbandry activities
{fyou answered YES to QQ your application
requires assessment against and must comply
with the Wild Rivers Code,
The assessing agency is NRW.
Note: Applications for animal husbandry
activities will not be accepted if proposed in a
HPA. For more details and a definition of animal
husbandry activities see the Wild Rivers Act
2005 and refer to Guide 27.
Does the application involve a material change of use for animal husbandry activities (as defined
under the Wild Rivers Act 2005) in a PA?
INo LIVES (ensure you have completed Part R of Form 1)
Agricultural activities
Hyou answered YES to Q10, your application
requires assessment against and must comply
with the Wild Rivers Code.
The assessing agency is NRW.
Note: Applications for agricultural activities will
not be accepted if proposed In a HPA. For more
details and a definition of agricultural activities
see the Wild Rivers Act 2005 and refer to Guide
27.
The production of fodder in a PA, and pasture
improvement using fow impact soll disturbance
techniques is not an agricultural activity as
defined under the Wild Rivers Act 2005. For
more information see Guide 27.
10.
Does the application involve agricultural activities (as defined under the Wild Rivers Act 2005) in
aPA?
KJ No
If YES is the application for:
(Ji) a material change of use; or
(J ii) operational works.
Ol YES (ensure you have completed Part Q of Form 1)
Page 12
Page 19
"INTEGRATED PLANNING ACT 1997
Works that take overland flow water
The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.
if you Scked Q13 i), your appfcation must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
Ifyou ticked Q13 if) an appfication is not required
to be made however the works must comply with
the relevant seltassessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
If you ticked Q13 iii) your application is not
subject to wild river requirements.
Applications for development that Is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
Works that interfere with overland
flow water
The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.
tf you ticked Q15 i}, your applicaton must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.
If you ticked Q15 ii) an application is not required
to be made hawever the works must comply with
the relevant seif-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.
Wyou ficked Q15 iil) your appfication is not
subject to wild river requirements.
Applications for development that|s other than
that stated to be assessable, self-assessable or
exempt will not be accepted.
13.
IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?
NO Clyes (ensure you have completed Part Ka of Form 1)
If YES, is the application for works stated in the relevant wild river declaration to be?
(J) assessable works
(J ii) self-assessable works
(J iil) exempt works
Does the appiication involve works that interfere with overland flow water in a FMA?
XI No Lives (ensure you have completed Part Kio of Form 1)
If YES, is the application for works stated in the relevant wild rivers declaration to be?
(1 i) assessable works
CJ ii) self-assessable works
(1 iii) exempt works
Waterway barrier works
Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Aquaculture (non ERA)
Applications for aquaculture in a HPA will not be
accepted.
\f you answered YES to Q17, your application
Must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.
Works that interfere with water In a
watercourse
Note: If the development is proposed in a HPA,
applications for alt works that interfere with water
in a watercourse (including dams or weirs,
stream reatignment or stream diversion) will not
be accepted.
In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
Ifyou ticked bax ii) in Q19, your application will
not be accepted.
Note: Operational works outside a KPA or
nominated waterway are not subject to wild
tiver requirements.
More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
Yww.onw. gid .qov.au of contacting the
department by email on:
wild [email protected] qov.au.
16.
Does the application involve building or raising waterway barrier works in a PA?
NO Clyes {ensure you have completed Part O3 of Form 1)
Does the application involve aquaculture in a PA?
NO | YES (ensure you have completed Part O; of Form 1)
Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?
No
IF YES,
O i) The application is for an instream dam or weir, or
CJ ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.
Cc YES (ensure you have completed the relevant Part K of Form 1)
Page 13
Page 20
-INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 20, 2 April 2007
Environmentally relevant activities
Most applications for an ERA In a HPA will not
be accepted. Applications which may be made
require referral to the EPA. The assessment of
some ERAs is assessed by NRW, others have
been devolved to DPIF, NRW or delegated
local goverment (see EPA website for more
information on devolved ERAs)
Wyou answered NO to Q20 you do not need to
complete Qs 21-24.
Ifyou answered YES to Q20 and the
development is in a PA, your application must be
assessed by the administering authority2*
against the Wid Rivers Code and must comply
with the code, unless the proposal is for
development where an application will not be
accepted, or is exempt from wild river
requirements (see Q2). You will be able to
determine if an application will not be accepted
for the development by answering Q21 - Q24.
If you answered NO to Q21, you do not need to
complete Q22. Ifyou answered YES to Q21 you
are required to complete Q22.
Ifyou answered NO to Q22, the application will
not be accepted. If you answered YES to Q22,
the application must be assessed by NRW
against the Wid Rivers Code and must compty
with the code.
tf you answered NO to Q23 and the development
is proposed in the HPA the application will not be
accepted. Ifyou answered YES to Q23, the
application must be assessed by the EPA or
NRW {as prescribed in schedule 8A of the IPA)
against the Wild Rivers Code and must comply
with the code.
if you answered YES to Q24 the application wil
not be accepted. If you answered NO to Q24,
your application must be assessed by NRW
against the Wild Rivers Code and must comply
with the code.
Exempt ERAs In a designated urban
area
if the development Is propased in a designated
urban area there may be no wild river
tequirements. See Section 2 02.
Note: All applications that can be accepted must
be assessed against and must comply with the
Wild Rivers Code (other than exempt ERAs in a
designated urban area).
20.
21.
22.
23,
24.
Does the application involve an ERA?
& NO O YES (ensure you have completed Part G of Form)
Is the application for an ERA 20 instream?
NO Dyes
ls a quarry allocation notice held for the proposed ERA 20 instream?
NO CJ yes
Does the application involve any of the following in a HPA?
i) a level 2 ERA 11, (and is for specified works or a residential complex)
ii) an ERA 19 (dredging)
iii) Low impact ERA 20 (out of stream) for specified works or a residential complex (as defined in
the Wild Rivers Act 2005, and Environmental Protection Act 1994)
iv) an ERA 22 (out of stream)
NO Cl yes
Is the proposed development for ERA 20 (out of stream) and;
- inaFMA; and
— not low impact, and
— not for a residential complex in the area, or for specified works.
JNO LJ Yes
Documentation
Hf you answered NO to Q25, your application
May be subject to an information request and
processing of the application may be delayed.
25.
Has documentation been included with the application describing how the applicant proposes to
comply with the mandatory requirements, required outcomes, and/ or performance requirements
as set out in the relevant part/s of the Wild Rivers Code?
