Original source · versioned page text
2021-08-10 P&E Agenda - Item 7 - Attachment 1 - Climate Change Response Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Planning & Environment Committee Agenda
10 August 2021
Item 7 - Attachment 1
Noosa Climate Change
Response Plan
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 57 sections
Section 2
© Noosa Council 2021 www.noosa.qld.gov.au General Enquiries: By telephone: (07) 5329 6500 By email: [email protected] Fax: (07) 5329 6501 Street Address: 9 Pelican Street, TEWANTIN Postal address: PO Box 141, TEWANTIN QLD 4565 Endorsed by Noosa Council << >>
Section 3
Noosa Climate Change Response Plan
Table of Contents
1. INTRODUCTION..................................................................................................................... 4
The climate emergency......................................................................................................... 5
A better future........................................................................................................................ 7
Why do we need to act?........................................................................................................ 8
About this Plan....................................................................................................................... 9
Climate change principles and objectives.......................................................................... 10
Climate projections.............................................................................................................. 10
2. LOCAL CLIMATE CHANGE IMPACTS.................................................................................. 11
Our current climate.............................................................................................................. 12
Our changing climate.......................................................................................................... 12
Temperature......................................................................................................................... 13
Rainfall................................................................................................................................. 13
Oceans................................................................................................................................ 14
Extreme events.................................................................................................................... 15
Transition risks..................................................................................................................... 15
The economic cost of climate change................................................................................ 16
Climate impacts and risks for key local sectors.................................................................. 16
3. NOOSA’S CARBON EMISSIONS.......................................................................................... 19
Noosa Shire community emissions...................................................................................... 20
Noosa Council emissions.................................................................................................... 20
What does Net Zero Emissions mean?................................................................................ 22
Why is net zero emissions important?................................................................................. 22
Why net zero by 2026.......................................................................................................... 22
Pathway to Zero Community Emissions............................................................................... 23
4. RESPONDING TO THE CLIMATE EMERGENCY.................................................................. 24
Themes and strategic priorities........................................................................................... 25
Theme 1: Strong leadership and governance..................................................................... 27
Theme 2. Energy efficiency and renewable energy............................................................ 29
Theme 3: Clean low emissions industries............................................................................ 31
Theme 4. Sustainable Transport.......................................................................................... 33
Theme 5: Healthy and resilient natural systems and carbon sequestration........................ 35
Theme 6. Sustainable agriculture and food systems.......................................................... 37
Theme 7: Resilient and adaptive communities and built environments............................... 39
Theme 8: Zero waste and circular economy....................................................................... 42
5. SUMMARY OF ACTIONS...................................................................................................... 44
6. IMPLEMENTATION, MONITORING AND REVIEW................................................................ 54
DEFINITIONS............................................................................................................................ 57
Page 3
Section 4
Noosa Shire Council
Introduction
Page 4
Ra ERS eiteetimmiinaie TS eT ATS Re
Sire ay Sete MTs a
Nike IOAN Dee ane |
a Pais ASP Y Ae i) Pe gt ee ey rh
5 ae o RAO bie dyed 2h Lo iw by AGS RS
LATO Wee ne ty y Ae?) Me 5 he? og _
; vont Wa ath 2 Non) 2 SEs ae
Naey ED Nab CG ARI Se
Weise ee xieet ee Wy KSA
Se Pee Mi Ma Y ie in §; i
5 1 1 1 10 10 1397 343 4 3 6 :
5 1 1 1 10 11 1541 322 3 7 0 y
4 1 1 1 11 0 57 334 1471 107 -1
5 1 1 1 11 1 57 418 4 4 24 ny
5 1 1 1 11 2 108 393 48 48 11 aL
5 1 1 1 11 3 225 399 6 13 26 Rae
5 1 1 1 11 4 294 410 6 7 27 |
5 1 1 1 11 5 875 334 119 80 28 LIM
5 1 1 1 11 6 1024 336 16 64 4 ‘i
5 1 1 1 11 7 1213 361 37 42 22 md
5 1 1 1 11 8 1326 352 28 33 27 rs
5 1 1 1 11 9 1366 337 29 44 14 Ae
5 1 1 1 11 10 1512 338 16 12 0 C
4 1 1 1 12 0 70 366 2325 113 -1
5 1 1 1 12 1 70 418 52 46 0 a
5 1 1 1 12 2 133 422 36 57 6 PY
5 1 1 1 12 3 239 420 13 36 0 %
5 1 1 1 12 4 285 412 40 43 0 ey
5 1 1 1 12 5 857 411 3 4 0 }
5 1 1 1 12 6 878 384 33 56 59 rA
5 1 1 1 12 7 910 388 44 48 31 ve
5 1 1 1 12 8 973 418 4 6 44 oe
5 1 1 1 12 9 1024 406 13 17 0 anX
5 1 1 1 12 10 1148 399 3 3 0 ;
5 1 1 1 12 11 1214 389 15 38 77 $
5 1 1 1 12 12 1284 393 64 29 18 seni
5 1 1 1 12 13 1364 384 29 30 30 ef
5 1 1 1 12 14 1423 374 34 64 27 3
5 1 1 1 12 15 1507 374 11 28 0 :
5 1 1 1 12 16 2392 366 3 4 68 .
4 1 1 1 13 0 55 393 2351 99 -1
5 1 1 1 13 1 55 460 91 28 24 ae
5 1 1 1 13 2 170 453 66 39 20 eS
5 1 1 1 13 3 313 455 10 23 13 y
5 1 1 1 13 4 908 443 22 21 25 op
5 1 1 1 13 5 1076 447 6 9 45
t oSahe ee +} thy ; a oy Sy rH RF Ag if was Zz
Ne Sar eee i UK 4 }
PY Lam es PRA Wn go 8
vt bof Waa) A J 7 o- 7 ft 3 + ”
Sie PENT SAR gee | :
AAS, ee oS 44 Leg an fA Be 5 i ”
east) \ ae DS ke oe 5 a, He sis , : >
3 er ay “ 4 Te) oy
AN 4) hae ee tes . O
ona Se RS eo . ©
' OE) is F M : (SF
Beha P NS 9
D Aiiaae be =
V3 i ees ‘ |
Ma & LY, ‘ Th] . 7 | ,
Ne k , bE) Te ty 4 1 1 1 30 0 57 1024 1127 107 -1
5 1 1 1 30 1 57 1081 35 49 21 i
5 1 1 1 30 2 110 1085 44 42 28 ry
5 1 1 1 30 3 179 1080 23 29 0 ie
5 1 1 1 30 4 267 1081 20 31 6 Py
5 1 1 1 30 5 312 1092 5 12 0 '
5 1 1 1 30 6 994 1054 26 32 8 ry
5 1 1 1 30 7 1076 1024 108 107 10 es
4 1 1 1 31 0 56 1037 2292 102 -1
5 1 1 1 31 1 56 1122 78 17 28 hy
5 1 1 1 31 2 131 1097 46 50 13 Aa
5 1 1 1 31 3 272 1116 13 6 38 Ry
5 1 1 1 31 4 996 1091 10 19 11 ep}
5 1 1 1 31 5 1049 1079 119 24 26 Saw?
5 1 1 1 31 6 2261 1037 87 29 29 “a
4 1 1 1 32 0 54 1135 2529 90 -1
5 1 1 1 32 1 54 1186 28 39 37 i
5 1 1 1 32 2 98 1184 65 37 21 Oh
5 1 1 1 32 3 175 1178 19 43 6 iy
5 1 1 1 32 4 275 1204 5 6 41 ts
5 1 1 1 32 5 295 1186 24 34 35 Ay
5 1 1 1 32 6 2338 1135 1 5 0 ;
5 1 1 1 32 7 2580 1136 3 4 0 ;
4 1 1 1 33 0 55 1157 2288 123 -1
5 1 1 1 33 1 173 1230 130 47 0 ae
5 1 1 1 33 2 2190 1157 153 51 40 A
4 1 1 1 34 0 56 1274 2185 133 -1
5 1 1 1 34 1 56 1354 48 49 15 Bi
5 1 1 1 34 2 203 1339 122 68 14 Raat.
5 1 1 1 34 3 856 1334 150 44 6 oe
5 1 1 1 34 4 1333 1340 103 28 5 —_——
5 1 1 1 34 5 2231 1274 10 43 40 |
4 1 1 1 35 0 82 1327 1907 115 -1
5 1 1 1 35 1 82 1411 25 25 19 Wh
5 1 1 1 35 2 150 1423 9 19 54 ;
5 1 1 1 35 3 187 1399 26 41 9 0
5 1 1 1 35 4 235 1397 6 19 77 \
5 1 1 1 35 5 257 1385 68 43 22 PS
5 1 1 1 35 6 857 1377 34 32 10 ee
5 1 1 1 35 7 937 1374 21 40 0 ‘
5 1 1 1 35 8 999 1380 58 22 56 “ay.
5 1 1 1 35 9 1070 1354 88 55 29 PE.
5 1 1 1 35 10 1171 1373 3 9 35 |
5 1 1 1 35 11 1180 1364 42 38 10 aS
5 1 1 1 35 12 1312 1358 66 22 0 aets
5 1 1 1 35 13 1964 1327 25 47 54 co
4 1 1 1 36 0 94 1390 1362 68 -1
5 1 1 1 36 1 131 1435 21 21 38 ra.
5 1 1 1 36 2 177 1434 45 24 26 SUF
5 1 1 1 36 3 244 1433 23 21 35 ><
5 1 1 1 36 4 851 1410 32 32 3 Pe
5 1 1 1 36 5 941 1420 3 2 57 +
5 1 1 1 36 6 1028 1405 11 27 35 by
5 1 1 1 36 7 1076 1401 19 28 63 Ly
5 1 1 1 36 8 1184 1411 24 13 13 rr
5 1 1 1 36 9 1263 1395 61 22 28 ag
5 1 1 1 36 10 1367 1390 10 12 5 5
5 1 1 1 36 11 1437 1391 19 36 0 y
4 1 1 1 37 0 55 1384 2293 115 -1
5 1 1 1 37 1 55 1457 119 39 30 Nees
5 1 1 1 37 2 139 1449 60 59 23 tae
5 1 1 1 37 3 191 1459 99 40 9 tases
5 1 1 1 37 4 856 1430 47 36 12 ya
5 1 1 1 37 5 943 1419 9 33 16 he
5 1 1 1 37 6 1015 1442 3 4 38 ig
5 1 1 1 37 7 1121 1429 28 17 55 <<
5 1 1 1 37 8 1163 1424 65 29 34 TN
5 1 1 1 37 9 1929 1409 44 7 75 <
5 1 1 1 37 10 2084 1384 56 25 34 i
5 1 1 1 37 11 2336 1395 12 7 49 ~
4 1 1 1 38 0 75 1408 2271 114 -1
5 1 1 1 38 1 75 1501 16 11 40 ee
5 1 1 1 38 2 162 1488 95 27 5 rar
5 1 1 1 38 3 279 1483 46 39 29 Oe
5 1 1 1 38 4 856 1467 30 23 26 ey
5 1 1 1 38 5 910 1453 59 47 0 1aty
5 1 1 1 38 6 986 1458 38 28 40 9
5 1 1 1 38 7 1117 1479 3 2 0 :
5 1 1 1 38 8 1141 1447 64 38 43 ak
5 1 1 1 38 9 1248 1452 2 2 40 rit
5 1 1 1 38 10 1350 1432 11 63 15 *
5 1 1 1 38 11 2089 1420 39 24 35 eit
5 1 1 1 38 12 2175 1423 1 23 9 A
5 1 1 1 38 13 2338 1408 8 30 11 »-
4 1 1 1 39 0 146 1438 2061 103 -1
5 1 1 1 39 1 146 1520 4 4 0 .
5 1 1 1 39 2 239 1513 53 28 13 sae
5 1 1 1 39 3 857 1507 3 3 32 bees
5 1 1 1 39 4 905 1492 11 18 29 +
5 1 1 1 39 5 935 1484 15 31 4 Y
5 1 1 1 39 6 952 1466 62 58 36 Abe
5 1 1 1 39 7 1018 1466 29 58 52 te
5 1 1 1 39 8 1089 1469 48 49 34 Ph
5 1 1 1 39 9 1170 1474 99 27 0 Lee
5 1 1 1 39 10 1436 1472 8 12 36 ‘
5 1 1 1 39 11 2089 1438 118 35 22 ey
4 1 1 1 40 0 143 1472 2192 97 -1
5 1 1 1 40 1 143 1558 23 11 0 S
5 1 1 1 40 2 252 1536 42 27 19 rs
5 1 1 1 40 3 316 1548 7 15 0 ;
5 1 1 1 40 4 942 1522 31 30 0 WG
5 1 1 1 40 5 998 1523 10 16 33 Sy
5 1 1 1 40 6 1101 1512 49 32 29 ae
5 1 1 1 40 7 1182 1514 14 15 0 n
5 1 1 1 40 8 1213 1506 4 8 0 ,
5 1 1 1 40 9 1258 1507 13 19 0 ‘
5 1 1 1 40 10 1365 1496 78 22 10 ie
5 1 1 1 40 11 2149 1472 74 25 24 Se
5 1 1 1 40 12 2328 1476 7 16 36 f
4 1 1 1 41 0 115 1502 2217 101 -1
5 1 1 1 41 1 115 1588 9 13 0 -
5 1 1 1 41 2 131 1571 57 29 23 ee
5 1 1 1 41 3 245 1541 66 62 0 aR
5 1 1 1 41 4 877 1552 8 19 22 v
5 1 1 1 41 5 944 1558 8 13 0 ’
5 1 1 1 41 6 1001 1535 95 29 81 “he
5 1 1 1 41 7 1122 1534 29 38 22 2!
5 1 1 1 41 8 1194 1531 58 28 52 Le
5 1 1 1 41 9 1455 1526 5 24 11 ,
5 1 1 1 41 10 2279 1516 5 1 38 —
4 1 1 1 42 0 90 1539 1381 101 -1
5 1 1 1 42 1 111 1602 11 22 6 ba
5 1 1 1 42 2 168 1587 143 53 28 heey!
5 1 1 1 42 3 321 1608 4 4 47 4
5 1 1 1 42 4 863 1581 10 22 21 ne
5 1 1 1 42 5 1000 1584 2 3 43 a
5 1 1 1 42 6 1051 1574 7 27 26 }
5 1 1 1 42 7 1073 1555 15 25 0 s
5 1 1 1 42 8 1106 1553 52 20 40 au
5 1 1 1 42 9 1233 1562 6 16 0 ‘
5 1 1 1 42 10 1256 1539 15 49 19 \,
5 1 1 1 42 11 1295 1556 14 14 25 v
5 1 1 1 42 12 1403 1572 8 11 0 -
5 1 1 1 42 13 1437 1552 8 30 0 -
5 1 1 1 42 14 1455 1558 16 25 0 \
4 1 1 1 43 0 74 1584 1399 69 -1
5 1 1 1 43 1 74 1630 60 23 15 eA
5 1 1 1 43 2 156 1619 7 24 4 5
5 1 1 1 43 3 202 1606 22 43 14 te
5 1 1 1 43 4 248 1620 77 24 35 a
5 1 1 1 43 5 838 1584 44 57 0 r\
5 1 1 1 43 6 946 1596 9 25 74 ‘
5 1 1 1 43 7 974 1597 35 32 36 ree
5 1 1 1 43 8 1063 1590 8 10 0 n
5 1 1 1 43 9 1097 1595 56 29 14 So
5 1 1 1 43 10 1262 1586 44 23 23 vd
5 1 1 1 43 11 1462 1585 11 35 3 ;
4 1 1 1 44 0 128 1593 1335 88 -1
5 1 1 1 44 1 128 1648 35 33 49 ons
5 1 1 1 44 2 189 1646 25 34 38 (4
5 1 1 1 44 3 247 1630 36 48 49 7
5 1 1 1 44 4 304 1641 18 34 17 ry
5 1 1 1 44 5 871 1628 13 18 15 «
5 1 1 1 44 6 973 1607 77 57 14 fhe
5 1 1 1 44 7 1049 1611 87 33 26 soe
5 1 1 1 44 8 1176 1593 55 71 67 ee
5 1 1 1 44 9 1367 1610 8 17 46 |
5 1 1 1 44 10 1460 1627 3 3 0 :
4 1 1 1 45 0 55 1582 3225 132 -1
5 1 1 1 45 1 55 1668 39 46 15 HR
5 1 1 1 45 2 112 1674 54 29 27 wa
5 1 1 1 45 3 185 1657 32 62 38 wy
5 1 1 1 45 4 253 1669 23 17 6 Mae
5 1 1 1 45 5 863 1639 35 38 20 et
5 1 1 1 45 6 970 1653 32 25 19 AR
5 1 1 1 45 7 1090 1640 45 31 26 xe
5 1 1 1 45 8 1248 1659 22 5 0 »\6\
5 1 1 1 45 9 1366 1633 42 15 12 weal
5 1 1 1 45 10 3270 1582 10 3 0 :
4 1 1 1 46 0 55 1583 3220 168 -1
5 1 1 1 46 1 55 1716 28 35 0 H
5 1 1 1 46 2 113 1704 41 21 11 ae
5 1 1 1 46 3 227 1680 61 52 13 SPE
5 1 1 1 46 4 309 1691 16 31 35 a
5 1 1 1 46 5 566 1692 84 9 74 —
5 1 1 1 46 6 858 1663 74 37 21 Rass
5 1 1 1 46 7 976 1660 91 29 30 Se
5 1 1 1 46 8 1113 1667 20 22 34 ME
5 1 1 1 46 9 1203 1678 2 2 0 .
5 1 1 1 46 10 1242 1662 36 28 40 die
5 1 1 1 46 11 1400 1659 52 9 31 ee
5 1 1 1 46 12 3237 1583 38 50 42 3.
4 1 1 1 47 0 87 1606 3245 153 -1
5 1 1 1 47 1 87 1755 5 3 56 4
5 1 1 1 47 2 101 1722 31 37 22 it
5 1 1 1 47 3 219 1719 106 32 42 eX,
5 1 1 1 47 4 858 1705 138 23 33 Cette
5 1 1 1 47 5 1051 1693 6 18 27 Tia
5 1 1 1 47 6 1242 1691 16 26 44 AS
5 1 1 1 47 7 1373 1685 45 24 18 ee
5 1 1 1 47 8 3243 1606 89 53 34 Sinan
4 1 1 1 48 0 64 1642 3295 154 -1
5 1 1 1 48 1 197 1739 128 57 0 AEA
5 1 1 1 48 2 555 1718 73 77 61 =)
5 1 1 1 48 3 856 1738 67 29 22 iY
5 1 1 1 48 4 982 1729 15 32 0 &
5 1 1 1 48 5 1028 1694 31 52 34 by
5 1 1 1 48 6 1111 1720 44 34 6 ai
5 1 1 1 48 7 1224 1715 89 39 17 gone
5 1 1 1 48 8 1363 1725 15 20 28 a
5 1 1 1 48 9 3197 1642 162 35 15 ae
4 1 1 1 49 0 65 1676 3374 158 -1
5 1 1 1 49 1 65 1781 27 53 10 ms
5 1 1 1 49 2 105 1788 82 38 48 pore
5 1 1 1 49 3 229 1789 19 24 67 a)
5 1 1 1 49 4 308 1793 17 28 14 8
5 1 1 1 49 5 860 1746 76 60 6 iE
5 1 1 1 49 6 990 1762 18 27 28 3
5 1 1 1 49 7 1078 1763 23 33 54 5
5 1 1 1 49 8 1130 1785 9 9 30 A
5 1 1 1 49 9 1229 1740 65 49 0 Vaiss
5 1 1 1 49 10 1307 1753 11 25 22 +e
5 1 1 1 49 11 1364 1753 8 7 7 teh
5 1 1 1 49 12 1489 1763 12 15 0 e
5 1 1 1 49 13 3062 1703 37 19 41 ade
5 1 1 1 49 14 3152 1699 7 4 0 .
5 1 1 1 49 15 3230 1683 27 15 0 <
5 1 1 1 49 16 3301 1688 26 21 37 <n
5 1 1 1 49 17 3437 1676 2 2 0 ;
4 1 1 1 50 0 54 1714 3167 149 -1
5 1 1 1 50 1 85 1828 45 34 8 ear
5 1 1 1 50 2 166 1805 112 57 48 RAY
5 1 1 1 50 3 574 1791 36 72 29 om
5 1 1 1 50 4 856 1795 163 40 0 (fh
5 1 1 1 50 5 1132 1814 5 4 14 Re
5 1 1 1 50 6 1205 1767 157 51 12 ee
5 1 1 1 50 7 3085 1714 136 29 23 ea
5 1 1 1 50 8 3296 1720 134 26 39 ene
4 1 1 1 51 0 64 1754 3311 159 -1
5 1 1 1 51 1 64 1867 70 38 50 Ot,
5 1 1 1 51 2 168 1864 153 33 38 Saas
5 1 1 1 51 3 572 1838 38 75 16 e@
5 1 1 1 51 4 856 1830 98 49 29 Let
5 1 1 1 51 5 989 1835 73 24 0 2a
5 1 1 1 51 6 1123 1815 116 53 20 ee,
5 1 1 1 51 7 1270 1821 95 45 0 ei
5 1 1 1 51 8 1496 1826 7 30 52 ;
5 1 1 1 51 9 3060 1764 91 6 0 ———
4 1 1 1 52 0 76 1786 3283 149 -1
5 1 1 1 52 1 76 1902 51 32 28 Tae
5 1 1 1 52 2 308 1894 9 8 36 A
5 1 1 1 52 3 906 1861 59 63 7 >.
5 1 1 1 52 4 1008 1865 132 39 24 SY
5 1 1 1 52 5 1325 1864 47 33 33 As
5 1 1 1 52 6 1485 1870 61 11 0 a”
5 1 1 1 52 7 3285 1786 74 28 35 +
4 1 1 1 53 0 59 1816 3263 164 -1
5 1 1 1 53 1 59 1922 69 45 50 Ve
5 1 1 1 53 2 188 1925 137 40 31 Re
5 1 1 1 53 3 587 1899 63 81 35 OQ.
