Skip to the record
Accept no imitations.

Original source · versioned page text

2021-08-10 P&E Agenda - Item 7 - Attachment 1 - Climate Change Response Plan

of 58

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
              Planning & Environment Committee Agenda
                                        10 August 2021
                                  Item 7 - Attachment 1




Noosa Climate Change
Response Plan
Log in to download the original file

2021-08-10 P&E Agenda - Item 7 - Attachment 1 - Climate Change Response Plan(PDF, 3MB).pdf · 3.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 57 sections

Section 2

© Noosa Council 2021

www.noosa.qld.gov.au

General Enquiries:
By telephone: (07) 5329 6500
By email: [email protected]
Fax: (07) 5329 6501
Street Address: 9 Pelican Street, TEWANTIN
Postal address: PO Box 141, TEWANTIN QLD 4565

Endorsed by Noosa Council <<   >>

Section 3

                                                                                        Noosa Climate Change Response Plan




Table of Contents
 1. INTRODUCTION..................................................................................................................... 4
     The climate emergency......................................................................................................... 5
     A better future........................................................................................................................ 7
     Why do we need to act?........................................................................................................ 8
     About this Plan....................................................................................................................... 9
     Climate change principles and objectives.......................................................................... 10
     Climate projections.............................................................................................................. 10
 2. LOCAL CLIMATE CHANGE IMPACTS.................................................................................. 11
     Our current climate.............................................................................................................. 12
     Our changing climate.......................................................................................................... 12
     Temperature......................................................................................................................... 13
     Rainfall................................................................................................................................. 13
     Oceans................................................................................................................................ 14
     Extreme events.................................................................................................................... 15
     Transition risks..................................................................................................................... 15
     The economic cost of climate change................................................................................ 16
     Climate impacts and risks for key local sectors.................................................................. 16
 3. NOOSA’S CARBON EMISSIONS.......................................................................................... 19
     Noosa Shire community emissions...................................................................................... 20
     Noosa Council emissions.................................................................................................... 20
     What does Net Zero Emissions mean?................................................................................ 22
     Why is net zero emissions important?................................................................................. 22
     Why net zero by 2026.......................................................................................................... 22
     Pathway to Zero Community Emissions............................................................................... 23
 4. RESPONDING TO THE CLIMATE EMERGENCY.................................................................. 24
     Themes and strategic priorities........................................................................................... 25
     Theme 1: Strong leadership and governance..................................................................... 27
     Theme 2. Energy efficiency and renewable energy............................................................ 29
     Theme 3: Clean low emissions industries............................................................................ 31
     Theme 4. Sustainable Transport.......................................................................................... 33
     Theme 5: Healthy and resilient natural systems and carbon sequestration........................ 35
     Theme 6. Sustainable agriculture and food systems.......................................................... 37
     Theme 7: Resilient and adaptive communities and built environments............................... 39
     Theme 8: Zero waste and circular economy....................................................................... 42
 5. SUMMARY OF ACTIONS...................................................................................................... 44

 6. IMPLEMENTATION, MONITORING AND REVIEW................................................................ 54

 DEFINITIONS............................................................................................................................ 57