EXJNo Clyes
2 The administering authority may be either the EPA, or if devolved or delegated, the local government, DPIF or NRW.
Page 14
Page 21
y INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 SECTION 3 - BUILDING REFERRALS (completion not mandatory) Below is alist of the referrals that can apply to an application for building work assessable against the Building Regulation 2006. This section of the DAS Assessment Checklist is provided for advice only. This section of the IDAS Assessment Checklist is not required to be completed and lodged with an application for building work assessable against the Building Regulation 2006 only. Speciat fire services - generally 1. For more information go to schedule 2 table 1 and schedute 2A of the IP Requlation. Assessment period 15 days. No response is a deemed refusal. An application may trigger referral to Qid Fire and Rescue Services as an advice agency if the building work requires special fire services mentioned in schedule 2A part 1 of the integrated Planning Regulation 1998 (IP Regulation) or includes an alternative solution assessed against the performance requirements of the Building Code of Australia. Fire safety for budget accommodation | 2. For more information go to schedule 2 of the IP Regulation An application may trigger referral to Qld Fire and Rescue Services as an advice agency if the building work the subject of the application requires the installation of a fire safety system for a budget accommodation building. Spray painting 3. For more informafian go to schedule 2 of the IP Regulation An application may trigger referral to the Department of Industrial Relations (O1R) as a concurrence agency if the application involves a workplace incorporating spray painting. Retail meat premises 4. For more information go to schedule 2 of the IP Reguiation An application may trigger referral to Safe Food Qld as a concurrence agency if the application involves a tetai] meat premises. Private health facilities 5. For more information go to schedule 2 of the IP Requlation An application may trigger referral to the Department of Health as a concurrence agency if the application involves a private health facility. Workplace area less than 2.3m? 6. For more information go to schedule 2 of the [P. Regulation An application may trigger referral to the Department of Industrial Relations (DIR) as an advice agency if the application involves a work place area less that 2.3m?. Land contiguous to a State-controlled | 7. toad For move information go to schedute 2 of the IP Requlation An application may trigger referral to the Department of Main Roads as a concurrence agency or advice agency if the application involves land contiguous to a State-controlled road. Pastoral workers accommodation 8. For mora information go to schedule 2 of the IP Requlation An application may trigger referral to the Department of Industrial Relations (DIR) as a concurrence agency if the application invalves pastoral workers accommodation. Child care centre 9. For more information go to schedule 2 of the IP Regulation An application may trigger referral to the Department of Communities as a concurrence agency if the application involves a childcare centre, Coastal development 10, For mora information go to schedule 2 of the IP Regulation An application may trigger referral to the Environmentat Protection Agency (EPA) as a concurrence agency if the application involves land completely or partly seaward of a coastal building line22, Heritage 41. For more information go to schedule 2 of the 1P Regulation An application may trigger referral to the Heritage Council as a concurrence agency if the application involves a heritage registered place. Fisheries matters 12. For more Information go to schedule 2 of the [IP Regulation An application may trigger referral to the Department of Primary Industries and Fisheries (DPI&F) as a concurrence agency if the application involves assessable building work in a declared fish habitat area; or as an advice agency if the application involves assessable building work on land that adjoins a declared fish habitat area. Integration of land use and public 13. transport For more information go to schedule 2 of the IP Requlation An application may trigger referral to Queensland Transport as a concurrence agency if the application involves existing or future public transport corridors, or airport operational airspace”, Railway safety and efficiency For more information go to schedule 2 of the IP Regulation 14, An application may trigger referral to Queensland Transport as a concurrence agency if the application involves future railway land. NOTE: CONCURRENCE AGENCY ASSESSMENT PERIODS The local government, as the concurrence agency, is required to assess and provide a response for the following building applications within a prescribed time. For applications relating to design and siting (17, 18 & 19), and building work for removal or rebuilding (23), the assessment period is 5 days. For all other applications the assessment period is 15 days. If no response is received from the local government for an application, it is taken to be a deemed tefusal. However for amenity and aesthetics impact of particular building work for a single detached class 1 or class 10 building or structure (15), no fesponse is taken to be a deemed approval. Amenity and aesthetic impact of particular building work for single detached class 1 building or class 10 building or structure For more information go to schedule 2 table 1 of the P Requiation. Assessment period 15 days. No response is a deemed approval. 15. An application will trigger a referral to the local government if itis : © fora single detached class 1 building or class 10 structure; and e the local government has declared by resolution the following: — the appearance of the building or structure will have an extremely adverse impact on the amenity of the locality; and ~ the appearance of the building or structure would be in extreme conflict with the character of the locality. 2 Coastal building lines are prescribed under the Coastal Protection and Management Act 1995. 23 Operational airspace 's as defined In State Planning Policy 1/02 "Development in the Vicinity of Certain Airports and Aviation Facilities”. Page 15
Page 22
* INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007 Whether particular buildings may be occupied for residential purposes For more information go to schedule 2 table 1 of the IP Regulation. Assessment period 15 days. No response is a deemed refusal. 6. An application to use an existing building that is not class 1, 2, 3 ar 4 for residential purposes may trigger a referral to the local government as the concurrence agency. Design and siting For more information go to schedule 2 table 1 of the IP Regulation, Assessment period 5 days. No response is a deemed refusal. 17, 18. 19. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code. An application may trigger referral to the local government as the concurrence agency if the building work does not comply with the qualitative statement for building clearance and site cover. An application may trigger referral to the tocal government as the concurrence agency if the building work does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland Development Code, part 11 or 12. Fire safety in particular budget accommodation buildings Far more information go to schedule 2 table 1 of the IP Regulation, Assessment period 15 days. No response is a deemed refusal. 20. An application may trigger referral to the local government as the concurrence agency to determine the building will comply with the fire safety standard under the Building Act 1975 when the building work has been completed. Higher risk personal appearance services For more information go to schedule 2 table 1 of the IP Regulation and the QOC part 15, Assessment period 15 days. No response is a deemed refusall, 21. An application may trigger referral to the local government as the concurrence agency to determine if the building work ¢ complies with the performance criteria of the Queensland Development code part 15; and e the work does not comply with an acceptable solution stated in the part. Buitding work for residential service For more Information go to schedule 2 table 4 of the P Requlation and the QDC part 20. Assessment period 15 days. No response is a deemed refusal. 22, An application for building work for premises in which residential care service under the Residential Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, wil trigger referral to the local government as the concurrence agency. Building work for removal or rebuilding For more information go to schedule 2 table 1 of the IPReaulation. Assessment period 5 days. No response is a deemed refusal. 23. An application for the removal and/or rebuilding at another site of a building or other structure, will trigger referral to the local government as the concurrence agency. Building work for rainwater tank in designated rainwater tank area For more information go to schedule 2 table 1 of the IP Requlation and the QDC part 25. Assessment period 15 days. No response is a deemed refusal. 24. An application may trigger referral to the local government as the concurrence agency to determine if the building work or structure complies with the relevant performance criteria if - e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant building work, in a designated rainwater tank area; and e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable solution for a relevant performance criteria. Page 16
Page 23
SALE OF DOCUMENTS Superseded Planning Scheme’Documentation Copy of Permit/Approval Letter The Noosa Plan Documentation APPLICATION FEES- Material Change of Use - Code/Impact Consistent Inconsistent . Assessment under Superseded Planning Scheme Modification to a Development Permit Extension of a Currency Period Operational Works - Landscaping e@ Bldg Work assessable against the Planning Scheme PRE LODGEMENT REVIEW Half Hour One Hour ADVERTISING Purchase Advertised Applications SETTIES © Jetty Application Fee Jetty Bond BONDS / Performance Bond SIGNS Registration Fee sE@EH Fee Search of Land Use Section file Liquor Licensing Request NAME: ke JO no. Bin tbe — ADDRESS: Lvef 24 Nietets wha ROOD VwSTIS FILENO: 7] 1A42- ‘RECEIPT NO: - 24nb6079 AUTHORITY NO: LAND USE SECTION FEES RECEIPT TYPE 520 110 441 521 521 524 524 521 (=95 521 §21 522 522 523 524 51 (Category 4) . §41 (Category 9) 222 112 113. TOTAL. $ [o757 Aap brown’ ri Z2ft-Jes Signatur of TP Officer: PS SK none I] 2001) (4424,
Page 24
NOOSA DEVELOPMENT FEES & CONTRIBUTIONS
(Cashier: Please @ um to Admin Officer, Development) @
|
AP ND GENERAL FEES | AMOUNT BONDS - Bond Refund Details oe
[AppicaionFees CU | PayeeNamez CSC~—=szd
[| Road/DrainagePlanExam | STAT | Address:
| Road /Drainage Field Inspection =| TA
|
|
| 45 | CALCULATIONS —_— .
| 46 | Lot Catculation —
| 8B
| 9
AMOUNT Plan Examination Calculation
Inspection Calculation .
| 580 | ROADWORKS CONTRIBUTIONS
CONTRIBUTIONS .
Developer Contribution - Landscaping
Developer Contribution - Road Other thanPSP
Developer Contribution - Drainage Other than PSP
Developer Contribution —Pathway Other than PSP
Developer Contrib. ~ in Lieu Off St Parking (PSP13 Car parking)
Developer Contribution - Other Parks and Community
CS - Community Land (Not currently active)
ICS — Public Transport
ICS - Sewerage (PSP Rural)
557 Road/Section:
ICS - Sewerage (PSP Coastal) | 8
ICS - Sewerage ~ South Peregian (PSP Maroochy) |___-681_—| APPLICATION DETAILS ee
ICS - Sport and Recreation Land (PSP Parks) | _-'559_— | Address:
(CS - Drainage (PSP Noosaville Master & Ward Street) ee
ICS ~ Road (CMRNICP) If BA not entered then use 594 } 588
ICS - Pathway (PSP) | ae
CPIDate: = | »_| AMOUNT __| RECEIPT TYPE | File Numbers or Reference:
Security Deposits/PerformancelMaintenancelUnoompleled Works Bond
. i
4 i
i
Total of Fees Paid (Excluding Bonds) $ \6{S meee Renne .
— a - — . = . AE, Y
Date application properly made:
Receipt No: Receipt Date:
Total of Fees Paid (Including Bonds)
PyLand DevelopmentFEES & CONTRIBUTIONSIDEVELOPMENT FEES.doc
Page 25
af
mp Te
~~
AWANAYBUITDINGIARBROVAUS:
Phone: 5444 0430 Fax: 5444 0429 Email: [email protected]
Professional Building Certifiers
Licenced Building Certifier No A927431 Licensed Builder No 32253
A.B.N. 56 032 875 811 A.C.N. 118 768 568
Order
To: Noosa Shire Council : Permit # 07-527 |
joosa Ire Counch =
PO Box 141 . Order # 00002967
Tewantin Qld 4565 Date 27/09/2007
i
= Operational Works Application
Type of Work: Duplex Unit
Owner: M. & J. Exley
Site Address: 21 Grant St, Noosa Heads.
Property Description: Lot 9 SP 179879
Ship fiees
=i \ “ NOT
Details \ NS _ Amoyit Tax
Operational Works Permit é “T seabo N-T
Total (ine-GST): $2,405.00
Please use the credit card authority below for the amount of Total Inc GST plus credit card processing fee if applicable.
