* INTEGRATED PLANNING ACT 1997

IDAS Assessment Checklist, Version 20, 2 April 2007

 

Whether particular buildings may be
occupied for residential purposes

For more information go to schedule 2 table 1 of the
IP Regulation.

Assessment period 15 days. No response is a
deemed refusal.

6.

An application to use an existing building that is not class 1, 2, 3 ar 4 for residential purposes may trigger a
referral to the local government as the concurrence agency.

 

Design and siting
For more information go to schedule 2 table 1 of the
IP Regulation,

Assessment period 5 days. No response is a
deemed refusal.

17,
18.

19.

An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
An application may trigger referral to the local government as the concurrence agency if the building work
does not comply with the qualitative statement for building clearance and site cover.

An application may trigger referral to the tocal government as the concurrence agency if the building work
does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
Development Code, part 11 or 12.

 

Fire safety in particular budget
accommodation buildings

Far more information go to schedule 2 table 1 of the
IP Regulation,

Assessment period 15 days. No response is a
deemed refusal.

20.

An application may trigger referral to the local government as the concurrence agency to determine the
building will comply with the fire safety standard under the Building Act 1975 when the building work has
been completed.

 

Higher risk personal appearance
services

For more information go to schedule 2 table 1 of the
IP Regulation and the QOC part 15,

Assessment period 15 days. No response is a
deemed refusall,

21.

An application may trigger referral to the local government as the concurrence agency to determine if the
building work

¢ complies with the performance criteria of the Queensland Development code part 15; and

e the work does not comply with an acceptable solution stated in the part.

 

Buitding work for residential service

For more Information go to schedule 2 table 4 of the
P Requlation and the QDC part 20.

Assessment period 15 days. No response is a

deemed refusal.

22,

An application for building work for premises in which residential care service under the Residential
Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, wil trigger
referral to the local government as the concurrence agency.

 

Building work for removal or
rebuilding

For more information go to schedule 2 table 1 of the
IPReaulation.

Assessment period 5 days. No response is a
deemed refusal.

23.

An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
referral to the local government as the concurrence agency.

 

Building work for rainwater tank in
designated rainwater tank area

For more information go to schedule 2 table 1 of the
IP Requlation and the QDC part 25.

Assessment period 15 days. No response is a
deemed refusal.

 

 

24.

An application may trigger referral to the local government as the concurrence agency to determine if the

building work or structure complies with the relevant performance criteria if -

e Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
building work, in a designated rainwater tank area; and

e Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
solution for a relevant performance criteria.

 

Page 16

 

Used in these records

About this file

File size
3.1 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1993 - Op Works - landscaping, carparking, access, frontage works, stormwater, erosion & sediment control [As Published].pdf · 3.1 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.