                                                                                                                                                Page 3

Section 4

Noosa Shire Council




                               Introduction


Page 4

Ra ERS                 eiteetimmiinaie       TS            eT       ATS Re
 Sire ay                                      Sete           MTs a
  Nike                                       IOAN     Dee                      ane |
 a Pais ASP Y                                Ae   i) Pe gt        ee   ey            rh
5 ae o RAO                                   bie dyed 2h Lo   iw    by   AGS    RS
 LATO Wee ne                                  ty y     Ae?) Me      5 he?   og _
   ; vont   Wa                                      ath       2    Non) 2  SEs  ae
 Naey ED                                     Nab        CG    ARI       Se
  Weise ee                                   xieet      ee          Wy        KSA
 Se Pee      Mi                              Ma     Y    ie  in    §; i
5	1	1	1	10	10	1397	343	4	3	6	:
5	1	1	1	10	11	1541	322	3	7	0	y
4	1	1	1	11	0	57	334	1471	107	-1	
5	1	1	1	11	1	57	418	4	4	24	ny
5	1	1	1	11	2	108	393	48	48	11	aL
5	1	1	1	11	3	225	399	6	13	26	Rae
5	1	1	1	11	4	294	410	6	7	27	|
5	1	1	1	11	5	875	334	119	80	28	LIM
5	1	1	1	11	6	1024	336	16	64	4	‘i
5	1	1	1	11	7	1213	361	37	42	22	md
5	1	1	1	11	8	1326	352	28	33	27	rs
5	1	1	1	11	9	1366	337	29	44	14	Ae
5	1	1	1	11	10	1512	338	16	12	0	C
4	1	1	1	12	0	70	366	2325	113	-1	
5	1	1	1	12	1	70	418	52	46	0	a
5	1	1	1	12	2	133	422	36	57	6	PY
5	1	1	1	12	3	239	420	13	36	0	%
5	1	1	1	12	4	285	412	40	43	0	ey
5	1	1	1	12	5	857	411	3	4	0	}
5	1	1	1	12	6	878	384	33	56	59	rA
5	1	1	1	12	7	910	388	44	48	31	ve
5	1	1	1	12	8	973	418	4	6	44	oe
5	1	1	1	12	9	1024	406	13	17	0	anX
5	1	1	1	12	10	1148	399	3	3	0	;
5	1	1	1	12	11	1214	389	15	38	77	$
5	1	1	1	12	12	1284	393	64	29	18	seni
5	1	1	1	12	13	1364	384	29	30	30	ef
5	1	1	1	12	14	1423	374	34	64	27	3
5	1	1	1	12	15	1507	374	11	28	0	:
5	1	1	1	12	16	2392	366	3	4	68	.
4	1	1	1	13	0	55	393	2351	99	-1	
5	1	1	1	13	1	55	460	91	28	24	ae
5	1	1	1	13	2	170	453	66	39	20	eS
5	1	1	1	13	3	313	455	10	23	13	y
5	1	1	1	13	4	908	443	22	21	25	op
5	1	1	1	13	5	1076	447	6	9	45
 t  oSahe ee +}                              thy  ;   a oy Sy    rH  RF Ag if was                                                                                                  Zz
                                                            Ne Sar  eee     i UK 4                                                 }
 PY Lam                                      es PRA          Wn     go                                                                                                             8
  vt bof   Waa)                                   A J    7   o- 7     ft 3       +                                                                                                 ”
Sie                                          PENT           SAR        gee                                                        |                                                :
  AAS,    ee                                 oS     44 Leg an    fA Be       5 i                                                                                                   ”
 east)    \ ae                               DS ke oe 5 a, He sis       ,        :                                                                                                 >
  3   er ay   “                                4      Te)                                                                                                                          oy
 AN 4)    hae                                ee       tes                      .                                                                                                   O
  ona Se     RS                               eo                                              .                                                                                    ©
 ' OE) is F   M                                                                                                                  :                                                 (SF
Beha      P                                                                                                               NS                                                       9
  D Aiiaae                                                                                                                be                                                       =
 V3  i   ees                                                                                                            ‘     |
Ma     & LY,   ‘                                  Th]                                                              .  7 |                  ,
    Ne       k ,                                     bE)   Te                                                        ty     4	1	1	1	30	0	57	1024	1127	107	-1	
5	1	1	1	30	1	57	1081	35	49	21	i
5	1	1	1	30	2	110	1085	44	42	28	ry
5	1	1	1	30	3	179	1080	23	29	0	ie
5	1	1	1	30	4	267	1081	20	31	6	Py
5	1	1	1	30	5	312	1092	5	12	0	'
5	1	1	1	30	6	994	1054	26	32	8	ry
5	1	1	1	30	7	1076	1024	108	107	10	es
4	1	1	1	31	0	56	1037	2292	102	-1	
5	1	1	1	31	1	56	1122	78	17	28	hy
5	1	1	1	31	2	131	1097	46	50	13	Aa
5	1	1	1	31	3	272	1116	13	6	38	Ry
5	1	1	1	31	4	996	1091	10	19	11	ep}
5	1	1	1	31	5	1049	1079	119	24	26	Saw?
5	1	1	1	31	6	2261	1037	87	29	29	“a
4	1	1	1	32	0	54	1135	2529	90	-1	
5	1	1	1	32	1	54	1186	28	39	37	i
5	1	1	1	32	2	98	1184	65	37	21	Oh
5	1	1	1	32	3	175	1178	19	43	6	iy
5	1	1	1	32	4	275	1204	5	6	41	ts
5	1	1	1	32	5	295	1186	24	34	35	Ay
5	1	1	1	32	6	2338	1135	1	5	0	;
5	1	1	1	32	7	2580	1136	3	4	0	;
4	1	1	1	33	0	55	1157	2288	123	-1	
5	1	1	1	33	1	173	1230	130	47	0	ae
5	1	1	1	33	2	2190	1157	153	51	40	A
4	1	1	1	34	0	56	1274	2185	133	-1	
5	1	1	1	34	1	56	1354	48	49	15	Bi
5	1	1	1	34	2	203	1339	122	68	14	Raat.
5	1	1	1	34	3	856	1334	150	44	6	oe
5	1	1	1	34	4	1333	1340	103	28	5	—_——
5	1	1	1	34	5	2231	1274	10	43	40	|
4	1	1	1	35	0	82	1327	1907	115	-1	
5	1	1	1	35	1	82	1411	25	25	19	Wh
5	1	1	1	35	2	150	1423	9	19	54	;
5	1	1	1	35	3	187	1399	26	41	9	0
5	1	1	1	35	4	235	1397	6	19	77	\
5	1	1	1	35	5	257	1385	68	43	22	PS
5	1	1	1	35	6	857	1377	34	32	10	ee
5	1	1	1	35	7	937	1374	21	40	0	‘
5	1	1	1	35	8	999	1380	58	22	56	“ay.
5	1	1	1	35	9	1070	1354	88	55	29	PE.
5	1	1	1	35	10	1171	1373	3	9	35	|
5	1	1	1	35	11	1180	1364	42	38	10	aS
5	1	1	1	35	12	1312	1358	66	22	0	aets
5	1	1	1	35	13	1964	1327	25	47	54	co
4	1	1	1	36	0	94	1390	1362	68	-1	
5	1	1	1	36	1	131	1435	21	21	38	ra.
5	1	1	1	36	2	177	1434	45	24	26	SUF
5	1	1	1	36	3	244	1433	23	21	35	><
5	1	1	1	36	4	851	1410	32	32	3	Pe
5	1	1	1	36	5	941	1420	3	2	57	+
5	1	1	1	36	6	1028	1405	11	27	35	by
5	1	1	1	36	7	1076	1401	19	28	63	Ly
5	1	1	1	36	8	1184	1411	24	13	13	rr
5	1	1	1	36	9	1263	1395	61	22	28	ag
5	1	1	1	36	10	1367	1390	10	12	5	5
5	1	1	1	36	11	1437	1391	19	36	0	y
4	1	1	1	37	0	55	1384	2293	115	-1	
5	1	1	1	37	1	55	1457	119	39	30	Nees
5	1	1	1	37	2	139	1449	60	59	23	tae
5	1	1	1	37	3	191	1459	99	40	9	tases
5	1	1	1	37	4	856	1430	47	36	12	ya
5	1	1	1	37	5	943	1419	9	33	16	he
5	1	1	1	37	6	1015	1442	3	4	38	ig
5	1	1	1	37	7	1121	1429	28	17	55	<<
5	1	1	1	37	8	1163	1424	65	29	34	TN
5	1	1	1	37	9	1929	1409	44	7	75	<
5	1	1	1	37	10	2084	1384	56	25	34	i
5	1	1	1	37	11	2336	1395	12	7	49	~
4	1	1	1	38	0	75	1408	2271	114	-1	
5	1	1	1	38	1	75	1501	16	11	40	ee
5	1	1	1	38	2	162	1488	95	27	5	rar
5	1	1	1	38	3	279	1483	46	39	29	Oe
5	1	1	1	38	4	856	1467	30	23	26	ey
5	1	1	1	38	5	910	1453	59	47	0	1aty
5	1	1	1	38	6	986	1458	38	28	40	9
5	1	1	1	38	7	1117	1479	3	2	0	:
5	1	1	1	38	8	1141	1447	64	38	43	ak
5	1	1	1	38	9	1248	1452	2	2	40	rit
5	1	1	1	38	10	1350	1432	11	63	15	*
5	1	1	1	38	11	2089	1420	39	24	35	eit
5	1	1	1	38	12	2175	1423	1	23	9	A
5	1	1	1	38	13	2338	1408	8	30	11	»-
4	1	1	1	39	0	146	1438	2061	103	-1	
5	1	1	1	39	1	146	1520	4	4	0	.
5	1	1	1	39	2	239	1513	53	28	13	sae
5	1	1	1	39	3	857	1507	3	3	32	bees
5	1	1	1	39	4	905	1492	11	18	29	+
5	1	1	1	39	5	935	1484	15	31	4	Y
5	1	1	1	39	6	952	1466	62	58	36	Abe
5	1	1	1	39	7	1018	1466	29	58	52	te
5	1	1	1	39	8	1089	1469	48	49	34	Ph
5	1	1	1	39	9	1170	1474	99	27	0	Lee
5	1	1	1	39	10	1436	1472	8	12	36	‘
5	1	1	1	39	11	2089	1438	118	35	22	ey
4	1	1	1	40	0	143	1472	2192	97	-1	
5	1	1	1	40	1	143	1558	23	11	0	S
5	1	1	1	40	2	252	1536	42	27	19	rs
5	1	1	1	40	3	316	1548	7	15	0	;
5	1	1	1	40	4	942	1522	31	30	0	WG
5	1	1	1	40	5	998	1523	10	16	33	Sy
5	1	1	1	40	6	1101	1512	49	32	29	ae
5	1	1	1	40	7	1182	1514	14	15	0	n
5	1	1	1	40	8	1213	1506	4	8	0	,
5	1	1	1	40	9	1258	1507	13	19	0	‘
5	1	1	1	40	10	1365	1496	78	22	10	ie
5	1	1	1	40	11	2149	1472	74	25	24	Se
5	1	1	1	40	12	2328	1476	7	16	36	f
4	1	1	1	41	0	115	1502	2217	101	-1	
5	1	1	1	41	1	115	1588	9	13	0	-
5	1	1	1	41	2	131	1571	57	29	23	ee
5	1	1	1	41	3	245	1541	66	62	0	aR
5	1	1	1	41	4	877	1552	8	19	22	v
5	1	1	1	41	5	944	1558	8	13	0	’
5	1	1	1	41	6	1001	1535	95	29	81	“he
5	1	1	1	41	7	1122	1534	29	38	22	2!
5	1	1	1	41	8	1194	1531	58	28	52	Le
5	1	1	1	41	9	1455	1526	5	24	11	,
5	1	1	1	41	10	2279	1516	5	1	38	—
4	1	1	1	42	0	90	1539	1381	101	-1	
5	1	1	1	42	1	111	1602	11	22	6	ba
5	1	1	1	42	2	168	1587	143	53	28	heey!
5	1	1	1	42	3	321	1608	4	4	47	4
5	1	1	1	42	4	863	1581	10	22	21	ne
5	1	1	1	42	5	1000	1584	2	3	43	a
5	1	1	1	42	6	1051	1574	7	27	26	}
5	1	1	1	42	7	1073	1555	15	25	0	s
5	1	1	1	42	8	1106	1553	52	20	40	au
5	1	1	1	42	9	1233	1562	6	16	0	‘
5	1	1	1	42	10	1256	1539	15	49	19	\,
5	1	1	1	42	11	1295	1556	14	14	25	v
5	1	1	1	42	12	1403	1572	8	11	0	-
5	1	1	1	42	13	1437	1552	8	30	0	-
5	1	1	1	42	14	1455	1558	16	25	0	\
4	1	1	1	43	0	74	1584	1399	69	-1	
5	1	1	1	43	1	74	1630	60	23	15	eA
5	1	1	1	43	2	156	1619	7	24	4	5
5	1	1	1	43	3	202	1606	22	43	14	te
5	1	1	1	43	4	248	1620	77	24	35	a
5	1	1	1	43	5	838	1584	44	57	0	r\
5	1	1	1	43	6	946	1596	9	25	74	‘
5	1	1	1	43	7	974	1597	35	32	36	ree
5	1	1	1	43	8	1063	1590	8	10	0	n
5	1	1	1	43	9	1097	1595	56	29	14	So
5	1	1	1	43	10	1262	1586	44	23	23	vd
5	1	1	1	43	11	1462	1585	11	35	3	;
4	1	1	1	44	0	128	1593	1335	88	-1	
5	1	1	1	44	1	128	1648	35	33	49	ons
5	1	1	1	44	2	189	1646	25	34	38	(4
5	1	1	1	44	3	247	1630	36	48	49	7
5	1	1	1	44	4	304	1641	18	34	17	ry
5	1	1	1	44	5	871	1628	13	18	15	«
5	1	1	1	44	6	973	1607	77	57	14	fhe
5	1	1	1	44	7	1049	1611	87	33	26	soe
5	1	1	1	44	8	1176	1593	55	71	67	ee
5	1	1	1	44	9	1367	1610	8	17	46	|
5	1	1	1	44	10	1460	1627	3	3	0	:
4	1	1	1	45	0	55	1582	3225	132	-1	
5	1	1	1	45	1	55	1668	39	46	15	HR
5	1	1	1	45	2	112	1674	54	29	27	wa
5	1	1	1	45	3	185	1657	32	62	38	wy
5	1	1	1	45	4	253	1669	23	17	6	Mae
5	1	1	1	45	5	863	1639	35	38	20	et
5	1	1	1	45	6	970	1653	32	25	19	AR
5	1	1	1	45	7	1090	1640	45	31	26	xe
5	1	1	1	45	8	1248	1659	22	5	0	»\6\
5	1	1	1	45	9	1366	1633	42	15	12	weal
5	1	1	1	45	10	3270	1582	10	3	0	:
4	1	1	1	46	0	55	1583	3220	168	-1	
5	1	1	1	46	1	55	1716	28	35	0	H
5	1	1	1	46	2	113	1704	41	21	11	ae
5	1	1	1	46	3	227	1680	61	52	13	SPE
5	1	1	1	46	4	309	1691	16	31	35	a
5	1	1	1	46	5	566	1692	84	9	74	—
5	1	1	1	46	6	858	1663	74	37	21	Rass
5	1	1	1	46	7	976	1660	91	29	30	Se
5	1	1	1	46	8	1113	1667	20	22	34	ME
5	1	1	1	46	9	1203	1678	2	2	0	.
5	1	1	1	46	10	1242	1662	36	28	40	die
5	1	1	1	46	11	1400	1659	52	9	31	ee
5	1	1	1	46	12	3237	1583	38	50	42	3.
4	1	1	1	47	0	87	1606	3245	153	-1	
5	1	1	1	47	1	87	1755	5	3	56	4
5	1	1	1	47	2	101	1722	31	37	22	it
5	1	1	1	47	3	219	1719	106	32	42	eX,
5	1	1	1	47	4	858	1705	138	23	33	Cette
5	1	1	1	47	5	1051	1693	6	18	27	Tia
5	1	1	1	47	6	1242	1691	16	26	44	AS
5	1	1	1	47	7	1373	1685	45	24	18	ee
5	1	1	1	47	8	3243	1606	89	53	34	Sinan
4	1	1	1	48	0	64	1642	3295	154	-1	
5	1	1	1	48	1	197	1739	128	57	0	AEA
5	1	1	1	48	2	555	1718	73	77	61	=)
5	1	1	1	48	3	856	1738	67	29	22	iY
5	1	1	1	48	4	982	1729	15	32	0	&
5	1	1	1	48	5	1028	1694	31	52	34	by
5	1	1	1	48	6	1111	1720	44	34	6	ai
5	1	1	1	48	7	1224	1715	89	39	17	gone
5	1	1	1	48	8	1363	1725	15	20	28	a
5	1	1	1	48	9	3197	1642	162	35	15	ae
4	1	1	1	49	0	65	1676	3374	158	-1	
5	1	1	1	49	1	65	1781	27	53	10	ms
5	1	1	1	49	2	105	1788	82	38	48	pore
5	1	1	1	49	3	229	1789	19	24	67	a)
5	1	1	1	49	4	308	1793	17	28	14	8
5	1	1	1	49	5	860	1746	76	60	6	iE
5	1	1	1	49	6	990	1762	18	27	28	3
5	1	1	1	49	7	1078	1763	23	33	54	5
5	1	1	1	49	8	1130	1785	9	9	30	A
5	1	1	1	49	9	1229	1740	65	49	0	Vaiss
5	1	1	1	49	10	1307	1753	11	25	22	+e
5	1	1	1	49	11	1364	1753	8	7	7	teh
5	1	1	1	49	12	1489	1763	12	15	0	e
5	1	1	1	49	13	3062	1703	37	19	41	ade
5	1	1	1	49	14	3152	1699	7	4	0	.
5	1	1	1	49	15	3230	1683	27	15	0	<
5	1	1	1	49	16	3301	1688	26	21	37	<n
5	1	1	1	49	17	3437	1676	2	2	0	;
4	1	1	1	50	0	54	1714	3167	149	-1	
5	1	1	1	50	1	85	1828	45	34	8	ear
5	1	1	1	50	2	166	1805	112	57	48	RAY
5	1	1	1	50	3	574	1791	36	72	29	om
5	1	1	1	50	4	856	1795	163	40	0	(fh
5	1	1	1	50	5	1132	1814	5	4	14	Re
5	1	1	1	50	6	1205	1767	157	51	12	ee
5	1	1	1	50	7	3085	1714	136	29	23	ea
5	1	1	1	50	8	3296	1720	134	26	39	ene
4	1	1	1	51	0	64	1754	3311	159	-1	
5	1	1	1	51	1	64	1867	70	38	50	Ot,
5	1	1	1	51	2	168	1864	153	33	38	Saas
5	1	1	1	51	3	572	1838	38	75	16	e@
5	1	1	1	51	4	856	1830	98	49	29	Let
5	1	1	1	51	5	989	1835	73	24	0	2a
5	1	1	1	51	6	1123	1815	116	53	20	ee,
5	1	1	1	51	7	1270	1821	95	45	0	ei
5	1	1	1	51	8	1496	1826	7	30	52	;
5	1	1	1	51	9	3060	1764	91	6	0	———
4	1	1	1	52	0	76	1786	3283	149	-1	
5	1	1	1	52	1	76	1902	51	32	28	Tae
5	1	1	1	52	2	308	1894	9	8	36	A
5	1	1	1	52	3	906	1861	59	63	7	>.
5	1	1	1	52	4	1008	1865	132	39	24	SY
5	1	1	1	52	5	1325	1864	47	33	33	As
5	1	1	1	52	6	1485	1870	61	11	0	a”
5	1	1	1	52	7	3285	1786	74	28	35	+
4	1	1	1	53	0	59	1816	3263	164	-1	
5	1	1	1	53	1	59	1922	69	45	50	Ve
5	1	1	1	53	2	188	1925	137	40	31	Re
5	1	1	1	53	3	587	1899	63	81	35	OQ.
5	1	1	1	53	4	877	1902	58	38	9	Ae
5	1	1	1	53	5	1277	1901	20	15	12	hay
5	1	1	1	53	6	1340	1876	28	54	18	he
5	1	1	1	53	7	1503	1904	9	8	7	:
5	1	1	1	53	8	3311	1816	11	28	0	:
4	1	1	1	54	0	54	1958	1322	69	-1	
5	1	1	1	54	1	123	2000	20	21	35	es
5	1	1	1	54	2	193	2010	1	3	50	©
5	1	1	1	54	3	259	1990	26	37	24	ry
5	1	1	1	54	4	865	1977	17	13	20	Cy
5	1	1	1	54	5	1139	1983	5	5	58	2
5	1	1	1	54	6	1369	1958	7	18	0	.
4	1	1	1	55	0	59	2001	2019	105	-1	
5	1	1	1	55	1	59	2026	94	80	16	PRM
5	1	1	1	55	2	245	2050	74	27	7	es
5	1	1	1	55	3	857	2021	39	43	30	ial
5	1	1	1	55	4	932	2022	106	61	19	Sn
5	1	1	1	55	5	1131	2001	425	58	24	Pe
5	1	1	1	55	6	2030	2002	48	12	63	<
4	1	1	1	56	0	67	2068	1549	68	-1	
5	1	1	1	56	1	67	2113	37	23	14	ee
5	1	1	1	56	2	186	2116	2	4	0	X
5	1	1	1	56	3	272	2096	53	35	42	we
5	1	1	1	56	4	848	2086	17	30	0	hs
5	1	1	1	56	5	905	2068	17	33	0	rT
5	1	1	1	56	6	1045	2090	3	4	9	Pb
5	1	1	1	56	7	1120	2076	30	30	18	ir
5	1	1	1	56	8	1199	2087	3	4	2
        oe

                                                                                       ¢
    7 2  5	1	1	1	57	4	291	2127	34	16	49	Ve
5	1	1	1	57	5	554	2108	56	42	36	fom
5	1	1	1	57	6	620	2108	29	42	38	ws
5	1	1	1	57	7	862	2088	62	54	43	BK:
5	1	1	1	57	8	957	2077	43	50	27	iy
5	1	1	1	57	9	1111	2088	29	35	0	‘ag
5	1	1	1	57	10	1194	2096	15	34	64	3
5	1	1	1	57	11	1278	2097	2	2	27	:
5	1	1	1	57	12	1348	2079	13	51	0	hi
5	1	1	1	57	13	1384	2090	6	9	0	\
5	1	1	1	57	14	1486	2079	50	18	29	‘om
5	1	1	1	57	15	1870	2077	1	4	3	'
5	1	1	1	57	16	1941	2067	9	11	62	.
5	1	1	1	57	17	3272	2046	2	2	23	'
4	1	1	1	58	0	221	2062	3061	170	-1	
5	1	1	1	58	1	81	2135	244	97	35	Paw
5	1	1	1	58	2	566	2156	84	8	8	mY
5	1	1	1	58	3	983	2104	169	63	46	RG
5	1	1	1	58	4	1368	2112	24	53	37	ae
5	1	1	1	58	5	3262	2062	20	18	38	;
4	1	1	1	59	0	163	2126	2504	85	-1	
5	1	1	1	59	1	163	2194	81	17	20	Pete
5	1	1	1	59	2	289	2192	2	2	0	Ye
5	1	1	1	59	3	856	2169	52	19	17	aS
5	1	1	1	59	4	977	2148	14	39	13	R
5	1	1	1	59	5	1135	2166	1	3	7	:
5	1	1	1	59	6	1214	2150	75	28	43	wre
5	1	1	1	59	7	1373	2150	20	27	44	a
5	1	1	1	59	8	1501	2149	5	12	0	:
5	1	1	1	59	9	2662	2126	5	2	48	:
4	1	1	1	60	0	68	2134	3253	141	-1	
5	1	1	1	60	1	68	2190	175	85	56	wen
5	1	1	1	60	2	564	2167	580	82	18	OR
5	1	1	1	60	3	1193	2150	337	64	19	Ee
5	1	1	1	60	4	3317	2134	4	3	54	|
4	1	1	1	61	0	83	2189	2704	127	-1	
5	1	1	1	61	1	83	2266	61	49	21	i
5	1	1	1	61	2	158	2262	81	54	37	ee
5	1	1	1	61	3	271	2270	54	36	36	es
5	1	1	1	61	4	566	2247	62	48	32	>
5	1	1	1	61	5	954	2229	196	45	0	eee
5	1	1	1	61	6	1979	2206	4	1	0	.
5	1	1	1	61	7	2718	2166	66	87	35	yt
4	1	1	1	62	0	61	2257	1459	107	-1	
5	1	1	1	62	1	61	2286	124	68	15	oe
5	1	1	1	62	2	227	2307	98	57	35	ae
5	1	1	1	62	3	869	2295	7	6	38	;
5	1	1	1	62	4	1006	2280	58	36	24	Sa
5	1	1	1	62	5	1433	2268	87	60	0	LY.
4	1	1	1	63	0	77	2268	3020	112	-1	
5	1	1	1	63	1	77	2348	70	32	30	Ln
5	1	1	1	63	2	126	2344	78	43	0	ete.
5	1	1	1	63	3	223	2352	102	21	23	PRINT
5	1	1	1	63	4	856	2322	4	6	14	:
5	1	1	1	63	5	1017	2321	27	25	12	sf
5	1	1	1	63	6	1136	2313	66	11	2	Mase
5	1	1	1	63	7	1275	2304	41	28	18	Si
5	1	1	1	63	8	1350	2296	106	40	0	Sar
5	1	1	1	63	9	3094	2268	3	2	0	;
4	1	1	1	64	0	84	2363	1386	62	-1	
5	1	1	1	64	1	84	2413	68	12	33	UN
5	1	1	1	64	2	856	2386	245	31	11	WMG
5	1	1	1	64	3	1131	2398	11	11	11	as
5	1	1	1	64	4	1170	2363	93	58	35	Sh
5	1	1	1	64	5	1286	2374	67	32	34	pee
4	1	1	1	65	0	993	2406	529	22	-1	
5	1	1	1	65	1	993	2426	14	2	0	—
5	1	1	1	65	2	1226	2413	12	6	3	-
5	1	1	1	65	3	1337	2423	1	3	0	~
5	1	1	1	65	4	1406	2406	19	6	29	a
5	1	1	1	65	5	1464	2416	58	12	67	—

