Skip to the record
Accept no imitations.

Council archive · source document

07/1993 - Op Works - landscaping, carparking, access, frontage works, stormwater, erosion & sediment control [As Published] · 142007.1993

of 34

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

"INTEGRATED PLANNING ACT 1997
Works that take overland flow water

The relevant wild river declaration will state
works that take overland flow water are either
self assessable or assessable, or are exempt
from wild river requirements.

if you Scked Q13 i), your appfcation must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

Ifyou ticked Q13 if) an appfication is not required
to be made however the works must comply with
the relevant seltassessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

If you ticked Q13 iii) your application is not
subject to wild river requirements.

Applications for development that Is other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

Works that interfere with overland
flow water

The relevant wild river declaration will state
works that interfere with overland flow water that
are either self assessable, assessable or exempt
from wild river requirements.

tf you ticked Q15 i}, your applicaton must be
assessed by NRW against the Wild Rivers Code
and must comply with the code.

If you ticked Q15 ii) an application is not required
to be made hawever the works must comply with
the relevant seif-assessable section of the Wild
Rivers Code, otherwise the works become
assessable development for which an application
is required and must be assessed by NRW
against the relevant part of the Wild Rivers Code
and must comply with the code.

Wyou ficked Q15 iil) your appfication is not
subject to wild river requirements.

Applications for development that|s other than
that stated to be assessable, self-assessable or
exempt will not be accepted.

13.

IDAS Assessment Checklist, Version 20, 2 April 2007
Does the application involve works that take overland flow water in a HPA or an FMA?

NO Clyes (ensure you have completed Part Ka of Form 1)

If YES, is the application for works stated in the relevant wild river declaration to be?
(J) assessable works

(J ii) self-assessable works

(J iil) exempt works

Does the appiication involve works that interfere with overland flow water in a FMA?
XI No Lives (ensure you have completed Part Kio of Form 1)

If YES, is the application for works stated in the relevant wild rivers declaration to be?
(1 i) assessable works

CJ ii) self-assessable works

(1 iii) exempt works

 

Waterway barrier works

Applications for building or raising waterway
barrier works in a HPA will not be accepted.
If you answered YES to Q16, your application
must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Aquaculture (non ERA)

Applications for aquaculture in a HPA will not be
accepted.

\f you answered YES to Q17, your application
Must be assessed by DPIF against the Wild
Rivers Code and must comply with the code.

Works that interfere with water In a
watercourse

Note: If the development is proposed in a HPA,
applications for alt works that interfere with water
in a watercourse (including dams or weirs,
stream reatignment or stream diversion) will not
be accepted.

In a PA, applications for instream dams and
weirs may be accepted in nominated waterways.
Ifyou ticked bax ii) in Q19, your application will
not be accepted.

Note: Operational works outside a KPA or
nominated waterway are not subject to wild
tiver requirements.

More information and locations of nominated
waterways is available by contact NRW,
accessing the department's website
Yww.onw. gid .qov.au of contacting the
department by email on:

wild [email protected] qov.au.

 

16.

 

Does the application involve building or raising waterway barrier works in a PA?
NO Clyes {ensure you have completed Part O3 of Form 1)

Does the application involve aquaculture in a PA?

NO | YES (ensure you have completed Part O; of Form 1)

Does the application involve operational works that interfere with water in a watercourse that is in
a nominated waterway in a PA?

No

IF YES,
O i) The application is for an instream dam or weir, or

CJ ii) The application is for operational works that interfere with water in a watercourse, and is
for development other than a dam or weir.

Cc YES (ensure you have completed the relevant Part K of Form 1)

Page 13

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1993 - Op Works - landscaping, carparking, access, frontage works, stormwater, erosion & sediment control [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.