5 1 1 1 53 4 877 1902 58 38 9 Ae
5 1 1 1 53 5 1277 1901 20 15 12 hay
5 1 1 1 53 6 1340 1876 28 54 18 he
5 1 1 1 53 7 1503 1904 9 8 7 :
5 1 1 1 53 8 3311 1816 11 28 0 :
4 1 1 1 54 0 54 1958 1322 69 -1
5 1 1 1 54 1 123 2000 20 21 35 es
5 1 1 1 54 2 193 2010 1 3 50 ©
5 1 1 1 54 3 259 1990 26 37 24 ry
5 1 1 1 54 4 865 1977 17 13 20 Cy
5 1 1 1 54 5 1139 1983 5 5 58 2
5 1 1 1 54 6 1369 1958 7 18 0 .
4 1 1 1 55 0 59 2001 2019 105 -1
5 1 1 1 55 1 59 2026 94 80 16 PRM
5 1 1 1 55 2 245 2050 74 27 7 es
5 1 1 1 55 3 857 2021 39 43 30 ial
5 1 1 1 55 4 932 2022 106 61 19 Sn
5 1 1 1 55 5 1131 2001 425 58 24 Pe
5 1 1 1 55 6 2030 2002 48 12 63 <
4 1 1 1 56 0 67 2068 1549 68 -1
5 1 1 1 56 1 67 2113 37 23 14 ee
5 1 1 1 56 2 186 2116 2 4 0 X
5 1 1 1 56 3 272 2096 53 35 42 we
5 1 1 1 56 4 848 2086 17 30 0 hs
5 1 1 1 56 5 905 2068 17 33 0 rT
5 1 1 1 56 6 1045 2090 3 4 9 Pb
5 1 1 1 56 7 1120 2076 30 30 18 ir
5 1 1 1 56 8 1199 2087 3 4 2
oe
¢
7 2 5 1 1 1 57 4 291 2127 34 16 49 Ve
5 1 1 1 57 5 554 2108 56 42 36 fom
5 1 1 1 57 6 620 2108 29 42 38 ws
5 1 1 1 57 7 862 2088 62 54 43 BK:
5 1 1 1 57 8 957 2077 43 50 27 iy
5 1 1 1 57 9 1111 2088 29 35 0 ‘ag
5 1 1 1 57 10 1194 2096 15 34 64 3
5 1 1 1 57 11 1278 2097 2 2 27 :
5 1 1 1 57 12 1348 2079 13 51 0 hi
5 1 1 1 57 13 1384 2090 6 9 0 \
5 1 1 1 57 14 1486 2079 50 18 29 ‘om
5 1 1 1 57 15 1870 2077 1 4 3 '
5 1 1 1 57 16 1941 2067 9 11 62 .
5 1 1 1 57 17 3272 2046 2 2 23 '
4 1 1 1 58 0 221 2062 3061 170 -1
5 1 1 1 58 1 81 2135 244 97 35 Paw
5 1 1 1 58 2 566 2156 84 8 8 mY
5 1 1 1 58 3 983 2104 169 63 46 RG
5 1 1 1 58 4 1368 2112 24 53 37 ae
5 1 1 1 58 5 3262 2062 20 18 38 ;
4 1 1 1 59 0 163 2126 2504 85 -1
5 1 1 1 59 1 163 2194 81 17 20 Pete
5 1 1 1 59 2 289 2192 2 2 0 Ye
5 1 1 1 59 3 856 2169 52 19 17 aS
5 1 1 1 59 4 977 2148 14 39 13 R
5 1 1 1 59 5 1135 2166 1 3 7 :
5 1 1 1 59 6 1214 2150 75 28 43 wre
5 1 1 1 59 7 1373 2150 20 27 44 a
5 1 1 1 59 8 1501 2149 5 12 0 :
5 1 1 1 59 9 2662 2126 5 2 48 :
4 1 1 1 60 0 68 2134 3253 141 -1
5 1 1 1 60 1 68 2190 175 85 56 wen
5 1 1 1 60 2 564 2167 580 82 18 OR
5 1 1 1 60 3 1193 2150 337 64 19 Ee
5 1 1 1 60 4 3317 2134 4 3 54 |
4 1 1 1 61 0 83 2189 2704 127 -1
5 1 1 1 61 1 83 2266 61 49 21 i
5 1 1 1 61 2 158 2262 81 54 37 ee
5 1 1 1 61 3 271 2270 54 36 36 es
5 1 1 1 61 4 566 2247 62 48 32 >
5 1 1 1 61 5 954 2229 196 45 0 eee
5 1 1 1 61 6 1979 2206 4 1 0 .
5 1 1 1 61 7 2718 2166 66 87 35 yt
4 1 1 1 62 0 61 2257 1459 107 -1
5 1 1 1 62 1 61 2286 124 68 15 oe
5 1 1 1 62 2 227 2307 98 57 35 ae
5 1 1 1 62 3 869 2295 7 6 38 ;
5 1 1 1 62 4 1006 2280 58 36 24 Sa
5 1 1 1 62 5 1433 2268 87 60 0 LY.
4 1 1 1 63 0 77 2268 3020 112 -1
5 1 1 1 63 1 77 2348 70 32 30 Ln
5 1 1 1 63 2 126 2344 78 43 0 ete.
5 1 1 1 63 3 223 2352 102 21 23 PRINT
5 1 1 1 63 4 856 2322 4 6 14 :
5 1 1 1 63 5 1017 2321 27 25 12 sf
5 1 1 1 63 6 1136 2313 66 11 2 Mase
5 1 1 1 63 7 1275 2304 41 28 18 Si
5 1 1 1 63 8 1350 2296 106 40 0 Sar
5 1 1 1 63 9 3094 2268 3 2 0 ;
4 1 1 1 64 0 84 2363 1386 62 -1
5 1 1 1 64 1 84 2413 68 12 33 UN
5 1 1 1 64 2 856 2386 245 31 11 WMG
5 1 1 1 64 3 1131 2398 11 11 11 as
5 1 1 1 64 4 1170 2363 93 58 35 Sh
5 1 1 1 64 5 1286 2374 67 32 34 pee
4 1 1 1 65 0 993 2406 529 22 -1
5 1 1 1 65 1 993 2426 14 2 0 —
5 1 1 1 65 2 1226 2413 12 6 3 -
5 1 1 1 65 3 1337 2423 1 3 0 ~
5 1 1 1 65 4 1406 2406 19 6 29 a
5 1 1 1 65 5 1464 2416 58 12 67 —Section 5
Noosa Climate Change Response Plan
The climate emergency
We are living in times of increasingly complex and rapid change, driven by technological advances,
economic transitions, demographic shifts, and a changing climate. Noosa Council, in partnership
with the local community and other levels of government, has an important responsibility for providing
essential services, managing local risks, and supporting disaster recovery, as well as adapting to
changing circumstances and finding new opportunities to support a safe and prosperous Noosa into
the future.
The 2019-2020 bushfire season, and the global pandemic, are stark reminders of both the fragility of
the social systems and networks upon which we all depend, as well as the importance and benefits
of responsible planning, rapid mobilisation, and working together as a community. COVID-19 has
also shown us that we can make our own new normal – throw out old rules that no longer work for our
community and make new ones, and ask ourselves what we want for our world. The response to the
COVID-19 pandemic has demonstrated how scientifically-sound and carefully considered actions can
lead us out of a crisis.
This is the type of unified response needed for responding to the global climate emergency. The
disruptions to our way of life caused by a rapidly changing climate demand a certain moral courage
that enables us to prioritise the ‘collective’ and to take positive action for ourselves, for future
generations, and for the planet. It requires everyone to act, to ‘step up’ and to reimagine and create a
new, cleaner, and safer Noosa.
This Climate Change Response Plan is a vision for a new future for Noosa, and a blueprint for us all to
do our bit locally and to be an example for others of something better. It challenges us all to think big,
heed the scientific advice and take careful and resolute action now.
Our journey so far
Noosa Council declared a climate emergency in 2019, making a strong statement in support
of taking action on climate change as part of a collective voice across local, state, and federal
governments worldwide. We need action at all levels of government and across all sectors to avoid
dangerous climate change. There are carbon emissions within the control of Council, carbon
emissions elsewhere within the Shire that we can influence, as well as those that require regulatory
change and leadership beyond Noosa’s boundaries.
Over the last several years Council has been working to reduce its own emissions. Since 2016,
Council has had in place a Zero Emissions Organisational Strategy for the Council’s operations to
achieve zero net emissions by 2026. In this time, we’ve successfully achieved the following:
• Installation of over 600 kW solar PV across Council owned and operated buildings and facilities
• Improved energy efficiency of air conditioning systems for Council facilities
• Changed hundreds of lights to energy efficient LEDs
• Worked to improve waste management and the efficiency of the landfill gas extraction at the
Noosa landfill site
• Provided grants to community groups for solar and energy efficiency projects
Page 5
Section 6
Noosa Shire Council
• Provided a free solar advice hotline and The Noosa Council Environment Strategy
education programs for households and was also adopted in 2019 with outcomes and
businesses through the Australian Energy targets for both emission reduction and climate
Foundation adaptation. This includes the target that Noosa
• Partnered with ZEN Inc on a range of Council operations, and the Noosa community
initiatives including solar for business, the as a whole, reach net zero emissions by 2026.
electric vehicle expo and Race to Zero
school program. Through its participation in initiatives such as
the Queensland Climate Resilient Councils,
The installation of the solar systems has saved
Council over $500,000 in electricity costs since and the Cities Power Partnership, Council has
the program commenced in 2017. joined many other local governments across
Queensland and Australia in committing to a
In 2017 Council prepared a Climate Change
sustainable post-COVID economic recovery
Response Policy setting out our commitment
to proactively plan and prepare for climate that creates local jobs, supports industries
change, and to build knowledge and capacity and sectors that invest in a zero-carbon
as an organisation. future, and contributes to sustainable resilient
Council is also progressing the development communities.
and implementation of a Coastal Hazard Whilst this Plan sits under the Environment
Adaptation Plan for addressing increasing Strategy, it is recognised that this is a whole of
risks associated with coastal erosion, tidal
Council document and has implications for all
inundation and sea level rise for public
operations throughout Council.
and private assets, including critical public
infrastructure.
Environment Policy Framework
Sustainability Principles
Environment and Sustainability Policy
Strategy 10 years Links to: Social Strategy
Environment Strategy Economic strategy (local economic plan)
Transport Strategy
Climate Change
Noosa River Plan
Response Plan
Detailed Plans 5 years Links to: Corporate Plan
Planning Scheme
Coastal Foreshores Coastal Hazards
Other detailed plans
Management Plan Adapta�on Plan
Local Laws
Asset management plans
Bushland Reserves Flood Management
Strategic Plan Plan
Biodiversity Bushfire
Conserva�on Plan Management Plan
Koala Conserva�on Biosecurity Plan
Plan
Mary River Waste
management plans Management Plan
Annual plans and Operational Plans
programs
Page 6
Section 7
Noosa Climate Change Response Plan
A better future
Through the strategic priorities and actions outlined within this Climate Change Response Plan,
Noosa Council is striving to lead by example by making positive progress, showing the way,
and supporting and inspiring others.
Together, Council and the community are well positioned to be a powerful influencer to drive
deep systemic change from the grassroots level. This includes:
• Transition to net zero emissions by 2026 for Council operations and for the community
Transition to 100% renewable energy powering Council buildings and facilities, and
•
powering Noosa Shire
Drive clean low emissions industry, and innovative technologies and solutions that
•
address the climate crisis
• e a well informed and prepared community that considers climate change in making
B
day-to-day and business decisions
Facilitate sustainable, resilient and adaptive communities, buildings and infrastructure to
•
help reduce the impacts of climate change and reduce emissions
Support vulnerable populations, ensuring inclusion in solutions and equitable access to
•
opportunities and benefits
• ccelerate transition to sustainable transport and increase mobility through new
A
technologies and active modes of transport such as walking and cycling
• nhance ecosystem health, adaptive capacity and carbon drawdown whilst balancing
E
other climate risks such as more frequent bushfires
Grow and distribute food locally and sustainably, enabled by sustainable land
•
management and regenerative farming practices
Advance a zero waste circular economy where products and materials are reused and
•
repurposed.
Responding to climate change involves a multi-pronged approach:
• Reducing emissions by reducing the levels of heat-trapping greenhouse gases in the
atmosphere through: eliminating the sources of these gases (such as the burning of
fossil fuels for electricity, heat or transport); adopting sustainable development solutions in
energy, land, infrastructure and industrial systems; and enhancing the sinks that store these
gases including vegetation and soils (referred to as carbon drawdown or sequestration)
Adapting to climate change by building resilience in our local communities, built
•
environments, economy and natural systems to reduce our vulnerability to the harmful
effects of climate change.
This new future also means making the most of the potential opportunities that climate change
brings, such as fostering new clean tech industries and positioning Noosa at the forefront of
innovation and economic development. It means transitioning beyond business as usual to
making a systemic shift across a range of sectors.
Page 7
Section 8
Noosa Shire Council
Why do we need to act? • Ensuring appropriate development
requirements, infrastructure planning and
We are already beginning to experience asset management that take account of
the effects of a changing climate. We can climate risks and emissions reduction
expect to see more extreme weather events,
• Ensuring climate-ready and effective
bushfires, changes in rainfall patterns,
disaster management and governance
increased temperatures and heatwaves. As
systems
the climate continues to change, the risks to
• Improving knowledge, capability and
people and property, infrastructure, human
capacity to respond to climate change
health, natural systems, agriculture and the
in order to drive meaningful action and
economy are expected to increase.
localised emissions reduction
We all have a responsibility to reduce our
• Assessing climate impacts and
share of global emissions as a Council and
coordinating an appropriate response
as a community to minimise further impacts
and measuring progress.
and safeguard our future.
The choices we make today are the pathway
to our children’s future - one that is safe and
Council’s role well prepared for any unavoidable impacts
It is critical that Council continues to adopt a of climate change. Effective and affordable
proactive approach regarding climate risk to emissions reduction solutions are available,
help build the adaptive capacity of our shire and we are confident that we can mitigate
and reduce emissions. Council has a role in: risks and adapt to climate change impacts
• Helping to inform and prepare our local locally. We need a clear and collaborative
community to ensure greater resilience in process to prepare and deliver solutions.
the face of climate change impacts and This includes making the most of the new
extreme weather events opportunities here in Noosa. We also
need to engage and empower everyone
• Helping to mobilise and strengthen
in our community and to protect our most
community advocacy for greater action
vulnerable as we adjust to a new future
on climate change across all levels of
together - where people, businesses and
government and different sectors by
nature thrive.
strengthening relationships, amplifying
community voices and leveraging
connections
• Improving decision making by
embedding consideration of climate risks
and emissions reduction into all areas of
council operations
Page 8
Section 9
Noosa Climate Change Response Plan
About this Plan
This Climate Change Response Plan intends to establish Noosa as a genuine leader in
responding to climate change by creating and implementing a cross-sectoral, cross-functional
approach that is bold and efficient and maximises co-benefits.
The document details a 5-year plan that sets out the context, desired outcomes and actions
for addressing climate change in Noosa Shire in partnership with the community. The plan
provides overarching strategic direction, specific actions and targets for responding to climate
change. The objectives are to ensure:
• Key climate risks are understood and accepted by Council and the community
• Roles and responsibilities for addressing climate risks with Council and key sectors of the
community are established
• Climate risks and emissions reduction are considered and responded to in a holistic and
strategic way and embedded in decision making, policy and planning
• Opportunities arising from climate change for Council and the community are identified
• Collaborative approaches are considered and pursued for reducing emissions and
adapting to climate change
• Implementation and outcomes of climate action and changing risks are monitored and
regularly evaluated.
The plan is structured under 8 themes:
1. Strong leadership and governance
2. Energy efficiency and renewable energy
3. Clean low emissions industries
4. Sustainable transport
5. Healthy and resilient natural systems and carbon drawdown
6. Sustainable agriculture and food systems
7. Resilient and adaptive communities and built environments
8. Zero waste and circular economy
Each theme has strategic priorities with information on why these priorities matter; how they will
be achieved; Council’s role in driving and influencing change; and important partnerships.
Within the Summary of Actions there is an overview of the specific actions to be implemented
over the next few years, indicators for monitoring progress, and estimated timeframes for
delivery.
Ongoing community involvement and contribution in the plan’s implementation is important for
ensuring successful delivery of the ambitions and strategic priorities of the plan.
Page 9
Noosa Climate Change Response Plan
About this Plan
This Climate Change Response Plan intends to establish Noosa as a genuine leader in
responding to climate change by creating and implementing a cross-sectoral, cross-functional
approach that is bold and efficient and maximises co-benefits.
The document details a 5-year plan that sets out the context, desired outcomes and actions
for addressing climate change in Noosa Shire in partnership with the community. The plan
provides overarching strategic direction, specific actions and targets for responding to climate
change. The objectives are to ensure:
* Key climate risks are understood and accepted by Council and the community
* Roles and responsibilities for addressing climate risks with Council and key sectors of the
community are established
* Climate risks and emissions reduction are considered and responded to in a holistic and
strategic way and embedded in decision making, policy and planning
* Opportunities arising from climate change for Council and the community are identified
* Collaborative approaches are considered and pursued for reducing emissions and
adapting to climate change
¢ Implementation and outcomes of climate action and changing risks are monitored and
regularly evaluated.
The plan is structured under 8 themes:
1. Strong leadership and governance
2. Energy efficiency and renewable energy
3. Clean low emissions industries
4. Sustainable transport
5. Healthy and resilient natural systems and carbon drawdown
6. Sustainable agriculture and food systems
7. Resilient and adaptive communities and built environments
8. Zero waste and circular economy
Each theme has strategic priorities with information on why these priorities matter; how they will
be achieved; Council’s role in driving and influencing change; and important partnerships.
Within the Summary of Actions there is an overview of the specific actions to be implemented
over the next few years, indicators for monitoring-progress, and estimated timeframes for
delivery.
Ongoing community involvement and contribution in the plan’s implementation is-important for
ensuring successful delivery of the ambitions and strategic priorities of the plan.
Page 9Section 10
Noosa Shire Council
Climate change principles and • Provide up-to-date and balanced information
to the community on climate change
objectives
that builds community understanding,
The following principles from the Climate Change preparedness and resilience, and helps
Response Policy and overarching Environment mobilise community action on climate
Strategy will help guide strategic priorities, and change and emissions reduction.
the implementation of climate change actions:
Climate and emission reduction decisions
• Apply systems thinking to climate change consider Council’s broader ongoing financial
adaptation and emissions reduction by sustainability requirements including ongoing
developing and implementing short- and affordability considerations on annual rating
long-term responses that achieve timely, decisions.
well informed and effective action while
also delivering other social, economic and
environmental co-benefits Climate projections
• Commit to being innovative, flexible and Council recognises the important role of the
adaptive in responding to climate change United Nations Intergovernmental Panel on
• I ncrease resilience of the community, Climate Change (IPCC) in reviewing and
the economy and our natural assets to summarising the latest climate change science
environmental hazards and climate change for public use. Due to slow global progress on
• Ensure ecological sustainability is fully reducing carbon emissions, Council will use,
integrated into decision making in order to as a minimum, regional climate projections that
help secure the continued availability of are based on a low-moderate global emissions
natural resources for present and future reduction trend to inform its climate risk analysis
generations (commonly referred to as “business as usual”
• Use a scientific evidence-based approach or BAU)1. We will also use climate change
to managing the environment and projections that are consistent with those used
climate change and adapt and respond or supported by the Queensland Government.
appropriately as new information arises
In the absence of either of these, we will seek
• Take an adaptive management approach to apply climate projections published by
to climate risks and periodically undertake the Commonwealth Scientific and Industrial
climate risk assessments and updates Research Organisation (CSIRO).
consistent with ISO 31000:2009
Council will commence a review of its climate
• Be a regional and Queensland leader for
response plans and actions within 12 months
climate action and advocacy
of the publication date of new regional climate
• ctively communicate and partner with the
A
projections from the above organisations.
broader community to improve awareness
and build capacity around environment
issues, climate risks and emissions reduction
1
Referred to as “Representative Concentration Pathway (RCP) 8.5”
Page 10
Section 11
Noosa Climate Change Response Plan
Local Climate Change Impacts
Page 11
i" ; ES Se
Gi Pee in Nt eRe Pe
pe SEG ENE 1S
y a WE he ek Meee Se Peet Br bart eh ite oa .
, \ ee SS |
1 ] 8s 4 “th am Fi ay wae . ‘ Thad x
je x P Gums Sees -
@) \ ————- Oe
q) . od ihe ‘3 Ss
a Ss fe = F
i eee |
\ h- << . +. |
( ) vs “~, ak > — , “\
ae, ae — ee \ f
a ’ <3 Hy) ih) - = % a" = . es — \ ‘ {
\ i). aS SAS. ON
\ Wy, whi) — = Sy Y
“ ry ~ a
4D) ) WT Z x fi } {
2 , ay Sa
= = ~ ae =fdy a
ed) . . i » a
5 ess a
5 1 1 1 23 4 3161 1178 2 2 37 |
4 1 1 1 24 0 541 1201 2614 164 -1
5 1 1 1 24 1 541 1264 200 101 92 Oy
5 1 1 1 24 2 1777 1197 34 129 3 wy
5 1 1 1 24 3 2860 1233 72 51 4 ”
5 1 1 1 24 4 2966 1236 189 81 33 a
4 1 1 1 25 0 1624 1306 621 37 -1
5 1 1 1 25 1 1624 1323 10 4 14 -
5 1 1 1 25 2 1775 1306 51 37 26 «
5 1 1 1 25 3 2236 1327 9 6 19 7
4 1 1 1 26 0 560 1324 1389 97 -1
5 1 1 1 26 1 560 1332 67 89 14 ey
5 1 1 1 26 2 1651 1374 34 13 42 wh
5 1 1 1 26 3 1755 1345 72 60 48 Su
5 1 1 1 26 4 1901 1324 48 88 40 f°
4 1 1 1 27 0 1883 1416 1277 53 -1
5 1 1 1 27 1 1883 1423 14 15 0 .