Section 5

                                                                 Noosa Climate Change Response Plan




The climate emergency
We are living in times of increasingly complex and rapid change, driven by technological advances,
economic transitions, demographic shifts, and a changing climate. Noosa Council, in partnership
with the local community and other levels of government, has an important responsibility for providing
essential services, managing local risks, and supporting disaster recovery, as well as adapting to
changing circumstances and finding new opportunities to support a safe and prosperous Noosa into
the future.
The 2019-2020 bushfire season, and the global pandemic, are stark reminders of both the fragility of
the social systems and networks upon which we all depend, as well as the importance and benefits
of responsible planning, rapid mobilisation, and working together as a community. COVID-19 has
also shown us that we can make our own new normal – throw out old rules that no longer work for our
community and make new ones, and ask ourselves what we want for our world. The response to the
COVID-19 pandemic has demonstrated how scientifically-sound and carefully considered actions can
lead us out of a crisis.
This is the type of unified response needed for responding to the global climate emergency. The
disruptions to our way of life caused by a rapidly changing climate demand a certain moral courage
that enables us to prioritise the ‘collective’ and to take positive action for ourselves, for future
generations, and for the planet. It requires everyone to act, to ‘step up’ and to reimagine and create a
new, cleaner, and safer Noosa.
This Climate Change Response Plan is a vision for a new future for Noosa, and a blueprint for us all to
do our bit locally and to be an example for others of something better. It challenges us all to think big,
heed the scientific advice and take careful and resolute action now.


Our journey so far
Noosa Council declared a climate emergency in 2019, making a strong statement in support
of taking action on climate change as part of a collective voice across local, state, and federal
governments worldwide. We need action at all levels of government and across all sectors to avoid
dangerous climate change. There are carbon emissions within the control of Council, carbon
emissions elsewhere within the Shire that we can influence, as well as those that require regulatory
change and leadership beyond Noosa’s boundaries.
Over the last several years Council has been working to reduce its own emissions. Since 2016,
Council has had in place a Zero Emissions Organisational Strategy for the Council’s operations to
achieve zero net emissions by 2026. In this time, we’ve successfully achieved the following:
•   Installation of over 600 kW solar PV across Council owned and operated buildings and facilities
•   Improved energy efficiency of air conditioning systems for Council facilities
•   Changed hundreds of lights to energy efficient LEDs
•	Worked to improve waste management and the efficiency of the landfill gas extraction at the
   Noosa landfill site
•   Provided grants to community groups for solar and energy efficiency projects



                                                                                                      Page 5

Section 6

           Noosa Shire Council



  •	Provided a free solar advice hotline and                                 The Noosa Council Environment Strategy
     education programs for households and                                    was also adopted in 2019 with outcomes and
     businesses through the Australian Energy                                 targets for both emission reduction and climate
     Foundation                                                               adaptation. This includes the target that Noosa
  •	Partnered with ZEN Inc on a range of                                     Council operations, and the Noosa community
     initiatives including solar for business, the                            as a whole, reach net zero emissions by 2026.
     electric vehicle expo and Race to Zero
     school program.                                                          Through its participation in initiatives such as
                                                                              the Queensland Climate Resilient Councils,
  The installation of the solar systems has saved
  Council over $500,000 in electricity costs since                            and the Cities Power Partnership, Council has
  the program commenced in 2017.                                              joined many other local governments across
                                                                              Queensland and Australia in committing to a
  In 2017 Council prepared a Climate Change
                                                                              sustainable post-COVID economic recovery
  Response Policy setting out our commitment
  to proactively plan and prepare for climate                                 that creates local jobs, supports industries
  change, and to build knowledge and capacity                                 and sectors that invest in a zero-carbon
  as an organisation.                                                         future, and contributes to sustainable resilient
  Council is also progressing the development                                 communities.
  and implementation of a Coastal Hazard                                      Whilst this Plan sits under the Environment
  Adaptation Plan for addressing increasing                                   Strategy, it is recognised that this is a whole of
  risks associated with coastal erosion, tidal
                                                                              Council document and has implications for all
  inundation and sea level rise for public
                                                                              operations throughout Council.
  and private assets, including critical public
  infrastructure.


                                       Environment Policy Framework

                                                                        Sustainability Principles

                               Environment and Sustainability Policy


 Strategy 10 years                                                                            Links to: Social Strategy
                                     Environment Strategy                                               Economic strategy (local economic plan)
                                                                                                        Transport Strategy

                                                     Climate Change
                           Noosa River Plan
                                                     Response Plan
 Detailed Plans 5 years                                                                        Links to: Corporate Plan
                                                                                                         Planning Scheme
                          Coastal Foreshores         Coastal Hazards
                                                                                                         Other detailed plans
                          Management Plan            Adapta�on Plan
                                                                                                         Local Laws
                                                                                                         Asset management plans
                          Bushland Reserves        Flood Management
                            Strategic Plan                Plan

                            Biodiversity               Bushfire
                          Conserva�on Plan          Management Plan

                          Koala Conserva�on          Biosecurity Plan
                                 Plan

                             Mary River                 Waste
                          management plans          Management Plan

 Annual plans and                                                          Operational Plans
    programs


Page 6

Section 7

                                                              Noosa Climate Change Response Plan




A better future
Through the strategic priorities and actions outlined within this Climate Change Response Plan,
Noosa Council is striving to lead by example by making positive progress, showing the way,
and supporting and inspiring others.
Together, Council and the community are well positioned to be a powerful influencer to drive
deep systemic change from the grassroots level. This includes:
•   Transition to net zero emissions by 2026 for Council operations and for the community
  Transition to 100% renewable energy powering Council buildings and facilities, and
•	
  powering Noosa Shire
  Drive clean low emissions industry, and innovative technologies and solutions that
•	
  address the climate crisis
•    e a well informed and prepared community that considers climate change in making
    B
    day-to-day and business decisions
  Facilitate sustainable, resilient and adaptive communities, buildings and infrastructure to
•	
  help reduce the impacts of climate change and reduce emissions
  Support vulnerable populations, ensuring inclusion in solutions and equitable access to
•	
  opportunities and benefits
•    ccelerate transition to sustainable transport and increase mobility through new
    A
    technologies and active modes of transport such as walking and cycling
•    nhance ecosystem health, adaptive capacity and carbon drawdown whilst balancing
    E
    other climate risks such as more frequent bushfires
  Grow and distribute food locally and sustainably, enabled by sustainable land
•	
  management and regenerative farming practices
  Advance a zero waste circular economy where products and materials are reused and
•	
  repurposed.

Responding to climate change involves a multi-pronged approach:
•   Reducing emissions by reducing the levels of heat-trapping greenhouse gases in the
     atmosphere through: eliminating the sources of these gases (such as the burning of
     fossil fuels for electricity, heat or transport); adopting sustainable development solutions in
     energy, land, infrastructure and industrial systems; and enhancing the sinks that store these
     gases including vegetation and soils (referred to as carbon drawdown or sequestration)
  Adapting to climate change by building resilience in our local communities, built
•	
  environments, economy and natural systems to reduce our vulnerability to the harmful
  effects of climate change.

This new future also means making the most of the potential opportunities that climate change
brings, such as fostering new clean tech industries and positioning Noosa at the forefront of
innovation and economic development. It means transitioning beyond business as usual to
making a systemic shift across a range of sectors.




                                                                                                   Page 7

Section 8

         Noosa Shire Council




  Why do we need to act?                             •	Ensuring appropriate development
                                                        requirements, infrastructure planning and
  We are already beginning to experience                asset management that take account of
  the effects of a changing climate. We can             climate risks and emissions reduction
  expect to see more extreme weather events,
                                                     •	Ensuring climate-ready and effective
  bushfires, changes in rainfall patterns,
                                                        disaster management and governance
  increased temperatures and heatwaves. As
                                                        systems
  the climate continues to change, the risks to
                                                     •	Improving knowledge, capability and
  people and property, infrastructure, human
                                                        capacity to respond to climate change
  health, natural systems, agriculture and the
                                                        in order to drive meaningful action and
  economy are expected to increase.
                                                        localised emissions reduction
  We all have a responsibility to reduce our
                                                     •	Assessing climate impacts and
  share of global emissions as a Council and
                                                        coordinating an appropriate response
  as a community to minimise further impacts
                                                        and measuring progress.
  and safeguard our future.
                                                     The choices we make today are the pathway
                                                     to our children’s future - one that is safe and
  Council’s role                                     well prepared for any unavoidable impacts
  It is critical that Council continues to adopt a   of climate change. Effective and affordable
  proactive approach regarding climate risk to       emissions reduction solutions are available,
  help build the adaptive capacity of our shire      and we are confident that we can mitigate
  and reduce emissions. Council has a role in:       risks and adapt to climate change impacts
  •	Helping to inform and prepare our local         locally. We need a clear and collaborative
     community to ensure greater resilience in       process to prepare and deliver solutions.
     the face of climate change impacts and          This includes making the most of the new
     extreme weather events                          opportunities here in Noosa. We also
                                                     need to engage and empower everyone
  •	Helping to mobilise and strengthen
                                                     in our community and to protect our most
     community advocacy for greater action
                                                     vulnerable as we adjust to a new future
     on climate change across all levels of
                                                     together - where people, businesses and
     government and different sectors by
                                                     nature thrive.
     strengthening relationships, amplifying
     community voices and leveraging
     connections
  •	Improving decision making by
     embedding consideration of climate risks
     and emissions reduction into all areas of
     council operations




Page 8

Section 9

Noosa Climate Change Response Plan




About this Plan
This Climate Change Response Plan intends to establish Noosa as a genuine leader in
responding to climate change by creating and implementing a cross-sectoral, cross-functional
approach that is bold and efficient and maximises co-benefits.
The document details a 5-year plan that sets out the context, desired outcomes and actions
for addressing climate change in Noosa Shire in partnership with the community. The plan
provides overarching strategic direction, specific actions and targets for responding to climate
change. The objectives are to ensure:
•	Key climate risks are understood and accepted by Council and the community
•	Roles and responsibilities for addressing climate risks with Council and key sectors of the
   community are established
•	Climate risks and emissions reduction are considered and responded to in a holistic and
   strategic way and embedded in decision making, policy and planning
•	Opportunities arising from climate change for Council and the community are identified
•	Collaborative approaches are considered and pursued for reducing emissions and
   adapting to climate change
•	Implementation and outcomes of climate action and changing risks are monitored and
   regularly evaluated.

   The plan is structured under 8 themes:
   1. Strong leadership and governance
   2. Energy efficiency and renewable energy
   3. Clean low emissions industries
   4. Sustainable transport
   5. Healthy and resilient natural systems and carbon drawdown
   6. Sustainable agriculture and food systems
   7. Resilient and adaptive communities and built environments
   8. Zero waste and circular economy

Each theme has strategic priorities with information on why these priorities matter; how they will
be achieved; Council’s role in driving and influencing change; and important partnerships.
Within the Summary of Actions there is an overview of the specific actions to be implemented
over the next few years, indicators for monitoring progress, and estimated timeframes for
delivery.
Ongoing community involvement and contribution in the plan’s implementation is important for
ensuring successful delivery of the ambitions and strategic priorities of the plan.




                                                                                                   Page 9

Noosa Climate Change Response Plan

About this Plan
This Climate Change Response Plan intends to establish Noosa as a genuine leader in
responding to climate change by creating and implementing a cross-sectoral, cross-functional
approach that is bold and efficient and maximises co-benefits.
The document details a 5-year plan that sets out the context, desired outcomes and actions
for addressing climate change in Noosa Shire in partnership with the community. The plan
provides overarching strategic direction, specific actions and targets for responding to climate
change. The objectives are to ensure:
*   Key climate risks are understood and accepted by Council and the community
*   Roles and responsibilities for addressing climate risks with Council and key sectors of the
    community are established
*   Climate risks and emissions reduction are considered and responded to in a holistic and
    strategic way and embedded in decision making, policy and planning
*   Opportunities arising from climate change for Council and the community are identified
*   Collaborative approaches are considered and pursued for reducing emissions and
    adapting to climate change
¢   Implementation and outcomes of climate action and changing risks are monitored and
    regularly evaluated.
   The plan is structured under 8 themes:
    1. Strong leadership and governance
    2. Energy efficiency and renewable energy
    3. Clean low emissions industries
   4. Sustainable transport
    5. Healthy and resilient natural systems and carbon drawdown
    6. Sustainable agriculture and food systems
    7. Resilient and adaptive communities and built environments
    8. Zero waste and circular economy

Each theme has strategic priorities with information on why these priorities matter; how they will
be achieved; Council’s role in driving and influencing change; and important partnerships.
Within the Summary of Actions there is an overview of the specific actions to be implemented
over the next few years, indicators for monitoring-progress, and estimated timeframes for
delivery.
Ongoing community involvement and contribution in the plan’s implementation is-important for
ensuring successful delivery of the ambitions and strategic priorities of the plan.