Credit Card Authority
Cardholders Name:
Card #:
Expiry Date:
Card Type:
1
Authorised - |
Page 26
KAWANAIBUIEDINGIARPROVAUS Phone: 5444 0430 Fax: 5444 0429 Email: [email protected] . 5 Professional Building Certifiers oY 6 Licenced Building Certifier No A927431 Licensed Builder No 32253 * é os A.B.N. 56 032.875 811 A.C.N. 118 768 568 In) RF w ceived - . ~~ * eT %, o DE S ee Pane ow? NOOSASHIRE couNcR —/ <> 2, UND USE US : < ~ >> Yo Ww To! a Tg Noosa Shire Council Permit # z 1 A “PO Box 144 Order # 00002968 Tewantin Qid 4565 Date 27/09/2007 Operational Works Application Type of Work: Duplex Unit Owner: M. & J. Exley : Site Address: 19 Grant St, Noosa Heads. Property Description: Lot 10 SP 179879 Details Amount Tax Operational Works Permit , $2,690.00 N-T Total (inc-GST): $2,690.00 Please use the credit card authority below for the amount of Total Inc GST plus credit card processing fee if applicable. Credit Card Authority Cardholders Name: Card #: Expiry Date: Card Type: ee RE
Page 27
' 1:20 1:7 1:8 1:20 1:40
r| |
an
a
3 - & §
t Provide Roof runoff_harvesting 5
i tank type TANK MASTA ° ~ _
a ! or equivalent. S$ el
‘ Minimum volume 10,000litre 8 8
> Size: 3100 diameter
a 1640 height go I
, a8 +
W S TELACDM PIT
APs 16.92 LINE OF BUILDING UNDER RPB
a | "x LIGHT POLE GA G
a RA\ 1
H V | oY hreng BOX '
ov AND&SCAPING | | FFL23.790 |
¢ Ali i
Tq Hy iB
H
“ «|| y H a |
pal His
a 8 a? .
£ 5 | | Hid { t
b Te glue Hy z
@ Sill He
i S| Hi 4
mm HT |
= | !
o ol Ps i ) Lo
s te 1
i 2 Eas Y) J
' i $ ? ap
0 = : 2
3 Al PCONGRETE ) hy we
Ht 4
foe | Hp 1:40
v E 4
2 a“ I 720
a LANUSCAP ING a
CO a
3 el |
lo an
aw
a“
aw
aj * UPPER FLOOR 3
tz] = RL 23.84 i U
S oe [SLAB RL 23.79] Q
y qo 4400 3320 1200 | 1000) 1500
a a
a <q 3
a ‘| Le
a R a
v 2
x { P | 3 se SF &
ws me
8 2 op x ey oe
£ a s meee .
Spi eo hh Ns | ee debe P23 790 oe rns SIBRESER —_—
Connect to existing — oT PWATER METER RESERERR RRR Seine ere
council stormwater inlet. Yi
Core drill and seal with @
non shrink grout.
@) | & Figs HyRant
PATER HEFER eee
Pee
‘go
02,5S.22€
60st
foo [
Ss
— =
ube)
Sane,
a
Poo :
a
LOTUS
= OT
EMT V
s
160 —$—— (6.0 — ——=T8t
drain
grated
250Wig
Providp
LT TTT TE)
|
|
|
|
drevedoh PIT
|
riveway revised 122—8-07 ]
For Development Approval
For Building Approvat
x For Tender
For Construction
ny %
my fo wow
Ly 2) & : S [o) s Constructed i |
Eggs F ss
@ cLecteid Box
contact: Reinhold Koenning migAust RPEQ No 7023
BC Box 1176 75
uddina QLD 45
email: [email protected] PH: 5444 8645
www.conhyd.com FX: 5444 8224
| Trench
grate
CUENT :
'
I
VEHICLE t
ACCESS DECK !
TIMBER i
DRAIN TO GROUND CONCRETE DRIVEWAY
—————_.—] DRAIN TO TRENCH GRATE
MATTEW & JOANNE EXLEY
ARCHITEST SOUTHERN CROSS
BD N ¢ DRA
Provide cut off ENTRY -——_
drain 150mm high
eee
TT Coe
TE db sovd Ht | I [lS BED 1
™m Te ee ee
ae II STE eee I
iT === T= ===
ual I: DUO Uae ee
Vea isso 1 oe, 208) — =I f=i=—I— i=
a Fe oe ee
ETE ni TEU
os A iy
PROJECT: PROPOSED RESIDENTIAL
LOTS 9 & 10 GRANT STREET
NOOSA HEADS
DRAWING TITLE:
TERRACE
STORMWATER
OPERATIONAL WORKS
& DRIVEWAY DESIGN
Design| RK _ [Checked Date |17-5-07 | Dwe. No.
TANK LOCATION INSERT SCALE : 1:100 on at uno.| 2 of 2 | 1743-0-
UPHILL DRAINAGE TANK LOCATION RPD:— Lots 9 & 10 on SP179879
LAUNDRY
it
il
Page 28
Rev
HYVDRAULIGES
HA
LOTS 9 & 10 GRANT STREET
NOOSA HEADS
FOR
MATTEW & JOANNE EXLEY
GENERAL NOTES
Water Supply and Sanitary Drainage has been designed and shall be constructed in
accordance with the Q'ld Standard Sewerage tow, Q'ld Standard Water Supply Law,
the Nationa! Plumbing and Drainage Code AS 3500., all relevant Australian Standards,
and the requirements of the Local Authority.
These Drawings are diagrammatic only and shall be read in conjunction with all relevant
Architectural and other consultants drawings and specifications and other written
instructions that may be issued during the course of the contract.
Any discrepancies sholl be referred to the supervising officer for decision before
proceeding with the work.
Contractor shall verify all fixture locations, invert levels, surface levels, and
cover to pipes are correct and obtainable prior to commencement of the work.
The exact location of existing, and proposed services, shall be verified with
the relevant Authority, or other trades as applicable.
Fire stop collars to be used on all plastic pipework penetrating fire resistant
construction.
SANITARY DRAINAGE
Underground pipework shall be 100 dia. PVC DWV, min grade 1:60 U.N.O.
Suspended Pipework shal! be PVC class Dw.
Trade waste pipework to grease trap suspended shall be “Coesprene” or
HOPE. Underground shall be vitreous clay or HDPE.
Trade waste pipework to oil separator shall be HDPE, or Vitreous clay with
“Nitrite” rubber rings.
CLeanouts or inspection openings brought to surface in poved or concrete
areas, or within buildings to have brass caps.
STORMWATER DRAINAGE
Underground pipework shail be 100 dia PVC class SW min grade 1:100 U.N.O.
Downpipes shal} be 100 Dia PVC class SW.
Rainwater outlets (RWO) ond planter outlets (PO) shall be “Gatic Wade” or similar,
with membrane clamp where required.
WATER SUPPLY
Pipework shall be copper tube type B. UNO. Water supply pipework shall be 20 dia
U.N.O. Except one fitting only may be 15 dia. mox. length 3000 mm.
Hot water pipework shall lagged.
Hot water recirculoting lines to be insulated with 20mm "Armafiex” or similar.
Provide tempering valves on hot water to personal hygiene fixtures.
Underground copper pipework shall be "Kemlagged” or otherwise protected.
Underground pipework not under concrete slab may be polypipe class PN20.
one size larger than shown.
Exposed pipework in amenities areas, shall be chrome plated.
Where water meters are installed within tennancies, provide remote readout
adjacent to Electrical meters, or in a position as indicated by the Architect.
BACKFLOW PREVENTION
Provide hose connection vacuum breakers to all hose cocks
Provide RPZD to any irrigation connections.
COVERS & FRAMES
Covers subject to vehicular traffic to be 535 dia, cast iron, medium duty UNO.
Covers in grassed or conc. areas to be 535 dia. cast iron, concrete infil! light duty.
Covers in paved areas to be 600 sq. Infill to match paving pattern.
Covers in tiled areas to be as for paved areas with brass edging.
Concrete infill covers to be stamped “SWD” or "SEW" as appropriate.
Covers & Frames to be "Faston” or equal approved.
GRATINGS
Gratings for storm water to be “faston, Gatic” or approved equal.
Duty to match manufacturers recommendations for loading condition.
Trench grate to be transverse bar.
Floor waste grates to be chrome plated brass
LEGEND
Non potable water 4 Diameter
Existing water C.0.8, Cleanout to surface
Existing sewer CJ Capped junction
Existing storm water cv Conrol valve
Existing house drain cs Cleaners sink
Sanitary Drainage cw Cold Water
Vent Pipe DAP Duct access panel
Cold Water bev Double check valve
Een Eccentric Enlarger
Hot water . Elev Dge Evevated Drainage
Storm Water Drainage Enl Enlarger
Fire FC False ceiling
Agi Drain FH Fire Hydrant
FHR Fire hose reel
. FFL Finished floor jevel
Cold Woter Riser FU Fixture units
a]
Down Pipe GIT Grease Interceptor trap
@y=— 9 Stack GP Gully pit
. GMH Gully Man Hole
Ce) o Vent Pipe gv Gate valve
o HW Hot water
Group vent HCB House connection branch
) © Educt vent HD House drain
®) ° HL High Sevel
@ Induct vent Ic Inspection Chamber
Ox") ° Hot water riser IL Invert Level
Fire Dropper io inspection opening
. . jos Inspection Opening to Surface
0 Fire Riser K&C Kerb & Channel
8} 6 * MH Monhole
8°) Non potable riser NRV Non return valve
_. — t t PB Path box
Wi) water meter PLY Pressure limiting valve
PO Planter outlet
v Valve RPB Reai Property Boundary
a
— he Hose Cock REDD Real Property description
. educe Pressure Zone device
ee een Eccentric enlarger RWO Rain water outlet
--—<ch-= en Enlarger RWH Rain water head
sD Sanitary Drainage
@) ORG Overflow Relief Gully SL Surface Level
34 Squore
lo wo Water s/t Safe Tray
Closet swd Storm water drain
. t/td Trapped Tundish
sk Sink TG Test gate
td Tundish
iT Laundry tub Tah Trench grate transverse bar
. TG Trench grate longitudinal bar
wm Washing TMV, Thermostatic mixing vaive
Machine Vv Tempering valve
EWG Floor Waste u/g Underground
gully u/s Under’ slab
. U.n.o. Unless noted otherwise
Bn Basin WS Water supply
Bath
Shr Shower
FHR Fire Hose Reel C)
cs Cleaners Sk
HWS Hot water system
Bulje> of
PROPOSED
DEVELOPMENT
enity Ct
-
eT
L..