5 1 1 1 27 2 3130 1416 30 48 5 '
4 1 1 1 28 0 1921 1468 1387 58 -1
5 1 1 1 28 1 1921 1509 2 2 39 »
5 1 1 1 28 2 3271 1468 37 58 29 a
4 1 1 1 29 0 1852 1525 1447 71 -1
5 1 1 1 29 1 1852 1572 6 9 39 ~~
5 1 1 1 29 2 2558 1525 40 71 0 \
5 1 1 1 29 3 3271 1529 28 49 0 o}
4 1 1 1 30 0 1834 1586 1452 140 -1
5 1 1 1 30 1 1834 1588 74 55 44 \s
5 1 1 1 30 2 2465 1640 55 86 40 ie
5 1 1 1 30 3 2729 1600 109 56 74 =
5 1 1 1 30 4 3126 1621 38 24 39 4
4 1 1 1 31 0 565 1673 2743 85 -1
5 1 1 1 31 1 565 1698 60 55 22 2
5 1 1 1 31 2 2330 1686 43 72 41 |
5 1 1 1 31 3 3163 1674 2 58 42 |
5 1 1 1 31 4 3294 1673 14 22 67 4
4 1 1 1 32 0 561 1776 2603 93 -1
5 1 1 1 32 1 561 1790 54 72 42 Cp
5 1 1 1 32 2 2260 1783 34 86 16 A
5 1 1 1 32 3 2342 1776 72 49 15 i
5 1 1 1 32 4 3162 1796 2 22 74 |
4 1 1 1 33 0 1901 1800 1022 100 -1
5 1 1 1 33 1 1901 1841 108 47 52 =)
5 1 1 1 33 2 2690 1800 233 100 2 “—)
4 1 1 1 34 0 1972 1883 9 29 -1
5 1 1 1 34 1 1972 1883 9 29 20 :
4 1 1 1 35 0 1958 1921 1471 152 -1
5 1 1 1 35 1 1958 1939 55 108 28 ‘
5 1 1 1 35 2 2357 1921 858 135 48 ee
5 1 1 1 35 3 3264 1938 165 135 35 ee
4 1 1 1 36 0 186 2027 3113 176 -1
5 1 1 1 36 1 186 2067 129 129 18 —
5 1 1 1 36 2 646 2027 104 176 70 N
5 1 1 1 36 3 1087 2067 61 121 0 -
5 1 1 1 36 4 1568 2126 42 7 46 =
5 1 1 1 36 5 2677 2060 117 75 30 ar
5 1 1 1 36 6 2985 2070 96 96 50 re
5 1 1 1 36 7 3159 2110 25 21 31 ~
5 1 1 1 36 8 3262 2059 37 78 37 9
4 1 1 1 37 0 2707 2123 14 14 -1
5 1 1 1 37 1 2707 2123 14 14 3 a
4 1 1 1 38 0 2032 2084 1410 133 -1
5 1 1 1 38 1 2032 2148 36 33 49 >
5 1 1 1 38 2 2272 2141 38 49 18 oe
5 1 1 1 38 3 2358 2084 156 133 17 ~~.
5 1 1 1 38 4 2802 2122 88 56 66 er
5 1 1 1 38 5 2972 2138 5 4 11 ;
5 1 1 1 38 6 3229 2144 69 50 32 ee
:
a a »~ ‘ A> 4 fo)
3 A ‘ > y oe ao
i ~ -Section 12
Noosa Shire Council
Our current climate
The South East Queensland region has a sub-tropical climate. The average annual temperature
is 19°C. Summer average temperature is around 24°C, in autumn and spring it is 20°C, and in
winter 14°C.
Annual and seasonal average rainfall are variable, affected by local factors such as
topography and vegetation, and broader scale weather patterns, such as the El Niño–La Nina.
Most rainfall occurs in summer and autumn.
Our changing climate
The climate is changing across Queensland. Average temperatures across the state are
around 1°C higher than they were 100 years ago. Recent decades have shown a clear
warming trend driven by increasing atmospheric carbon emissions stemming from human
activities. The climate has always been variable, but human-caused climate change is leading
to shifts beyond this natural variability, at a rate that could be as much as 50 times greater than
otherwise would have occurred.
Noosa has a long history of climate-driven extremes such as floods, droughts, heatwaves and
bushfires.
Climate change is likely to exacerbate the frequency and/or severity of these events. It can be
an amplifier of these and other hazards, and even lead to the emergence of new risks.
Below is a summary of the expected changes in key climate variables for Noosa, as well as
some of the risks that we will likely need to adapt to. The figures presented have been obtained
from the Queensland Government’s Climate Dashboard (2021), and are based on a global
emissions scenario whereby low-moderate efforts to reduce carbon emissions are made by the
year 20901.
The risks posed by a rapidly changing climate can be chronic (e.g. changes in average
temperature or annual rainfall totals) or acute (e.g. rapid onset but relatively short-lived disaster
events such as floods and storms).
1
This scenario is called ‘Representative Concentration Pathway (RCP) 8.5’
Page 12
Section 13
Noosa Climate Change Response Plan
Temperature elderly, the homeless, and those with pre-existing
health conditions. This is significant given the
Noosa’s average, maximum and minimum average age for a resident of Noosa is higher
temperatures are projected to continue to rise. than the Queensland average. In addition to
For the near future (2030), the annually averaged people, heatwaves can have an impact on critical
warming is projected to be around 1.5°C above infrastructure services, livestock and other
the climate baseline of 1986–2005. By the year agricultural practices, building cooling costs,
2070, this projected range of warming will and local flora and fauna.
reach between 2.1 to 3.4°C above the baseline.
Noosa’s current summer average temperature is Rainfall
25°C. This could increase to 27°C by 2050, 28°C High climate variability is likely to remain the
by 2070, and 29°C by 2090. major factor influencing rainfall changes in the
next few decades. By the year 2090, projections
Such rapid changes in temperature could have
of average total annual rainfall show little
an effect on the lifecycles of local flora and change or a decrease across the Noosa Shire.
fauna, the viability of horticultural enterprises, However, the intensity of heavy rainfall events is
and increase the prevalence of mosquito-borne likely to increase as summer totals rise by 11%
diseases and other harmful pests. Increases in by 2090. Conversely, winter and spring totals
the average and maximum temperatures will also are projected to decrease by 8% and 25%
increase cooling costs for private- and publicly- respectively, by the year 2090.
owned buildings. By late this century, it is likely that the region will
experience more time in drought, compared to
There is likely to be a substantial increase
the present day.
in the frequency and duration of heatwaves.
Currently, the average duration for the longest The combination of a drier dry season and
single heatwave in a year is around 5 days. wetter wet seasons, and an increase in drought
The duration of such an event is projected to conditions, could lead to a range of risks and
changes such as soil loss through erosion
increase to 7.5 days by 2030,
(during heavy rainfall), localised flooding,
14 days by 2050, 33 days by 2070, and 67 days
compaction of soils leading to reduced
by 2090. Such a change represents one of the
absorption of rainfall, increased prevalence of
most significant climate risks to Noosa.
outdoor sporting injuries, soil movement leading
In Queensland, heatwaves are responsible to fractures in built structures, and impacts on
for more deaths than all other natural hazards agricultural enterprises and native flora and
combined. Those groups most at risk include the fauna.
Page 13
Section 14
Noosa Shire Council
Oceans
The average sea level for the coastal region Noosa is situated is projected to rise by 0.8m
above present day levels by the year 2100. Higher sea levels will increase the risks posed by
coastal hazards such as storm tide inundation and coastal erosion, and lead to more frequent
nuisance flooding of low-lying foreshore areas. Noosa Council’s Coastal Hazards Adaptation
Plan, and accompanying technical studies, contain details regarding how these risks are
expected to change, and what the most appropriate pathways for dealing with these risks are
for Noosa’s coastal zone.
In addition to sea level rise, sea surface temperatures off the Queensland coast have risen
markedly over recent decades, and warming is projected to continue. Such increases could
lead to changes in the makeup of local marine and estuarine ecosystems. Warmer seas could
lead to a southward expansion in the range of certain tropical marine species, including those
both visually attractive to beachgoers and those that are potentially harmful.
The world’s oceans have been absorbing a significant amount of carbon dioxide emitted by
human activities, and have increased in acidity by around 25%. If carbon emissions continue
to increase as currently, this acidification of the oceans will also increase. Along with increases
in sea surface temperature, this is likely to have a significant effect on marine ecosystems, as
a more acidic ocean makes it more difficult for important marine species such as corals and
plankton to make their skeletons and shells. Such impacts will extend up the oceanic food
chain, affecting important ecological values and economic activities such as commercial and
recreational fisheries and tourism.
Page 14
Section 15
Noosa Climate Change Response Plan
Extreme events An example of a transition risk is a levy on
carbon emissions. The introduction of a carbon
A warmer world is likely to result in an levy would increase the cost of doing business
increase in the severity of extreme wind and for organisations responsible for carbon
storm events. Based on currently available emissions, such as a local government that
information, the frequency of tropical cyclones owns a landfill or an airline whose planes rely
forming and impacting the Queensland coast on fossil fuels. Increases in business costs are
is expected to decrease. However, a warmer often passed on to customers and consumers,
atmosphere and seas is likely to result in an thereby potentially affecting the Noosa
increase in the average severity of tropical community through the household budget.
cyclones, as well as a southward expansion
Another example is a reduction in the expected
in their normal range. Whilst there does not
return on investment for assets and activities
appear to be any change in their frequency yet,
that do not align with a clean economy,
climate change projections indicate an overall
such as a coal-fired power station. Some
decrease in East Coast Lows can be expected.
institutions have already begun to refuse to
An increase in the severity of storm and provide financing or commercial insurance
tropical cyclone events will lead to increased for business activities on the grounds that the
risks to people, private property, important activities will result in an increase in carbon
infrastructure, and the local environment of emissions. The lack of finance or insurance can
Noosa associated with more intense and create what is known as a ‘stranded asset’. If
frequent flash flooding, and more frequent investment portfolios (such as those included
severe or extreme wind events. in superannuation funds) are not carefully
Bushfire weather is a measure of fuel dryness managed, the prospect of stranded assets can
and hot, dry, windy conditions. Recent bushfire create an economic transition risk, which can
events of 2019/20 in Peregian, Cooroibah and affect the superannuation returns for ordinary
Noosa North Shore have highlighted the ever- people.
present risk of bushfire. The combination of A more direct form of economic transition risk is
higher average temperatures, more frequent the transition from internal combustion engine
and longer heatwaves, and an overall drying (ICE) cars to electric vehicles (EV). For example,
trend is likely to result in an increase in bushfire a buyer of an ICE car may be expecting to
risks across certain areas of Noosa Shire. re-sell the vehicle in several years for 50% of
the purchase price. However, they may receive
Transition risks significantly less than this amount if future
buyers are only interested in purchasing an EV.
Not all risks associated with a changing
climate are related to the natural or physical The existence of transition risks should not
environment. How society responds to the be viewed as a reason to avoid actions to
threat of climate change can lead to ‘transition avert climate change, but rather as an added
risks’. Transition risks are the result of steps incentive to transition to a cleaner economy
taken primarily by governments, but also and society more rapidly; a form of first-mover
individuals and businesses, to reduce carbon advantage. Taking such steps in Noosa, sooner
emissions. Most transition risks are the result of rather than later, is likely to minimise pressure
either regulatory or economic change. on future budgets for Noosa Council, and
potentially the community as well.
.
Page 15
Section 16
Noosa Shire Council
The economic cost of climate change
The costs of a changing climate are already being felt, and without action these are likely
to increase significantly in the decades ahead.
For example, the cost of extreme weather in Australia has more than doubled since 1970,
totalling $35 billion over the past decade. By around mid-century, extreme weather events
exacerbated by climate change, as well as the impacts caused by rising sea levels,
could cost the Australian economy $100 billion every year. Figures regarding the potential
economic cost to Noosa from climate change are not yet available.
Climate impacts and risks for key local sectors
Figures 1 – 5 illustrate how key sectors across the Noosa Shire are likely to be affected
by a rapidly changing climate. It is common for the same or similar risks to be faced by
multiple sectors.
Increased public
health burden
Impact on tourism and reputation
as a sustainable destination
Figure 1: Climate risks for Noosa’s business and economy
Page 16
Section 17
Noosa Climate Change Response Plan
Increased risk of localised
flooding of roads
Figure 2: Climate risks for Noosa’s transport system
Changes to species
distribution and diversity
Decreased provision of
ecosystem services such as
pollination, clean air and water
Changes in extent and
condition of native
vegetation
Impact on plant survival
Figure 3: Climate risks faced by biodiversity in Noosa
Page 17
Section 18
Noosa Shire Council
Increased disruption to
agri-business due to
seasonal changes and
rainfall patterns
Figure 4: Climate risks for Noosa’s agricultural sector
Figure 5: Climate risks for Noosa’s built environment, infrastructure, and community
Page 18
Section 19
Noosa Climate Change Response Plan
Noosa’s Carbon Emissions
Page 19
77 CAE
s ' ae ) ' e mae
' c oe Tt A | _— ~s
Wes ae ;
! \ Sa rey = <h ee i 4
he aie vee Nh S :
ores | - ES th ree ;
eee” | : 3 :
he ag a =e ES .
4 a 7
: a i. 7
»~ ® wee i . y
é . A . |
; =
Oy Bae oer os
; te a » 3 , we |
WE LE :
Ae tS oa Oe os
; be we po &
ne tape: ae! Ss
a ai x a! '
Fy Ae fe : :
; )
a teas Be | : :
POF _ - -
Re ;
PAT GS ‘ = we
i | “se } ; aS ree a =
be ved Sah. \ | |
Ee, a. | :
yetrs 3 3 . ‘
a i * nt “= ae ~
We | wee. =
iat “
; pe ) 4 =
‘aa a ; |
, ; Ne . f rn
ani y ee NP.
La tae | | es
| | | tam
: : r e Os = a rc
- & «Sy , m= tes
eae *
| | | aoe Ary ar
wr iry et a ee ©
- oe |
a aia A, oy,
LP ae a=
Dele 1 uy
aeeeey” . -— ASRS. oy
ey AEE - ; o—
i ’ 1 - : a
ote |
- > ‘4 |
oo the
' ete _ 7
wat: im
we : bAP>
‘i Pea
a Me
sie «Sader -
Liat +7 | | |
a Wisc’ } ; ;
=. LPP ae m
2 | thet Pr >
pes, A ht
S Carbon Emi
Noosa’ ISSIO
Tx i : mL 7 Sa’ a oe,
, ae vm
ie
mr eS oo
ea
a ara
rae tien TO
i eee
OO a nn
asSection 20
Noosa Shire Council
Noosa Shire community emissions
Community emissions have been estimated in accordance with the Global Protocol for Community-
scale Greenhouse Gas Emission Inventories2 (GPC). The GPC is designed to promote best practice
greenhouse gas accounting and reporting. The breakdown of Noosa Shire emissions is shown in
Figure 6 below.
Emissions from electricity consumption from the grid account for 58% of the total emissions, whilst
transport emissions make up 33% and waste comprises 9% of total emissions.
Council will regularly update this profile, however it should be noted that the actual quantum of
emissions may change as more accurate and granular data becomes available on a community wide
basis. Updated community emission profiles will be available on Council’s website.
Noosa
Community
Emissions
Figure 6: Breakdown of Noosa Community emissions profile
2
https://ghgprotocol.org/greenhouse-gas-protocol-accounting-reporting-standard-cities
Page 20
Section 21
Noosa Climate Change Response Plan
Noosa Council emissions
Noosa Council calculates its own emissions from Council operations in accordance with the Climate
Active Carbon Neutral Standard for Organisations3. These emissions are reported annually.
Council emissions are also included in the community emissions profile. As Council reduces its own
emissions from its operations, it will be reflected in the community emissions profile.
Figure 7 shows Council’s corporate emissions over time, since the baseline year of 2015/16. There
has been an 11% reduction in Council’s total emissions since 2015/16 despite further categories
of emissions being added to Council’s emissions profile as data has become available. Council
has reduced its electricity consumption for its own buildings and facilities by 34% compared to the
baseline year as a result of the installation of over 600kW of rooftop solar, energy efficiencies and
staff behavioural change.
The most significant source of Council emissions (63%) is the landfill owned and operated by Noosa
Council that receives and manages the Noosa community’s residential and commercial waste.
Council’s waste management plan (in development) will deal with landfill emission reductions, as well
as reducing overall waste.
Figure 7: Noosa Council operation emission sources by year
3
https://www.industry.gov.au/data-and-publications/climate-active-carbon-neutral-standard-for-organisations
Page 21
Section 22
Noosa Shire Council
What does Net Zero Hence, reducing greenhouse gas emissions
is hugely important - but we can’t stop there.
Emissions mean? The end goal is to balance the scales and
The target of ‘net zero emissions’ by 2026 for restore the global climate to pre-climate change
Council and the community refers to achieving levels. To get there, we need to urgently reduce
an overall balance between greenhouse gas greenhouse gas emissions to zero and then get
emissions produced and greenhouse gas cracking on repairing past harm by drawing
emissions taken out of the atmosphere. down past emissions.4
Getting to net zero means we can still produce “Unless we act decisively to phase out the
some emissions, provided they are offset by use of fossil fuels, global temperatures will
exceed a 2oC-rise above the pre-industrial
processes that reduce greenhouse gases
levels in a few decades. By 2030 the average
already in the atmosphere. The more emissions
increase in global temperatures will reach
we produce the more carbon dioxide we need
1.5oC, and the Earth’s climate system is likely
to remove from the atmosphere to reach net
to begin to unravel. If we fail to act, dramatic
zero. The process of removing carbon dioxide destabilisation will be felt when the temperature
is called carbon sequestration or drawdown. rise breaches 2oC, sometime before 2050.
To meet the goal of net zero, new emissions must Despair is not an option. Nor is selfish
be avoided or as a minimum, maintained as low complacency. Instead, this is the moment to ask
as possible. This means that we need to rapidly what you can do.”
phase out the use of fossil fuels – coal, oil and (Tim Flannery ‘The Climate Cure: Solving the
gas – and transition to renewable energy. Climate Emergency in the Era of COVID-19)
Why is net zero emissions Why net zero by 2026
important? Even if we limit global increases to 1.5oC, we
Reaching and sustaining net zero emissions is can still expect rapid and far-reaching changes
important in order to restore the Earth’s energy in our land and water resources, energy,
industry, buildings and transport. A target of
balance and halt further global warming. The
‘net zero emissions by 2026’ for the Noosa
total amount of emissions released up until the
community is commensurate with what these
point of reaching net zero will then determine
impacts mean, what the science is saying, and
the level of warming that will result for decades
the urgency of the situation - irrespective of
to come. The longer we wait, the harder it will how difficult the target is to achieve.
be to reach, and the more warming that will
result. Achieving net zero emissions is a shared
responsibility. This plan outlines how Council
Climate change isn’t a tap we can turn off once is contributing to meeting this target with an
we stop using fossil fuels. Carbon dioxide, the increased focus on advocacy and mobilisation
main contributor to climate change, will stay in of the community. More broadly, social and
the atmosphere and keep heating the planet for economic transformation is required at all levels
years and years. of government and industry.
4
Climate Council https://www.climatecouncil.org.au/resources/what-does-net-zero-emissions-me
an/?atb=DSA01b&gclid=Cj0KCQiAgomBBhDXARIsAFNyUqPLFjZu4r3nfCOpoZxsMo858cG_
faBYzQyuPl1ocqNNKX7QSgRrMQIaAjxCEALw_wcB
Page 22
Section 23
Noosa Climate Change Response Plan
Pathway to Zero Community
Community Emissions
Emissions Indicative Reduction Pathway
350000
300000
250000
Tonnes CO2.e
200000
150000
100000
50000
0
2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27
Electricity ‐ residential Electricity ‐ Business Transport Waste & water
Figure 8: Community Emissions Indicative Reduction Pathway
This graph shows an indicative pathway to net zero emissions for the highest emission sources contributing to the
Noosa Community carbon footprint. It should be noted that this data is from 3rd parties and may be subject to error.
unity emissions graph estimated emissions pathway
Council recognises that the Community emission profile is incomplete as the data is not yet available for the agriculture
sector, nor the carbon drawdown potential of vegetation and landuse change. Council will update the emissions profile
aph shows the reductions required to be made in the most significant emission sources
when this data is available, however it will not alter the main contributors to emissions herein.
osa Shire Emissions Opportunities Barriers
EmissionsElectricity
from Agriculture and Landuse Change have not yet• Cbeen estimated
sources
• The National Electricity Grid is de-carbonising and the cost of ost of emerging
sourced from 3rd• electricity
party modelled data and is subject
from renewable energy supply is becoming cheaper.
to change as data sources become
technologies
te Council can have a role in assisting residents and businesses transition • Landlord take up of solar for
to renewable energy by: tenants including low income
- Investigating renewable energy opportunities such as Power households
Purchase Agreements (PPAs), micro grids and virtual power plants • Electricity grid capacity to
- Advocating to State and Federal governments to remove barriers and absorb the excess solar
enhance incentives electricity being generated
- Providing assistance to the community to increase renewable energy
and improve energy efficiency
• Utilising expertise of community groups (eg. ZEN inc) to drive change.
Transport • The electrification of the private transport sector is inevitable. • Range of models and
• Council can encourage Noosa residents and businesses to switch to perceived cost of EVs in
electric vehicles (EVs) through: Australia
- Provision of EV charging stations • Consumer confidence in EVs
- Lobbying State and Federal Government to remove structural barriers • Lack of gov. incentives for
and create incentives take up of EVs
• Council can also help encourage a modal shift to walking, cycling and • State gov run diesel bus
public transport through a range of Transport Strategy initiatives fleet
Waste • Council controls the Noosa landfill and can continue to implement and • Cost and resources required
upscale emission reduction initiatives by: for different technologies
- Continuing to improve landfill methane gas capture (eg anaerobic digesters for
- Investigating organic waste reduction and reuse opportunities organic waste)
- Continuing community waste education programs
Page 23
Noosa Climate Change Response Plan
Pathway to Zero Community Emissions
350000
300000
250000
y
© 200000
O
Wn
wo
= 150000
°
ke
100000
- i L
0
2020/21 2021/22 2022/23 2023/24 2024/25 2025/26 2026/27
Electricity - residential | m™Electricity- Business Transport m Waste & water
Figure 8: Community Emissions Indicative Reduction Pathway
This graph shows an indicative pathway to net zero emissions for the highest emission sources contributing to the
Noosa Community carbon footprint. It should be noted that this data is from 3rd parties and may be subject to error.
Council recognises that the Community emission profile is incomplete as the data is not yet available for the agriculture
sector, nor the carbon drawdown potential of vegetation and landuse change. Council will update the emissions profile
when this data is available, however it will not alter the main contributors to emissions herein.