                                                                                           Page 9

Section 10

            Noosa Shire Council




  Climate change principles and                                  •	Provide up-to-date and balanced information
                                                                    to the community on climate change
  objectives
                                                                    that builds community understanding,
  The following principles from the Climate Change                  preparedness and resilience, and helps
  Response Policy and overarching Environment                       mobilise community action on climate
  Strategy will help guide strategic priorities, and                change and emissions reduction.
  the implementation of climate change actions:
                                                                 Climate and emission reduction decisions
  •	Apply systems thinking to climate change                    consider Council’s broader ongoing financial
     adaptation and emissions reduction by                       sustainability requirements including ongoing
     developing and implementing short- and                      affordability considerations on annual rating
     long-term responses that achieve timely,                    decisions.
     well informed and effective action while
     also delivering other social, economic and
     environmental co-benefits                                   Climate projections
  •	Commit to being innovative, flexible and                    Council recognises the important role of the
     adaptive in responding to climate change                    United Nations Intergovernmental Panel on
  •      I ncrease resilience of the community,                 Climate Change (IPCC) in reviewing and
          the economy and our natural assets to                  summarising the latest climate change science
          environmental hazards and climate change               for public use. Due to slow global progress on
  •	Ensure ecological sustainability is fully                   reducing carbon emissions, Council will use,
     integrated into decision making in order to                 as a minimum, regional climate projections that
     help secure the continued availability of                   are based on a low-moderate global emissions
     natural resources for present and future                    reduction trend to inform its climate risk analysis
     generations                                                 (commonly referred to as “business as usual”
  •	Use a scientific evidence-based approach                    or BAU)1. We will also use climate change
     to managing the environment and                             projections that are consistent with those used
     climate change and adapt and respond                        or supported by the Queensland Government.
     appropriately as new information arises
                                                                 In the absence of either of these, we will seek
  •	Take an adaptive management approach                        to apply climate projections published by
     to climate risks and periodically undertake                 the Commonwealth Scientific and Industrial
     climate risk assessments and updates                        Research Organisation (CSIRO).
     consistent with ISO 31000:2009
                                                                 Council will commence a review of its climate
  •	Be a regional and Queensland leader for
                                                                 response plans and actions within 12 months
     climate action and advocacy
                                                                 of the publication date of new regional climate
  •       ctively communicate and partner with the
         A
                                                                 projections from the above organisations.
         broader community to improve awareness
         and build capacity around environment
         issues, climate risks and emissions reduction




  1
      Referred to as “Representative Concentration Pathway (RCP) 8.5”


Page 10

Section 11

Noosa Climate Change Response Plan




Local Climate Change Impacts


                                               Page 11

i"           ;        ES Se
                                                       Gi         Pee    in Nt eRe Pe
                                                                 pe    SEG           ENE       1S
                                                              y    a     WE he ek Meee Se Peet Br bart eh ite oa .
                    ,                          \                        ee SS                                                 |
                                                           1       ] 8s 4 “th am Fi ay wae . ‘ Thad x
                    je                            x           P       Gums               Sees                    -
                    @)                                        \      ————-                Oe
                   q)                                       .         od ihe                  ‘3     Ss
                    a                                               Ss         fe                        =                    F
                                                                                i                   eee        |
                                                           \ h-         <<    .             +.                                |
                    ( )                                   vs          “~,      ak            > —              ,  “\
                                                              ae,                ae             —        ee        \         f
                    a                                        ’         <3 Hy) ih) - = %              a"         = . es — \ ‘ {
                                                                 \          i).                               aS     SAS.     ON
                                                                  \        Wy, whi) —                                  = Sy Y
                    “                                            ry                                        ~            a
                    4D)                                         )  WT       Z       x                       fi                  } {
                    2                    ,                               ay                  Sa
                    =                                             =       ~      ae           =fdy                            a
                   ed)          .                      .              i               »                a
                    5                                             ess                                      a
5	1	1	1	23	4	3161	1178	2	2	37	|
4	1	1	1	24	0	541	1201	2614	164	-1	
5	1	1	1	24	1	541	1264	200	101	92	Oy
5	1	1	1	24	2	1777	1197	34	129	3	wy
5	1	1	1	24	3	2860	1233	72	51	4	”
5	1	1	1	24	4	2966	1236	189	81	33	a
4	1	1	1	25	0	1624	1306	621	37	-1	
5	1	1	1	25	1	1624	1323	10	4	14	-
5	1	1	1	25	2	1775	1306	51	37	26	«
5	1	1	1	25	3	2236	1327	9	6	19	7
4	1	1	1	26	0	560	1324	1389	97	-1	
5	1	1	1	26	1	560	1332	67	89	14	ey
5	1	1	1	26	2	1651	1374	34	13	42	wh
5	1	1	1	26	3	1755	1345	72	60	48	Su
5	1	1	1	26	4	1901	1324	48	88	40	f°
4	1	1	1	27	0	1883	1416	1277	53	-1	
5	1	1	1	27	1	1883	1423	14	15	0	.
5	1	1	1	27	2	3130	1416	30	48	5	'
4	1	1	1	28	0	1921	1468	1387	58	-1	
5	1	1	1	28	1	1921	1509	2	2	39	»
5	1	1	1	28	2	3271	1468	37	58	29	a
4	1	1	1	29	0	1852	1525	1447	71	-1	
5	1	1	1	29	1	1852	1572	6	9	39	~~
5	1	1	1	29	2	2558	1525	40	71	0	\
5	1	1	1	29	3	3271	1529	28	49	0	o}
4	1	1	1	30	0	1834	1586	1452	140	-1	
5	1	1	1	30	1	1834	1588	74	55	44	\s
5	1	1	1	30	2	2465	1640	55	86	40	ie
5	1	1	1	30	3	2729	1600	109	56	74	=
5	1	1	1	30	4	3126	1621	38	24	39	4
4	1	1	1	31	0	565	1673	2743	85	-1	
5	1	1	1	31	1	565	1698	60	55	22	2
5	1	1	1	31	2	2330	1686	43	72	41	|
5	1	1	1	31	3	3163	1674	2	58	42	|
5	1	1	1	31	4	3294	1673	14	22	67	4
4	1	1	1	32	0	561	1776	2603	93	-1	
5	1	1	1	32	1	561	1790	54	72	42	Cp
5	1	1	1	32	2	2260	1783	34	86	16	A
5	1	1	1	32	3	2342	1776	72	49	15	i
5	1	1	1	32	4	3162	1796	2	22	74	|
4	1	1	1	33	0	1901	1800	1022	100	-1	
5	1	1	1	33	1	1901	1841	108	47	52	=)
5	1	1	1	33	2	2690	1800	233	100	2	“—)
4	1	1	1	34	0	1972	1883	9	29	-1	
5	1	1	1	34	1	1972	1883	9	29	20	:
4	1	1	1	35	0	1958	1921	1471	152	-1	
5	1	1	1	35	1	1958	1939	55	108	28	‘
5	1	1	1	35	2	2357	1921	858	135	48	ee
5	1	1	1	35	3	3264	1938	165	135	35	ee
4	1	1	1	36	0	186	2027	3113	176	-1	
5	1	1	1	36	1	186	2067	129	129	18	—
5	1	1	1	36	2	646	2027	104	176	70	N
5	1	1	1	36	3	1087	2067	61	121	0	-
5	1	1	1	36	4	1568	2126	42	7	46	=
5	1	1	1	36	5	2677	2060	117	75	30	ar
5	1	1	1	36	6	2985	2070	96	96	50	re
5	1	1	1	36	7	3159	2110	25	21	31	~
5	1	1	1	36	8	3262	2059	37	78	37	9
4	1	1	1	37	0	2707	2123	14	14	-1	
5	1	1	1	37	1	2707	2123	14	14	3	a
4	1	1	1	38	0	2032	2084	1410	133	-1	
5	1	1	1	38	1	2032	2148	36	33	49	>
5	1	1	1	38	2	2272	2141	38	49	18	oe
5	1	1	1	38	3	2358	2084	156	133	17	~~.
5	1	1	1	38	4	2802	2122	88	56	66	er
5	1	1	1	38	5	2972	2138	5	4	11	;
5	1	1	1	38	6	3229	2144	69	50	32	ee

                                                                                                                                       :
                                           a     a                           »~                    ‘          A>            4   fo)
    3                                   A      ‘                                           >         y         oe               ao
i                                                                                                                          ~        -

Section 12

            Noosa Shire Council




         Our current climate
         The South East Queensland region has a sub-tropical climate. The average annual temperature
         is 19°C. Summer average temperature is around 24°C, in autumn and spring it is 20°C, and in
         winter 14°C.
         Annual and seasonal average rainfall are variable, affected by local factors such as
         topography and vegetation, and broader scale weather patterns, such as the El Niño–La Nina.
         Most rainfall occurs in summer and autumn.


         Our changing climate
         The climate is changing across Queensland. Average temperatures across the state are
         around 1°C higher than they were 100 years ago. Recent decades have shown a clear
         warming trend driven by increasing atmospheric carbon emissions stemming from human
         activities. The climate has always been variable, but human-caused climate change is leading
         to shifts beyond this natural variability, at a rate that could be as much as 50 times greater than
         otherwise would have occurred.
         Noosa has a long history of climate-driven extremes such as floods, droughts, heatwaves and
         bushfires.
         Climate change is likely to exacerbate the frequency and/or severity of these events. It can be
         an amplifier of these and other hazards, and even lead to the emergence of new risks.
         Below is a summary of the expected changes in key climate variables for Noosa, as well as
         some of the risks that we will likely need to adapt to. The figures presented have been obtained
         from the Queensland Government’s Climate Dashboard (2021), and are based on a global
         emissions scenario whereby low-moderate efforts to reduce carbon emissions are made by the
         year 20901.
         The risks posed by a rapidly changing climate can be chronic (e.g. changes in average
         temperature or annual rainfall totals) or acute (e.g. rapid onset but relatively short-lived disaster
         events such as floods and storms).




  1
      This scenario is called ‘Representative Concentration Pathway (RCP) 8.5’




Page 12

Section 13

                                                               Noosa Climate Change Response Plan




Temperature                                          elderly, the homeless, and those with pre-existing
                                                     health conditions. This is significant given the
Noosa’s average, maximum and minimum                 average age for a resident of Noosa is higher
temperatures are projected to continue to rise.      than the Queensland average. In addition to
For the near future (2030), the annually averaged    people, heatwaves can have an impact on critical
warming is projected to be around 1.5°C above        infrastructure services, livestock and other
the climate baseline of 1986–2005. By the year       agricultural practices, building cooling costs,
2070, this projected range of warming will           and local flora and fauna.
reach between 2.1 to 3.4°C above the baseline.
Noosa’s current summer average temperature is        Rainfall
25°C. This could increase to 27°C by 2050, 28°C      High climate variability is likely to remain the
by 2070, and 29°C by 2090.                           major factor influencing rainfall changes in the
                                                     next few decades. By the year 2090, projections
Such rapid changes in temperature could have
                                                     of average total annual rainfall show little
an effect on the lifecycles of local flora and       change or a decrease across the Noosa Shire.
fauna, the viability of horticultural enterprises,   However, the intensity of heavy rainfall events is
and increase the prevalence of mosquito-borne        likely to increase as summer totals rise by 11%
diseases and other harmful pests. Increases in       by 2090. Conversely, winter and spring totals
the average and maximum temperatures will also       are projected to decrease by 8% and 25%
increase cooling costs for private- and publicly-    respectively, by the year 2090.
owned buildings.                                     By late this century, it is likely that the region will
                                                     experience more time in drought, compared to
There is likely to be a substantial increase
                                                     the present day.
in the frequency and duration of heatwaves.
Currently, the average duration for the longest      The combination of a drier dry season and
single heatwave in a year is around 5 days.          wetter wet seasons, and an increase in drought
The duration of such an event is projected to        conditions, could lead to a range of risks and
                                                     changes such as soil loss through erosion
increase to 7.5 days by 2030,
                                                     (during heavy rainfall), localised flooding,
14 days by 2050, 33 days by 2070, and 67 days
                                                     compaction of soils leading to reduced
by 2090. Such a change represents one of the
                                                     absorption of rainfall, increased prevalence of
most significant climate risks to Noosa.
                                                     outdoor sporting injuries, soil movement leading
In Queensland, heatwaves are responsible             to fractures in built structures, and impacts on
for more deaths than all other natural hazards       agricultural enterprises and native flora and
combined. Those groups most at risk include the      fauna.




                                                                                                        Page 13

Section 14

          Noosa Shire Council




    Oceans
    The average sea level for the coastal region Noosa is situated is projected to rise by 0.8m
    above present day levels by the year 2100. Higher sea levels will increase the risks posed by
    coastal hazards such as storm tide inundation and coastal erosion, and lead to more frequent
    nuisance flooding of low-lying foreshore areas. Noosa Council’s Coastal Hazards Adaptation
    Plan, and accompanying technical studies, contain details regarding how these risks are
    expected to change, and what the most appropriate pathways for dealing with these risks are
    for Noosa’s coastal zone.
    In addition to sea level rise, sea surface temperatures off the Queensland coast have risen
    markedly over recent decades, and warming is projected to continue. Such increases could
    lead to changes in the makeup of local marine and estuarine ecosystems. Warmer seas could
    lead to a southward expansion in the range of certain tropical marine species, including those
    both visually attractive to beachgoers and those that are potentially harmful.
    The world’s oceans have been absorbing a significant amount of carbon dioxide emitted by
    human activities, and have increased in acidity by around 25%. If carbon emissions continue
    to increase as currently, this acidification of the oceans will also increase. Along with increases
    in sea surface temperature, this is likely to have a significant effect on marine ecosystems, as
    a more acidic ocean makes it more difficult for important marine species such as corals and
    plankton to make their skeletons and shells. Such impacts will extend up the oceanic food
    chain, affecting important ecological values and economic activities such as commercial and
    recreational fisheries and tourism.