Ternpering valve
max 50°C
NP
NP eee NP
mark “NON POTABLE’
Irrigation
Note:
NP npl
z
o
tps. |
STORMWATER HARVESTING STRATEGY
Attungg Hts
Angier St
Viewland Br
Dishwasher
Provide mosquito safe
overflow and infiow screening
Slow leak
Pump
HC
stormwater
system
to be determined
zone
Stormwater
pit
Harvesting
Roof water
Sludge valve
optional
limiting volve within
path box
Capilary bleed tubing
discharge point from
first flush device, or
in garden 1m away
Rainhead with leaf!
screen and mosquito
screen if applicable
|
floating ball
valve
Mox SO0OkPa pressure!
RPB Towns
Lots 9 & 10 on SP1/79879
DRAWINGS
1743
1743-0-1
— GENERAL NOTES & LEGEND
— STORMWATER OPERATIONAL WORKS
Pollution Control Management Plan (PCMP):
1. To be responsibility of Management
2. To list all in flow filtering devices like leaf eaters
at DP’s and other filters
3. To keep and maintain a log of cleaning
4. To clean devices including first flush storage tank
—as to manufactures specification
—minimum quarterly, but monthly in rainy season
—after each major rainfall event
To inspect and clean tanks minimum once yearly
To install and maintain pump and fixtures for
reuse/watering/irrigation as to manufactures specification
ao
Description
Hl
Issue Notes Date
For Development Approval
For Construction
s Constructed
TO85r#
CATCHMENT AREAS
(TOTAL OF BOTH
PROPERTIES)
Construction Hydraulic
contact: Reinhold Koenning MicAust RPEQ No 7023
PO Box 1176
Buddina QLD 4575
email: [email protected]
www.conh
PH: 5444 8645
FX: 5444 8224
MATTEW & JOANNE EXLEY
ARCHITECT“ OUTHERN CROSS
D N & DKA N
PROPOSED RESIDENTIAL
LOTS 9 & 10 GRANT STREET
NOOSA HEADS
DRAWING TITLE:
Note: PROJECT:
All kitchen, laundry & bathroom fittings and toilets
to comply with the AAA Water Conservation Rating
System as defined by AS/NZS6400.
Provide flow restrictor valves where necessary
to taps and shower roses. The flow shall not
exceed a maximum of 9L/min
GENERAL NOTES &
LEGEND
Sel ear e |
: iF
1743 )
RPD:— Lots 9 & 10 on SP179879
Page 29
— EXISTING TREES TO BE REMOVED.
REFER LANDSCAPE PLAN
4711 3000 5800 600 4400 4800
— —1 t —H
2600 4 3800 4000
~_ on DECK POST
nh
1809 HIGH GOOD NEIGHBOUR FENCING 37
N |
LINE OF BUILDING UNDER
[con
|e AS
—_
—_
10, 1200 | 1200
,
|
Be
ea!
N =
SS
N
N
N
=o
dd
SS
NN:
e
hoe
BRS
Sh
oO
NSS
YA ss
oo 1S
= 5
4030
NN
INI
16093
322°55'20"
Th
iy
1S
!)
I
j
y
i
y
Mn
AKAM"
LNA
V7
SAL)
La
VL
7)
Z
UO
£3
1103 , 1200
i
J ns
PMMA 4 ee
rs | en Q OR 1a aU) ORATED-DR
DECK POST
i 4030
AB
Ws
ELAS
Wh
at
AAA 7
LAG
Lies
ILE
P
I
I
Veg
y}
ee
\\
1800 HIGH GOOD NEIGHBOUR FENCING
\
WS Southern Cross
Design & Drafting
Commercial * {Industrial * residenti
| SITE PLAN
SCALE 1:100
= sult BO ait” Ave Maro yoo eoctionon ot
i : ax:
QBSA Lic 1110414 queensland inc.
Member
Oy rect BOX
P TELEECM PIT
lve LIGHT POLE
|
|
3
3
4
8
a
+
wo
Qa
6
o
5
8
PROPOSED LETTERBOX
2 LOCATION
oO
N.
| PROPOSED VEHICLE
3 CROSSOVER
B
2| 2
2 PROPOSED DRIVEWAY - REFER
3 DRIVEWAY DETAILS BY HYDRAULIC
* ENGINEER. EXPOSED AGGREGATE.
2 CONTROL JOINTS TO BE LOCATED @
3m cts MAX SPACING.
8
N
| ____ PROPOSED LETTERBOX
8 LOCATION
3
oO
a
a
8
LETTERBOX &
CROSSOVER
MAIN STRUCTURE
GRANT STREET
TELECOM PIT
ELECTRIE BOX
been prepared for Building Permit application only. itis the Builders/owners responsibility
er interprat the design and drawings to detail the project for construction.
Builder shall verify all locations of services, dimensions and levels prior to construction.
Setout dimensions on site shall be confirmed uilder before commencement of construction and ordering.
Amend setout if necessary to comply with council by-laws and setback distances.
During construction the building shall be maintained in a stable condition and no part shail be overstressed.
SITE NOTES:
LOT 9 ON SP179879
PARISH OF WAVER
COUNTY OF MARCH
GENERAL NOTES
1. All survey pegs are to be sited in
position prior to the commencement of
construction.
2. The dwelling is not to exceed 8m
above the natural ground line.
3. The profile of the vehicle access
drive Is to be as per council requirements
4. LANDSCAPING. The site is to be
adequately drained to the engineer's
recommendation as set out in the SOIL
REPORT and CSIRO
for the maintenance of residential slabe
5. Stormwater to on-site water storage
tanks as per Hydraulic Engineer's design
6. All downplpes to be 900 UPVC No.
OFF as shown.
7. Household waste to local authority
sewer
8. All dimensions are in milimeires
U.N.O.
NOTE:
DISCHARGE STORMWATER AS
PER HYDRAULIC ENGINEERS
DETAILS AND SPEC
SCHEDULE OF SITE AREAS
AREA LOT 9
a
SITE COVERAGE | 39.5% (214.61m3
(FOOTPRINT)
LANDSCAPED AREA | 192m2 REQUIRED
(60% SOFT LANDSCAPING)
_ | 218.44m2 PROVIDED
AMENDMENTS
27.08.07 Raised carport slab RL
Updated driveway profile
19.09.07 Moved Unit 800mm towards rear
boundai
Raise Unit 200mm and lower
carport slab mm.
Updated driveway profile.
PROJECT TYPE:
CLIENT:
LOT NUMBER:
STREET:
Noosa Heads
Page 30
(>
VY
£ a
a _—
i —
+ Qo —
a 550 of/hang —
1800 o/hang —
+—# +——___# — 600 ofhang
ALUMINIUM FRAMED WINDOWS COLORBOND CUSTOM ORB TIMBER PURLINS AND RAFTERS _—
AND DOORS FIXED TO ROOF SHEETING TO MANUF. @ 900 CRS TO ENGINEERS, —_—
MANUFACTURER'S SPEC AND SPEC FIXED TO N3 DESIGN AND DETAIL.
N3 RATING NON-CYCLONIG RATING PBO LINING TO U/SIDE OF
HWD RAFTERS - SEALED AND RAFTERS ¢—_—___—_———_ HWD RAFTERS - SPANRIB ROOF SHEETING TO
PAINTED WHERE EXPOSED SEALED AND PAINTED MANUF. SE le N3
NON-CYCLON!
gm ABOVE NGL a
PITCH + —
JOINERY _ | oT
| UNIT 2 : 250mm GRATED DRAIN
| LIVING DINING et CONCRETE
| DRIVEWAY
Ht 1000mm GLAZED 7 2
BALUSTRADE B
TIMBER FRAMED FLOORS ae
: TO ENGINEERS DETAILS :
UPPER FLOOR @ RL 23.84 | : i +H He page Ga FEE ID RR BRT So ip
2 * —r Pp pl ee a nnn = = Cae LEO
eee 7 | Wh DPC UNDER TIMBER : [ “EP: ss : we : w .
a Wak ene ot FRAME & SLAB. . her
JOINERY - . Vg EY _ _ CONTINUE CEILING Det
ao wpe SP ee LINING UNDER SLAB ean
i RC BLOCK WALL TO oe
ENGINEERS DESIGN wey:
| AND DETAIL. PBD piv
BED 1 LINING TO WALL po oo
| BED 2 ae ee II OX SYP NYNYNYN
TIMBER FRAMED pte . CLAN CCAS
FLOORS TO DPC TO MANUF. we TAY SS ~~
LOWER FLOOR @ RL 20.94 ENGINEERS DETAILS SPECIFICATIONS I. G CY 7 ENGINEERS DESIGN AND
@RL 20, 7 KES SY -ERRACE SLAB even
@RL 20.89
RC SLAB, BLOCK RETAINING WALL
AND FOOTING TO ENGINEERS DESIGN
AND DETAIL.
ar H/
MN) ig
ANAS!
