Original source · versioned page text
2016-10-11 S&O Agenda - Attachment 1 to Item 8 - Delegations of Authority
The original of this document is very large (12.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
PLANNING & ENVIRONMENT COMMITTEE MEETING AGENDA 11 OCTOBER 2016
Pavilion Scheme Definition Specific Use Area
2
Nursery Retail Business – Nursery and lifestyle centre (minimum area of 1,000m
2
Type 7 Garden and 1000m )
Lifestyle Centre –
2
minimum 1000m
4. The nursery use must be retained as the principal use on the site at all times and
have a minimum use area of 1,000m2.
5. The total dining area for the café must not exceed 82m2, being the shaded area
indicated on the approved plan of development.
6. Retail food sales (such as the artisan pantry) within Pavilion 1 must not exceed an
area of 50m2.
7. Medical uses on the site must not exceed 110m2 and no more than 3 medical
practitioners must operate from the site at any time.
8. Yoga/Pilates classes must not be conducted between 10am-3pm.
9. The development must not operate outside the hours of 7am to 7pm.
10. Any advertising signage shall have a maximum 4m2 sign face area, and a combined
sign face area projecting to the street of no more than 10m2.
11. All plants and goods are to be displayed on site within the property boundaries.
There is to be no display plants and goods on the streets about the site.
Amenity
12. There is to be no detrimental effect upon the amenity of the neighbourhood by reason
of the creation of excessive noise, lighting nuisance or other emissions.
Noise
13. External speakers or amplified music are not permitted.
14. Internal amplified music must not be audible at the property boundaries.
15. Refuse disposal, particularly glass bottles and the like, must be considerate of noise
at all times.
16. An acoustic fence must be constructed along the southern property boundary within 3
months of this approval taking effect. The fence is to be constructed to a height of 3
metres along the full length of the common boundary with Lot 2 SP120996 and a
minimum of 10m length of the eastern portion of the common boundary with Lot 1
SP120996. Fence materials shall be timber (ship-lapped palings), fibre-cement,
aerated concrete (Hebel) or other material with a minimum density of 12.5kg/m2 with
no gaps.
17. Noise emissions from any new mechanical equipment associated with the
development shall comply with the following requirements:
17.1. Air-conditioning and Refrigeration:
7am to 10pm: Background + 5dB(A)
10pm to 7am: Background + 3dB(A)
18. On installation of any new mechanical equipment OR if requested by Council, written
certification must be submitted from a suitably qualified person confirming noise
levels from any mechanical equipment comply when measured at either the
residential boundary or outside the most exposed part of an affected building,
whichever is the closest to the equipment.
Page 52 of 86
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.