Page 14

Section 15

                                                               Noosa Climate Change Response Plan




Extreme events                                         An example of a transition risk is a levy on
                                                       carbon emissions. The introduction of a carbon
A warmer world is likely to result in an               levy would increase the cost of doing business
increase in the severity of extreme wind and           for organisations responsible for carbon
storm events. Based on currently available             emissions, such as a local government that
information, the frequency of tropical cyclones        owns a landfill or an airline whose planes rely
forming and impacting the Queensland coast             on fossil fuels. Increases in business costs are
is expected to decrease. However, a warmer             often passed on to customers and consumers,
atmosphere and seas is likely to result in an          thereby potentially affecting the Noosa
increase in the average severity of tropical           community through the household budget.
cyclones, as well as a southward expansion
                                                       Another example is a reduction in the expected
in their normal range. Whilst there does not
                                                       return on investment for assets and activities
appear to be any change in their frequency yet,
                                                       that do not align with a clean economy,
climate change projections indicate an overall
                                                       such as a coal-fired power station. Some
decrease in East Coast Lows can be expected.
                                                       institutions have already begun to refuse to
An increase in the severity of storm and               provide financing or commercial insurance
tropical cyclone events will lead to increased         for business activities on the grounds that the
risks to people, private property, important           activities will result in an increase in carbon
infrastructure, and the local environment of           emissions. The lack of finance or insurance can
Noosa associated with more intense and                 create what is known as a ‘stranded asset’. If
frequent flash flooding, and more frequent             investment portfolios (such as those included
severe or extreme wind events.                         in superannuation funds) are not carefully
Bushfire weather is a measure of fuel dryness          managed, the prospect of stranded assets can
and hot, dry, windy conditions. Recent bushfire        create an economic transition risk, which can
events of 2019/20 in Peregian, Cooroibah and           affect the superannuation returns for ordinary
Noosa North Shore have highlighted the ever-           people.
present risk of bushfire. The combination of           A more direct form of economic transition risk is
higher average temperatures, more frequent             the transition from internal combustion engine
and longer heatwaves, and an overall drying            (ICE) cars to electric vehicles (EV). For example,
trend is likely to result in an increase in bushfire   a buyer of an ICE car may be expecting to
risks across certain areas of Noosa Shire.             re-sell the vehicle in several years for 50% of
                                                       the purchase price. However, they may receive
Transition risks                                       significantly less than this amount if future
                                                       buyers are only interested in purchasing an EV.
Not all risks associated with a changing
climate are related to the natural or physical         The existence of transition risks should not
environment. How society responds to the               be viewed as a reason to avoid actions to
threat of climate change can lead to ‘transition       avert climate change, but rather as an added
risks’. Transition risks are the result of steps       incentive to transition to a cleaner economy
taken primarily by governments, but also               and society more rapidly; a form of first-mover
individuals and businesses, to reduce carbon           advantage. Taking such steps in Noosa, sooner
emissions. Most transition risks are the result of     rather than later, is likely to minimise pressure
either regulatory or economic change.                  on future budgets for Noosa Council, and
                                                       potentially the community as well.
                                                       .

                                                                                                   Page 15

Section 16

          Noosa Shire Council




  The economic cost of climate change
  The costs of a changing climate are already being felt, and without action these are likely
  to increase significantly in the decades ahead.
  For example, the cost of extreme weather in Australia has more than doubled since 1970,
  totalling $35 billion over the past decade. By around mid-century, extreme weather events
  exacerbated by climate change, as well as the impacts caused by rising sea levels,
  could cost the Australian economy $100 billion every year. Figures regarding the potential
  economic cost to Noosa from climate change are not yet available.


  Climate impacts and risks for key local sectors
  Figures 1 – 5 illustrate how key sectors across the Noosa Shire are likely to be affected
  by a rapidly changing climate. It is common for the same or similar risks to be faced by
  multiple sectors.




              Increased public
               health burden




                                                                          Impact on tourism and reputation
                                                                            as a sustainable destination



                                                  Figure 1: Climate risks for Noosa’s business and economy




Page 16

Section 17

                                                                                Noosa Climate Change Response Plan




                                                                            Increased risk of localised
                                                                                 flooding of roads


Figure 2: Climate risks for Noosa’s transport system


                                                                   Changes to species
                                                                distribution and diversity




                                       Decreased provision of
                                   ecosystem services such as
                                  pollination, clean air and water




                                                                                                           Changes in extent and
                                                                                                            condition of native
                                                                                                                vegetation
                                                                                                          Impact on plant survival

Figure 3: Climate risks faced by biodiversity in Noosa
                                                                                                                              Page 17

Section 18

          Noosa Shire Council




                                              Increased disruption to
                                                agri-business due to
                                               seasonal changes and
                                                  rainfall patterns




                                                       Figure 4: Climate risks for Noosa’s agricultural sector




                       Figure 5: Climate risks for Noosa’s built environment, infrastructure, and community
Page 18

Section 19

Noosa Climate Change Response Plan




Noosa’s Carbon Emissions


                                               Page 19

77 CAE
 s ' ae      )    ' e                                                 mae
'   c oe       Tt A       |                    _—         ~s
Wes       ae        ;
     !           \                                Sa   rey = <h ee                                                              i 4
 he   aie    vee        Nh                     S                      :
ores              |                             -          ES    th    ree                                                       ;
       eee”             |                       :           3           :
he    ag     a                                =e           ES       .
4        a                                                                                                                     7
 :    a                                                                i.                                                     7
      »~ ®      wee                             i          .      y
 é     .    A      .                                |
      ;                                                                =
 Oy Bae oer                                                          os
    ; te a        »                             3        , we      |
     WE                                           LE         :
 Ae tS     oa                                     Oe os
      ; be                                    we po       &
 ne   tape:                                     ae!      Ss
    a  ai x a!       '
 Fy Ae       fe                                               :        :
 ;     )
   a    teas Be                |               :                      :
       POF                                      _          -          -
 Re                       ;
    PAT GS              ‘                       =            we
 i | “se                     }                   ; aS       ree  a =
be ved Sah. \         |                            |
 Ee, a.                  |                                             :
  yetrs   3                                                   3  .     ‘
      a i                                        *     nt “=   ae      ~
    We                           |                wee.      =
  iat                                                     “
 ;   pe     )                                                 4 =
  ‘aa a      ;          |
 ,  ; Ne                                        . f rn
     ani                 y                            ee NP.
 La tae                |                                    |    es
|   |      |                                                        tam
 :     : r                                                   e    Os = a rc
 - &                                                     «Sy , m= tes
   eae                                                         *
   |      |             |                       aoe         Ary     ar
    wr  iry                                        et a         ee ©
    - oe                        |
 a    aia    A,                                  oy,
LP    ae                                         a=
   Dele 1  uy
      aeeeey” .                                  -—        ASRS.     oy
 ey AEE -                                        ;                   o—
i    ’ 1 - :                                                           a
    ote                         |
 - >   ‘4                       |
 oo the
'   ete                                           _ 7
wat:      im
  we     :                                              bAP>
      ‘i                                                     Pea
 a    Me
    sie «Sader -
  Liat  +7                                                    |  |   |
a Wisc’                                             }   ; ;
 =. LPP  ae                                        m
   2       |                                              thet   Pr >
pes,  A  ht

                               S    Carbon                  Emi
           Noosa’                                                    ISSIO

  Tx                                             i : mL 7 Sa’ a oe,
    ,                                            ae     vm
ie
mr                                                  eS    oo
                                                           ea
                                                 a        ara
                                                    rae tien TO
                                                     i     eee
                                                        OO  a nn
                                                                    as

Section 20

            Noosa Shire Council




  Noosa Shire community emissions
  Community emissions have been estimated in accordance with the Global Protocol for Community-
  scale Greenhouse Gas Emission Inventories2 (GPC). The GPC is designed to promote best practice
  greenhouse gas accounting and reporting. The breakdown of Noosa Shire emissions is shown in
  Figure 6 below.
  Emissions from electricity consumption from the grid account for 58% of the total emissions, whilst
  transport emissions make up 33% and waste comprises 9% of total emissions.
  Council will regularly update this profile, however it should be noted that the actual quantum of
  emissions may change as more accurate and granular data becomes available on a community wide
  basis. Updated community emission profiles will be available on Council’s website.




                                                        Noosa
                                                    Community
                                                     Emissions




                              Figure 6: Breakdown of Noosa Community emissions profile




  2
      https://ghgprotocol.org/greenhouse-gas-protocol-accounting-reporting-standard-cities




Page 20

Section 21

                                                                           Noosa Climate Change Response Plan




Noosa Council emissions
Noosa Council calculates its own emissions from Council operations in accordance with the Climate
Active Carbon Neutral Standard for Organisations3. These emissions are reported annually.
Council emissions are also included in the community emissions profile. As Council reduces its own
emissions from its operations, it will be reflected in the community emissions profile.
Figure 7 shows Council’s corporate emissions over time, since the baseline year of 2015/16. There
has been an 11% reduction in Council’s total emissions since 2015/16 despite further categories
of emissions being added to Council’s emissions profile as data has become available. Council
has reduced its electricity consumption for its own buildings and facilities by 34% compared to the
baseline year as a result of the installation of over 600kW of rooftop solar, energy efficiencies and
staff behavioural change.
The most significant source of Council emissions (63%) is the landfill owned and operated by Noosa
Council that receives and manages the Noosa community’s residential and commercial waste.
Council’s waste management plan (in development) will deal with landfill emission reductions, as well
as reducing overall waste.




                             Figure 7: Noosa Council operation emission sources by year


3
    https://www.industry.gov.au/data-and-publications/climate-active-carbon-neutral-standard-for-organisations




                                                                                                                 Page 21

Section 22

          Noosa Shire Council




  What does Net Zero                                          Hence, reducing greenhouse gas emissions
                                                              is hugely important - but we can’t stop there.
  Emissions mean?                                             The end goal is to balance the scales and
  The target of ‘net zero emissions’ by 2026 for              restore the global climate to pre-climate change
  Council and the community refers to achieving               levels. To get there, we need to urgently reduce
  an overall balance between greenhouse gas                   greenhouse gas emissions to zero and then get
  emissions produced and greenhouse gas                       cracking on repairing past harm by drawing
  emissions taken out of the atmosphere.                      down past emissions.4

  Getting to net zero means we can still produce              “Unless we act decisively to phase out the
  some emissions, provided they are offset by                 use of fossil fuels, global temperatures will
                                                              exceed a 2oC-rise above the pre-industrial
  processes that reduce greenhouse gases
                                                              levels in a few decades. By 2030 the average
  already in the atmosphere. The more emissions
                                                              increase in global temperatures will reach
  we produce the more carbon dioxide we need
                                                              1.5oC, and the Earth’s climate system is likely
  to remove from the atmosphere to reach net
                                                              to begin to unravel. If we fail to act, dramatic
  zero. The process of removing carbon dioxide                destabilisation will be felt when the temperature
  is called carbon sequestration or drawdown.                 rise breaches 2oC, sometime before 2050.
  To meet the goal of net zero, new emissions must            Despair is not an option. Nor is selfish
  be avoided or as a minimum, maintained as low               complacency. Instead, this is the moment to ask
  as possible. This means that we need to rapidly             what you can do.”
  phase out the use of fossil fuels – coal, oil and           (Tim Flannery ‘The Climate Cure: Solving the
  gas – and transition to renewable energy.                   Climate Emergency in the Era of COVID-19)


  Why is net zero emissions                                   Why net zero by 2026
  important?                                                  Even if we limit global increases to 1.5oC, we
  Reaching and sustaining net zero emissions is               can still expect rapid and far-reaching changes
  important in order to restore the Earth’s energy            in our land and water resources, energy,
                                                              industry, buildings and transport. A target of
  balance and halt further global warming. The
                                                              ‘net zero emissions by 2026’ for the Noosa
  total amount of emissions released up until the
                                                              community is commensurate with what these
  point of reaching net zero will then determine
                                                              impacts mean, what the science is saying, and
  the level of warming that will result for decades
                                                              the urgency of the situation - irrespective of
  to come. The longer we wait, the harder it will             how difficult the target is to achieve.
  be to reach, and the more warming that will
  result.                                                     Achieving net zero emissions is a shared
                                                              responsibility. This plan outlines how Council
  Climate change isn’t a tap we can turn off once             is contributing to meeting this target with an
  we stop using fossil fuels. Carbon dioxide, the             increased focus on advocacy and mobilisation
  main contributor to climate change, will stay in            of the community. More broadly, social and
  the atmosphere and keep heating the planet for              economic transformation is required at all levels
  years and years.                                            of government and industry.