HWD TIMBER DECK WITH HWO
SHOTEDGE DECKING AS PER orem te Wy To AG. DRAINAGE PIPE. MIN. 100mm
| es vr Xx KK 90 X 19mm SHOTEDGE HWD
OY KS ~ S TIMBER BATTENS BETWEEN
NEIGHEOUR FENCING | RRA KS» 7, » We, » BLOCK WALLS
> f
NGL AT SECTION
; 75 x 75 SHS POST A
VCS
VRRIRIRISINS y I
FIRE RATED PARTITION WALL RC FOOTING STO ENGINEERS
TO MIN. FRL 60/60/60. DESIGN AND DETAIL.
SELECT CR FINISH
SECTION A-A - TYPICAL
SCALE 1:50
Southern Cross a
D e S I n & D r a ft | Nn g These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility
to further interpret the design and drawings to detail the project for construction.
Comme rcial * Industrial * residentia building . Builder shail verify all ‘acations of services, dimensions and jevels prior to construction.
Suite/4 80 Sixth Ave Maroochydore Gesigners' Setout dimensions on site shall be confirmed by builder before commencement of construction and ordering.
Ph: 5479 5313 Fax: 5479 5314 asecciation of Amend setout if necessary to comply with council by-laws and setback distances.
QBSA Lic 1110414 queensiand Ine. During construction the building shall be maintained in a stable condition and no part shall be overstressed.
ee
£
—_
£
a
2
a
GRANT STREET
RL 24.754 Ri 24.008 Ri 24.767
RL 24.634 — RL 24.630
My RL 24.027 oo \ \ XS XS XY RX Sx
: ROR NININ NINE
Sot
CARPORT SLAB @ RL 23.79
190mm RC BLOCK RETAINING
WALLS AND FOOTINGS TO
ENGINEERS DETAILS.
AG. DRAINAGE PIPE. MIN. 100mm
AMENDMENTS
27.08.07 Raised carport slab RL
& added 400mm step in slab.
Updated driveway profile
19.09.07 Moved Unit 800mm towards rear
boundary.
Raise Unit 200mm and lower
carport slab 250mm.
Updated driveway profile.
Changed truss roof to rafter
and purlins with raked ceiling.
Changed wall between Bed 2 &
Terrace from timber frame to
RC block.
PROJECT INFORMATION Title: SECTION A-A
Drawn: JL
provectTvpe | AESDENTIAL | [Signed
LOT NUMBER: Date: 19/9/07
STREET: Scale: 1:50_Al 40f8
SUBURE:
Page 31
REFER ENGINEER'S = : S SA S
DETAILS se RC BLOCK PARTITION WALL =‘, Ss S Ss
fT REFER ENGINEER'S fF
DETAILS
| FRAMING PLAN - TYPICAL ROOF
| SCALE 1:100
NOTE: UNIT 2 MIRRORED
REFER
ENGINEER'S: RC BLOCK WALL TO ENGINEERS
DETAILS —- DESIGN AND DETAIL
a
REFER ENGINEER'S ~~),
DETAILS ed RC BLOCK PARTITION WALL
TRIMMER
FRAMING PLAN - TYPICAL FLOOR
| SCALE 1:100
NOTE: UNIT 2 MIRRORED
RIMBOARD TO ENDS OF
CANTILEVERED FLOOR JOISTS.
REFER ENGINEER'S DETAILS
PBD LINING TO BLOCK WALL
CARPET FLOOR AS
PER BUILDER'S
CONTRACT
P41 PI
anced
Is | / LOWER FLOOR
mts “el FB TN | one
Bt. : TS
ena 7! | | - : 7 | | | Yqnove,” é Quem
Pi gee Pls tidy sl |. xi \\/ z| FLOOR BEARER +
- . “ cone 3S
- | | | . | | UNIT 1 1: | : | | li ze /\ E F14 HWD POLE PLATE FIXED TO
— _ Fe = __ st | Nes \ $ RC BLOCK RETAINING
__@ : =T Fo) — -2 t 2b @ w WALL TO ENGINEERS DETAIL
Pip OM Pl | { { | | | yon os uc mo \ 5|
-—3I 5. . to Is . \
|
L-
f
REFER ENGINEER'S ———},
$ SAAS SANSA ANANS ROGGE
DETAIL! “e@- RC BLOCK PARTITION WALL
BES
RRR
FRAMING PLAN - TYPICAL SUB FLOOR
DETAIL SECTION
Rimboard
Fiooring to be continuous over top edge of
Rimboard and under bottom walt plate. Use
a continuous glue-line strip along the top of
the rimboard prior to fixing the flooring. Nail
Rimboard to end of joists using 1/76%x3.15 nait
to each top and bottom flange.
17mm F11 Pty Rimboard for
full depth of Hyne--Beams.
Bottom edge of rimboard to be
skew nailed to lower wall plate or
bearer at 200mm centres. Use
75x3.15mm nails.
HYNE-1-BEAM
Joists
For correctly supported rimboard, with fixings as
detailed above, the bottom wall plate of the upper
storey frame may be sized as fully supported.
TYPICAL RIMBOARD DETAIL
N.T.S.
REFER DESIGN-IN-HYNE DETAILS
STRUCTURAL DESIGN BASED UPON
NON-CYCLONIC N3 FOR WIND SPEEDS TO 41 ms.
FOR FURTHER STRUCTURAL & FOOTING DETAILS
REFER STRUCTURAL ENGINEERS REPORT.
WHERE NO LINTEL SPECIFIED OVER OPENING
MINIMUM 90 x 35 F17 APPLIES.
WHERE GIRDER TRUSSES OR OTHER
POINT LOADS ARE TO 6E SUPPORTED
OVER LINTELS & VERANDAH PLATES
SIZES ARE TO BE CONFIRMED BY A
STRUCTURAL ENGINEER PRIORTO
CONSTRUCTION & PLANS AMENDED
ACCORDINGLY
SELECT CR FINISH TO BLOCK WALL
OPC TO MANUF. SPECIFICATIONS.
TERRACE SLAB @ RL 20.89
RC SLAB AND BLOCK RETAINING
WALL TO ENGINEERS DESIGN
AND DETAIL
AG. DRAINAGE PIPE. MIN.
100mm COVER OF 206mm
AGGREGATE. BACKFILL WITH
RUBBLE
RC FOOTING TO ENGINEERS
DESIGN AND DETAIL
SCALE 1:100
NOTE: UNIT 2 MIRRORED
SCALE 1:20
~ Southern Cross
Design & Drafting
Commercial * Industrial * residenti
Suite/4 80 Sixth Ave Maroochydore
Ph: 5479 5313 Fax: 5479 5314
QBSA Lic 1110414
POST FOOTING DETAILS
FRAMING SCHEDULE LEGEND
BT1 £14 HWD ROOF BATTENS @ 900CRS P2 75x 75mm SHS
CB1 F14 HWD CARPORT BEAM OR SIMILAR PP1 F14 HWD POLE PLATE
CB2 F14HWD CARPORT BEAM OR SIMILAR R1 F14 HWD TIMBER RAFTER @ 900CRS
DJ1 F14 HWD DECK JOISTS @ 450CRS OR SIMILAR
FB1 FLOOR BEARER TO R2 TIMBER RAFTERS @ 900CRS
ENGINEER'S DETAIL TO ENGINEER'S DETAIL
FJ1 HYNE I-BEAM FLOOR JOISTS R314 HWD TIMBER RAFTER @ 900CRS
@ 450CRS R4 HYNEI-BEAM RAFTERS @ 900CRS
L1F17 KD HWO TIMBER LINTEL RB1 F14 HWD ROOF BEAM OR SIMILAR
L2 BESSER LINTEL BLOCK RB2 TIMBER ROOF BEAM TO
P1 = 100 x 100 F14 HWD ENGINEER'S DETAIL
VB1 F14 HWD VERANDAH BEAM OR SIMILAR
REFER TO STRUCTURAL ENGINEERS DWGS & SPEC
FOR FURTHER STRUCTURAL DETAIL
STUDS AT SIDES OF OPENINGS
2400 HIGH CEILING
WIDTH OF No, OF STUDS
OPENING EACH SIDE
900 1
1200 2
1500 2
4800 2
2100 2
2400 3
2700 3
3000 3
3600 3
48000 4
TIMBER SCHEDULE
TOP PLATES EXTERNAL — 1/35x70 + 1/45x70 MGP12
INTERNAL 35x70 MGP10
STUDS EXTERNAL & 70x35 MGP12 @ 450 CRS
INTERNAL
BOTTOM PLATE 35x70 MGP12 - ONLY IF SOLID BLOCKED BELOW
OTHERWISE 45x70 MGP12
TERMITE PROTECTION
AS PER AUSTRALIAN STANDARDS AS3660. 1/2000
NOTE:
FOR BRACING, TIE-DOWN AND
FURTHER TIMBER SCHEDULE
DETAILS REFER STRUCTURAL
ENGINEER'S SPECIFICATION
AND DESIGN
400x100mm HWD POST 7§ x 75 SHS POST
TOP OF FOOTING SLOPED
AWAY FROM POST
GROUND
HOT DIP GALVANISED
STIRRUP CONCRETE PAD
FOOTING
‘MIN 20MPa MASS:
CONCRETE FOOTING.
