Original source · versioned page text
TP-06 Cooroy Clubhouse & Bowling Green-Tree Planting Plan
Attached to the e-mail Landscaping as per condition 9- Email 2 of 3 MCU16/0111 & REC15/0031.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn
CHANGE
ROOMS
as
ccmool
BOWLING GREEN
DANCE FLOOR
ACCESS
we
MAIN DECK
OFFICE
CLUBHOUSE
COCHERE
TELL ELL
“0000 TH O00F
COFFEE
HAIR
DRESSER
oe a9) ES DECK
HD
SERVICE O1DL
y
| we
|
|
|
|
|
|
p _
/
fos
4
SL
<-m STF
ae
QOON
we2
\
BOWLING
ALLEY
CORRIDOR 1
BOWLING
vounce \
\
SERVERY CORRIDOR 2
STORE
ve
Dock
| |
0 LOADING =
coy
ve Wo BOCK =
coy
eA
LEGEND
1 XX PROPOSED TREES/PALMS
Refer to Tree Planting Schedule below.
TREE SCHEDULE
Pot Size/
Code Botanical Name Common Name Height Spacing Quantity
PALMS/TREES
PHOENIX canariensis Canary Island Palm 500 Litre/7.0m_ | As shown 01
AC ARCHONTOPHOENIX cunninghamiana Bangalow palm 100 Litre/3.0m | As shown 24
*DR DELONIX regia Royal poinciana 100Litre/3.0m As shown 03
*PO PLUMERIA obtusa Singapore Frangipani 100Litre/3.0m As shown 12
PT PANDANUS tectorius Screw Pine 100 Litre/3.0m_ | As shown 14
DL DYPSIS lutescens Golden Cane Palm 300mm/2.0m ‘As shown 22
cc CHAMAEDOREA cataractarum Cascade Palm 250mm/1.0m As shown 08
* Tree to be planted as per Advanced Tree Planting Detail
3 No 75x75x2100mm LONG HARDWOOD
STAKES POINTED AT ONE END AND FREE
OF KNOTS, SPLINTERS AND CRACKS.
STAKES TO BE PAINTED BLACK. TWO (2)
APPLICATIONS PER STAKE. STAKES ARE TO
BE DRIVEN 900mm INTO THE GROUND,
] CLEAR OF THE ROOT BALL.
| NOTE : CONTRACTOR SHALL BE LIABLE
FIGURE - EIGHT 50MM PLASTIC TIES STAPLED TO ALL \
STAKES WITH 15mm FLATHEAD GALVANIZED STAPLES. “~~, |
, THE LANDSCAPE WORKS.
FOR ANY DAMAGES TO SERVICES DURING
75mm DEPTH FINE SHREDDED WOOD MULCH. DO e——__——__ || |
NOT PLACE MULCH AROUND THE TRUNK AND |
MAINTAIN SPCARATION OF MULCH AND TRUNK TO | |
PREVENT COLLAR ROT. BACKFILL AROUND |
ROOTBALL WITH APPROVED TOPSOIL (75mm HIGH)
TO FORM 1500mm O 'SAUCER' FOR WATERING.
1. NO. 75mm PERFORATED FLEXIBLE AG PIPE FOR
WATERING IS COILED AROUND BASE OF TREE. TOP OF FRSA ey
PIPE TO BE 50MM CLEAR OF MULCH. ’ r
\)
Y i)
BREAK UP SIDES AND BASE OF EXCAVATION TO 100mm. —_ FY
PLANTING HOLE SHALL BE WATERED PRIOR TO THE
SETTING OF TREES
-———— ADJACENT FINISHED SURFACE LEVEL (ie.
MULCH, GRANITIC SAND)
PROVIDE A MINIMUM OF 150mm
APPROVED SITE TOPSOIL AROUND
ROOTBALL. LIGHTLY COMPACT
PROGRESSIVELY TO REMOVE ANY AIR
POCKETS. APPLY ‘OSMOCOTE' FERTILIZER
(OR NEAREST APPROVED EQUIVALENT) AS
PER MANUFACTURERS INSTRUCTIONS
: TOP OF ROOT BALL LEVEL TO MATCH
|<—e PLANTING HOLE DEPTH IS TO BE THE
SAME AS THE ROOTBALL
TO PROMOTE LATERAL ROOT GROWTH,
THE PLANTING HOLE SHALL BE THREE
TIMES THE DIAMETER OF THE ROOTBALL
WHERE SPACE PERMITS. SLOPE ALL SIDES
AT 45 DEGREES.
(C100 Litre - ADVANCED TREE PLANTING DETAIL
\ NOT TO SCALE
REVISIONS
REV.
DESCRIPTION
BY
DATE
ISSUED TO COUNCIL
GVS
11/11/2016
HAMILTON LANDSCAPE ARCHITECTS PTY LTD
a Site Planning | Urban Design | Landscape Architecture
1 York Place, Carlton VIC 3053 - Australia | Tel: +61 03 9348 2800
E-mail: [email protected] | http://www.hla.net.au
PROJECT DRAWING No.
PALM LAKE RESORT - COOROY CLUBHOUSE TP-06
COOROY
REVISION
DRAWING TREE/PALM PLANTING PLAN CLIENT PALM LAKES FILE NAME
SCALE 1:200@A1 |DRAWN G.V.S JOB NUMBER 15-016 15-016-Coory Clubhouse-REVA.02 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.