Emissions Opportunities stolaalclasy
sources
Electricity | * The National Electricity Grid is de-carbonising and the cost of * Cost of emerging
electricity from renewable energy supply is becoming cheaper. technologies
* Council can have a role in assisting residents and businesses transition | * Landlord take up of solar for
to renewable energy by: tenants including low income
- Investigating renewable energy opportunities such as Power households
Purchase Agreements (PPAs), micro grids and virtual power plants * Electricity grid capacity to
- Advocating to State and Federal governments to remove barriers and absorb the excess solar
enhance incentives electricity being generated
- Providing assistance to the community to increase renewable energy
and improve energy efficiency
* Utilising expertise of community groups (eg. ZEN inc) to drive change.
Transport | * The electrification of the private transport sector is inevitable. « Range of models and
* Council can encourage Noosa residents and businesses to switch to perceived cost of EVs in
electric vehicles (EVs) through: Australia
- Provision of EV charging stations * Consumer confidence in EVs
- Lobbying State and Federal Government to remove structural barriers | . | ack of gov. incentives for
and create incentives take up of EVs
* Council can also help encourage a modal shift to walking, cycling and | « State gov run diesel bus
public transport through a range of Transport Strategy initiatives fleet
Waste * Council controls the Noosa landfill and can continue to implement and | * Cost and resources required
upscale emission reduction initiatives by: for different technologies
- Continuing to improve landfill methane gas capture (eg anaerobic digesters for
- Investigating organic waste reduction and reuse opportunities organic waste)
- Continuing community waste education programs
Page 23Section 24
Noosa Shire Council Responding to the Climate Emergency Page 24 a? a 4 1 1 1 2 0 325 67 2940 151 -1 5 1 1 1 2 1 325 109 54 55 46 Te 5 1 1 1 2 2 428 67 96 127 6 - 5 1 1 1 2 3 558 121 27 49 0 ' 5 1 1 1 2 4 954 91 18 42 71 4 5 1 1 1 2 5 1767 73 52 145 2 4 5 1 1 1 2 6 1964 121 43 61 14 i 5 1 1 1 2 7 3177 121 88 49 15 7 4 1 1 1 3 0 286 260 3039 152 -1 5 1 1 1 3 1 286 309 44 24 20 a 5 1 1 1 3 2 361 260 85 152 0 ee 5 1 1 1 3 3 2055 291 6 18 68 | 5 1 1 1 3 4 2880 296 64 55 32 6 4 1 1 1 4 0 361 327 2581 97 -1 5 1 1 1 4 1 461 357 166 61 27 ee 5 1 1 1 4 2 1039 327 40 66 25 . 5 1 1 1 4 3 2261 339 36 85 10 i 5 1 1 1 4 4 2880 364 62 47 70 = 4 1 1 1 5 0 270 377 3055 137 -1 5 1 1 1 5 1 361 412 133 78 46 ae 5 1 1 1 5 2 1873 424 13 12 7 4 5 1 1 1 5 3 2267 442 44 54 49 fa 5 1 1 1 5 4 2893 377 55 107 2 Dy 5 1 1 1 5 5 3241 430 84 84 0 t 4 1 1 1 6 0 363 484 2902 106 -1 5 1 1 1 6 1 363 484 71 79 62 & 5 1 1 1 6 2 2249 502 90 73 16 ‘a 5 1 1 1 6 3 2867 491 100 99 53 ©) 5 1 1 1 6 4 3226 520 39 49 0 * 4 1 1 1 7 0 210 527 2734 221 -1 5 1 1 1 7 1 210 581 11 54 5 : 5 1 1 1 7 2 2206 629 18 12 41 i 5 1 1 1 7 3 2242 527 158 187 60 ¥ 5 1 1 1 7 4 2880 600 64 148 48 : 4 1 1 1 8 0 210 672 2732 151 -1 5 1 1 1 8 1 210 702 149 115 9 a 5 1 1 1 8 2 518 738 61 37 0 of 5 1 1 1 8 3 2194 678 85 133 40 ts 5 1 1 1 8 4 2418 726 66 73 52 A 5 1 1 1 8 5 2575 678 29 121 86 } 5 1 1 1 8 6 2828 672 114 151 28 iT 4 1 1 1 9 0 295 817 2649 104 -1 5 1 1 1 9 1 295 817 320 85 4 oi 5 1 1 1 9 2 2236 847 25 24 2 * 5 1 1 1 9 3 2400 835 66 73 27 nat 5 1 1 1 9 4 2880 866 64 55 1 oD) 4 1 1 1 10 0 379 864 2904 104 -1 5 1 1 1 10 1 428 914 127 48 42 a 5 1 1 1 10 2 2406 926 6 6 52 a 5 1 1 1 10 3 2874 864 48 96 47 OD 4 1 1 1 11 0 391 956 2553 79 -1 5 1 1 1 11 1 426 956 26 42 0 -_ 5 1 1 1 11 2 537 1023 6 12 13 7 5 1 1 1 11 3 2321 974 61 37 22 ‘J 5 1 1 1 11 4 2880 963 64 54 56 av 4 1 1 1 12 0 214 1031 2728 137 -1 5 1 1 1 12 1 214 1099 104 69 58 _ 5 1 1 1 12 2 389 1041 51 85 19 by 5 1 1 1 12 3 537 1101 23 55 9 Fe 5 1 1 1 12 4 2858 1031 84 131 85 = 4 1 1 1 13 0 290 1262 2631 90 -1 5 1 1 1 13 1 290 1283 5 6 34 1 5 1 1 1 13 2 671 1277 5 6 0 F 5 1 1 1 13 3 1091 1277 81 30 33 a 5 1 1 1 13 4 1208 1295 6 6 22 ee 5 1 1 1 13 5 1946 1319 17 30 10 , 5 1 1 1 13 6 2291 1301 6 18 78 i 5 1 1 1 13 7 2533 1313 6 6 21 ; 5 1 1 1 13 8 2876 1262 45 90 0 OM 4 1 1 1 14 0 960 1253 1982 156 -1 5 1 1 1 14 1 932 1255 71 141 0 - 5 1 1 1 14 2 2031 1253 139 145 0 i] 5 1 1 1 14 3 2303 1361 6 13 31 im) 5 1 1 1 14 4 2605 1362 337 47 18 12 4 1 1 1 15 0 1934 1419 1009 70 -1 5 1 1 1 15 1 1934 1422 194 67 10 es 5 1 1 1 15 2 2862 1419 81 29 71 + 4 1 1 1 16 0 295 1476 2649 73 -1 5 1 1 1 16 1 295 1482 84 49 0 * 5 1 1 1 16 2 1836 1476 62 67 47 ey 5 1 1 1 16 3 1911 1472 61 81 47 ry 5 1 1 1 16 4 2007 1543 6 6 52 = 5 1 1 1 16 5 2188 1507 73 12 25 sh 5 1 1 1 16 6 2400 1476 66 49 41 a 5 1 1 1 16 7 2880 1487 64 55 73 O 4 1 1 1 17 0 363 1452 2580 236 -1 5 1 1 1 17 1 363 1573 28 55 0 * 5 1 1 1 17 2 712 1585 133 49 27 oi. 5 1 1 1 17 3 887 1579 97 49 27 =. 5 1 1 1 17 4 1166 1610 18 18 33 ol 5 1 1 1 17 5 1744 1545 75 99 47 fi 5 1 1 1 17 6 1898 1470 233 164 52 AE 5 1 1 1 17 7 2279 1452 175 236 35 si 5 1 1 1 17 8 2551 1610 18 12 0 L. 5 1 1 1 17 9 2587 1525 49 103 54 / 5 1 1 1 17 10 2862 1549 81 29 46 a 4 1 1 1 18 0 200 1621 2767 79 -1 5 1 1 1 18 1 200 1664 36 14 31 = 5 1 1 1 18 2 391 1634 6 36 0 : 5 1 1 1 18 3 760 1634 115 54 36 oa 5 1 1 1 18 4 1250 1640 6 12 27 . 5 1 1 1 18 5 1696 1628 38 72 32 . 5 1 1 1 18 6 1940 1628 61 66 20 ae 5 1 1 1 18 7 2279 1640 18 30 42 4 5 1 1 1 18 8 2557 1634 85 48 35 ie 5 1 1 1 18 9 2880 1621 87 57 77 ©) 4 1 1 1 19 0 209 1628 2733 205 -1 5 1 1 1 19 1 349 1694 30 24 16 ene 5 1 1 1 19 2 984 1670 36 73 18 ee 5 1 1 1 19 3 1408 1682 59 36 0 e 5 1 1 1 19 4 1668 1670 91 67 22 i? 5 1 1 1 19 5 1904 1688 84 103 36 AY 5 1 1 1 19 6 2218 1664 188 169 31 ae 5 1 1 1 19 7 2497 1628 148 133 17 RN 5 1 1 1 19 8 2880 1692 62 47 0 o 4 1 1 1 20 0 193 1728 2751 112 -1 5 1 1 1 20 1 193 1737 35 69 0 fe 5 1 1 1 20 2 289 1791 18 24 0 , 5 1 1 1 20 3 385 1737 61 66 2 ' 5 1 1 1 20 4 619 1737 8 42 54 | 5 1 1 1 20 5 766 1749 73 36 78 iv 5 1 1 1 20 6 924 1815 5 6 70 | 5 1 1 1 20 7 1002 1749 6 6 0 H 5 1 1 1 20 8 1081 1755 42 54 70 * 5 1 1 1 20 9 1498 1773 6 6 82 j 5 1 1 1 20 10 1855 1797 67 24 41 Vs 5 1 1 1 20 11 1970 1761 12 24 37 ‘ 5 1 1 1 20 12 2121 1761 31 24 12 a 5 1 1 1 20 13 2376 1773 60 48 15 i 5 1 1 1 20 14 2491 1755 6 6 0 ° 5 1 1 1 20 15 2535 1728 111 91 4 ei 5 1 1 1 20 16 2858 1757 86 83 21 a 4 1 1 1 21 0 199 1795 3048 73 -1 5 1 1 1 21 1 199 1795 38 31 0 “ 5 1 1 1 21 2 319 1827 6 6 0 : 5 1 1 1 21 3 912 1821 6 6 36 I 5 1 1 1 21 4 1135 1833 6 13 2 , 5 1 1 1 21 5 1408 1827 12 12 9 oi 5 1 1 1 21 6 1465 1822 16 46 24 i 5 1 1 1 21 7 1570 1817 39 51 48 re 5 1 1 1 21 8 1698 1839 12 19 84 4 5 1 1 1 21 9 1720 1822 40 46 41 a 5 1 1 1 21 10 1867 1821 6 12 29 a 5 1 1 1 21 11 2289 1817 26 51 37 il 5 1 1 1 21 12 2344 1821 26 37 35 al 5 1 1 1 21 13 2630 1839 6 7 0 : 5 1 1 1 21 14 2714 1817 26 51 21 yi 5 1 1 1 21 15 3241 1827 6 6 0 c 4 1 1 1 22 0 416 1737 2528 284 -1 5 1 1 1 22 1 200 1737 1056 284 37 PS 5 1 1 1 22 2 1317 1773 284 157 34 SS 5 1 1 1 22 3 2339 1858 176 72 31 es 4 1 1 1 23 0 209 1926 2790 204 -1 5 1 1 1 23 1 209 2001 28 76 65 3 5 1 1 1 23 2 307 2003 102 66 0 7 5 1 1 1 23 3 452 2009 48 54 0 . 5 1 1 1 23 4 567 2015 52 115 5 \ 5 1 1 1 23 5 887 2015 25 54 0 ‘ 5 1 1 1 23 6 1099 1979 65 109 28 a 5 1 1 1 23 7 1208 2009 30 24 0 e. 5 1 1 1 23 8 1244 2021 18 12 22 , 5 1 1 1 23 9 1317 2003 36 72 0 . 5 1 1 1 23 10 1445 1979 27 106 10 Sf 5 1 1 1 23 11 1547 2033 30 6 51 ll 5 1 1 1 23 12 1607 1926 169 159 5 eal 5 1 1 1 23 13 1825 2009 309 66 18 1 5 1 1 1 23 14 2200 2015 230 66 29 be: 5 1 1 1 23 15 2880 1980 82 121 46 = 5 1 1 1 23 16 2993 2015 78 48 40 al 4 1 1 1 24 0 200 2075 2787 109 -1 5 1 1 1 24 1 200 2083 95 41 32 Zh 5 1 1 1 24 2 416 2106 59 66 17 A 5 1 1 1 24 3 621 2075 23 37 25 oA 5 1 1 1 24 4 729 2076 84 99 46 Ss. 5 1 1 1 24 5 936 2106 42 54 0 . 5 1 1 1 24 6 1008 2112 59 34 34 on 5 1 1 1 24 7 1129 2088 62 78 38 ee 5 1 1 1 24 8 1281 2081 48 97 26 a 5 1 1 1 24 9 1390 2106 127 72 18 ao 5 1 1 1 24 10 1631 2075 19 25 77 4 5 1 1 1 24 11 1686 2136 18 12 36 ‘ 5 1 1 1 24 12 1837 2075 157 91 23 — 5 1 1 1 24 13 2043 2118 85 24 32 ae 5 1 1 1 24 14 2194 2088 42 90 9 5 5 1 1 1 24 15 2327 2094 96 60 4 “ona 5 1 1 1 24 16 2599 2100 43 84 0 : 5 1 1 1 24 17 2956 2124 31 30 35 7 4 1 1 1 25 0 464 2160 2680 123 -1 5 1 1 1 25 1 555 2178 12 61 28 ee 5 1 1 1 25 2 664 2202 66 37 9 «A 5 1 1 1 25 3 1014 2190 49 43 11 ee 5 1 1 1 25 4 1383 2178 49 43 10 ir 5 1 1 1 25 5 1668 2215 12 12 44 die 5 1 1 1 25 6 1794 2168 59 115 11 WV 5 1 1 1 25 7 1904 2160 157 115 59 AG 5 1 1 1 25 8 2303 2172 42 37 34 ani 5 1 1 1 25 9 2472 2172 55 18 29 eae 5 1 1 1 25 10 2708 2233 6 6 12 : 5 1 1 1 25 11 2908 2215 6 6 32 ‘ 4 1 1 1 26 0 335 2219 2821 80 -1 5 1 1 1 26 1 335 2245 62 50 37 a 5 1 1 1 26 2 534 2227 21 18 11 a 5 1 1 1 26 3 664 2245 6 6 70 . 5 1 1 1 26 4 718 2245 30 48 28 aa 5 1 1 1 26 5 1111 2239 6 6 30 : 5 1 1 1 26 6 1253 2220 48 71 1 Lf, 5 1 1 1 26 7 1396 2269 18 30 9 / 5 1 1 1 26 8 1492 2227 37 72 39 t 5 1 1 1 26 9 1631 2263 7 6 0 , 5 1 1 1 26 10 1759 2251 12 6 0 r 5 1 1 1 26 11 2138 2219 44 46 17 ma 5 1 1 1 26 12 2303 2287 30 12 69 = 5 1 1 1 26 13 2445 2220 50 65 6 ie 5 1 1 1 26 14 3120 2239 36 36 26 1 4 1 1 1 27 0 313 2360 2474 74 -1 5 1 1 1 27 1 313 2390 236 42 39 aS 5 1 1 1 27 2 694 2384 30 36 51 A 5 1 1 1 27 3 948 2384 121 36 29 ENE 5 1 1 1 27 4 1148 2372 102 62 41 ote 5 1 1 1 27 5 1583 2360 115 74 36 7! 5 1 1 1 27 6 1777 2360 230 74 12 a 5 1 1 1 27 7 2097 2408 55 26 31 |. 5 1 1 1 27 8 2249 2378 242 56 22 SE 5 1 1 1 27 9 2714 2378 73 54 0 ea
Section 25
Noosa Climate Change Response Plan
Themes and strategic priorities
The following themes and strategic priorities have been identified to structure and direct climate risk
actions and emissions reduction opportunities for the Noosa community and Noosa Council.
Theme 1: Strong leadership and governance
1.1 Advocate to levels of government and mobilise the community to drive
decisive climate emergency action
1.2 Strengthen partnerships with governments and stakeholders to
take urgent action to achieve a low carbon economy and resilient
community
1.3 Move council from business-as-usual operations to adopting deep,
systemic change and being a powerful influencer and example of
climate action.
Theme 2: Energy efficiency and renewable energy
2.1 Transition Noosa Council and Noosa Shire to 100% renewable energy
and ensure the transition is inclusive of low income and vulnerable
residents and businesses, including strata tenants
2.2 Pursue energy efficiency and renewable energy measures within
Council and for Council owned buildings
2.3 Develop a climate aware and empowered community for reducing
climate risks and emissions
Theme 3: Clean low emissions industries
3.1 Through targeted initiatives, create an environment that supports
business development, innovation and investment shift to clean,
green low emission industries and technology
3.2 Work with industry, business associations and government agencies
to facilitate emissions reduction and environmental sustainability for
local businesses
Theme 4: Sustainable Transport
4.1 Accelerate public and active transport infrastructure investment and
community usage through the implementation of Council’s Transport
Strategy and Walking and Cycling Plan.
4.2 Transition Council and the community to sustainable transport use
and zero-emissions vehicles
Page 25
Noosa Climate Change Response Plan
Themes and strategic priorities
The following themes and strategic priorities have been identified to structure and direct climate risk
actions and emissions reduction opportunities for the Noosa community and Noosa Council.
Theme 1: Strong leadership and governance
1.1 Advocate to levels of government and mobilise the community to drive
decisive climate emergency action
1.2 Strengthen partnerships with governments and stakeholders to
take urgent action to achieve a low carbon economy and resilient
community
1.3 Move council from business-as-usual operations to adopting deep,
systemic change and being a powerful influencer and example of
climate action.
(7 \ Theme 2: Energy efficiency and renewable energy
) 2.1 Transition Noosa Council and Noosa Shire to 100% renewable energy
and ensure the transition is inclusive of low income and vulnerable
ww | | residents and businesses, including strata tenants
2.2 Pursue energy efficiency and renewable energy measures within
Council and for Council owned buildings
2.3 Develop a climate aware and empowered community for reducing
climate risks and emissions
Theme 3: Clean low emissions industries
3.1 Through targeted initiatives, create an environment that supports
business development, innovation and investment shift to clean,
green low emission industries and technology
3.2 Work with industry, business associations and government agencies
to facilitate emissions reduction and environmental sustainability for
local businesses
Theme 4: Sustainable Transport
4.1 Accelerate public and active transport infrastructure investment and
community usage through the implementation of Council’s Transport
Strategy and Walking and Cycling Plan.
4.2 Transition Council and the community to sustainable transport use
and zero-emissions vehicles
Page 25Section 26
Noosa Shire Council
Theme 5: Healthy and resilient natural systems and
carbon drawdown
5.1 Increase revegetation, ecosystems restoration and urban greening
to increase carbon drawdown, reduce urban heating and support
ecosystem and species resilience
5.2 Optimise use and management of water resources through integrated
water cycle management including drinking water, recycled water,
surface water and groundwater
Theme 6: Sustainable agriculture and food systems
6.1 Support agri-businesses and landholders to create a sustainable and
regenerative food system that includes consideration and preparation
for climate change risks
6.2 Promote sustainable, locally produced food and improve local food
access for farmers, residents, visitors and vulnerable people
6.3 Support agri-businesses and landholders to reduce their emissions
through changes in farming practices and technology implementation,
and to take up opportunities for income generation through carbon
drawdown activities.
Theme 7: Resilient and adaptive communities and
built environments
7.1 Create a resilient built environment for householders, businesses,
vulnerable people, property and infrastructure
7.2 Build Council and community awareness and preparedness for climate
change and extreme weather events
Theme 8: Zero waste and circular economy
8.1 Adopt circular economy principles to cut waste and pollution, keep
products and materials in use and regenerate natural systems.
8.2 Manage the landfill in accordance with best practice to minimise
greenhouse gas emissions
8.3 Minimise organic matter going to landfill from community waste
Page 26
Noosa Shire Council
IN O Theme 5: Healthy and resilient natural systems and
carbon drawdown
5.1 Increase revegetation, ecosystems restoration and urban greening
to increase carbon drawdown, reduce urban heating and support
ecosystem and species resilience
5.2 Optimise use and management of water resources through integrated
water cycle management including drinking water, recycled water,
surface water and groundwater
o Theme 6: Sustainable agriculture and food systems
6.1 Support agri-businesses and landholders to create a sustainable and
regenerative food system that includes consideration and preparation
for climate change risks
6.2 Promote sustainable, locally produced food and improve local food
access for farmers, residents, visitors and vulnerable people
6.3 Support agri-businesses and landholders to reduce their emissions
through changes in farming practices and technology implementation,
and to take up opportunities for income generation through carbon
drawdown activities.
® D5 Theme 7: Resilient and adaptive communities and
“) built environments
7.4 Create a resilient built environment for householders, businesses,
vulnerable people, property and infrastructure
1.2 Build Council and community awareness and preparedness for climate
change and extreme weather events
OXY Theme 8: Zero waste and circular economy
8.1 Adopt circular economy principles to cut waste and pollution, keep
products and materials in use and regenerate natural systems.
8.2 Manage the landfill in accordance with best practice to minimise
greenhouse gas emissions
8.3 Minimise organic matter going to landfill from community waste
Page 26Section 27
Noosa Climate Change Response Plan
Theme 1:
Strong leadership and governance
Why this is important
Responding to the climate emergency is a collective effort across all sectors of the community.
Council has a unique role to lead by example for the community, other councils and levels
of government. By showing powerful leadership and governance, Council can inspire and
support others to integrate climate emergency responses into their daily activities and longer-
term plans. This means moving from community engagement and education to mobilisation of
the broader community, as well as stronger, political and strategic advocacy.
Council has engaged the community through education campaigns around solar power and
energy efficiency and working with community groups such as Zero Emissions Noosa Inc
(ZEN Inc). This is important and ongoing work. However, Council is broadening its reach and
influence to drive collective action, not just individual action.
How we’ll achieve this
Through this Climate Change Response Plan, Council will assess local climate risks, help
coordinate responses for the Council and local community, and monitor change and progress
over time. Embedding consideration of climate change within all Council departments,
including procurement processes, key policy documents and decisions, including the
corporate plan and staff performance plans is an ongoing priority.
Council will continue to advocate for climate action and strengthen partnership opportunities.
This includes advocacy with other local governments through Climate Emergency Australia to
provide a collective voice for strong action on climate change. An advocacy and community
mobilisation plan will be prepared to establish positions on a range of state and federal issues
and to help support local community groups to develop their own climate advocacy programs
for promoting positive climate action across the different sectors of the Sunshine Coast.