TERMITE PROTECTION
AS PER AS 3660
SCALE 1:20
For further detail & information refer engineers spec
Notes:
These drawings have baen prepared for Building Permit application only. itis the Builders‘owners responsibility
to further interpret the design and drawings to detail the project for construction
building designers’
queensiand Inc.
Member
Builder shall verify all locations of services, dimensions and levels prior to construction.
Setout dimensions on site shall be confirmed by builder before commencement of construction and ordering.
Amend satout if necessary to comply with council by-laws and setback distances. STREET:
During construction the building shall be maintained in a stable condition and no part shall be overstressed.
AMENDMENTS
19.09.07 Raise Unit 200mm.
Changed truss roof to rafter
and purlins with raked ceiling.
Changed wall and lintels
between Bed 2 & Terrace from
timber frame to RC block.
Amend framing and
timber schedule.
ite: FRAMING PLAN/DETS.
PROJECT INFORMATION
Drawn: JL
PROJECT TYPE: RESIDENTIAL Signed:
CLIENT:
LOT NUMBER: Date: 19/9/07
Scale: As Shown A1_| 6 of 8
(SUBURB: | BURB: Noosa Heads
Page 32
. 24200 a _
. _. 10800 . +9800 . | o
sy an sacar : a — sauonere rap nn s.ock b
no 70 3730 LIVING 70 3860 KITCHEN 70 2930 DINING. 70 300 2750 \ 7H 100, 5000 TIMBER BATTEN 2 B
5 ENCLOSURE AS REQUIRED bE
i] 100 70 3730 LIVING a . 6860 KITCHEN/DINING 70 100 2750 2750 100 00 4400 - ao
3 go le & C
s REFER WINDOW sHo © HwD ot % 3 A
WW 90 X 19mm TEDGI
a SHADE TIMBER BATTENS TO POSTS. 2 & ae)
Se eR ee te e +> Se
REFER WINDOW Line of beam over oe D
ggje2 SHADE TAP << x 3g
P| ok ok FR “| | GF BIN < 3 |
| | 8 3, —_ Panty ; eee. STORE s PL.
ies _ © DWP SINK wo oss g | 9 5 ELEVATIONS
- rr a fea KiTeH By CARPORT | Bg
r 3 = = a5 CONCRETE [ry . S| NOTES:
a | 2 3 men 5 se 1:20 RISE NOTES:
i s o 5 400 x 100 HWD | LIVING she ,o8 : 23 g g 8 2
> 2 gg TIMBER POSTS HAND TIMBER FLOOR = 6 eu 3 28 400 x 100 FWD e} z= STAIRS TO COMPLY WITH BCA 3.9.1.3 AND 3.9.1.4
s x1 S| 3 | g 2 E 3 | TIMBER POSTS E z HANDRAILS AND BALUSTRADES TO
mS] <| & 9.2.
aoe & 3 UNIT1 3 @ | "| & § | g (MIN 1000 HIGH AND 125 BETWEEN RAILS)
8 § 5 i 2 e
- FIRE RATED . Line of beam over gs
= | ITCEN 290 Sy WenRTITION T CONCRETE 2 a8 ROOF WATER TO BE DISCHARGED TO
i aI WALL MIN. FRL @ 50 STEP ENTRY GATE = s| 8 ON-SITE WATER STORAGE TANKS
2 Steteteret | = ; Sam erereenes oe ORIVEWAY = ¢ 1:4 4:8 (4:41) [1:40 | 1:8 ai AS PER HYDRAULIC ENGINEERS
2 xg 7 aaa TTA — z RISE IRISEIRISEY RISE [RISE oreerere DETAILS AND SPEC
ENTRY cate o 3
2 2 1 a sts N3
a | IT CEN E aL. "olen er RE BLOCK WALL 5 A eae STRUCTURAL DESIGN BASED UPON
x Fe PBD LINING TOTS. & 3 FWaLLz700 | 4 g NON-CYCLONIC N3 FOR WIND SPEEDS
a 3] PARTY WALL. - 3 TOP OF WALL 270 2 g 3
N Barre] 2 BOTH SIDES 5 UNIT 2 ‘5 @ | 2] ores 5 a | 2 TO 44 mis.
3 a & 4 s 100 x 100 HWD &|
- il g 5 100x10oHWo _| | NG & ° “eS > : DINING Es TIMBER PosTs 5 Zz ALL WATER CLOSET DOORS TO HAVE
z a |= 8 ruinrosts Foor 3 “COs. [5 wo Tamer Foon i: gHal 1-20 RISE ga |g LIFT OFF HINGES
S g Ze ir)
a 5 3 2 KITCHEN 38 | CARPORT i 5 | & 3 LINTELS SPECIFIED REFER ENGINEERS
zg a " © MWD TIMBER FLOOR’ £8 3BE 3 REPORT. ALL WET AREAS TO COMPLY
2% dua ws Mek 2 | s WITH B.G.A. 3.8.1 LINE U/SIDE OF
a ar Panty r toox100HWwp | IN | BIN eer EXTERNAL COVERED AREAS WITH F/C
gO = Bue TIMBER POSTS STORE SHEETING.
2 8 _| | | A a | | +
x] & x REFER WINDOW TAP Ly & “| SMOKE ALARM
in WY
AR eae ee ome soe abasic = < ~ ae ~ SMOKE ALARMS TO BE INSTALLED IN
o REFER WINDOW 90 X 19mm SHOTEDGE HWD = YS =| 3 ACCORDANCE WITH BCA 1996 CLAUSE
Ee
5 SHADE (D1) TIMBER BATTENS TO POSTS Rs © 3.7.2. SMOKE ALARMS TO COMPLY
° 10 Nr Ly a WITH AS 3786
x 100 2500. 3730 LIVING 70 6860 KITCHEN/DINING 70 100 2750 { 2750 100; 0 4400 9
° bE
tu 100 2500 70 3730 LIVING 70 3860 KITCHEN 70 2930 DINING 70 [i 06 2750 100 2750 400) 5000 HATCHINGS AND FITTINGS ARE INDICATIVE
a 2600 DECK 3800 4000 3000 5800 T . 5000 WAL ron ns AND BLOCK S ONLY. REFER BUILDERS SPECIFICATION
EN
Aen OER “ee 4 ENCLOSURE AS REQUIRED s TERMITE PROTECTION:
24200 + AS PER AUSTRALIAN STANDARDS AS3660.1/2000
SCALE 1:100 — a 24200 xe aw + SCHEDULE OF FLOOR AREAS
UNIT 1
2600 DECK a a m0 i190 —_—__ S510 LOWER FLOOR LIVING: 64.92 sqim
100 2500 70 2660 70 1000 1890 BATH 4 1 eo S130 BED 2 1860 750 A90 1810 af 4620 190 LOWER FLOOR OUTDOOR: 30.80 sqim
100 2500 70 3480 BED 1 ye LOR’ +2 2830 2810 TERI E A90 6620 A90 UPPER FLOOR LIVING: 57.05 sq/m
o 3500 UPPER FLOOR OUTDOOR: —10.40 sq/m
B a 90 x 19m CARPORT/ENTRY: 39.44 sq/m
3 100 2400 00 00 im SHOTEDGE HWD
&® STAIR POSTS 1004 _2400_" ff s00_ 100 TIMBER BATTENS TO POSTS SUB TOTAL: 202.61 Sq.m
5 REFER wypow REFER WINDOW tween pees UNIT 2
a 8 LINE OF STRUCTURE OVER “\ Ey LOWER FLOOR LIVING: 64.92 sq/m
Ae Re a ae : ~~ + ——'—z 3 + DOOR SCHEDULE LOWER FLOOR OUTDOOR: — 30.80 sq/m
a a | 8 Sq eer q g y S > a NO. SEE TYPE UPPER FLOOR LIVING: 57.05 sq/m
LL Bley = Ty Uva 3 N : UPPER FLOOR OUTDOOR: 10.41
+e = ft + N NL = af e| SELECTED TIMBER FRAME OR OQUTDOO! 0.40 sqim
3 ei N CARPORTIENTRY: 39.44 sq/m
SSS al x 2 N \ 5 g FEATURE DOOR SUB TOTAL: 202.61 Sq.m
ee w S44 N \ a [D2 | 21/24 SLIDING GLASS DOOR
Td é si +) | s
= a 3 Pe 2 = 2 GARDEN N a 8 |03 [820 _| SOLID CORE W/- GLAZING PANE
3 Sw on z z TOTAL F.A. 405.22 sq/m
g = ue xe 2 N a| 8 D4 | 24/24 VINYL SLIDER
bk 8 oP 100 x 100 HWD ¥ TERRACE || 32 3 N \ aca s #
> 3 = TIMBER POSTS 35 cence || P29 N ga 3 rps] 820] HOLLOW CORE
s 5 2.5 5 E ee N | | D6 | 720. __—* | HOLLOWCORE TO SUITOP.
