07/1993 - Op Works - landscaping, carparking, access, frontage works, stormwater, erosion & sediment control [As Published] · 142007.1993

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

* INTEGRATED PLANNING ACT 1997

Development within the limits of a

port

For more information refer to Guide 18. For

information about prescribed fidal work refer to

Guide 24.

Hf you answered “YES” to Q12, the application

triggers referral to the Port Authority.

The Port Authority is a concurrence agency if the

development is -

« within 200m of a shipping channel or an enty
and exit shipping corridor for the port

® within 1000m of a swing basin, a commercial
shipping wharf, a mooring, anchorage or spoal
grounds;

® within 1000m of a planned port facility
identified in a land use plan approved under
the Transport Infrastructure Act 1994.

in all other situation the Port Authority is an

advice agency.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve development below high water mark'® and within the limits of a port
under the Transport Infrastructure Act 1994?

INO

(71 YES — complete Part M of Form 1, or Part P of Form 1 if the work is prescribed tidal work

 

 

Marinas

For more information refer to Guide 18. For
information about whether a marina is prescribed
tidal work refer to Guide 24. The local
government is the assessment manager for all
prescribed tidal work.

if you answered “YES” to Q13, the application
triggers referral to Queenstand Fire and Rescue

 

13.

Does the application involve operational work that is tidal work for a marina’? with more than 6
vessel berths?

{INO

(C1 YES - complete Part M of Farm 1, or Part P of Form 1 ifthe tidal work is prescribed tidal work

 

 

 

 

For further information refer to Guide 19.

Ifyou answered “YES” to Q15, the application
triggers referral to the Queensland Heritage
Council as concurrence agency for the
application.

Unless you answered “none of the above” to
Q15(b), the application involves referral to the

Environmental Protection Agency as an advice
agency for the application

Service as an advice agency. .
~ Tidal works In strategic port land tidal] 14, Does the application involve tidal works within a strategic port land tidal area®?
areas NO
For more infarmation refer to Guide 18, oO YES - complete Part M of Form 1
Unless you answered “NO” to Q14, the relevant
Port Authority is the assessment manager for the
application and the Environmental Protection
Agency (EPA) and Queensland Transport (QT)
are concurrence agencies for the application.
Heritage 15. Does the application involve development in a heritage registered place as defined under the

Queensland Heritage Act 1992?
Kx] NO

(1 YES - complete Part C of Form 1

15(b)The application involves: (tick applicable boxes)

(i) a material change of use assessable against the planning scheme and the lot shares a
common boundary with a protected area or registered place under the Queensland
Heritage Act 1992;

(A (ii) reconfiguring a lot if the lot shares a common boundary with a protected area or
registered place under the Queensland Heritage Act 1992;
EX] (iii) none of the above.

 

Declared catchment areas

For more information, Including a list of the
declared catchment areas within Queenstand,
refer to Guide 13.

Unless you answered “none of the above” to
Q16, the application requires assessment by the
Department of Natural Ri Water
(NRW).

If an agency other than NRW is the assessment
manager for the application, NRWis a
concurrence agency for the application in
elation to this matter.

 

16.

The application is in an area declared to be a catchment area under the Water Act 2000 and
involves: (tick the applicable box/es)

&] (i) reconfiguring a lot if any lot resulting from the reconfiguration is less than 16 hectares;
C1 (ii) development assessable against the planning scheme involving the establishment or
expansion of a waste water disposal system, other than a disposal system for carrying
out an environmentally relevant activity under the Environmental Protection Act 1994;
L(t) none of the above

 

18 High water mark is defined in the Coastal Protection and Management Act 1995 and means the ordinary high water mark at spring tide.
49. Marina is defined in the Transport Operations (Maritime Pollution) Requtation 1995.
20 Strategic port land tidal areas are the areas generally 50 metres seaward of high water mark adjacent to strategic port land.

Page 5

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1993 - Op Works - landscaping, carparking, access, frontage works, stormwater, erosion & sediment control [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.