A climate change community reference group will be established to guide and provide advice
on the implementation of the Climate Change Response Plan. As part of this, Council will
continue to collaborate with local community groups and business associations through the
existing Zero Emissions Noosa Memorandum of Understanding.
Strengthening regional partnerships and collaborating across neighbouring councils to identify
and respond to common climate risks and to build a low carbon economy will also bring
important regional benefits.
Page 27
Section 28
Noosa Shire Council
Strategic Priorities
The following strategic priorities are identified for Strong Leadership and
Governance:
1.1 Advocate to levels of government and mobilise the community to drive
decisive climate emergency action
1.2 Strengthen partnerships with governments and stakeholders to take action to achieve a
low carbon economy and resilient community
1.3 Move council from business-as-usual operations to adopting deep, systemic change and
being a powerful influencer and example of climate action.
Specific actions for implementation through this Climate Change Response Plan are identified
in the Summary of Actions.
Targets
By 2026, 70% of survey respondents have a high understanding of climate change and what
they can do to reduce their emissions and adapt to impacts
Metrics
• Climate change advocacy actions and the effectiveness of this advocacy
• % survey respondents that understand the topic of climate change and
what it means for Noosa Shire and themselves
• Number of events and promotion activities
• Number of projects involving Traditional Owners and incorporating First
Nations knowledge
• Number of partnerships/collaborations with governments and other stakeholders for
responding to climate change
• Number of corporate and operational policies that have incorporated a climate response
• Number of strategies and plans that have incorporated climate response objectives and
actions
• Number of staff training and capacity building activities
Partnerships
There are broad ranging areas that Council will extend its advocacy work
through existing networks including Climate Council, Climate Emergency
Australia, SEQ Council of Mayors, Tourism Noosa, Zero Emissions Noosa Inc,
Food and Agri-business Network, Cleantech Sunshine Coast, Cities for Power Partnership,
LGAQ Queensland Climate Resilient Councils, Planning Institute of Australia, Engineers
Australia, Queensland Coastal Councils, and Youth Council, amongst others.
Page 28
Noosa Shire Council
soa
Strategic Priorities ( )
The following strategic priorities are identified for Strong Leadership and * O *
a os
Governance: 1 °
1.1 Advocate to levels of government and mobilise the community to drive SF
decisive climate emergency action
1.2 Strengthen partnerships with governments and stakeholders to take action to achieve a
low carbon economy and resilient community
1.3 Move council from business-as-usual operations to adopting deep, systemic change and
being a powerful influencer and example of climate action.
Specific actions for implementation through this Climate Change Response Plan are identified
in the Summary of Actions.
Targets
By 2026, 70% of survey respondents have a high understanding of climate change and what
they can do to reduce their emissions and adapt to impacts
Metrics 4
* Climate change advocacy actions and the effectiveness of this advocacy
° % survey respondents that understand the topic of climate change and aw
what it means for Noosa Shire and themselves ro,
¢ Number of events and promotion activities
° Number of projects involving Traditional Owners and incorporating First
Nations knowledge
° Number of partnerships/collaborations with governments and other stakeholders for
responding to climate change
° Number of corporate and operational policies that have incorporated a climate response
° Number of strategies and plans that have incorporated climate response objectives and
actions
° Number of staff training and capacity building activities
Partnerships @
There are broad ranging areas that Council will extend its advocacy work
through existing networks including Climate Council, Climate Emergency tif:
Australia, SEQ Council of Mayors, Tourism Noosa, Zero Emissions Noosa Inc,
Food and Agri-business Network, Cleantech Sunshine Coast, Cities for Power Partnership,
LGAQ Queensland Climate Resilient Councils, Planning Institute of Australia, Engineers
Australia, Queensland Coastal Councils, and Youth Council, amongst others.
Page 28Section 29
Noosa Climate Change Response Plan
Theme 2:
Energy efficiency and renewable energy
Why this is important
Stationary Energy comprises 58% of Noosa Shire’s emissions profile. Emissions from stationary
energy are predominantly from electricity generated from coal fired power stations and small
amounts from natural and liquified petroleum gas (LPG). Reducing emissions from stationary
energy includes improving energy efficiency, reducing energy demand and switching to
renewable energy supply.
It has been estimated that $77 million per year leaves the shire to pay for electricity generated
elsewhere. The renewable energy revolution is underway and the costs of renewable energy
continue to fall. Transitioning to renewable energy across the shire will significantly reduce
emissions and costs to Council, households and businesses. This is also a significant
opportunity for business development, economic growth and employment within Noosa.
Renters and low-income households are often locked out of the transition to renewable
energy and options to reduce energy demand such as more energy efficient appliances. It is
important that the programs to reduce electricity demand and the take up of renewable energy
is inclusive of this sector. Improving the energy efficiency of homes has co-benefits of freeing
up capital to be used on other essential expenses and makes homes more resilient to the
impacts of climate change such as increased heat.
How we’ll achieve this
Council is responsible for its own buildings and facilities including those buildings that are
leased to commercial or community tenants. Emissions from these buildings can be reduced
by reducing demand, improving energy efficiency, and switching to renewable energy sources.
To this end, Council will continue to invest in its own buildings and facilities to reduce emissions
from stationary energy and encourage tenants to improve energy efficiency and take up of
renewables through their leasing arrangements, grant opportunities and education.
Council will also support and assist the greater Noosa community to improve energy efficiency
and make the switch to renewable energy through education; facilitating the uptake of
renewable energy solutions via grants and expert advice; enabling access to energy solutions
to vulnerable residents of our community; and showcasing the positive actions of those within
the community that are reducing emissions from stationary energy.
Council will undertake further analyses of the options available to achieve 100% renewable
energy for Noosa Shire.
Page 29
Section 30
Noosa Shire Council
Strategic Priorities
The following strategic priorities are identified for Energy Efficiency and
Renewable Energy:
2.1 Transition Noosa Council and Noosa Shire to 100% renewable energy and
ensure the transition is inclusive of low income and vulnerable residents and
businesses, including strata tenants
2.2 Pursue energy efficiency and renewable energy measures within Council and for
Council owned buildings
2.3 Develop a climate aware and empowered community for reducing climate risks and
emissions
Specific actions for implementation through this Climate Change Response Plan are
identified in the Summary of Actions.
Targets
By 2026, all Council facilities will be powered by 100% renewable energy/
net zero emissions energy
By 2026 Noosa Shire is powered by 100% renewable energy/net zero
emissions energy
By 2026, community awareness and empowerment to reduce emissions
from stationary energy is increased.
Metrics
• kW of renewable energy within the Noosa community
• kW of renewable energy generated for Council operations
• Number of Council facilities powered by 100% /net zero renewable energy
• Number of households completing energy audits
• Number of community alliance grants provided for climate change initiatives
• % of households powered by renewable energy
• % of businesses powered by renewable energy
• % reduction in community energy use
Partnerships
Council engages with a number of community and business groups including
ZEN Inc, Clean Tech Sunshine Coast and other industry networks. Council will
continue to review opportunities to partner with other entities on a local and
regional basis to make renewable energy available to the Noosa Shire.
Page 30
Section 31
Noosa Climate Change Response Plan
Theme 3: Clean low emissions industries
Why this is important
Economic recovery post COVID-19 brings opportunities for industry and governments to
invest in initiatives that create clean low emissions jobs and set communities up for the future
- a recovery that supports the environmental industries sector1 and tackles the challenges of
climate change. The actions we take now must create an economic environment for innovation
where new technology and industries form part of the climate change solution and help make
communities more resilient and sustainable.
Noosa is in a unique and opportune position to leverage its clean green brand to attract and
drive investment in clean low emissions industries and to showcase best practice sustainability
and climate solutions. This means aligning economic activity and tourism promotion with the
vision of making Noosa the preferred destination for clean, green business investment and
clean tech industries.
This also includes supporting local businesses to be more sustainable through encouraging
decarbonisation, energy efficiency upgrades, and waste minimisation.
How we’ll achieve this
Council will help create a strong, clean economy for Noosa by exploring opportunities and
barriers to developing the environmental industries sector, through the development of
Council’s revised Economic Strategy (local economic plan). This will improve understanding
of how best to grow environmental industries in Noosa that are high impact (create jobs and
diversify the economy), leverage existing investment, are targeted for beneficial change, and
are timely for rapid job creation and economic recovery.
Council will actively work with local businesses to encourage participation in programs that
improve energy efficiency and sustainability, in partnership with Tourism Noosa, ZEN Inc and
other community groups.
1
Environmental industries consist of companies and organisations which carry out economic activities aimed at
protecting the environment and managing natural resources, including waste management, wastewater treatment,
limiting noise nuisance, correcting environmental damage, and production of cleaner technology products and
services, such as production of renewable energy, electric transport and energy saving activities.
Page 31
Section 32
Noosa Shire Council
Strategic Priorities
The following strategic priorities are identified for Clean Low Emissions Industries:
3.1 Through targeted initiatives, create an environment that supports business
development, innovation and investment shift to clean, green low emission
industries and technology
3.2 Work with industry, business associations and government agencies to
facilitate emissions reduction and environmental sustainability for local businesses
Specific actions for implementation through this Climate Change Response Plan are identified in the
Summary of Actions.
Targets
By 2026, the number of businesses in the environmental industries sector
has increased
By 2026, the energy efficiency and ecological sustainability of business in
Noosa has increased
Metrics
• No. of businesses in the environmental industries sector ((2021 baseline)
• No. of businesses participating in energy efficiency and sustainability
programs
Partnerships
Council partners with a number of industry and community groups to
diversity and grow a strong and clean economy including Cleantech
Sunshine Coast, Tourism Noosa, Food and Agri-business Network.
A collaborative approach to climate action and environmental industry
development will help with sharing knowledge, making efficient use of resources, reducing
duplication of effort/costs, scaling up successful local projects, and attracting partners and funding.
Council will pursue and develop regional partnerships to drive low emissions industry investment for
the broader Sunshine Coast region and beyond.
Page 32
Section 33
Noosa Climate Change Response Plan
Theme 4: Sustainable Transport
Why this is important
Transport is the second largest source of emissions in Noosa Shire and is responsible for
33% of our community emissions. Moving towards sustainable transport will bring huge
benefits for emissions reduction. This means reducing reliance on car travel in Noosa,
switching to low/zero-emissions vehicles, increasing uptake of active transport like walking and
cycling, improved pathway connectivity, adopting zero carbon public transport systems, and
supporting working from home and home-based businesses.
These changes will provide broad-ranging benefits including more convenient ways for locals
and visitors to travel, reduced congestion, improved health and wellbeing for individuals, and
job creation opportunities. Sustainable transport will also contribute to Noosa’s reputation as a
sustainable, clean, green destination by reducing fossil fuel use and keeping up with changing
technology.
How we’ll achieve this
Council is responsible for local roads and public parking and sets carparking design
requirements for new developments. Public buses are run by the State Government
Department of Transport through TransLink. A number of private bus companies provide
customer specific transport services to and within the shire. Addressing the barriers to the take
up of active transport and public transport due to high dependency on private vehicles and
Noosa’s dispersed settlement pattern is a key challenge. Climate change makes the task all
the more urgent.
Through the Noosa Shire Transport Strategy and the Walking and Cycling Plan, Council is
accelerating public and active transport investment and take-up by:
• Encouraging a modal shift away from private car use towards active transport modes
and public transport through behaviour change programs and improved pathways and
connections
• Addressing the transport emissions of over 2 million visitors to Noosa per year through
consultation with relevant stakeholders to establish parking controls and public transport
alternatives
• Increasing public transport use through improved services and increased bus services to
the hinterland
• Partnering with government agencies and transport providers to explore and enable the
replacement of diesel buses with electric/zero emission buses in Noosa
• Partnering with transport providers to explore and enable the uptake of electric bikes and
personal mobility devices
• Increasing parking management controls in congested areas through timed and paid
parking through timed and paid parking, with revenue to go towards sustainable transport
• Expanding the pathway network in urban and hinterland areas
• Rolling out electric vehicle charging stations at major Noosa destinations
• Amending the Noosa Plan 2020 to include requirements for new multi-residential and non-
residential developments for carparking areas to be ‘EV ready’.
Page 33
Section 34
Noosa Shire Council
Council’s fleet emissions are less than 2% of total Council emissions. Transitioning Council’s fleet
to zero-emissions vehicles where fit-for purpose demonstrates leadership to the community but has
an insignificant impact on Council’s overall emissions. Also needed is ongoing behaviour change
programs aimed at encouraging staff to walk, cycle, use public transport, scooter and carpool to
work by promoting the multiple health and environmental benefits.
Strategic Priorities
The following strategic priorities are identified for Sustainable Transport:
4.1 Accelerate public and active transport infrastructure investment and
community usage through the implementation of Council’s Transport
Strategy and Walking and Cycling Plan.
4.2 Transition Council and the community to sustainable transport use and zero-emissions vehicles.
Specific actions for implementation through this Climate Change Response Plan are identified in the
Summary of Actions.
Targets
By 2026, electric vehicle charging stations will be installed at all major
Noosa destinations to support the transition to EVs
By 2026, public transport services in Noosa have improved and meets
minimum standards from the Transport Operations Act.
Metrics
· % modal shift to walking and cycling in key urban areas and in hinterland towns
· % increase of children walking and riding to school and using school buses
· % increase in electric micro-mobility devices/e-wheeling devices (e-bikes,
e-scooter, e-skateboards etc.) in use by residents and visitors
· % increase in public transport use
· % increase in electric vehicle ownership
· kms of sealed cycling and walking pathways
· Number of staff that participate in walk/cycle-to-work day
· Number of EV charging stations in Noosa Shire for vehicles and e-bikes
· Electric vehicle infrastructure factored into development requirements
eg. for multi residential and non-residential developments
Partnerships
Accelerating sustainable transport requires strong advocacy and partnerships
with government agencies and transport providers including Translink to future
proof Noosa and connect communities. Council will continue to work with other
community partners such as ZEN Inc, Tourism Noosa, Electric Vehicle Council
and universities to help drive positive change and implement zero emissions transport solutions.
Page 34
Section 35
Noosa Climate Change Response Plan
Theme 5: Healthy and resilient natural
systems and carbon sequestration
Why this is important
Climate change will impact biodiversity, water resources and natural systems in many ways.
Restoring ecosystems also present huge opportunities to remove greenhouse gases from
the atmosphere, create jobs, support tourism, increase resilience of our native ecosystems,
improve health and wellbeing through recreation and connection with nature, and improve
heat-related impacts in our urban areas.
Changing temperature and rainfall trends and increasing risks of extreme weather events are
creating significant impacts for Noosa’s biodiversity and natural systems that will exacerbate
existing threats. These changes are already being observed in the natural environment.
Bushfires made worse by dry conditions across parts of Noosa Shire in the 2019/20 summer
had devastating consequences for local ecosystems and highlighted the vulnerability of these
natural assets.
Vegetation, soil and oceans are vital ‘sinks’ for absorbing greenhouse gases from the
atmosphere and storing them long term. Establishing restoration plantings to offset corporate
carbon emissions or to compensate for vegetated cleared elsewhere has broad ranging
benefits for the environment and for businesses and community groups that may partner in the
restoration efforts.
How we’ll achieve this
The Noosa Environment Strategy addresses many of the threats and impacts to biodiversity
and natural systems arising from the Climate Emergency. A range of initiatives are underway to
increase habitat, landscape connectivity, riparian buffers and ecosystem health.
Council will continue to build on this and improve vegetation and bushfire management
practices to address climate risks, as well as take-up opportunities for maximising carbon
drawdown through tree planting and ‘blue carbon’ restoration initiatives. This includes
increasing revegetation and ecosystems restoration around waterways and along connecting
habitat areas. Enhancing tree canopy cover in urban areas will be important for reducing urban
heat stress, increasing carbon drawdown, and reducing energy needed to keep internal and
external building spaces cool. A further initiative includes converting gardens to more drought
tolerant native gardens to reduce plant loss, and irrigation needs, increase habitat and food
for local wildlife. The development of a Coastal Foreshore Management Plan will provide
for a dedicated program of foredune restoration and management in partnership with local
bushcare groups. The Nature Conservancy (TNC) in partnership with Noosa Council continue
to investigate opportunities for seagrass restoration in the Noosa River.
Page 35
Section 36
Noosa Shire Council
Strategic Priorities
The following strategic priorities are identified for this theme:
5.1 Increase revegetation, ecosystems restoration and urban greening to increase
carbon drawdown, reduce urban heating and support ecosystem and species
resilience
5.2 Optimise use and management of water resources through integrated water cycle
management including for drinking water, recycled water, surface water and groundwater
Specific actions for implementation through this Climate Change Response Plan are identified in the
Summary of Actions.
Targets
Environment Strategy target: By 2030, half of all land in Noosa Shire is
managed for its environmental values (% in 2020)
By 2030, 50% of mapped riparian buffers along waterways have vegetation
coverage (42% in 2018)
By 2030, vegetation will be in place to increase canopy cover and shade
to 45% of public open spaces in urban environments
Metrics
• % urban canopy cover
• % change in estimated annual carbon drawdown by Noosa vegetation
• % of Noosa Shire managed for its environmental values
• % of mapped riparian buffers along waterways that have vegetation coverage (42% in 2018)
• No. Land for Wildlife properties and Voluntary Conservation Agreements
• Recycled water connections or uses in Noosa Shire
Partnerships
Extensive community effort is directed towards protecting, maintaining, and
restoring our natural environments. Many environment groups are actively
involved in caring for Noosa’s bushlands, wildlife, coasts and waterways,
including hundreds of volunteers.
There are important benefits in greater collaboration between property owners,
governments, community groups, businesses and infrastructure providers - working together to
improve the resilient of natural areas in the face of warmer and drier conditions.
Page 36
Section 37
Noosa Climate Change Response Plan
Theme 6:
Sustainable agriculture and food systems
Why this is important
Local agricultural systems in Noosa are generally small-scale but diverse. Cattle grazing is the
largest subsector in the shire and a variety of small to medium-scale horticultural crops are
also spread across the region including macadamia nuts, coffee, and a mix of various fruit and
vegetables. Short value chains for local food are growing with an increasing number of growers
marketing direct to the public through farmers markets or providing produce to local restaurants. In
2018/19 the local agricultural industry added $49.7 million to the local economy, or 2.2% of the total
gross regional product (GRP) while employing 1.4% of Noosa’s workforce (economy.id 2020).
Changing temperature and rainfall trends and increasing risks of extreme weather events are
creating significant hazards for Queensland’s agriculture sector that will escalate and exacerbate
existing risks that farm businesses already face. This will impact on food security for Queensland
and the nation.
Changing climate also brings opportunities. For example, vegetable growers producing summer
crops may have the additional option of planting earlier, and later, therefore extending the
production season. Runoff from higher intensity rainfall events may, with careful planning and
adequate infrastructure, provide opportunities for growers to capture more water for irrigation.
As a community, we can reduce emissions and adapt to climate change by supporting
sustainable regenerative agriculture in Noosa and by encouraging the availability and
consumption of fresh locally produced food.
Changes in climate conditions require constant adapting to remain productive and viable. Early
adoption of climate-smart agricultural practices will put enterprises in the best position to deal
with climate risks and extreme weather. This includes increasing the organic matter in soils to
increase the carbon taken up in the soils. This has added benefits of higher fertility levels, better
water retention and prolonged resistance to drought.
There is also considerable cost savings to be gained by implementing on-farm emission reduction
and there are benefits for income generation for farmers through carbon drawdown practices
such as restoring soil health, planting native trees, and managing livestock.
How we’ll achieve this
The Noosa Environment Strategy addresses the challenges and environmental threats relating
to agriculture in Noosa Shire, as well as opportunities for better managing agricultural areas to
ensure adaptive and sustainable food production that increases agricultural productivity and
protects the natural environment.
Council will investigate opportunities to encourage rural landholders to increase soil carbon
drawdown through sustainable agricultural practices and tree planting. Council will also continue
to support onground actions and education with landholders to improve their capacity to manage
climate risks. Providing support for local food producers to help promote and connect supply
chains to consumers is also a priority to help grow businesses and ensure fresh local food supply.
Page 37
Section 38
Noosa Shire Council
Strategic priorities
The following strategic priorities are identified for this theme:
6.1 Support agri-businesses and landholders to create a sustainable and
regenerative food system that includes consideration and preparation for
climate change risks
6.2 Promote sustainable, locally produced food and improve local food access
for farmers, residents, visitors and vulnerable people
6.3 Support agri-businesses and landholders to reduce their emissions through changes in
farming practices and technology implementation, and to take up opportunities for income
generation through carbon drawdown activities.
Specific actions for implementation through this Climate Change Response Plan are identified in
the Summary of Actions.
Targets
Environment Strategy target: By 2030, 80% of all grazing land achieves
best practice management for agriculture
By 2026, the knowledge and capacity of local food and agribusinesses to
prepare for climate risks and take up carbon reduction opportunities has
increased
Metrics
• Number of farmers participating in on-ground actions through land
management programs
• Number of local producers promoted or accredited as being
‘sustainable’ or an equivalent.
Partnerships
Council will continue to work with the Food and Agri-Business Network,
Regenerative Agriculture Alliance, Country Noosa, Noosa Landcare and other
organisations to improve support for agri-business and encourage take-up of
sustainable agriculture.
Strengthening regional partnerships across councils will provide important
benefits to the broader agricultural industry through increased collaboration and sharing of
knowledge and resources.
The establishment and enhancement of industry networks will allow the continual advancement
of knowledge and sharing of best practice to help move the sector towards a state of
adaptability and sustainability.
Page 38
Section 39
Noosa Climate Change Response Plan
Theme 7: Resilient and adaptive
communities and built environments
Why this is important
Climate change will result in very real impacts on the physical environment, water resources,
health and human services, the local economy and communities. Homes, businesses and
community infrastructure will experience the effects of more extreme weather, bushfires, coastal
hazards, flooding, and heatwaves. These hazards put increased pressure on emergency
services and pose increased risks to people, including from increased vector borne diseases,
mental health, blackouts and power shortages. These impacts are likely to be felt most by those
already vulnerable such as the elderly and low-income earners.
We are already experiencing detrimental changes to our climate and built and natural
environments. These effects will worsen over time.
Adapting to a changing climate involves adjusting to short duration events such as cyclones,
floods and fires, as well as gradual changes such as sea level rise. Community resilience is
the ability to not only cope with the impacts but to adapt and recover. Increasing the resilience
of individuals, businesses and the community requires risk awareness, disaster preparedness,
careful planning and management to help minimise risks and recover and adapt more easily.