alah =| s = & 90x 19mm SHOTEDGE N HOLLOW CORE
| eo . | Benet ocacnens Nd 3 | bs__| s20cs HOLLOW CORE CAVITY SLIDER
3 = LINE U/SIDE OF TM Ar 8100x100 HWO TIMBER YS [po | 214/15 VINYL SLIDER
Z CuLING To aur NEN 2000 a) Post N 38 " | D10_| 770 HOLLOW GORE TO SUIT OP
3 CEILING TO SUIT a 1 HOT - N 5 2 al .
& aiepaiee eS Sy go SSS SSS ST ae N au S| | D11 | 2118 SLIDING GLASS DOOR
7 3 LINE U/SIDE OF EI Litas FIRE RATED N 2 N w2 2
3 STAIRS - RAKED e PARTITION s Ny
3 CEILING TO SUIT wn] WALL MIN, FRL ai N oa g NOTE:
| iF au “| WINDOW SCHEDULE WINDOW AND DOOR SZES
5 g BED 1 tne tiGH Rc N ar 2 ARE INDICATIVE ONLY.
nN Berea one ON es | NEE + [No] SE ALL OPENING GLZES ARE TO BE
mio rs
= a" | 3 = rey gi 8 DETAILS y Twi | 124esw ALUMINIUM SLIDING CON RMON SITE BY
—_ wl A x a oI
> 2S ae 200 100 WD BED 2 .¢ and . y / g w2__| 18/06 DH ALUMINIUM DOUBLE HUNG ALL WEEDS AND DOORS
3 ¥S age 3 Ny 06/06 SW- OBS | ALUMINIUM SLIDING UUM FRAME
Z| Goa 25 O22 N / el EXCEPT WHERE NOTED
+a 8 3| © 9} GARDEN N | w4__| 06/15SW-OBS | ALUMINIUM SLIDING
a | a & o2¢ N / [ws | 122sw ALUMINIUM SLIDING
sf ef 2 Eu ci N J g | we | 18/24 Sw ALUMINIUM SLIDING LEGEND:
ne glee $ 4 t N ‘ g =
s/- 190mm RC BLOCK WALLS
~ a“ N / XI TO ENGINEER'S SPEC.
sg 7) & g N 2
SI AR he Se he ie _ u ALA ae MEE. 70mm TIMBER FRAMED WALL
2 REFER WINDOW REFER WINDOW LINE OF STRUCTURE OVER S 8
5 SHADE SHADE 100 x 100 HWD
& ~ SY tox mms sroreocs wo AMENDMENTS
< 100 2400 100, 800 [1100 a 3 27.08.07 _—_— Raised carport siab RL
a STAIR POSTS 3500 TIMBER BATTENS TO POST & added 400mm setp in slab
5 Updated driveway profile
10 2500 704. 3480.8ED 1 70 p80 10k 70 2830 70,4530 470 3130 BED 2 +p% 2810 TERRACE 190 6620 +a 19.09.07 Updated driveway profit.
Chan ed door between Dining &
100. 2500 Op 2660 70 1000} soo} 1690 BATH —H, 1000" 590 yo 3130 BED 2 490_ 1860 10044, 750 J [90 1810 42% 4620 pa ox pert to Window ining
4
+
+
2600 DECK 3800 f 4000 3800 + 3190 + 6810 Changed truss roof on Upper level
to rafter & purlins with raked ceiling.
Changed wail between Bed 2 &
Terrace from timber frame to
RC block and changed door sizes.
LOWER FLOOR PLAN
SCALE 1:100
24200
2600 DECK 17600 fe 31490 LY 6810
¢
S Southern Cross Notes
j & i i These drawings have been prepared for Building Permit application only. It is the Builders/owners responsibility - [Drawn
De S | g n Dra ft | n g to further interpret the design and drawings to detail the project for construction | PROJECT TYPE: | TYPE: [ RESIDENTIAL
a
Commercial * Industrial * residenti building designers’ Builder shait verify all locations of services, dimensions and levels prior to construction. | CUENT: | Matthew & Joanne Exley |
Suite/4 80 Sixth Ave Ma roochydore of Setout dimensions on site shail be confirmed by builder before commencement of construction and ordering. LOT NUMBER: 9 Date: 19/9/07
Ph: 5479 5313 Fax: 5479 5314 rctana a ae ee eb ih cunek by lows an eaback RTE, varrensed STREET. mrs Scale 1.100 AY | 2ata
QBSA Lic 1110414 queensiand inc. uring constr uiding shall be maintaine econ Pal overstressed. Revision’ 2
Member
Page 33
COLOUR 3
Unit 2
4
poner RENDERED FC SHEETING FIXED TO
70mm TIMBER F
COLOUR 3
LOWER FLOOR@RL 20.96
100 X 100 HWD TIMBER POSTS.
COLOUR 3
LOWER FLOOR @ RL 20.94
TIMBER FRAMED STAIRS WITH __|
SS WIRE BALUSTRADE
SCALE 1:100
Unit
COLORBOND CUSTOM ORB ROOF
SHEETING TO MANUF. SPEC FIXED
TO N3 NON-CYCLONIC RATING.
COLOUR 1
i
a!
ELEVATIONA
RAME.
N3 RATING
1 Unit 2
RENDERED FC SHEETING FIXED
TO 70mm TIMBER FRAME.
COLOUR 3
FIRE RATED PARTITION WALL
TO MIN. FRL 60/60/60.
-— 1000mm GLAZE
BALUSTRADE
SELECT CR FINISH. COLOUR 3
SCALE 1:100
Sheet roof, gutters
& downpipes.
Custom Orb
cladding
Timber batten
screens
Rendered sheeting
, walls & exposed
timber
(truss tails, posts,
ELEVATION C
COLORBOND
"Windspray”
or equal colour
DULUX
; "Ferry"
or equal colour
OULUX
"Clay Bake”
or equai colour
beams & battens)
Schedule of External Colours
= Foe
ul bition a
“er
90x 19mm SHOTEDGE HWD TIMBER
BATTEN SCREEN. COLOUR 2
SUSPENDED RC SLAB TO
ENGINEERS DESIGN AND DETAIL
RC BLOCK WALLS WITH SELECT
GR FINISH. COLOUR 3
SOLAR HOT WATER SYSTEM AS
PER BUILDER'S CONTRACT.
POSITION TO BE VERIFIED
COLORBOND FASCIA AND
GUTTER. COLOUR 4
+—— ALUMINIUM FRAMED WiNDOWS
AND DOORS FIXED TO
MANUFACTURER'S SPEC AND
N3 RATING
COLORBOND CUSTOM ORB
CLADDING TO MANUF. SPEC FIXED
TO N3 NON-CYCLONIC RATING.
COLOUR 1
|
|
Line O
COLORBOND CUSTOM ORB ROOF
SHEETING TO MANUP. SPEC FIXED
TO N3 NON-CYCLONIC RATING.
COLOUR 1
Property
ef
ALUMINIUM FRAMED WINDOWS AND
DOORS FIXED TO MANUFACTURER'S
SPEC AND N3 RATING
RENDERED FC SHEETING FIXED TO
70mm TIMBER FRAME.
HWD RAFTERS AND BATTENS - SEALED AND COLOUR 3
PAINTED WHERE EXPOSED. COLOUR 3
GRANT STREET
ly
|
|
/
COLORBOND CUSTOM ORB ROOF
SHEETING TO MANUF. SPEC FIXED
TO N3 NON-CYCLONIC RATING.
RENOERED FC SHEET FIXED TO
70mm TIMBER FRAME.
COLOUR3 ———
TERRACE SLAB @ RL 20.89
RC BLOCK WALLS WITH SELECT CR
FINISH. COLOUR 3
90 x 49mm SHOTEDGE HWD TIMBER
BATTEN SCREEN. COLOUR 2
DETAILS ON SHEET 7
TIMBER FRAMED STAIRS WITH
SS WIRE BALUSTRADE
COLORBOND CUSTOM ORB
CLADDING TO MANUF. SPEC FIXED
90 x 19mm SHOTEDGE HWD
Property Line ( )
TO N3 NON-CYCLONIC RATING.
TIMBER BATTEN SCREEN.
ELEVATION B ~~ me
2
£
a
é COLORBOND CUSTOM ORB ROOF eo
$ 400 SHEETING TO MANUF. SPEC FIXED 1 —
| g or ore TON3 NON-CYCLONIC RATING. pot _—
COLOUR 1 _
ALUMINIUM FRAMED WINOOWS AND RENDERED FC SHEETING FIXED TO _— —
70mm TIMBER FRAME.