  4
   Climate Council https://www.climatecouncil.org.au/resources/what-does-net-zero-emissions-me
  an/?atb=DSA01b&gclid=Cj0KCQiAgomBBhDXARIsAFNyUqPLFjZu4r3nfCOpoZxsMo858cG_
  faBYzQyuPl1ocqNNKX7QSgRrMQIaAjxCEALw_wcB


Page 22

Section 23

Noosa Climate Change Response Plan




              Pathway to Zero Community
                           Community     Emissions
                                     Emissions Indicative Reduction Pathway
                           350000


                           300000


                           250000
            Tonnes CO2.e




                           200000


                           150000


                           100000


                            50000


                               0
                                      2020/21           2021/22          2022/23          2023/24          2024/25          2025/26         2026/27

                                             Electricity ‐ residential   Electricity ‐ Business     Transport        Waste & water

                                                     Figure 8: Community Emissions Indicative Reduction Pathway
              This graph shows an indicative pathway to net zero emissions for the highest emission sources contributing to the
              Noosa Community carbon footprint. It should be noted that this data is from 3rd parties and may be subject to error.
unity emissions graph estimated emissions pathway
              Council recognises that the Community emission profile is incomplete as the data is not yet available for the agriculture
              sector, nor the carbon drawdown potential of vegetation and landuse change. Council will update the emissions profile
aph shows the reductions required to be made in the most significant emission sources
              when this data is available, however it will not alter the main contributors to emissions herein.

osa Shire Emissions Opportunities                                                                  Barriers

 EmissionsElectricity
             from Agriculture              and Landuse Change have not yet• Cbeen                               estimated
          sources
                      • The National Electricity Grid is de-carbonising and the cost of                ost of emerging
 sourced from 3rd• electricity
                           party     modelled         data      and    is subject
                                    from renewable energy supply is becoming cheaper.
                                                                                       to   change        as data sources become
                                                                                                      technologies

te                       Council can have a role in assisting residents and businesses transition • Landlord take up of solar for
                          to renewable energy by:                                                     tenants including low income
                                      - Investigating renewable energy opportunities such as Power                      households
                                         Purchase Agreements (PPAs), micro grids and virtual power plants              • Electricity grid capacity to
                                      - Advocating to State and Federal governments to remove barriers and               absorb the excess solar
                                         enhance incentives                                                               electricity being generated
                                      - Providing assistance to the community to increase renewable energy
                                         and improve energy efficiency
                                    • Utilising expertise of community groups (eg. ZEN inc) to drive change.
                  Transport         • The electrification of the private transport sector is inevitable.               • Range of models and
                                    • Council can encourage Noosa residents and businesses to switch to                  perceived cost of EVs in
                                       electric vehicles (EVs) through:                                                   Australia
                                       - Provision of EV charging stations                                             • Consumer confidence in EVs
                                       - Lobbying State and Federal Government to remove structural barriers          • Lack of gov. incentives for
                                          and create incentives                                                           take up of EVs
                                    • Council can also help encourage a modal shift to walking, cycling and            • State gov run diesel bus
                                       public transport through a range of Transport Strategy initiatives                  fleet
                  Waste             • Council controls the Noosa landfill and can continue to implement and           • Cost and resources required
                                       upscale emission reduction initiatives by:                                         for different technologies
                                       - Continuing to improve landfill methane gas capture                               (eg anaerobic digesters for
                                       - Investigating organic waste reduction and reuse opportunities                    organic waste)
                                       - Continuing community waste education programs

                                                                                                                                                 Page 23

Noosa Climate Change Response Plan

Pathway to Zero Community Emissions

   350000

   300000

   250000
 y
© 200000
O
 Wn
 wo
 = 150000
 °
ke
   100000
    -                                                                        i              L
         0
               2020/21         2021/22        2022/23        2023/24        2024/25        2025/26        2026/27
                    Electricity - residential | m™Electricity- Business Transport m Waste & water
                             Figure 8: Community Emissions Indicative Reduction Pathway
This graph shows an indicative pathway to net zero emissions for the highest emission sources contributing to the
Noosa Community carbon footprint. It should be noted that this data is from 3rd parties and may be subject to error.
Council recognises that the Community emission profile is incomplete as the data is not yet available for the agriculture
sector, nor the carbon drawdown potential of vegetation and landuse change. Council will update the emissions profile
when this data is available, however it will not alter the main contributors to emissions herein.

  Emissions   Opportunities                                                            stolaalclasy
  sources
 Electricity | * The National Electricity Grid is de-carbonising and the cost of       * Cost of emerging
               electricity from renewable energy supply is becoming cheaper.            technologies
              * Council can have a role in assisting residents and businesses transition | * Landlord take up of solar for
               to renewable energy by:                                                  tenants including low income
               - Investigating renewable energy opportunities such as Power             households
                 Purchase Agreements (PPAs), micro grids and virtual power plants      * Electricity grid capacity to
               - Advocating to State and Federal governments to remove barriers and     absorb the excess solar
                 enhance incentives                                                     electricity being generated
               - Providing assistance to the community to increase renewable energy
                 and improve energy efficiency
              * Utilising expertise of community groups (eg. ZEN inc) to drive change.
 Transport | * The electrification of the private transport sector is inevitable.      « Range of models and
              * Council can encourage Noosa residents and businesses to switch to       perceived cost of EVs in
               electric vehicles (EVs) through:                                         Australia
               - Provision of EV charging stations                                     * Consumer confidence in EVs
               - Lobbying State and Federal Government to remove structural barriers | . | ack of gov. incentives for
                 and create incentives                                                  take up of EVs
              * Council can also help encourage a modal shift to walking, cycling and | « State gov run diesel bus
                public transport through a range of Transport Strategy initiatives       fleet
Waste         * Council controls the Noosa landfill and can continue to implement and | * Cost and resources required
               upscale emission reduction initiatives by:                               for different technologies
               - Continuing to improve landfill methane gas capture                     (eg anaerobic digesters for
               - Investigating organic waste reduction and reuse opportunities          organic waste)
               - Continuing community waste education programs
                                                                                                               Page 23

Section 24

Noosa Shire Council




  Responding to the Climate Emergency


Page 24

a?                                a                                    4	1	1	1	2	0	325	67	2940	151	-1	
5	1	1	1	2	1	325	109	54	55	46	Te
5	1	1	1	2	2	428	67	96	127	6	-
5	1	1	1	2	3	558	121	27	49	0	'
5	1	1	1	2	4	954	91	18	42	71	4
5	1	1	1	2	5	1767	73	52	145	2	4
5	1	1	1	2	6	1964	121	43	61	14	i
5	1	1	1	2	7	3177	121	88	49	15	7
4	1	1	1	3	0	286	260	3039	152	-1	
5	1	1	1	3	1	286	309	44	24	20	a
5	1	1	1	3	2	361	260	85	152	0	ee
5	1	1	1	3	3	2055	291	6	18	68	|
5	1	1	1	3	4	2880	296	64	55	32	6
4	1	1	1	4	0	361	327	2581	97	-1	
5	1	1	1	4	1	461	357	166	61	27	ee
5	1	1	1	4	2	1039	327	40	66	25	.
5	1	1	1	4	3	2261	339	36	85	10	i
5	1	1	1	4	4	2880	364	62	47	70	=
4	1	1	1	5	0	270	377	3055	137	-1	
5	1	1	1	5	1	361	412	133	78	46	ae
5	1	1	1	5	2	1873	424	13	12	7	4
5	1	1	1	5	3	2267	442	44	54	49	fa
5	1	1	1	5	4	2893	377	55	107	2	Dy
5	1	1	1	5	5	3241	430	84	84	0	t
4	1	1	1	6	0	363	484	2902	106	-1	
5	1	1	1	6	1	363	484	71	79	62	&
5	1	1	1	6	2	2249	502	90	73	16	‘a
5	1	1	1	6	3	2867	491	100	99	53	©)
5	1	1	1	6	4	3226	520	39	49	0	*
4	1	1	1	7	0	210	527	2734	221	-1	
5	1	1	1	7	1	210	581	11	54	5	:
5	1	1	1	7	2	2206	629	18	12	41	i
5	1	1	1	7	3	2242	527	158	187	60	¥
5	1	1	1	7	4	2880	600	64	148	48	:
4	1	1	1	8	0	210	672	2732	151	-1	
5	1	1	1	8	1	210	702	149	115	9	a
5	1	1	1	8	2	518	738	61	37	0	of
5	1	1	1	8	3	2194	678	85	133	40	ts
5	1	1	1	8	4	2418	726	66	73	52	A
5	1	1	1	8	5	2575	678	29	121	86	}
5	1	1	1	8	6	2828	672	114	151	28	iT
4	1	1	1	9	0	295	817	2649	104	-1	
5	1	1	1	9	1	295	817	320	85	4	oi
5	1	1	1	9	2	2236	847	25	24	2	*
5	1	1	1	9	3	2400	835	66	73	27	nat
5	1	1	1	9	4	2880	866	64	55	1	oD)
4	1	1	1	10	0	379	864	2904	104	-1	
5	1	1	1	10	1	428	914	127	48	42	a
5	1	1	1	10	2	2406	926	6	6	52	a
5	1	1	1	10	3	2874	864	48	96	47	OD
4	1	1	1	11	0	391	956	2553	79	-1	
5	1	1	1	11	1	426	956	26	42	0	-_
5	1	1	1	11	2	537	1023	6	12	13	7
5	1	1	1	11	3	2321	974	61	37	22	‘J
5	1	1	1	11	4	2880	963	64	54	56	av
4	1	1	1	12	0	214	1031	2728	137	-1	
5	1	1	1	12	1	214	1099	104	69	58	_
5	1	1	1	12	2	389	1041	51	85	19	by
5	1	1	1	12	3	537	1101	23	55	9	Fe
5	1	1	1	12	4	2858	1031	84	131	85	=
4	1	1	1	13	0	290	1262	2631	90	-1	
5	1	1	1	13	1	290	1283	5	6	34	1
5	1	1	1	13	2	671	1277	5	6	0	F
5	1	1	1	13	3	1091	1277	81	30	33	a
5	1	1	1	13	4	1208	1295	6	6	22	ee
5	1	1	1	13	5	1946	1319	17	30	10	,
5	1	1	1	13	6	2291	1301	6	18	78	i
5	1	1	1	13	7	2533	1313	6	6	21	;
5	1	1	1	13	8	2876	1262	45	90	0	OM
4	1	1	1	14	0	960	1253	1982	156	-1	
5	1	1	1	14	1	932	1255	71	141	0	-
5	1	1	1	14	2	2031	1253	139	145	0	i]
5	1	1	1	14	3	2303	1361	6	13	31	im)
5	1	1	1	14	4	2605	1362	337	47	18	12
4	1	1	1	15	0	1934	1419	1009	70	-1	
5	1	1	1	15	1	1934	1422	194	67	10	es
5	1	1	1	15	2	2862	1419	81	29	71	+
4	1	1	1	16	0	295	1476	2649	73	-1	
5	1	1	1	16	1	295	1482	84	49	0	*
5	1	1	1	16	2	1836	1476	62	67	47	ey
5	1	1	1	16	3	1911	1472	61	81	47	ry
5	1	1	1	16	4	2007	1543	6	6	52	=
5	1	1	1	16	5	2188	1507	73	12	25	sh
5	1	1	1	16	6	2400	1476	66	49	41	a
5	1	1	1	16	7	2880	1487	64	55	73	O
4	1	1	1	17	0	363	1452	2580	236	-1	
5	1	1	1	17	1	363	1573	28	55	0	*
5	1	1	1	17	2	712	1585	133	49	27	oi.
5	1	1	1	17	3	887	1579	97	49	27	=.
5	1	1	1	17	4	1166	1610	18	18	33	ol
5	1	1	1	17	5	1744	1545	75	99	47	fi
5	1	1	1	17	6	1898	1470	233	164	52	AE
5	1	1	1	17	7	2279	1452	175	236	35	si
5	1	1	1	17	8	2551	1610	18	12	0	L.
5	1	1	1	17	9	2587	1525	49	103	54	/
5	1	1	1	17	10	2862	1549	81	29	46	a
4	1	1	1	18	0	200	1621	2767	79	-1	
5	1	1	1	18	1	200	1664	36	14	31	=
5	1	1	1	18	2	391	1634	6	36	0	:
5	1	1	1	18	3	760	1634	115	54	36	oa
5	1	1	1	18	4	1250	1640	6	12	27	.
5	1	1	1	18	5	1696	1628	38	72	32	.
5	1	1	1	18	6	1940	1628	61	66	20	ae
5	1	1	1	18	7	2279	1640	18	30	42	4
5	1	1	1	18	8	2557	1634	85	48	35	ie
5	1	1	1	18	9	2880	1621	87	57	77	©)
4	1	1	1	19	0	209	1628	2733	205	-1	
5	1	1	1	19	1	349	1694	30	24	16	ene
5	1	1	1	19	2	984	1670	36	73	18	ee
5	1	1	1	19	3	1408	1682	59	36	0	e
5	1	1	1	19	4	1668	1670	91	67	22	i?
5	1	1	1	19	5	1904	1688	84	103	36	AY
5	1	1	1	19	6	2218	1664	188	169	31	ae
5	1	1	1	19	7	2497	1628	148	133	17	RN
5	1	1	1	19	8	2880	1692	62	47	0	o
4	1	1	1	20	0	193	1728	2751	112	-1	
5	1	1	1	20	1	193	1737	35	69	0	fe
5	1	1	1	20	2	289	1791	18	24	0	,
5	1	1	1	20	3	385	1737	61	66	2	'
5	1	1	1	20	4	619	1737	8	42	54	|
5	1	1	1	20	5	766	1749	73	36	78	iv
5	1	1	1	20	6	924	1815	5	6	70	|
5	1	1	1	20	7	1002	1749	6	6	0	H
5	1	1	1	20	8	1081	1755	42	54	70	*
5	1	1	1	20	9	1498	1773	6	6	82	j
5	1	1	1	20	10	1855	1797	67	24	41	Vs
5	1	1	1	20	11	1970	1761	12	24	37	‘
5	1	1	1	20	12	2121	1761	31	24	12	a
5	1	1	1	20	13	2376	1773	60	48	15	i
5	1	1	1	20	14	2491	1755	6	6	0	°
5	1	1	1	20	15	2535	1728	111	91	4	ei
5	1	1	1	20	16	2858	1757	86	83	21	a
4	1	1	1	21	0	199	1795	3048	73	-1	
5	1	1	1	21	1	199	1795	38	31	0	“
5	1	1	1	21	2	319	1827	6	6	0	:
5	1	1	1	21	3	912	1821	6	6	36	I
5	1	1	1	21	4	1135	1833	6	13	2	,
5	1	1	1	21	5	1408	1827	12	12	9	oi
5	1	1	1	21	6	1465	1822	16	46	24	i
5	1	1	1	21	7	1570	1817	39	51	48	re
5	1	1	1	21	8	1698	1839	12	19	84	4
5	1	1	1	21	9	1720	1822	40	46	41	a
5	1	1	1	21	10	1867	1821	6	12	29	a
5	1	1	1	21	11	2289	1817	26	51	37	il
5	1	1	1	21	12	2344	1821	26	37	35	al
5	1	1	1	21	13	2630	1839	6	7	0	:
5	1	1	1	21	14	2714	1817	26	51	21	yi
5	1	1	1	21	15	3241	1827	6	6	0	c
4	1	1	1	22	0	416	1737	2528	284	-1	
5	1	1	1	22	1	200	1737	1056	284	37	PS
5	1	1	1	22	2	1317	1773	284	157	34	SS
5	1	1	1	22	3	2339	1858	176	72	31	es
4	1	1	1	23	0	209	1926	2790	204	-1	
5	1	1	1	23	1	209	2001	28	76	65	3
5	1	1	1	23	2	307	2003	102	66	0	7
5	1	1	1	23	3	452	2009	48	54	0	.
5	1	1	1	23	4	567	2015	52	115	5	\
5	1	1	1	23	5	887	2015	25	54	0	‘
5	1	1	1	23	6	1099	1979	65	109	28	a
5	1	1	1	23	7	1208	2009	30	24	0	e.
5	1	1	1	23	8	1244	2021	18	12	22	,
5	1	1	1	23	9	1317	2003	36	72	0	.
5	1	1	1	23	10	1445	1979	27	106	10	Sf
5	1	1	1	23	11	1547	2033	30	6	51	ll
5	1	1	1	23	12	1607	1926	169	159	5	eal
5	1	1	1	23	13	1825	2009	309	66	18	1
5	1	1	1	23	14	2200	2015	230	66	29	be:
5	1	1	1	23	15	2880	1980	82	121	46	=
5	1	1	1	23	16	2993	2015	78	48	40	al
4	1	1	1	24	0	200	2075	2787	109	-1	
5	1	1	1	24	1	200	2083	95	41	32	Zh
5	1	1	1	24	2	416	2106	59	66	17	A
5	1	1	1	24	3	621	2075	23	37	25	oA
5	1	1	1	24	4	729	2076	84	99	46	Ss.
5	1	1	1	24	5	936	2106	42	54	0	.
5	1	1	1	24	6	1008	2112	59	34	34	on
5	1	1	1	24	7	1129	2088	62	78	38	ee
5	1	1	1	24	8	1281	2081	48	97	26	a
5	1	1	1	24	9	1390	2106	127	72	18	ao
5	1	1	1	24	10	1631	2075	19	25	77	4
5	1	1	1	24	11	1686	2136	18	12	36	‘
5	1	1	1	24	12	1837	2075	157	91	23	—
5	1	1	1	24	13	2043	2118	85	24	32	ae
5	1	1	1	24	14	2194	2088	42	90	9	5
5	1	1	1	24	15	2327	2094	96	60	4	“ona
5	1	1	1	24	16	2599	2100	43	84	0	:
5	1	1	1	24	17	2956	2124	31	30	35	7
4	1	1	1	25	0	464	2160	2680	123	-1	
5	1	1	1	25	1	555	2178	12	61	28	ee
5	1	1	1	25	2	664	2202	66	37	9	«A
5	1	1	1	25	3	1014	2190	49	43	11	ee
5	1	1	1	25	4	1383	2178	49	43	10	ir
5	1	1	1	25	5	1668	2215	12	12	44	die
5	1	1	1	25	6	1794	2168	59	115	11	WV
5	1	1	1	25	7	1904	2160	157	115	59	AG
5	1	1	1	25	8	2303	2172	42	37	34	ani
5	1	1	1	25	9	2472	2172	55	18	29	eae
5	1	1	1	25	10	2708	2233	6	6	12	:
5	1	1	1	25	11	2908	2215	6	6	32	‘
4	1	1	1	26	0	335	2219	2821	80	-1	
5	1	1	1	26	1	335	2245	62	50	37	a
5	1	1	1	26	2	534	2227	21	18	11	a
5	1	1	1	26	3	664	2245	6	6	70	.
5	1	1	1	26	4	718	2245	30	48	28	aa
5	1	1	1	26	5	1111	2239	6	6	30	:
5	1	1	1	26	6	1253	2220	48	71	1	Lf,
5	1	1	1	26	7	1396	2269	18	30	9	/
5	1	1	1	26	8	1492	2227	37	72	39	t
5	1	1	1	26	9	1631	2263	7	6	0	,
5	1	1	1	26	10	1759	2251	12	6	0	r
5	1	1	1	26	11	2138	2219	44	46	17	ma
5	1	1	1	26	12	2303	2287	30	12	69	=
5	1	1	1	26	13	2445	2220	50	65	6	ie
5	1	1	1	26	14	3120	2239	36	36	26	1
4	1	1	1	27	0	313	2360	2474	74	-1	
5	1	1	1	27	1	313	2390	236	42	39	aS
5	1	1	1	27	2	694	2384	30	36	51	A
5	1	1	1	27	3	948	2384	121	36	29	ENE
5	1	1	1	27	4	1148	2372	102	62	41	ote
5	1	1	1	27	5	1583	2360	115	74	36	7!
5	1	1	1	27	6	1777	2360	230	74	12	a
5	1	1	1	27	7	2097	2408	55	26	31	|.
5	1	1	1	27	8	2249	2378	242	56	22	SE
5	1	1	1	27	9	2714	2378	73	54	0	ea