Increasing the resilience and adaptive capacity of our communities and the built environment
is about designing places, buildings and infrastructure to be more adaptive and sustainable,
creating more comfortable and safe homes and workplaces, and reduced emissions and
energy costs.
How we’ll achieve this
Council can support the community to increase resilience to climate change through building,
infrastructure and landscape design that is responsive to the subtropical climate, and that is
resource efficient for energy, water and materials, and minimises emissions. The Noosa Plan
2020 planning scheme (including planning scheme policy 5) sets standards for sustainable,
subtropical design. These standards will be built upon to ensure that design outcomes increase
the resilience and comfort of building occupants from climate risks, such as extreme heat.
The development of climate responsive design guidelines will help provide support to the
planning scheme, place making, asset management and infrastructure design. Localised
assessments of climate risk, such as flooding, inundation and urban heat risk, will also help
build understanding of appropriate design responses required for high-risk locations, including
along foreshore areas subject to sea level rise and inundation risks.
Council is responsible for its own capital works program which includes new buildings.
Buildings need to be designed and constructed to meet the 6 Star Green Building Standard
and national standards for carbon neutral buildings.
Page 39
Section 40
Noosa Shire Council
Council seeks to build awareness and preparedness for extreme weather events through disaster
management planning and response, development requirements, and resilient infrastructure
design and delivery. Individuals and households are encouraged to develop and maintain up
to date emergency action plans and Council collaborates with the State government as part of
the Get Ready program. Providing resilient community infrastructure and safe refuge spaces for
extreme weather events that are accessible to all community members is an ongoing priority.
Involving health and family violence experts in emergency planning and response coordination
and ensuring adequate access to health services including mental health and family violence
services is also critical.
Strategic Priorities
The following strategic priorities are identified for this theme:
7.1 Create a resilient built environment for householders, businesses and
vulnerable people, property and infrastructure
7.2 Build Council and community awareness and preparedness for climate
change and extreme weather events
Specific actions for implementation through this Climate Change Response Plan
are identified in the Summary of Actions.
Targets
Environment Strategy target: By 2030, sustainable building outcomes
are delivered through regulation, education and showcasing best
practice design.
Environment Strategy target: By 2030, community awareness, planning
and preparedness for natural hazards and climate change is increased
By 2026, 60% of people in Noosa have a very good understanding of climate change
Page 40
Section 41
Noosa Climate Change Response Plan
Metrics
• % respondents that understand the topic of climate change and what
it means for Noosa and themselves. (In 2019 almost four fifths of
respondents (79%) either understood climate change reasonably well
(41%) or had a very good understanding of climate change (38%).
• % respondents aware of the level of risk posed by climate change
and natural hazard events with respect to heatwaves, drought, flooding, beach erosion,
stormtide, tropical diseases, extreme weather (2019 baseline available)
• % respondents that are prepared for the risks of climate change and natural hazards
with respect to heatwaves, drought, flooding, beach erosion, stormtide, tropical diseases,
extreme weather (2019 baseline available)
• % respondents that are prepared for a disaster or emergency and have an emergency plan.
(In 2017 60% of respondents had a disaster management plan in place for a flood or fire,
increasing to 66% in 2019).
• Climate change and heat risks factored into land use planning.
• Number of Council buildings that achieve a 5 Star or above under the Green Building
Council of Australia rating scheme or equivalent.
Partnerships
Council will continue to work with representatives of the Local Government
Association of Queensland, other councils participating in the Queensland
Climate Resilient Councils initiative, State agencies, and key infrastructure
services delivery partners, such as Unity Water, SEQWater and electricity providers.
Page 41
Section 42
Noosa Shire Council
Theme 8:
Zero waste and circular economy
Why this is important
Our current linear economic model of take-make-waste results in the excess use of resources,
land and water pollution, and vast amount of waste going to landfill once products are no longer
deemed necessary. In a circular economy, raw materials enter a cycle wherein their value is
maintained throughout their life cycle.
Around 79000 tonnes of waste is taken to the Noosa Landfill each year. Of this 48% is reused
or recycled, whilst the rest (41,000 tonnes) is buried in the landfill. Material that is dumped into
landfill is a lost resource and a source of carbon emissions.
When organic matter (food, green waste, paper, etc) is sent to landfill, it is decomposed under
anaerobic conditions. As the organic matter decomposes, it releases methane. Methane is 28
times more potent as a greenhouse gas than carbon dioxide. Emissions from landfill comprise
over 60% of Council’s corporate emissions and around 9% of the Noosa community emissions.
The degradation of organic waste in landfills is a complex series of chemical and biological
reactions. Landfill gas is currently extracted from the Noosa Landfill, and flared, converting the
methane into carbon dioxide. Methane from landfill gas can also be used to generate electricity.
Landfill conditions, weather conditions, age of the waste and gas extraction equipment
productivity will all affect the methanogenic bacterial action and hence the resultant landfill gas
that is captured.
By moving from a take-make-waste system linear system to the circular economy, resources are
used many times over, the nutrients from organic material are captured, land required for waste
disposal is reduced, and the costs throughout the system overall are lower.
How we’ll achieve this
Council is responsible for the collection and processing of the community’s waste. The landfill
operations and the landfill gas system is managed by Council in partnership with its contractor.
A waste management plan is being developed to determine the most effective management
methods for the collection and processing of waste and the management of the landfill.
Council is also responsible for the generation of waste within its own operations and can
increase demand for recycled products through its own procurement practices.
Council has a role in influencing how the community reduces its waste generation and the
amount of waste ending up in landfill through the provision of appropriate infrastructure such as
bins and collection services and through providing and supporting community waste reduction
education and behaviour change initiatives with businesses and households. As part of this,
Council supports and promotes programs such as Plastic Free Noosa.
Page
Page42
42
Section 43
Noosa Climate Change Response Plan
Strategic Priorities
The following strategic priorities are identified for this theme:
8.1 Adopt circular economy principles to cut waste and pollution, keep
products and materials in use and regenerate natural systems
8.2 Manage the landfill in accordance with best practice to minimise
greenhouse gas emissions
8.3 Minimise organic matter going to landfill from community waste
Specific actions for implementation through this Climate Change Response Plan
are identified in the Summary of Actions.
Target
Environment Strategy target: By 2030, all green waste and food waste is
diverted from landfill
Metrics
• % green waste and food waste diverted from landfill
• Reduction in waste to landfill
• Landfill gas emission reductions
Partnerships
Noosa Council partners with a number of community groups to educate the
community on how to reduce waste. Noosa Council has a waste education
program that is delivered to schools and the wider community.
Page 43
Section 44
Noosa Shire Council
Summary of Actions
Page 44
Nevesersiiic Counc
7 : 4
| = .
| | '
rr j i
ae pt )
ov * 5 :
LF ae 8
et i Of Ab ~st
Cee gael as
— j F . fe as Si nt : n r ~
a} | yy; <a > / . ~~
i a 5 i¢ | : . ) i \ o ~ > f ,
ie wr 2 »» ; -
iia ii *_4e , af
Ol ae g : y
Da BS te ~~ .
i At . 7
V4 (ts
| hy Vii a ae
summary of Actions
Ae hye, a faa? , a ~ ie . I
6 ae an ee ~~Section 45
Noosa Climate Change Response Plan
The following identifies strategic priorities and specific actions including relevant metrics for
measuring progress and timing for delivery.
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 1 – Strong leadership and governance
1.1 Advocate to levels • Advocate to other local governments is Queensland and • Climate advocacy actions and the Ongoing
of government and Australia for them to declare a climate emergency/take climate effectiveness of this advocacy
mobilise the community action and adopt net zero emissions targets and policies in line
to drive decisive climate with climate science
emergency action. • Advocate to the Federal and State government to increase • Climate advocacy actions and the Ongoing
support for renewable energy, transitioning to a low carbon effectiveness of this advocacy
economy, and addressing climate risk impacts from coastal
hazards, flooding, drought, heat risk, bushfires and biodiversity
loss.
• Advocate for legislative change to allow for Council to facilitate • Advocacy actions and effectiveness of this Ongoing
Environmental Upgrade Finance to enable eligible parties to advocacy
access low risk finance for building upgrades.
• Advocate to State government and transport providers to: • Advocacy actions and effectiveness of this Ongoing
• improve and increase public transport services in Noosa advocacy
Shire including for the hinterland, and to explore and enable
the replacement of diesel buses with electric/zero emissions
buses in Noosa; and
• Provide leadership direction and incentives regarding EV
technologies and investment.
• Develop an education, advocacy and community mobilisation • Plan developed and progress made 2022/23
plan to prepare advocacy positions on a wide ranging of
state and federal issues and to educate and assist community
groups, residents and others to become effective advocates.
• Develop an information tool kit to raise awareness and • Information tool kit developed 2021/22
understanding of climate risks in the community, amongst • % survey respondents that understand the
industry sectors and within Council. topic of climate change and what it means for
Noosa Shire and themselves.
• Develop and promote an annual program of community- based • Events and promotion activities 2021/22 -
climate education events for the broader Sunshine Coast region. ongoing
• Incorporate Indigenous knowledge systems, particularly for • Projects involving Traditional Owners and Ongoing
land management and ecosystem resilience, and involve and incorporating First Nations knowledge
consider the needs of Traditional Owners.
1.2 Strengthen • Scope and develop a strategic approach to transitioning to • Approach established and next steps 2021/22
partnerships with LED street lighting and adopt turtle friendly lighting for coastal identified
governments and areas in partnership with infrastructure providers and state
stakeholders to take government agencies.
urgent action to achieve a • Develop collaborations with other local governments to address • Collaborations with other local governments 2021/22 -
low carbon economy and climate risks and help build a low carbon economy. This and progress made ongoing
resilient community includes developing a regional climate action roadmap for
the broader Sunshine Coast region, as well as collaborative
community education and carbon reduction initiatives across
local government areas in SEQ.
• Pursue opportunities for private-public partnerships to develop • Collaborative private-public partnerships with 2021/22 -
scalable pilot projects in Noosa that demonstrate solutions for others and progress made ongoing
climate resilience and/or radical emissions reduction.
1.3 Move Council from • Continue to embed climate emergency responses across • Council and organisational policies that have Ongoing
business-as-usual council and within key policy documents, procurement incorporated a climate response
operations to adopting decisions, strategies and plans including in corporate and • Strategies and plans that have incorporated
deep, systemic change operational plans. climate response objectives and actions
and being a powerful • Embed the climate change emergency into all staff roles and • Climate change included in performance
influencer and example of responsibilities and in performance planning. planning
climate action • Update Council’s climate governance road map based on • Governance roadmap reviewed and up to Ongoing
findings of QLD Climate Resilient Councils (Q CRC) governance date
audit and Council’s risk assessment, with annual updates
provided to the Audit & Risk Committee
• Establish a community reference group for climate change that • Community reference group established and 2021/22
periodically meets to provide information and advice to Council progress made
on climate issues, required actions, barriers and successes
and ongoing program development.
• Continue to develop a web-based platform and dashboard to • Website and dashboard developed and 2021/22 -
provide information on climate resilience and sustainability for updated Ongoing
households, businesses and farmers.
• Provide training and capacity building for council staff on • Number of staff training and capacity Ongoing
embedding climate change within their roles, procedures and building activities
decisions.
Page 45
Section 46
Noosa Shire Council
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 2 - Energy efficiency and renewable energy
Targets:
By 2026, all Council facilities will be powered by 100% renewable energy/net zero emissions energy
By 2026 Noosa Council is powered by 100% renewable energy/net zero emissions energy
By 2026 community awareness and empowerment to reduce emissions from stationary energy is increased
2.1 Transition Noosa • Renewable energy investigation (community focused) - Assess • Local renewable energy projects commenced Ongoing
Council and Noosa Shire opportunities and financial models within and outside the shire
to 100% renewable energy for community owned renewable energy projects, such as solar
and ensure the transition farms, micro grids and solar gardens.
is inclusive of low income
• Zero emissions pathways study (community focused) - • Pathway to zero identified including next 2021/22 -
and vulnerable residents
and businesses, including to identify least cost emissions abatement opportunities for the steps for implementation Ongoing
strata tenants Noosa Shire community and the role council plays in this.
2.2 Pursue energy • Noosa Council 100% renewable energy study to determine • Pathway to 100% identified including next 2021/22
efficiency and renewable the most effective way for council to achieve 100% renewable steps for implementation
energy measures within energy for council facilities including leased facilities eg. power • kW of renewable energy generated for
Council and for Council purchasing agreement (PPA), green power, etc. Council operations
owned buildings
• Number of Council facilities powered by
Review under-utilised 100% / net zero renewable energy
Council buildings used for • Continue to invest in energy efficiency and renewable energy • Number of Council facilities powered by Ongoing
community purposes to measures within Council and for Council owned buildings and 100%/net zero renewable energy
help rationalise asset use public lighting
and reduce emissions • kW of renewable energy generated for
Council operations
• Trial the provision of energy audits for vulnerable households • Number of households completing energy 2022/23
audits
2.3 Develop a climate • Continue to partner with Australian Energy Foundation (AEF) • % of households powered by renewable Ongoing
aware and empowered and other services to enable residents and businesses to easily energy
community for reducing access expert advice on energy efficiency, solar and other • % of businesses powered by renewable
climate risks and products, including low income households/rentals. energy
emissions
• % reduction in community energy use
• kW of renewable energy within the Noosa
community
• Promotion activities completed
• Continue to make available community alliance grants • Number of grants provided Ongoing
for community groups delivering emission reduction and
adaptation benefits
• Trial an emissions reduction grant category to support • Number of emissions reduction grants 2021/22
households, businesses and community groups reduce provided and projects commenced
emissions and increase energy efficiency.
• Promote new technologies and tools that build capacity and • Promotion activities completed Ongoing
sustainable behaviour change.
Page 46
Section 47
Noosa Climate Change Response Plan
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 3 – Clean low emissions industries
Target:
By 2026, the number of businesses in the environmental industries sector has increased
By 2026, the energy efficiency and ecological sustainability of business in Noosa has increased
3.1 Through targeted Through the development and implementation of the Economic • No. of businesses in the environmental Ongoing
initiatives, create an Strategy: industries sector
environment that supports • Explore opportunities and barriers to developing the
business development, environmental industries sector.
innovation and investment
• Pursue and develop regional partnerships to drive low
shift to clean, green low
emissions industry investment for the broader Sunshine Coast
emission industries and
region and to support businesses and industries that are likely
technology
to come under pressure from the need to decarbonize.
(also linked to Themes 1,
• Align economic activity and tourism promotion with the long-
2, 5, 6, 7)
term vision for making Noosa the preferred destination for
clean, green business investment, new clean tech business (eg,
Firetech).
• Work with Tourism Noosa to investigate programs to offset travel
emissions for visitors to Noosa.
3.2 Work with industry, • Encourage business participation in emissions reduction, • No. of businesses participating in emissions Ongoing
business associations sustainability and climate resilience programs (eg. ecoBiz, reduction and climate resilience programs
and government EcoCheck) and actively promote businesses under the
• No. of businesses participating in energy
agencies to facilitate programs in partnership with Tourism Noosa and other
efficiency and sustainability programs
emissions reduction and networks.
environmental sustainability • Consider the use of clean/low emissions industries, contractors • Procurement policies and procedures Ongoing
for local businesses and goods/services through Council’s purchasing activities and include consideration of clean/low emissions
also linked to Themes 1, 2, property and facilities management. Use suppliers located in industries, contractors and good/services
5, 6, 7) Noosa Shire where possible.
Page 47
Section 48
Noosa Shire Council
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 4 - Sustainable Transport
Target:
By 2026, electric vehicle charging stations will be installed at major Noosa destinations to support the transition to electric vehicles.
By 2026, public transport services in Noosa have improved.
4.1 Accelerate public Through implementation of the Transport Strategy and Walking • % modal shift to walking and cycling in key Ongoing
and active transport and Cycling Plan: urban areas and in hinterland towns
infrastructure investment • Encourage a modal shift away from private car use towards • % increase of children walking and riding to
and community active transport modes and public transport through behaviour school and using school buses
usage through the change programs and improved pathways and connections • % increase in electric micro-mobility devices/
implementation of • Increasing public transport use through improved services and e-wheeling devices (e-bikes, e-scooter,
Council’s Transport increased bus services to the hinterland e-skateboards etc.) in use by residents and
Strategy and Walking and
• Address the transport emissions of over 2 million visitors to visitors
Cycling Plan.
Noosa per year through consultation with relevant stakeholders • % increase in public transport use
(also linked to Themes 5 to establish parking controls and public transport alternatives • kms of sealed cycling and walking pathways
relating to urban greening) • Partner with government agencies and transport providers • Number of staff that participate in walk/ cycle
to explore and enable the replacement of diesel buses with to work day
electric/zero emissions buses in Noosa
• Partner with transport providers to explore and enable the
For other priority actions - Refer to Walking and
uptake of electric bikes and personal mobility devices
Cycling Plan (being developed)
• Increase parking management controls in congested areas
through timed and paid parking, with revenue to go towards
sustainable transport
• Expand the pathway network in urban and hinterland areas
• Planting of shade trees along pathways to encourage waking
and cycling
4.2 Transition Council • Commence a Council behaviour program that maximises • Behaviour program progressed 2022/23
and the community to efficient use of non-electric vehicles and offsets their emissions.
sustainable transport • Consider cost benefit information when making decisions • Policy developed and next steps identified 2022/23 -
use and zero-emissions on purchase of council fleet to support transition to lowest Ongoing
vehicles emission vehicles.
• Develop a roll out plan to incorporate electric vehicle charge • Roll out program developed 2021/22 -
stations at major Noosa destinations in partnership with EV • Number of EV charging stations in Noosa ongoing
providers and property owners Shire for vehicles and e-bikes
• % increase in electric vehicle ownership
• Install electric bike and electric scooter chargers at key • Number of electric bike and scooter chargers 2022/23:
destinations in Noosa Shire. in Noosa Shire 5 new chargers
• Amend the Noosa Plan 2020 to include requirements for • EVs factored into development requirements 2021/22
new multi-residential and non-residential developments for
carparking areas to be ‘EV ready’.
Page 48
Section 49
Noosa Climate Change Response Plan
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 5 - Healthy and resilient natural systems and carbon sequestration
Target:
By 2030, half of all land in Noosa Shire is managed for its environmental values
By 2030, 50% of mapped riparian buffers along waterways have vegetation coverage
By 2030, vegetation will be in place to increase canopy cover and shade to 45% of public open spaces in urban environments
5.1 Increase revegetation, • Develop an urban greening program for streets and public • % urban canopy cover 2021/22 -
ecosystems restoration spaces that increases tree canopy cover, native vegetation and ongoing
and urban greening biodiversity, as well as to increase carbon drawdown and reduce
to increase carbon urban heating. Investigate how implementation could be funded
drawdown, reduce urban through an alternative revenue source. eg Trees for Tourism. Work
heating and support with Indigenous people and young people to assist with onground
ecosystem and species planting to help build social capital.
resilience • Prepare a Climate Change Ecosystem Vulnerability and Carbon • Change in estimated annual carbon 2021/22
Drawdown Assessment to help prioritise revegetation and drawdown by Noosa vegetation
restoration of high priority biodiversity, riparian and wetland
areas vulnerable to climate threats and to assist with calculating
carbon credits.
• Review the Noosa Plan Planning Scheme Policy No. 2 • Whether action is completed
Landscaping to update the plant species schedule for Council’s
program of street tree replacement having regard to preferred
species for shade, carbon drawdown and bushfire resilience.
Through implementation of the Environment Strategy: • % of Noosa shire managed for its Ongoing
• Continue to increase habitat, landscape connectivity, riparian environmental values
buffers, and ecosystem health and resilience through
• % of mapped riparian buffers along
partnerships with levels of government, landholders and
waterways that have vegetation coverage
community groups (NPA, Biosphere, SCEC, NDLC)
(42% in 2018)
• Expand and promote Trees for Tourism in partnership with
Tourism Noosa, Landcare and Land for Wildlife properties • No. Land for Wildlife properties and Voluntary
• Continue to monitor groundwater systems and groundwater Conservation Agreements
dependent ecosystems and the impacts of climate change in
partnership with University of Queensland
• Continue to improve coastal ecosystem resilience through the
Coastal Connect bushcare project and related extension projects
(linked to Coastal Hazards Adaptation Plan)
• Continue to implement the urban gardens for wildlife program to
encourage planting of native plant species and enhance urban
biodiversity, in partnership with NICA.
• Develop a Coastal Foreshore Management Plan for dune
restoration and management in partnership with local bushcare
groups.
5.2 Optimise use and • Continue to participate with Unity Water in the development and • Whether action is progressed Ongoing
management of water implementation of a total water management plan for the Shire’s
resources through water use, supply and management.
integrated water cycle • Increase connection and access to alternative water sources • Recycled water connections or uses in Noosa Ongoing
management including for where suitable such as recycled water for irrigation eg. sports Shire
drinking water, recycled fields and agriculture.
water, surface water and • Strengthen requirements for water sensitive urban design for • Whether action is completed 2021/22
groundwater small scale developments through amendments to the Noosa
Plan 2020 planning scheme.
Page 49
Section 50
Noosa Shire Council
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 6 - Sustainable agriculture and food systems
Target:
By 2030, 80% of all grazing land achieves best practice management for agriculture
By 2026, the knowledge and capacity of local food and agribusinesses to prepare for climate risks and take up carbon reduction
opportunities has increased
6.1 Support agri- • Continue providing support to Landcare and MRCCC’s rural • Number of farmers participating in on-ground Ongoing
businesses and extension programs to encourage sustainable agriculture and actions through land management programs
landholders to create land management, and increase awareness of climate risks
a sustainable and (eg. Keep it in Kin Kin program).
regenerative food system • Promote platforms and programs for farmers to access climate • Whether action is completed 2021/22 -
that includes consideration projections, training, workshops, grants and guidance material ongoing
and preparation for climate for climate-ready farming.
change risks
• Work with Food and Agri-Business Network, Regenerative • Whether action is completed Ongoing
Agriculture Alliance and Country Noosa, and other
organisations to improve support for agri-business and
encourage take up of sustainable agriculture
6.2 Promote sustainable, Through development and implementation of the Economic • Number of local producers promoted or Ongoing
locally produced food and Strategy: accredited as being ‘sustainable’ or an
improve local food access • Support and promote farmers’ markets, farm gates and local equivalent.
for farmers, residents, food box programs.
visitors and vulnerable • Support and promote businesses that use sustainable,
people. regenerative food production methods including organic,
biodynamic and agro-ecological principles.