COLOUR 3
DOORS FIXED TO MANUFACTURER'S HWD RAFTERS AND BATTENS - SEALED AND
_ PITCH
JOINERY.
——— COLORBOND FASCIA
AND GUTTER.
COLOUR 1
UPPER FLOOR @ RL 23.84
CEILING
JOINERY.
100 X 100 HWD TIMBER
POSTS. COLOUR 3
LOWER FLOOR @ RL 20.94
BOUNDARY
FENCE
PITCH _
JOINERY
COLORBOND FASCIA
ANO GUTTER.
COLOUR 1
UPPER FLOOR @ RL 23.84
“CEILING
JOINERY
100 X 100 HWD TIMBER:
POSTS. COLOUR 3
BOUNDARY
FENCE
SPEC AND N3 RATING
gm ABOVE NGL
90 x 19mm SHOTEDGE HWD
i
TIMBER BATTEN SCREEN.
COLOUR 2
~ Southern Cross
ELEVATION D
Il
rend
PAINTED WHERE EXPOSED. COLOUR 3
GRANT STREET
COLORBSOND CUSTOM ORB ROOF
SHEETING TO MANUF. SPEC FIXED
TO N3 NON-CYCLONIC RATING.
COLOUR 1
— Oe
Ati
COLORBOND CUSTOM ORS
CLADDING TO MANUF. SPEC FIXED
TO N3 NON-CYCLONIC RATING.
COLOUR 1
Notes:
Des i g n & D r a ft i nN These drawings have been prepared for Building Permit application only. It is the Bullders/owners responsibility
to further interpret the design and drawings to detail the project for construction.
Commercial * industrial * residential building designers’ Builder shall verify all locations of services, dimensions and ‘evels prior to construction.
Suite/4 80 Sixth Ave Mar ochydore Setout dimensions on site shall be confirmed by builder before commencement of construction and ordering.
oochy;
Ph: 5479 5313 Fax: 5479 5314 association of Amend setout if necessary to comply with council by-laws and setback distances. STREET: Grant St
QBSA Lic 1110414 queenaland Inc. During construction the building shall be maintained in a stable condition and no part shall be overstressed.
Member
RENDERED FC SHEET FIXED TO
70mm TIMBER FRAME.
COLOUR 3
TERRACE SLAB @ RL 20.89
RC BLOCK WALLS WITH SELECT CR
FINISH. COLOUR 3
90 x 19mm SHOTEDGE HWD TIMBER
BATTEN SCREEN. COLOUR 2
HOODS. REFER
DETAILS ON SHEET 7
NOTES:
STAIRS TO COMPLY WITH BCA 3.9.1.3 AND 3.9.1.4
HANDRAILS AND BALUSTRADES TO
COMPLY WITH 3.9.2.3 (QLD)
(MIN 1000 HIGH AND 125 BETWEEN RAILS)
TIMBER FRAMED STAIRS WITH
SS WIRE BALUSTRADE
ROOF WATER TO BE DISCHARGED TO
ON-SITE WATER STORAGE TANKS
AS PER HYDRAULIC ENGINEERS
SCALE 1:100 DETAILS AND SPEC
N3
AMENDMENTS STRUCTURAL DESIGN BASED UPON
27.08.07 Raised carport slab RL NON-CYCLONIC N3 FOR WIND SPEEDS
& added 400mm setp in slab TO 41 mis.
Updated driveway profile
LINTELS SPECIFIED REFER ENGINEERS
19.09.07 Moved Unit 800mm towards rear REPORT. ALL WET AREAS TO COMPLY
boundary. WITH B.C.A. 3.8.1 LINE U/SIDE OF
Raise Unit 200mm and lower EXTERNAL COVERED AREAS WITH F/C
carport slab 250mm. SHEETING.
Updated driveway profile.
Add fixed s1azing panel above HATCHINGS AND FITTINGS ARE INDICATIVE
Changed truss roof on Upper level ONLY. REFER BUILDERS SPECIFICATION
to rafter & purlins with raked ceiling.
Changed wall between Bed 2 &
Terrace from timber frame to
RC block and changed door sizes.
TERMITE PROTECTION:
AS PER AUSTRALIAN STANDARDS AS3660. 1/2000
PROJECT INFORMATION ite: ELEVATIONS/COLOURS
2 JL
PROJECT TYPE: [ RESIDENTIAL |
CLIENT: Matthew & Joanne Exley
LoTMMeER [9
Noosa Heads
Date: 19/9/07
Scale: 1:100 At
(Revision: 2. | 2
Page 34
—_—— — —_——~—
—om) — — Rawr “ — ptvoutt 27 YSEO
ep. [CIWS oes seen [1930s Pewee PIES BLbS xe ELE BL¥S “Ud
tour wea} oLe6 FORE LOT NOLLONYLSNOD NOs LON soeiney Sapane : PCD SO). eeu Soa fal
. fang ——— AT es “NINO NOLLVONMdd¥ INSNdOT3A30 YO JUV SONIMVUG IS3HE Bunt 5 ene et 2 OOL-t JIWOS
= 3 ulyeig 9 ubISaq =
ee 0M §SOJ2) U@UINOS NV1d SLIS
—_ 0006 : 000s : OoRE o00r : oorr , 0092 LUSS
- § $
gs @ese & $ £ & & &
? v v ¥ v * * Be o> * © * °
AQ ONNTTION 40 INT
LLZEE ONIIN34 YNOBHOIIN GOOD HOIH 008L
Wu0OOL F009 NI WA009 S3AVS ——
SL “4s HOitd JOOY ‘NIN n02,GS02E2 28
TSNIGVISGNVT 1350S %09) ‘ ONIdvOSa 8
- 2WIPY'BLZ 2wZ6L V3UV O3dVISONVT
- SYIVLS
Ue gz 2WOZ Lle = %OF EDICERLOSENS | -
2 t- WID XVI ZWSE pez = USYO Owe LOW pote
4[L... [iSnodwazs 22) snosuaa 6’ SNOSUSd BY ALISN3G NOILWV dod ph | oe,
ZwEPS 2005 Vauv 31IS NIN po Eph a
S3A WG BO SATUOLS 2 IHDISH ONITIING * yu od. Ae: So ;
a3diAaoad SINIWSYINDIY ONINNY Td + i l| a a | v LINTY
: NOMWANOINI 11S 30 TINGSHOS — 7 ty ! h Bo GsSsod0ud.. «“-..
WIS A 1 WE wRaRT COrPBAZ BVVI Sep fee |. :
aa —] ot | WerrhT rE Ee | |; i oom . "___ omO09 TALS NIN
pS [— | wIGh yy wmont VSOGON TSATIOST s bay | on bo TIM NOUNS O31VE F813 3
erg =| aoe [wom § Pe = = YOO YIM)
mS VL Te moe | $e ow a ae diy [ ’ g
or t ii . y
onoasiytes Wey wavy HSNG SoU IN Pig dhe raga, fe " , . Pe
(pron iv Len wert wage HSPaVTLIT_ sonra NO | ‘OL 107 - -€ LINN, \°
ARs wan Pt ty i ;
Maas Sv] dy IGE “GOUMIMAL | Finanis viindawna| S773, : ff N | | | | | 14 . qasodoud
seeds lel Jaze etn gwen newutor | Iwo ayo neleg | | \ by
’ —_" AGT IER AG — amo eee a Pe
J | + RR | : $--;
: Q pao j
. =x
SOROUNMLI W258 SUOKELOUND AY “£ . =") g o
squewe be) ouNOD Jad $2 90 O1 St BAUD Sorayeyrg sw - SISHHYD OR z me = 8
S52008 ORION OLN JO OOK OU, “2 5 KI :
x . " me &
wp poears Oru 91 SUNOM BU et armoray Verh? ~ F282 FIMINI4 x ~ a | . > %
" SBLON TWu3N39 ~ , ves, z
Brg (lig S0AZO' SCI - WANS woul) fe é ;
aueyS - OL LOT V3NV ‘ : oa : a |
(Shenson Ar womcnsmen- ores une (2) PAY Ly | toauvo | - ZINN |
e1a6ctgeNO OL 2B S107 . ~* fos fo masons P| ; a3so dowd yo30 |
‘SALON SLIS noyen B30 igang ef and oor | i —— + 1 99108700 TH 4 NIN TIYM | we]
SIPONA AS &TIN 3 |_AVANSAINC | O30 ssi0°oVv ! : 4 I US : _ , | |: nN 2 x
: . 8 PSISHONOO | goman PP 77 7 {8 2 —¥YOO1s daddn
mag winghths oe br tora Pp | | | 8
Pre fi “4 : : ' . =
eal OHTA TENE ., iz | L LINN yoga | |
; -GaSOd0ud | yp
J | Oye
4 ‘dwo wer *
bon e |
. _s
, g id. “7 ¢ ‘
Q .
! 3 .02.SS.2S
r/ L LZEE DNIDN TY SOR QHO TA OOM) HOH ooBL )
ANA ONIOTING $0 UW?
0006 008s one oom cost one LUSS
Used in these records
07/1993 - Op Works - landscaping, carparking, access, frontage works, stormwater, erosion & sediment control [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.