Section 25

Noosa Climate Change Response Plan




Themes and strategic priorities
The following themes and strategic priorities have been identified to structure and direct climate risk
actions and emissions reduction opportunities for the Noosa community and Noosa Council.


                       Theme 1: Strong leadership and governance
                       1.1	Advocate to levels of government and mobilise the community to drive
                            decisive climate emergency action
                       1.2	Strengthen partnerships with governments and stakeholders to
                            take urgent action to achieve a low carbon economy and resilient
                            community
                       1.3	Move council from business-as-usual operations to adopting deep,
                            systemic change and being a powerful influencer and example of
                            climate action.


                       Theme 2: Energy efficiency and renewable energy
                       2.1	Transition Noosa Council and Noosa Shire to 100% renewable energy
                            and ensure the transition is inclusive of low income and vulnerable
                            residents and businesses, including strata tenants
                       2.2	Pursue energy efficiency and renewable energy measures within
                            Council and for Council owned buildings
                       2.3 	Develop a climate aware and empowered community for reducing
                             climate risks and emissions


                       Theme 3: Clean low emissions industries
                       3.1	Through targeted initiatives, create an environment that supports
                            business development, innovation and investment shift to clean,
                            green low emission industries and technology
                       3.2	Work with industry, business associations and government agencies
                            to facilitate emissions reduction and environmental sustainability for
                            local businesses


                       Theme 4: Sustainable Transport
                       4.1	Accelerate public and active transport infrastructure investment and
                            community usage through the implementation of Council’s Transport
                            Strategy and Walking and Cycling Plan.
                       4.2	Transition Council and the community to sustainable transport use
                            and zero-emissions vehicles


                                                                                                    Page 25

Noosa Climate Change Response Plan

Themes and strategic priorities
The following themes and strategic priorities have been identified to structure and direct climate risk
actions and emissions reduction opportunities for the Noosa community and Noosa Council.

                     Theme 1: Strong leadership and governance
                     1.1    Advocate to levels of government and mobilise the community to drive
                             decisive climate emergency action
                     1.2     Strengthen partnerships with governments and stakeholders to
                            take urgent action to achieve a low carbon economy and resilient
                             community
                     1.3     Move council from business-as-usual operations to adopting deep,
                             systemic change and being a powerful influencer and example of
                             climate action.

 (7      \           Theme 2: Energy efficiency and renewable energy
            )        2.1    Transition Noosa Council and Noosa Shire to 100% renewable energy
                             and ensure the transition is inclusive of low income and vulnerable
  ww | |                     residents and businesses, including strata tenants
                     2.2     Pursue energy efficiency and renewable energy measures within
                             Council and for Council owned buildings
                     2.3     Develop a climate aware and empowered community for reducing
                             climate risks and emissions

                     Theme 3: Clean low emissions industries
                     3.1    Through targeted initiatives, create an environment that supports
                             business development, innovation and investment shift to clean,
                             green low emission industries and technology
                     3.2    Work with industry, business associations and government agencies
                            to facilitate emissions reduction and environmental sustainability for
                             local businesses

                     Theme 4: Sustainable Transport
                     4.1    Accelerate public and active transport infrastructure investment and
                             community usage through the implementation of Council’s Transport
                             Strategy and Walking and Cycling Plan.
                     4.2    Transition Council and the community to sustainable transport use
                             and zero-emissions vehicles

                                                                                           Page 25

Section 26

Noosa Shire Council




                         Theme 5: Healthy and resilient natural systems and
                         carbon drawdown
                         5.1	Increase revegetation, ecosystems restoration and urban greening
                              to increase carbon drawdown, reduce urban heating and support
                              ecosystem and species resilience
                         5.2	Optimise use and management of water resources through integrated
                              water cycle management including drinking water, recycled water,
                              surface water and groundwater


                         Theme 6: Sustainable agriculture and food systems
                         6.1	Support agri-businesses and landholders to create a sustainable and
                              regenerative food system that includes consideration and preparation
                              for climate change risks
                         6.2	Promote sustainable, locally produced food and improve local food
                              access for farmers, residents, visitors and vulnerable people
                         6.3	Support agri-businesses and landholders to reduce their emissions
                              through changes in farming practices and technology implementation,
                              and to take up opportunities for income generation through carbon
                              drawdown activities.


                         Theme 7: Resilient and adaptive communities and
                         built environments
                         7.1	Create a resilient built environment for householders, businesses,
                              vulnerable people, property and infrastructure
                         7.2	Build Council and community awareness and preparedness for climate
                              change and extreme weather events


                         Theme 8: Zero waste and circular economy
                         8.1	Adopt circular economy principles to cut waste and pollution, keep
                              products and materials in use and regenerate natural systems.
                         8.2	Manage the landfill in accordance with best practice to minimise
                              greenhouse gas emissions
                         8.3    Minimise organic matter going to landfill from community waste




Page 26

Noosa Shire Council

          IN O            Theme 5: Healthy and resilient natural systems and
                          carbon drawdown
                          5.1    Increase revegetation, ecosystems restoration and urban greening
                                 to increase carbon drawdown, reduce urban heating and support
                                 ecosystem and species resilience
                          5.2    Optimise use and management of water resources through integrated
                                 water cycle management including drinking water, recycled water,
                                 surface water and groundwater

         o                Theme 6: Sustainable agriculture and food systems
                          6.1    Support agri-businesses and landholders to create a sustainable and
                                 regenerative food system that includes consideration and preparation
                                 for climate change risks
                          6.2    Promote sustainable, locally produced food and improve local food
                                 access for farmers, residents, visitors and vulnerable people
                          6.3    Support agri-businesses and landholders to reduce their emissions
                                 through changes in farming practices and technology implementation,
                                 and to take up opportunities for income generation through carbon
                                 drawdown activities.

       ®      D5          Theme 7: Resilient and adaptive communities and
              “)          built environments
                          7.4    Create a resilient built environment for householders, businesses,
                                 vulnerable people, property and infrastructure
                          1.2    Build Council and community awareness and preparedness for climate
                                 change and extreme weather events

        OXY               Theme 8: Zero waste and circular economy
                          8.1    Adopt circular economy principles to cut waste and pollution, keep
                                 products and materials in use and regenerate natural systems.
                          8.2    Manage the landfill in accordance with best practice to minimise
                                 greenhouse gas emissions
                          8.3    Minimise organic matter going to landfill from community waste

Page 26

Section 27

                                                            Noosa Climate Change Response Plan




Theme 1:
Strong leadership and governance
Why this is important
Responding to the climate emergency is a collective effort across all sectors of the community.
Council has a unique role to lead by example for the community, other councils and levels
of government. By showing powerful leadership and governance, Council can inspire and
support others to integrate climate emergency responses into their daily activities and longer-
term plans. This means moving from community engagement and education to mobilisation of
the broader community, as well as stronger, political and strategic advocacy.
Council has engaged the community through education campaigns around solar power and
energy efficiency and working with community groups such as Zero Emissions Noosa Inc
(ZEN Inc). This is important and ongoing work. However, Council is broadening its reach and
influence to drive collective action, not just individual action.


How we’ll achieve this
Through this Climate Change Response Plan, Council will assess local climate risks, help
coordinate responses for the Council and local community, and monitor change and progress
over time. Embedding consideration of climate change within all Council departments,
including procurement processes, key policy documents and decisions, including the
corporate plan and staff performance plans is an ongoing priority.
Council will continue to advocate for climate action and strengthen partnership opportunities.
This includes advocacy with other local governments through Climate Emergency Australia to
provide a collective voice for strong action on climate change. An advocacy and community
mobilisation plan will be prepared to establish positions on a range of state and federal issues
and to help support local community groups to develop their own climate advocacy programs
for promoting positive climate action across the different sectors of the Sunshine Coast.
A climate change community reference group will be established to guide and provide advice
on the implementation of the Climate Change Response Plan. As part of this, Council will
continue to collaborate with local community groups and business associations through the
existing Zero Emissions Noosa Memorandum of Understanding.
Strengthening regional partnerships and collaborating across neighbouring councils to identify
and respond to common climate risks and to build a low carbon economy will also bring
important regional benefits.




                                                                                               Page 27

Section 28

Noosa Shire Council




    Strategic Priorities
    The following strategic priorities are identified for Strong Leadership and
    Governance:
    1.1	Advocate to levels of government and mobilise the community to drive
         decisive climate emergency action
    1.2	Strengthen partnerships with governments and stakeholders to take action to achieve a
         low carbon economy and resilient community
    1.3	Move council from business-as-usual operations to adopting deep, systemic change and
         being a powerful influencer and example of climate action.
    Specific actions for implementation through this Climate Change Response Plan are identified
    in the Summary of Actions.


    Targets
    By 2026, 70% of survey respondents have a high understanding of climate change and what
    they can do to reduce their emissions and adapt to impacts


    Metrics
    •      Climate change advocacy actions and the effectiveness of this advocacy
    •	% survey respondents that understand the topic of climate change and
       what it means for Noosa Shire and themselves
    •      Number of events and promotion activities
    •	Number of projects involving Traditional Owners and incorporating First
       Nations knowledge
    •	Number of partnerships/collaborations with governments and other stakeholders for
       responding to climate change
    •	Number of corporate and operational policies that have incorporated a climate response
    •	Number of strategies and plans that have incorporated climate response objectives and
       actions
    •	Number of staff training and capacity building activities


    Partnerships
    There are broad ranging areas that Council will extend its advocacy work
    through existing networks including Climate Council, Climate Emergency
    Australia, SEQ Council of Mayors, Tourism Noosa, Zero Emissions Noosa Inc,
    Food and Agri-business Network, Cleantech Sunshine Coast, Cities for Power Partnership,
    LGAQ Queensland Climate Resilient Councils, Planning Institute of Australia, Engineers
    Australia, Queensland Coastal Councils, and Youth Council, amongst others.