• Continue to work with Eat Local Noosa, Slow Food Noosa,
Tourism Noosa (eg. food and drink festival) and other
organisations to promote local producers and connect supply
chains to local consumers.
6.3 Support agri- • Investigate opportunities to encourage rural landowners to • Whether action is completed 2022/23
businesses and sequester soil carbon and accrue carbon credits through
landholders to reduce restoring soil health and sustainable agricultural practices. (eg.
their emissions through Landcare Soil Health Cards, Carbon Farmers of Australia)
changes in farming
practices and technology
implementation, and to
take up the opportunities
for income generation
through carbon drawdown
activities.
Page 50
Section 51
Noosa Climate Change Response Plan
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 7 - Resilient and adaptive communities and built environments
Target:
By 2030, sustainable building outcomes are delivered through regulation, education and showcasing best practice design.
By 2030, community awareness, planning and preparedness for natural hazards and climate change is increased.
By 2026, 60% of people in Noosa have a very good understanding of climate change
7.1 Create a resilient • Develop climate responsive design guidelines to support the • Whether action is completed 2021/22
built environment for planning scheme, place making, asset management and
householders, businesses, design to improve understanding of how infrastructure and
vulnerable people, urban design measures can be used to increase climate
property and infrastructure resilience within Noosa’s public areas, streetscapes and
buildings.
• Develop locality-based Heat Risk Assessment and mapping • Whether action is completed 2021/22
for urban areas to improve understand and help development
responses to urban heat impacts in Noosa.
• Continue to update Noosa Plan 2020 planning scheme to • Climate change and heat risks factored into 2021/22-ongoing
manage the impacts of climate change on buildings and public land use planning
spaces including heat mitigation requirements, as well as for • Number of buildings that achieve a 5 star or
flooding, inundation and bushfire risks. above under the Green Building Council of
Australia rating scheme.
• Advocate through LGAQ and the State for state policy and • Whether action is completed 2022/23
guidelines that provide a minimum standard for designing
buildings to reduce emissions, improve sustainability and
reduce urban heat risks.
• Prepare a Socio-economic impact hazard assessment of flooding • Whether action is completed 2022/23
and inundation including survey of building stock vulnerability
(floor heights, building types and materials) to provide a business
case for risk mitigation. This will also inform wind vulnerability
assessment by Geoscience Australia. Linked to Coastal Hazards
Adaptation Plan.
• Prepare localised modelling and concept design of inundation • Whether action is completed 2021/22
hazard reduction measures for Noosaville/Noosa Heads area
(e.g. flood levy, landscape design, stormwater improvements).
Linked to Coastal Hazards Adaptation Plan.
• Implement a monitoring program for coastal hazards for • Whether action is completed Ongoing
monitoring coastal erosion and inundation risks. Linked to
Coastal Hazards Adaptation Plan. Linked to Coastal Hazards
Adaptation Plan.
7.2 Build Council and • Provide best available hazard information and update design • Whether action is completed Ongoing
community awareness and guidelines and capital works procedures for design, upgrade
preparedness for climate and maintenance of infrastructure works and building assets,
change and extreme e.g. new cyclone standards informed by the State’s severe wind
weather events assessment.
• Work with industry partners to conduct disaster management • % respondents aware of the level of risk Ongoing
and climate change preparedness workshops with various posed by climate change and natural hazard
sectors (ie. businesses, households, aged care, farmers). events with respect to heatwaves, drought,
flooding, beach erosion, stormtide, tropical
diseases, extreme weather
• % respondents that understand the topic of
climate change and what it means for Noosa
and themselves.
• % respondents that are prepared for the
risks of climate change and natural hazards
with respect to heatwaves, drought, flooding,
beach erosion, stormtide, tropical diseases,
extreme weather
• % respondents that are prepared for
a disaster or emergency and have an
emergency plan.
Page 51
Section 52
Noosa Shire Council
Strategic Priorities Specific actions Metrics Timing
What are our priorities over How will we achieve our strategic priorities or encourage positive How will we measure effectiveness or success (for
the 5 year life of this plan? change? of risk mitigation or emissions reduction efforts? commencement)
Theme 8 - Zero waste and circular economy
Target: By 2030, all green waste and food waste is diverted from landfill
8.1 Adopt circular Through development and implementation of the waste • Reduction in waste to landfill Ongoing
economy principles to cut management plan:
waste and pollution, keep • Ensure Council’s waste management program adheres to
products and materials circular economy principles for waste elimination, reuse and
in use and regenerate recycling and carbon reduction
natural systems. • Continue and expand the community waste education and
behavioural change programs to build community awareness
about emissions from waste and how to reduce them (eg
methane emissions from food waste)
• Explore opportunitites for circular economy approaches through
Council’s purchasing activities, including the use of recycled
material where feasible/appropriate
• Investigate opportunities for local/regional processing of
recycled materials
• Investigate composting options for organic waste including end
user opportunities, eg farms
• Advocate to State and Federal governments for strict packaging
and product stewardship standards and improved infrastructure/
business opportunities for waste reuse.
8.2 Manage the landfill • Continue to install landfill gas wells and improve the quality of • Landfill gas emission reductions Ongoing
in accordance with best the landfill cap to increase capture of landfill gas
practice to minimise • Continue to explore power generation from landfill gas
greenhouse gas emissions
8.3 Minimise organic • Implement recommendations from the new waste management • % green waste and food waste diverted from Ongoing
matter going to landfill plan to minimise organic matter going to landfill landfill
from community waste
Page 52
Section 53
Noosa Climate Change Response Plan
Page 53
Noosa Climate Change Response Plan
Page 53Section 54
Noosa Shire Council
Implementation, Monitoring and Review
Page 54
earn mae : SS a yay SE a 5825 ie, Ty 3 Smee: Me.)
NER 5 Sane ee hs fis ee or a as Tee = Seg oon ee SRS
MS x Sr a Sean mi y AS - 4 = % Nt Ae ae 43 Re ;
” a Pa
kedmay)
Sk Smal ee iy =e ah “ a} 4 Rt RY, ES ‘ ie ate fe Ca iad ae ©.
TERPS) Say aN nas Sth4s ; Be oe
N. age ot} , oe ee : aged 1B & i HEWN) j : ae 2 , Va , hy fi , ~ a i se a, - Sore - YS A
Se Bit fh “slr : tea Soo n Oe Drag SR ae , ee Yo Bae ee Sh EE ats
/ ae BOD) aX ies b Be 4 } BP ean ; ~ i. eo
omy y % i Bie re ta A
“aR A!
are ee Dee Lh egieN he Meta ae | : Bes" POON = SS 0 BN Se ie ae ap ioe Ceo
ne i a ie ~ Ly nt hts e é ae pike Em Ns é —_¥ ‘ oe = 7 eee a ws :
Beet “| \ cee ae Ny Mt es Ve es: Vee AY a BAI SSS oa Se Ses Stee :
PE ee? sia! a ie Pu gaia | z ,. en Ogee seat . Re Poe oat ae
c= We ¥ ae poi)
Y 7] RS x
si Ss ig Ze Fees =e Pape HEA) 4 ees Mpa? wre Sa ee eae Pe re. WA, of aw a
= ae ee) Ze ee a al Fe Hn Wace a ae oe, Dah) Prey A K See es eee
= Sty). 3 $5 Li oe ' Ba aN Wie aaa : 5 De og re aS ay ree Ati ~ SY hae Mins 45 A ss
: ie elie eae eh Sam 4 ; ws a rs Suet x xe ee - ia cee z Coe y
eee as Wee = ies = eee a eae: 5 Ra fae < A das bx rohe eae ts
ne 1 OSES, Baia soy te RP nN M ae aro. irae ey Se sy ies Ea oe as 7 beg 7 RO AF vy yt eee nf
pee es 3 UG | He iat aioe ee a SS ae A CS: bye aera
© = if De os Be ea Wy 3 aol re a Fe - Se <5 Shs ay - tees Cy % he Bots eS
ey GE eS = beta aah i, i aie re. Pt eit is Bie Pao en ae Z a ee es bog rit a 4 ee
g ce eg STE eh i rae. ese ear Le anes a ek
. a ie | Mi Be GS A WE: AB WE Byer .
o 4 ee ee OS a aa oma Bee rer 4: :
Gis be Beet i ea ME Wh Se ‘ab = 5 1 1 1 31 12 1948 818 64 29 47 ie
5 1 1 1 31 13 2054 834 53 38 47 Sede
5 1 1 1 31 14 2184 874 11 14 35 =
5 1 1 1 31 15 2324 892 22 11 9 és
5 1 1 1 31 16 2421 916 58 30 27 hits
5 1 1 1 31 17 2498 929 31 36 0 WP
5 1 1 1 31 18 2565 922 32 63 0 .
5 1 1 1 31 19 2769 986 38 38 23 en
5 1 1 1 31 20 2828 1008 119 47 14 PRL
5 1 1 1 31 21 3034 1049 22 28 17 yee
5 1 1 1 31 22 3079 1060 48 33 18 Tre
5 1 1 1 31 23 3203 1078 55 47 14 a)
5 1 1 1 31 24 3362 1120 88 46 29 Cs
4 1 1 1 32 0 295 492 3163 700 -1
5 1 1 1 32 1 295 492 5 11 0 b
5 1 1 1 32 2 867 615 66 27 7 arn
5 1 1 1 32 3 954 633 47 28 16 Bey
5 1 1 1 32 4 1018 651 9 15 28 me
5 1 1 1 32 5 1043 651 100 41 35 ee
5 1 1 1 32 6 1158 677 52 54 40 ett
5 1 1 1 32 7 1243 692 66 35 32 St
5 1 1 1 32 8 1385 719 12 20 40 i
5 1 1 1 32 9 1410 722 27 50 49 Hii
5 1 1 1 32 10 1455 721 69 107 19 Mt
5 1 1 1 32 11 1539 745 84 65 32 mAh
5 1 1 1 32 12 1639 778 4 29 85 {
5 1 1 1 32 13 1658 763 18 48 37 i
5 1 1 1 32 14 1697 795 41 23 23 hs
5 1 1 1 32 15 1772 806 20 26 20 a
5 1 1 1 32 16 1801 812 19 32 36 Ss
5 1 1 1 32 17 1881 828 72 35 16 ee
5 1 1 1 32 18 1985 851 22 24 12 es
5 1 1 1 32 19 2068 851 45 49 6 nT
5 1 1 1 32 20 2191 894 3 3 34 ¢
5 1 1 1 32 21 2437 944 63 40 18 Ah
5 1 1 1 32 22 2518 978 19 12 36 ae
5 1 1 1 32 23 2579 978 31 30 28 ed
5 1 1 1 32 24 2610 961 130 86 25 CHa
5 1 1 1 32 25 2773 1019 57 41 39 oa
5 1 1 1 32 26 2833 1032 46 50 30 vite
5 1 1 1 32 27 2912 1049 32 32 10 ae
5 1 1 1 32 28 2955 1065 45 29 23 CN
5 1 1 1 32 29 3010 1076 49 31 20 Le
5 1 1 1 32 30 3103 1091 42 47 33 ei?
5 1 1 1 32 31 3216 1121 67 28 12 re
5 1 1 1 32 32 3344 1145 37 47 42 bs
5 1 1 1 32 33 3414 1161 44 31 0 ‘
4 1 1 1 33 0 599 536 2841 671 -1
5 1 1 1 33 1 599 536 29 79 23 |
5 1 1 1 33 2 911 650 109 34 28 fai
5 1 1 1 33 3 1253 719 175 53 33 Tres
5 1 1 1 33 4 1509 795 1 7 20 A
5 1 1 1 33 5 1575 791 16 25 4 MANES
5 1 1 1 33 6 1621 804 94 39 0 Hik
5 1 1 1 33 7 1776 833 56 30 12 Uo
5 1 1 1 33 8 1878 829 30 58 25 eae
5 1 1 1 33 9 2058 902 25 21 20 poe
5 1 1 1 33 10 2184 937 3 4 26 ee
5 1 1 1 33 11 2458 986 109 29 48 es
5 1 1 1 33 12 2577 999 110 61 15 port
5 1 1 1 33 13 2699 999 17 61 31 oe
5 1 1 1 33 14 2764 1058 79 25 50 i
5 1 1 1 33 15 2868 1072 116 41 16 Ae
5 1 1 1 33 16 3012 1105 26 15 21 be
5 1 1 1 33 17 3260 1168 32 5 56 is
5 1 1 1 33 18 3437 1202 3 5 10 '
4 1 1 1 34 0 571 630 2857 615 -1
5 1 1 1 34 1 571 630 57 55 31 a
5 1 1 1 34 2 960 694 69 36 23 eee
5 1 1 1 34 3 1041 690 420 146 32 =
5 1 1 1 34 4 1491 777 81 85 38 Vi
5 1 1 1 34 5 1657 809 37 63 34 i
5 1 1 1 34 6 1710 837 65 61 27 Bee
5 1 1 1 34 7 1866 872 45 65 0 e
5 1 1 1 34 8 2060 924 81 47 19 Oe
5 1 1 1 34 9 2219 959 63 38 0 SRA
5 1 1 1 34 10 2363 980 98 42 12 Bk
5 1 1 1 34 11 2490 1019 31 31 28 ie
5 1 1 1 34 12 2547 1014 42 62 21 cit
5 1 1 1 34 13 2654 1035 58 66 44 a
5 1 1 1 34 14 2740 1064 44 48 43 3:
5 1 1 1 34 15 2807 1068 143 82 21 Bie
5 1 1 1 34 16 2978 1092 46 73 29 de
5 1 1 1 34 17 3107 1157 60 51 43 a
5 1 1 1 34 18 3378 1162 50 83 37 Lo
4 1 1 1 35 0 889 718 2494 533 -1
5 1 1 1 35 1 889 718 2 3 0 ,
5 1 1 1 35 2 956 731 76 17 26 Fae,
5 1 1 1 35 3 1055 737 58 29 28 aren
5 1 1 1 35 4 1134 768 39 17 17 tr
5 1 1 1 35 5 1270 796 5 4 0 &
5 1 1 1 35 6 1325 802 12 19 5 Hy
5 1 1 1 35 7 1364 812 35 23 18 alte
5 1 1 1 35 8 1406 818 10 16 18 ty
5 1 1 1 35 9 1458 837 1 6 96 |
5 1 1 1 35 10 1562 853 2 4 7 uy
5 1 1 1 35 11 1596 866 48 14 19 a)
5 1 1 1 35 12 1697 881 62 23 10 Lees
5 1 1 1 35 13 1826 909 2 3 11 s
5 1 1 1 35 14 1956 946 96 24 19 Spot
5 1 1 1 35 15 2100 969 45 13 26 ean
5 1 1 1 35 16 2176 985 43 19 36 wr
5 1 1 1 35 17 2459 1051 15 14 43 lt
5 1 1 1 35 18 2517 1057 22 19 29 a
5 1 1 1 35 19 2569 1067 21 29 32 vi
5 1 1 1 35 20 2735 1103 40 25 29 ee
5 1 1 1 35 21 2834 1141 16 6 0 <<
5 1 1 1 35 22 3066 1187 52 20 13 Pry
5 1 1 1 35 23 3166 1194 7 8 0 ”
5 1 1 1 35 24 3380 1248 3 3 0 :
4 1 1 1 36 0 871 718 2561 585 -1
5 1 1 1 36 1 871 718 31 46 16 By.
5 1 1 1 36 2 929 737 99 53 37 eo
5 1 1 1 36 3 1189 784 67 98 48 Hl
5 1 1 1 36 4 1270 826 4 5 2 ,
5 1 1 1 36 5 1316 810 49 50 28 ae
5 1 1 1 36 6 1472 831 20 65 44 |
5 1 1 1 36 7 1504 837 141 98 21 nae
5 1 1 1 36 8 1738 942 2 5 39 ‘a
5 1 1 1 36 9 1864 945 14 26 9 aR
5 1 1 1 36 10 2004 959 70 63 20 nage
5 1 1 1 36 11 2065 948 75 90 0 Es
5 1 1 1 36 12 2191 1011 11 43 3 ‘
5 1 1 1 36 13 2235 1025 107 35 3 Cree
5 1 1 1 36 14 2363 1034 17 50 51 of
5 1 1 1 36 15 2447 1076 33 27 5 ts
5 1 1 1 36 16 2501 1069 21 31 29 By
5 1 1 1 36 17 2567 1094 130 62 32 Bacal
5 1 1 1 36 18 2736 1109 45 57 8 Wee
5 1 1 1 36 19 2803 1148 21 32 0 “w
5 1 1 1 36 20 3009 1181 51 51 36 ater
5 1 1 1 36 21 3077 1185 52 43 23 oe
5 1 1 1 36 22 3193 1239 47 28 0 e
5 1 1 1 36 23 3389 1274 43 29 37 ve
4 1 1 1 37 0 590 698 2710 596 -1
5 1 1 1 37 1 590 698 23 47 9 5
5 1 1 1 37 2 862 760 70 36 0 Sae7
5 1 1 1 37 3 954 773 99 53 34 ese
5 1 1 1 37 4 1068 802 81 52 42 Foto
5 1 1 1 37 5 1303 839 54 54 24 Hes
5 1 1 1 37 6 1375 873 74 49 29 ae
5 1 1 1 37 7 1460 884 58 44 11 eh
5 1 1 1 37 8 1552 916 76 20 12 ae
5 1 1 1 37 9 1670 960 4 4 31 ’
5 1 1 1 37 10 1704 935 60 44 8 yf
5 1 1 1 37 11 1864 979 38 26 25 ae
5 1 1 1 37 12 1973 999 47 34 26 SAN
5 1 1 1 37 13 2055 1014 11 15 11 ae
5 1 1 1 37 14 2113 1030 51 33 6 PANS
5 1 1 1 37 15 2218 1063 38 25 15 A
5 1 1 1 37 16 2280 1074 48 24 35 Kt
5 1 1 1 37 17 2351 1077 27 38 0 S
5 1 1 1 37 18 2396 1111 9 4 61 j
5 1 1 1 37 19 2451 1088 75 76 24 “Fes
5 1 1 1 37 20 2571 1139 36 17 38 nf
5 1 1 1 37 21 2633 1136 39 43 24 ia
5 1 1 1 37 22 2688 1136 36 55 16 EF
5 1 1 1 37 23 2760 1170 41 33 30 en
5 1 1 1 37 24 2818 1187 48 29 8 eS
5 1 1 1 37 25 2925 1207 33 23 0 *
5 1 1 1 37 26 2977 1224 77 29 52 PEI
5 1 1 1 37 27 3180 1264 120 30 46 M3
4 1 1 1 38 0 577 752 2884 652 -1
5 1 1 1 38 1 577 752 68 67 44 aS
5 1 1 1 38 2 862 815 25 25 66 &
5 1 1 1 38 3 967 815 80 80 35 ee,
5 1 1 1 38 4 1057 845 106 69 20 eae
5 1 1 1 38 5 1194 853 20 76 64 il
5 1 1 1 38 6 1303 879 72 78 0 i
5 1 1 1 38 7 1397 929 10 32 16 of
5 1 1 1 38 8 1496 939 48 45 17 A.
5 1 1 1 38 9 1592 966 17 38 0 .
5 1 1 1 38 10 1639 983 10 33 0 \.
5 1 1 1 38 11 1675 967 29 77 55 4),
5 1 1 1 38 12 1719 984 66 64 24 ve
5 1 1 1 38 13 1860 1027 24 35 29 fay
5 1 1 1 38 14 1934 1061 23 19 0 mc
5 1 1 1 38 15 1989 1049 23 40 14 a
5 1 1 1 38 16 2064 1077 19 17 47 he
5 1 1 1 38 17 2118 1070 29 66 0 UE
5 1 1 1 38 18 2188 1110 40 23 34 Pig
5 1 1 1 38 19 2249 1090 59 75 33 an
5 1 1 1 38 20 2348 1138 55 31 0 i.
5 1 1 1 38 21 2426 1157 32 32 51 ee
5 1 1 1 38 22 2499 1171 52 35 11 NR
5 1 1 1 38 23 2657 1196 54 41 41 a
5 1 1 1 38 24 2786 1222 46 57 27 Re
5 1 1 1 38 25 2896 1266 18 36 73 xv
5 1 1 1 38 26 2979 1269 33 36 32 hy
5 1 1 1 38 27 3136 1315 48 25 23 bs:
5 1 1 1 38 28 3309 1361 10 16 8 af
5 1 1 1 38 29 3353 1369 20 21 31 ths
5 1 1 1 38 30 3445 1374 16 30 58 4
4 1 1 1 39 0 554 780 2862 651 -1
5 1 1 1 39 1 554 780 71 70 77 Q)
5 1 1 1 39 2 865 850 26 37 0 s
5 1 1 1 39 3 919 867 81 37 16 ie
5 1 1 1 39 4 1094 901 53 32 18 sat
5 1 1 1 39 5 1135 895 15 42 0 |
5 1 1 1 39 6 1167 919 18 14 30 oh
5 1 1 1 39 7 1253 958 80 15 33 a
5 1 1 1 39 8 1379 960 135 64 29 es,
5 1 1 1 39 9 1529 997 23 32 11 Yi
5 1 1 1 39 10 1580 1014 5 25 9 ;
5 1 1 1 39 11 1623 1003 91 88 0 A
5 1 1 1 39 12 1725 1036 59 45 30 i
5 1 1 1 39 13 1903 1037 38 68 23 ee
5 1 1 1 39 14 1961 1090 45 35 40 he
5 1 1 1 39 15 2088 1128 11 9 2 E
5 1 1 1 39 16 2193 1147 10 14 0 f
5 1 1 1 39 17 2299 1163 11 7 0 -
5 1 1 1 39 18 2392 1197 5 16 10
—|— ee Sj ae) oy . he - ae ext MAT miei: > A re Ra : ~ x ae ae Riess ‘. PA e ‘a M Je 4 Ke via 6.
a + pane ae es wo 9 ae ae . Mi] ig ‘ ’ LS r- tens a te yaks po = iN . <i a5ee hes ae ‘ Bs
= pea ar — ae aah } i) a % As i pe Hace mae be ee wut eA nN
‘oe eee rar Nie Ye “had xe ee on re ee Phe Abs Pal ioe vex, pS S me S74. (3.8 ‘
. =>) a i WK oes See SR 0 Kags. Wr pin mee ag eee Ly! ki ROE A Oe
— a ud NAY ieee. rr ws : 7. Aas’ 5 ; ee ete DP eeon oh So aN
: cs tS aie i | i i
5 1 1 1 48 9 1617 1269 27 58 48 it
5 1 1 1 48 10 1691 1288 62 82 13 No
5 1 1 1 48 11 1966 1362 77 48 26 ae
5 1 1 1 48 12 2237 1384 41 89 25 (|
5 1 1 1 48 13 2307 1448 79 33 20 Le
5 1 1 1 48 14 2410 1456 117 57 4 LED.
5 1 1 1 48 15 2594 1483 44 68 23 “dl
5 1 1 1 48 16 2684 1498 39 46 60 &
5 1 1 1 48 17 2737 1532 44 44 12 £
5 1 1 1 48 18 2810 1550 247 74 40 oN
5 1 1 1 48 19 3097 1603 35 43 0 ea
5 1 1 1 48 20 3263 1655 190 61 9 SESE
4 1 1 1 49 0 903 1176 2539 566 -1
5 1 1 1 49 1 903 1176 13 5 23 an
5 1 1 1 49 2 939 1187 22 9 12 nme
5 1 1 1 49 3 1019 1208 42 10 0 o-
5 1 1 1 49 4 1153 1216 13 27 36 sh.
5 1 1 1 49 5 1562 1310 2 7 78 \
5 1 1 1 49 6 1620 1338 2 5 73 |
5 1 1 1 49 7 1687 1328 31 40 72 nen
5 1 1 1 49 8 1738 1350 20 13 14 a
5 1 1 1 49 9 1774 1347 16 36 47 Be
5 1 1 1 49 10 1851 1385 79 12 19 bats
5 1 1 1 49 11 1993 1420 3 5 7 ,
5 1 1 1 49 12 2014 1413 44 29 12 399
5 1 1 1 49 13 2267 1460 3 1 77 J
5 1 1 1 49 14 2314 1495 5 3 0 j
5 1 1 1 49 15 2379 1502 32 9 20 Ah
5 1 1 1 49 16 2440 1491 41 33 46 Pats
5 1 1 1 49 17 2500 1518 57 12 25 eink
5 1 1 1 49 18 2591 1533 25 22 28 Oy
5 1 1 1 49 19 2719 1560 9 14 0 ¥
5 1 1 1 49 20 2745 1570 43 21 39 oy
5 1 1 1 49 21 2841 1580 52 37 49 Rs)
5 1 1 1 49 22 2907 1601 145 53 20 Nee
5 1 1 1 49 23 3074 1651 4 2 62 ;
5 1 1 1 49 24 3145 1670 6 8 0 ;
5 1 1 1 49 25 3159 1640 14 27 0 iB
5 1 1 1 49 26 3205 1665 10 24 36 5
5 1 1 1 49 27 3253 1676 3 5 2 «
5 1 1 1 49 28 3278 1676 36 34 13 tS
5 1 1 1 49 29 3352 1714 10 9 44 >
5 1 1 1 49 30 3396 1695 46 47 25 aE
4 1 1 1 50 0 909 1246 2524 565 -1
5 1 1 1 50 1 909 1246 115 48 22 SS
5 1 1 1 50 2 1134 1281 86 65 20 aay
5 1 1 1 50 3 1438 1339 24 76 51 i
5 1 1 1 50 4 1475 1335 96 93 22 Nn
5 1 1 1 50 5 1587 1381 12 22 66 \
5 1 1 1 50 6 1614 1359 173 106 34 Is
5 1 1 1 50 7 2003 1467 20 35 33 RES
5 1 1 1 50 8 2046 1462 36 72 35 be
5 1 1 1 50 9 2169 1522 175 56 37 ae
5 1 1 1 50 10 2336 1518 25 71 18 F
5 1 1 1 50 11 2435 1562 30 48 37 Ds
5 1 1 1 50 12 2564 1597 50 30 42 ate
5 1 1 1 50 13 2703 1622 49 35 32 as
5 1 1 1 50 14 2782 1638 78 51 22 ANE
5 1 1 1 50 15 2982 1692 56 44 15 jo
5 1 1 1 50 16 3128 1711 202 82 25 a
5 1 1 1 50 17 3367 1761 66 50 58 Se
4 1 1 1 51 0 564 1206 2837 636 -1
5 1 1 1 51 1 564 1206 64 55 88 O
5 1 1 1 51 2 862 1266 136 67 18 SS
5 1 1 1 51 3 1016 1297 144 96 46 Sat
5 1 1 1 51 4 1435 1388 4 66 75 |
5 1 1 1 51 5 1474 1397 90 84 34 Ha
5 1 1 1 51 6 1633 1427 155 74 5 me
5 1 1 1 51 7 1819 1476 48 33 90 3
5 1 1 1 51 8 2063 1537 99 37 12 ae
5 1 1 1 51 9 2427 1611 13 24 5 y
5 1 1 1 51 10 2572 1649 74 34 0 ra'&
5 1 1 1 51 11 2710 1654 67 78 22 ey
5 1 1 1 51 12 2797 1682 135 60 28 cae
5 1 1 1 51 13 2969 1727 8 36 0 :
5 1 1 1 51 14 3017 1736 307 94 16 CNG
5 1 1 1 51 15 3328 1799 73 43 38 Gs
4 1 1 1 52 0 862 1320 2568 567 -1
5 1 1 1 52 1 862 1311 183 50 24 is
5 1 1 1 52 2 1071 1362 78 35 62 WH
5 1 1 1 52 3 1485 1446 208 64 10 HAO
5 1 1 1 52 4 1731 1500 53 38 13 i
5 1 1 1 52 5 1821 1541 115 24 44 =a
5 1 1 1 52 6 2151 1593 162 47 49 gle
5 1 1 1 52 7 2789 1679 39 78 0 RS
5 1 1 1 52 8 2903 1745 45 20 18 cat
5 1 1 1 52 9 2983 1770 18 36 14 ts
5 1 1 1 52 10 3048 1787 175 58 0 PAREN
5 1 1 1 52 11 3357 1821 47 70 0 Sea
4 1 1 1 53 0 553 1257 2857 665 -1
5 1 1 1 53 1 553 1257 75 107 44 =)
5 1 1 1 53 2 862 1336 311 101 33 Fis
5 1 1 1 53 3 1277 1390 165 111 31 Nh
5 1 1 1 53 4 1473 1465 317 95 41 ees
5 1 1 1 53 5 1819 1548 8 12 0 &
5 1 1 1 53 6 1918 1563 193 86 3 Be
5 1 1 1 53 7 2130 1619 107 51 33 gene
5 1 1 1 53 8 2334 1680 41 19 0 “
5 1 1 1 53 9 2597 1718 265 81 28 Se
5 1 1 1 53 10 2928 1797 182 60 23 ire
5 1 1 1 53 11 3281 1875 56 41 31 ae
5 1 1 1 53 12 3352 1873 58 49 0 i
4 1 1 1 54 0 639 1339 2780 608 -1
5 1 1 1 54 1 639 1339 11 8 8 -
5 1 1 1 54 2 1022 1413 30 24 16 +a
5 1 1 1 54 3 1084 1422 23 69 0 t
5 1 1 1 54 4 1124 1437 4 13 65 t
5 1 1 1 54 5 1143 1441 27 35 55 Mi
5 1 1 1 54 6 1199 1429 6 112 93 |
5 1 1 1 54 7 1252 1440 5 74 64 |
5 1 1 1 54 8 1350 1466 6 101 94 |
5 1 1 1 54 9 1431 1516 2 10 33 iA
5 1 1 1 54 10 1472 1488 50 72 0 iy
5 1 1 1 54 11 1619 1521 38 45 4 ss
5 1 1 1 54 12 1667 1547 74 28 16 pias,
5 1 1 1 54 13 1759 1564 26 55 18 ‘3
5 1 1 1 54 14 1801 1583 1 3 55 >
5 1 1 1 54 15 1830 1597 29 19 15 ty
5 1 1 1 54 16 1863 1586 128 56 14 see
5 1 1 1 54 17 2055 1636 46 13 0 he,
5 1 1 1 54 18 2146 1669 17 7 22 2
5 1 1 1 54 19 2213 1680 4 2 58 J
5 1 1 1 54 20 2271 1699 4 5 12 ;
5 1 1 1 54 21 2445 1737 29 7 16 RS
5 1 1 1 54 22 2623 1751 42 49 25 at
5 1 1 1 54 23 2688 1782 25 17 45 a
5 1 1 1 54 24 2761 1795 25 19 32 PA
5 1 1 1 54 25 2837 1815 3 4 39 i
5 1 1 1 54 26 2949 1830 137 47 25 ie
5 1 1 1 54 27 3099 1851 52 47 28 oN
5 1 1 1 54 28 3196 1878 13 16 50 ee.
5 1 1 1 54 29 3296 1910 57 20 43 a
5 1 1 1 54 30 3373 1929 46 18 66 =
4 1 1 1 55 0 930 1413 2466 544 -1
5 1 1 1 55 1 930 1413 39 19 12 ‘SS
5 1 1 1 55 2 1034 1440 3 8 0 ‘
5 1 1 1 55 3 1079 1448 8 9 21 %
5 1 1 1 55 4 1144 1465 27 15 42 “i
5 1 1 1 55 5 1435 1524 2 7 34 ]
5 1 1 1 55 6 1676 1574 18 7 0 “.
5 1 1 1 55 7 1816 1608 45 22 15 Te
5 1 1 1 55 8 2012 1653 3 6 56 ;
5 1 1 1 55 9 2100 1670 3 1 25 »
5 1 1 1 55 10 2146 1680 49 20 14 Pe.
5 1 1 1 55 11 2264 1708 6 5 12 ¢
5 1 1 1 55 12 2451 1733 39 33 16 art
5 1 1 1 55 13 2794 1817 39 12 41 a
5 1 1 1 55 14 2917 1853 4 5 27 ;
5 1 1 1 55 15 2970 1837 18 36 51 if
5 1 1 1 55 16 3064 1879 94 31 16 Se
5 1 1 1 55 17 3202 1907 21 16 37 a
5 1 1 1 55 18 3338 1916 58 41 30 herd
4 1 1 1 56 0 290 1291 3110 684 -1
5 1 1 1 56 1 290 1291 16 10 60 te
5 1 1 1 56 2 934 1430 87 33 22 ay
5 1 1 1 56 3 1071 1461 6 20 39 i
5 1 1 1 56 4 1126 1471 1 4 20 ae
5 1 1 1 56 5 1413 1533 24 22 34 Ni
5 1 1 1 56 6 1591 1591 28 6 0 o-
5 1 1 1 56 7 1634 1602 81 4 0 «.—
5 1 1 1 56 8 1785 1609 5 24 0 .
5 1 1 1 56 9 1928 1654 17 18 0 ‘
5 1 1 1 56 10 2099 1682 3 3 40 :
5 1 1 1 56 11 2166 1695 4 3 68 4
5 1 1 1 56 12 2236 1699 18 28 15 ra
5 1 1 1 56 13 2376 1743 11 13 14 7
5 1 1 1 56 14 2498 1762 6 19 74 1
5 1 1 1 56 15 2624 1787 81 42 50 ONG
5 1 1 1 56 16 2815 1823 89 54 31 ANS
5 1 1 1 56 17 2943 1863 23 27 13 ei
5 1 1 1 56 18 3062 1894 5 4 18 ¥
5 1 1 1 56 19 3075 1897 14 19 20 Pp
5 1 1 1 56 20 3102 1882 32 41 29 teen
5 1 1 1 56 21 3186 1924 56 21 31 +s
5 1 1 1 56 22 3272 1925 56 38 19 Le
5 1 1 1 56 23 3357 1950 43 25 18 a
4 1 1 1 57 0 565 1358 2885 662 -1
5 1 1 1 57 1 565 1358 62 29 61 ct
5 1 1 1 57 2 862 1432 14 14 0 &
5 1 1 1 57 3 930 1457 30 16 44 a
5 1 1 1 57 4 976 1447 51 52 8 Fie:
5 1 1 1 57 5 1039 1458 38 73 23 uy
5 1 1 1 57 6 1143 1480 23 70 20 |
5 1 1 1 57 7 1224 1525 2 6 21 j
5 1 1 1 57 8 1403 1525 68 73 28 a
5 1 1 1 57 9 1522 1584 23 29 19 ee
5 1 1 1 57 10 1605 1601 48 11 29 a9
5 1 1 1 57 11 1752 1636 4 2 0 :
5 1 1 1 57 12 1858 1634 72 38 40 —
5 1 1 1 57 13 1997 1699 65 16 7 Ling
5 1 1 1 57 14 2369 1777 10 16 28 ie
5 1 1 1 57 15 2400 1754 18 32 8 :
5 1 1 1 57 16 2447 1803 9 12 32 PR
5 1 1 1 57 17 2665 1832 28 31 1 ee
5 1 1 1 57 18 2735 1830 92 64 24 aa
5 1 1 1 57 19 2843 1866 161 62 32 VE
5 1 1 1 57 20 3047 1864 47 80 8 Me
5 1 1 1 57 21 3132 1942 7 3 20 -
5 1 1 1 57 22 3169 1939 69 41 33 ae
5 1 1 1 57 23 3273 1950 113 70 6 roel
5 1 1 1 57 24 3399 1986 51 30 16 be!
4 1 1 1 58 0 564 1394 2870 661 -1
5 1 1 1 58 1 564 1394 63 55 0 e
5 1 1 1 58 2 880 1474 26 20 10 3
5 1 1 1 58 3 973 1475 69 46 24 it
5 1 1 1 58 4 1084 1512 23 37 26 hI
5 1 1 1 58 5 1199 1531 16 56 68 |
5 1 1 1 58 6 1356 1569 8 26 0 .
5 1 1 1 58 7 1405 1589 108 35 27 Wg
5 1 1 1 58 8 1594 1645 5 2 0 °
5 1 1 1 58 9 1681 1665 7 2 0 E
5 1 1 1 58 10 1854 1703 7 6 0 es EEN i eS A a a ares
= | A ny f Bee aoa, oN ¥ ee BAU pe “ay tale + be ae i wires, ee
gest ae BSH! eM : SSRs ee ° li ’ Oe aA oy “io 2 4 Rep aa Bd Nee ARES. Re
r er iS 2S ee + | de ae Ae ae Coe ein oe Pie ay ar Pe A ia BD SA : % pa 8 RS <
ire oe ee Xe RMS a 2% sel Teen a Tae 1 ha fe. PUSS ES a ’ * Sees AR ica
, ¥ Teed iN eee fos eae = f aa a aha at a , ac) eo See, ae soe uJ aC
, Fe s Baa alae Wt fy — : iy) ON fF «He ‘tisha Ps hat, e's
2 See HE eae ABR ais oN ON Ne Ripe a Soe
ay e Pe : Y \ ha ne Wy gy J ; fee | * Al pt. , Pek SS , Rati
- © Fy Oe Sed Ail} tH hh } i by ‘ ad : . / a A Pt Wid Y %) . te ti
Ss may ri ee a oO Tn 1 } vis vol. — Mi 4 5 : “a a 6 : ~ is ye Ae
Q) — we S ~ SS Sate ao eens n ee =e : ace y . \ Nein) nen Tt Sy ye Kea F yi}
Se if a: aaa Se Beye ak hors
ae tae ake J fas Mi) ) | MN | iN i { S| a Pet + | Wi 4 moe Va) en Lge Ni te FNS Fe
ee Te : at m Re ly va ’ rh . R hE a“ , >. ety ; Re “ a ¥3 Ps ue va i
pe ‘eats fi ae Mie
5 1 1 1 71 6 1643 2007 4 7 44 i
5 1 1 1 71 7 1710 2018 32 11 50 =
5 1 1 1 71 8 1889 2059 7 13 18 es
5 1 1 1 71 9 1924 2067 39 23 27 Oa
5 1 1 1 71 10 1997 2063 59 55 37 oe:
5 1 1 1 71 11 2082 2110 2 2 9 :
5 1 1 1 71 12 2267 2154 11 4 83 4
5 1 1 1 71 13 2303 2137 64 48 7 We
5 1 1 1 71 14 2378 2168 67 34 20 ho
5 1 1 1 71 15 2553 2207 51 39 13 ne
5 1 1 1 71 16 2606 2209 27 35 23 ca
5 1 1 1 71 17 2660 2242 8 3 19 ' . UR: Noss od Paaset g a ee ae Nh:
‘ox a" ; j . 5 a ray a" N << at , aor Sy iS at mea pb ah
seh es 6 Sis 7 ——T S ye My 7 v3 Xf tm igen Ae wy uh A Ps ASS ny ‘Saey y bes
7 ret: —_ “— > Ij ay . ye om, ss Se sae a oune) “A a
A a j { Ny | Wt { eal Pee: ‘te ag pd. . x tye ee eK
yt i Hy UN un HY i. M a. 7 * BP ee 4 . SOS Lae N po? ee whee
MULT HH HA Wi a eee ET ie SA u
CD Via (}\ | \ itu Pin a pe, pity ER
oy i | ye i ene gy) i * “a's
<. ub) WI ee Sie
, = WAR iJ) at ai aR
J , ; tthe i rae AY ‘i a = - a AG? ae =
f eo = re Uh
‘) yA aid i e wen
Ys if e ¥ , Poh
|, haga
riSection 55
Noosa Climate Change Response Plan
Monitoring and evaluation
Monitoring and reporting on progress are critical to understanding the effectiveness of actions and to
ensure delivery of the ambitions and strategic priorities in this plan.
The scale and urgency of the climate emergency means that the Council and the community need
the evaluation of progress to be meaningful, transparent and timely.
A review of progress against the strategic priorities, actions, targets and metrics in this plan will
occur every second year to allow Council and the community to assess plan implementation and the
impact of action taken. Smaller interim annual reviews will also occur to help inform Council budget
processes.
The monitoring and evaluation framework for this CCRP has been designed to help Council and
other project partners to understand what is working and what is not. Our understanding of climate
change is evolving in terms of what makes people, communities and environments vulnerable to
climate impacts, and what to do about it. The monitoring and evaluation is about understanding
change – what has changed, how has it changed and by how much. Understanding how climate
actions are actually reducing vulnerability or reducing emissions or increasing capacity of people
and organization is complex. The process therefore needs to be elastic and inclusive to provide for
adaptability as things emerge and morph.
Page 55
Section 56
Noosa Shire Council
Community reference forum
Noosa Council will establish a climate change community reference group to strengthen
accountability, transparency, and cooperation. Representatives of the group will be able to discuss
and provide advice on climate change issues, on-ground action, barriers and successes, monitoring
and evaluation, and ongoing program development. This group will be an important component of
plan implementation given that many of the actions in the CCRP require a partnership approach
across a range of sectors. This includes working with community groups that form part of the existing
Zero Emissions Memorandum of Understanding.
Resources and funding
Potential funding sources will be actively pursued to enable ongoing implementation of the CCRP
for both emissions reduction and climate resilience. This includes investigating opportunities for
alternative revenue sources. This could include linking activities that occur locally and that derive
revenue within the community with delivery of real on-ground actions, such as Trees for Tourism in
the hinterland, other funding for urban greening projects, or funding for science-based programs that
monitor long term environmental and climate risks.
Council has been awarded grant funding for climate risk and resilience through a number of
programs in recent years amounting to around $3 million in funding for Noosa Council and for
cleantech business development. Some of these include:
Grants Funding source Funding to council Year
commenced
Climate Risk Management Strategy State government, $210,000 in 2021
grant – to develop a climate action administered through collaboration with
roadmap for the broader Sunshine LGAQ Sunshine Coast
Coast region Regional Council
Climate Resilience Alliances Pilot grant State government $100,000 in 2021
– to develop an alliance to accelerate funding, administered collaboration with SEQ
the delivery of on-ground climate through LGAQ councils
transition and adaptation actions
Regional Tourism Bushfire Recovery AusTrade – Federal $100,000 2020/21
grant – Firetech conference for Government $50,000
bushfire resilience through technology Additional contribution
innovation from State government
Firetech 2020 Program – incubator AusIndustry – Federal $100,000 2020
support, expert in residence Government
Queensland Bushfires Local Economic Qld Reconstruction $1,894,503 2019
Recovery Program – funding for new Authority (QRA) - State
fire tech laboratory including projects Government
for environmental monitoring and data
generation
QCoast 2100 coastal hazard program State government, $490,000 2016
- to develop a Coastal Hazard administered through
Adaptation Plan for coastal erosion, LGAQ
tidal inundation and sea level rise
Page 56
Section 57
Noosa Climate Change Response Plan
DEFINITIONS
Adaptation: Regarding climate change, adaptation is the process of adjustment to actual or
expected climate and its effects. It seeks to moderate or avoid harm or take advantage of beneficial
opportunities.
Carbon drawdown: The removal of carbon from the atmosphere by capturing or storing it through
biological, chemical and physical processes. Also referred to as carbon sequestration.
Circular economy: A closed system in which reuse, recycling and disposal channels are in-build to
consumer and industrial products, to elimination.
Climate: Relates to the average weather over various timescales, including over a period of months up
to millions of years.
Climate Change: is any change in the climate lasting for several decades, including changes in
temperature, rainfall and wind patterns. It refers to the average weather conditions over a period of
30 years or longer. Climate change is different from weather. Weather refers to what you seen and feel
outside from day to day (e.g. sunny, rainy).
Hazard: the potential occurrence of a natural or human-induced event, trend or impact that
may cause damage, including loss to property, infrastructure, livelihoods, service provision, and
ecosystems.
Intergovernmental Panel on Climate Change: Established by the United Nations, the IPCC is the
leading international body for the assessment of climate change, with representatives from 195
countries.
Mitigation: A human intervention to reduce the sources or enhance the sinks of greenhouse gases.
Resilience: The capacity of social, economic, and environmental systems to cope with a hazardous
event, trend, or disturbance, responding or reorganising in ways that maintain their essential
function, identity, and structure, while also maintaining the capacity for adaptation, learning, and
transformation.
Risk: is the potential for consequences where something of value is at stake and where the
outcome is uncertain, recognising the diversity of values. Risk is often represented as probability
of occurrence of hazardous events (likelihood) multiplied by the impacts (or consequences) should
these events or trends occur.
Water sensitive urban design: A holistic approach to water management that integrates urban design
and planning with social and physical sciences in order to deliver water services and protect aquatic
environments in an urban setting
Page 57
Section 58
Th ere | is |