Page 28

Noosa Shire Council

                                                                                             soa
      Strategic Priorities                                                                (     )
      The following strategic priorities are identified for Strong Leadership and       *   O       *
                                                                                        a           os

      Governance:                                                                         1 °
      1.1 Advocate to levels of government and mobilise the community to drive                 SF
          decisive climate emergency action
      1.2 Strengthen partnerships with governments and stakeholders to take action to achieve a
          low carbon economy and resilient community
      1.3 Move council from business-as-usual operations to adopting deep, systemic change and
          being a powerful influencer and example of climate action.
      Specific actions for implementation through this Climate Change Response Plan are identified
      in the Summary of Actions.

      Targets
      By 2026, 70% of survey respondents have a high understanding of climate change and what
      they can do to reduce their emissions and adapt to impacts

      Metrics                                                                                 4
      *   Climate change advocacy actions and the effectiveness of this advocacy
      °   % survey respondents that understand the topic of climate change and             aw
          what it means for Noosa Shire and themselves                                       ro,
      ¢   Number of events and promotion activities
      °   Number of projects involving Traditional Owners and incorporating First
          Nations knowledge
      °   Number of partnerships/collaborations with governments and other stakeholders for
          responding to climate change
      °   Number of corporate and operational policies that have incorporated a climate response
      °   Number of strategies and plans that have incorporated climate response objectives and
          actions
      °   Number of staff training and capacity building activities
      Partnerships                                                                          @
      There are broad ranging areas that Council will extend its advocacy work
      through existing networks including Climate Council, Climate Emergency                 tif:
     Australia, SEQ Council of Mayors, Tourism Noosa, Zero Emissions Noosa Inc,
      Food and Agri-business Network, Cleantech Sunshine Coast, Cities for Power Partnership,
      LGAQ Queensland Climate Resilient Councils, Planning Institute of Australia, Engineers
     Australia, Queensland Coastal Councils, and Youth Council, amongst others.

Page 28

Section 29

                                                              Noosa Climate Change Response Plan




Theme 2:
Energy efficiency and renewable energy
Why this is important
Stationary Energy comprises 58% of Noosa Shire’s emissions profile. Emissions from stationary
energy are predominantly from electricity generated from coal fired power stations and small
amounts from natural and liquified petroleum gas (LPG). Reducing emissions from stationary
energy includes improving energy efficiency, reducing energy demand and switching to
renewable energy supply.
It has been estimated that $77 million per year leaves the shire to pay for electricity generated
elsewhere. The renewable energy revolution is underway and the costs of renewable energy
continue to fall. Transitioning to renewable energy across the shire will significantly reduce
emissions and costs to Council, households and businesses. This is also a significant
opportunity for business development, economic growth and employment within Noosa.
Renters and low-income households are often locked out of the transition to renewable
energy and options to reduce energy demand such as more energy efficient appliances. It is
important that the programs to reduce electricity demand and the take up of renewable energy
is inclusive of this sector. Improving the energy efficiency of homes has co-benefits of freeing
up capital to be used on other essential expenses and makes homes more resilient to the
impacts of climate change such as increased heat.


How we’ll achieve this
Council is responsible for its own buildings and facilities including those buildings that are
leased to commercial or community tenants. Emissions from these buildings can be reduced
by reducing demand, improving energy efficiency, and switching to renewable energy sources.
To this end, Council will continue to invest in its own buildings and facilities to reduce emissions
from stationary energy and encourage tenants to improve energy efficiency and take up of
renewables through their leasing arrangements, grant opportunities and education.
Council will also support and assist the greater Noosa community to improve energy efficiency
and make the switch to renewable energy through education; facilitating the uptake of
renewable energy solutions via grants and expert advice; enabling access to energy solutions
to vulnerable residents of our community; and showcasing the positive actions of those within
the community that are reducing emissions from stationary energy.
Council will undertake further analyses of the options available to achieve 100% renewable
energy for Noosa Shire.




                                                                                                    Page 29

Section 30

          Noosa Shire Council




    Strategic Priorities
    The following strategic priorities are identified for Energy Efficiency and
    Renewable Energy:
    2.1	Transition Noosa Council and Noosa Shire to 100% renewable energy and
         ensure the transition is inclusive of low income and vulnerable residents and
         businesses, including strata tenants
    2.2 	Pursue energy efficiency and renewable energy measures within Council and for
          Council owned buildings
    2.3	Develop a climate aware and empowered community for reducing climate risks and
         emissions
    Specific actions for implementation through this Climate Change Response Plan are
    identified in the Summary of Actions.


    Targets
    By 2026, all Council facilities will be powered by 100% renewable energy/
    net zero emissions energy
    By 2026 Noosa Shire is powered by 100% renewable energy/net zero
    emissions energy
    By 2026, community awareness and empowerment to reduce emissions
    from stationary energy is increased.


    Metrics
    •      kW of renewable energy within the Noosa community
    •      kW of renewable energy generated for Council operations
    •      Number of Council facilities powered by 100% /net zero renewable energy
    •      Number of households completing energy audits
    •      Number of community alliance grants provided for climate change initiatives
    •      % of households powered by renewable energy
    •      % of businesses powered by renewable energy
    •      % reduction in community energy use


    Partnerships
    Council engages with a number of community and business groups including
    ZEN Inc, Clean Tech Sunshine Coast and other industry networks. Council will
    continue to review opportunities to partner with other entities on a local and
    regional basis to make renewable energy available to the Noosa Shire.




Page 30

Section 31

                                                                    Noosa Climate Change Response Plan




Theme 3: Clean low emissions industries
Why this is important
Economic recovery post COVID-19 brings opportunities for industry and governments to
invest in initiatives that create clean low emissions jobs and set communities up for the future
- a recovery that supports the environmental industries sector1 and tackles the challenges of
climate change. The actions we take now must create an economic environment for innovation
where new technology and industries form part of the climate change solution and help make
communities more resilient and sustainable.
Noosa is in a unique and opportune position to leverage its clean green brand to attract and
drive investment in clean low emissions industries and to showcase best practice sustainability
and climate solutions. This means aligning economic activity and tourism promotion with the
vision of making Noosa the preferred destination for clean, green business investment and
clean tech industries.
This also includes supporting local businesses to be more sustainable through encouraging
decarbonisation, energy efficiency upgrades, and waste minimisation.


How we’ll achieve this
Council will help create a strong, clean economy for Noosa by exploring opportunities and
barriers to developing the environmental industries sector, through the development of
Council’s revised Economic Strategy (local economic plan). This will improve understanding
of how best to grow environmental industries in Noosa that are high impact (create jobs and
diversify the economy), leverage existing investment, are targeted for beneficial change, and
are timely for rapid job creation and economic recovery.
Council will actively work with local businesses to encourage participation in programs that
improve energy efficiency and sustainability, in partnership with Tourism Noosa, ZEN Inc and
other community groups.




1
    Environmental industries consist of companies and organisations which carry out economic activities aimed at
     protecting the environment and managing natural resources, including waste management, wastewater treatment,
     limiting noise nuisance, correcting environmental damage, and production of cleaner technology products and
     services, such as production of renewable energy, electric transport and energy saving activities.



                                                                                                           Page 31

Section 32

          Noosa Shire Council




    Strategic Priorities
    The following strategic priorities are identified for Clean Low Emissions Industries:
    3.1	Through targeted initiatives, create an environment that supports business
         development, innovation and investment shift to clean, green low emission
         industries and technology
    3.2	Work with industry, business associations and government agencies to
         facilitate emissions reduction and environmental sustainability for local businesses
    Specific actions for implementation through this Climate Change Response Plan are identified in the
    Summary of Actions.


    Targets
    By 2026, the number of businesses in the environmental industries sector
    has increased
    By 2026, the energy efficiency and ecological sustainability of business in
    Noosa has increased


    Metrics
    •     No. of businesses in the environmental industries sector ((2021 baseline)
    •	No. of businesses participating in energy efficiency and sustainability
       programs


    Partnerships
    Council partners with a number of industry and community groups to
    diversity and grow a strong and clean economy including Cleantech
    Sunshine Coast, Tourism Noosa, Food and Agri-business Network.
    A collaborative approach to climate action and environmental industry
    development will help with sharing knowledge, making efficient use of resources, reducing
    duplication of effort/costs, scaling up successful local projects, and attracting partners and funding.
    Council will pursue and develop regional partnerships to drive low emissions industry investment for
    the broader Sunshine Coast region and beyond.




Page 32

Section 33

                                                              Noosa Climate Change Response Plan




Theme 4: Sustainable Transport
Why this is important
Transport is the second largest source of emissions in Noosa Shire and is responsible for
33% of our community emissions. Moving towards sustainable transport will bring huge
benefits for emissions reduction. This means reducing reliance on car travel in Noosa,
switching to low/zero-emissions vehicles, increasing uptake of active transport like walking and
cycling, improved pathway connectivity, adopting zero carbon public transport systems, and
supporting working from home and home-based businesses.
These changes will provide broad-ranging benefits including more convenient ways for locals
and visitors to travel, reduced congestion, improved health and wellbeing for individuals, and
job creation opportunities. Sustainable transport will also contribute to Noosa’s reputation as a
sustainable, clean, green destination by reducing fossil fuel use and keeping up with changing
technology.


How we’ll achieve this
Council is responsible for local roads and public parking and sets carparking design
requirements for new developments. Public buses are run by the State Government
Department of Transport through TransLink. A number of private bus companies provide
customer specific transport services to and within the shire. Addressing the barriers to the take
up of active transport and public transport due to high dependency on private vehicles and
Noosa’s dispersed settlement pattern is a key challenge. Climate change makes the task all
the more urgent.
Through the Noosa Shire Transport Strategy and the Walking and Cycling Plan, Council is
accelerating public and active transport investment and take-up by:
•	Encouraging a modal shift away from private car use towards active transport modes
   and public transport through behaviour change programs and improved pathways and
   connections
•	Addressing the transport emissions of over 2 million visitors to Noosa per year through
   consultation with relevant stakeholders to establish parking controls and public transport
   alternatives
•	Increasing public transport use through improved services and increased bus services to
   the hinterland
•	Partnering with government agencies and transport providers to explore and enable the
   replacement of diesel buses with electric/zero emission buses in Noosa
•	Partnering with transport providers to explore and enable the uptake of electric bikes and
   personal mobility devices
•	Increasing parking management controls in congested areas through timed and paid
   parking through timed and paid parking, with revenue to go towards sustainable transport
•    Expanding the pathway network in urban and hinterland areas
•    Rolling out electric vehicle charging stations at major Noosa destinations
•	Amending the Noosa Plan 2020 to include requirements for new multi-residential and non-
   residential developments for carparking areas to be ‘EV ready’.
                                                                                                    Page 33

Section 34

          Noosa Shire Council



    Council’s fleet emissions are less than 2% of total Council emissions. Transitioning Council’s fleet
    to zero-emissions vehicles where fit-for purpose demonstrates leadership to the community but has
    an insignificant impact on Council’s overall emissions. Also needed is ongoing behaviour change
    programs aimed at encouraging staff to walk, cycle, use public transport, scooter and carpool to
    work by promoting the multiple health and environmental benefits.


    Strategic Priorities
    The following strategic priorities are identified for Sustainable Transport:
    4.1	Accelerate public and active transport infrastructure investment and
         community usage through the implementation of Council’s Transport
         Strategy and Walking and Cycling Plan.
    4.2	Transition Council and the community to sustainable transport use and zero-emissions vehicles.
    Specific actions for implementation through this Climate Change Response Plan are identified in the
    Summary of Actions.


    Targets
    By 2026, electric vehicle charging stations will be installed at all major
    Noosa destinations to support the transition to EVs
    By 2026, public transport services in Noosa have improved and meets
    minimum standards from the Transport Operations Act.


    Metrics
    ·     % modal shift to walking and cycling in key urban areas and in hinterland towns
    ·     % increase of children walking and riding to school and using school buses
    ·	% increase in electric micro-mobility devices/e-wheeling devices (e-bikes,
       e-scooter, e-skateboards etc.) in use by residents and visitors
    ·     % increase in public transport use
    ·     % increase in electric vehicle ownership
    ·     kms of sealed cycling and walking pathways
    ·     Number of staff that participate in walk/cycle-to-work day
    ·     Number of EV charging stations in Noosa Shire for vehicles and e-bikes
    ·	Electric vehicle infrastructure factored into development requirements
       eg. for multi residential and non-residential developments


    Partnerships
    Accelerating sustainable transport requires strong advocacy and partnerships
    with government agencies and transport providers including Translink to future
    proof Noosa and connect communities. Council will continue to work with other
    community partners such as ZEN Inc, Tourism Noosa, Electric Vehicle Council
    and universities to help drive positive change and implement zero emissions transport solutions.


Page 34

Section 35

                                                           Noosa Climate Change Response Plan




Theme 5: Healthy and resilient natural
systems and carbon sequestration
Why this is important
Climate change will impact biodiversity, water resources and natural systems in many ways.
Restoring ecosystems also present huge opportunities to remove greenhouse gases from
the atmosphere, create jobs, support tourism, increase resilience of our native ecosystems,
improve health and wellbeing through recreation and connection with nature, and improve
heat-related impacts in our urban areas.
Changing temperature and rainfall trends and increasing risks of extreme weather events are
creating significant impacts for Noosa’s biodiversity and natural systems that will exacerbate
existing threats. These changes are already being observed in the natural environment.
Bushfires made worse by dry conditions across parts of Noosa Shire in the 2019/20 summer
had devastating consequences for local ecosystems and highlighted the vulnerability of these
natural assets.
Vegetation, soil and oceans are vital ‘sinks’ for absorbing greenhouse gases from the
atmosphere and storing them long term. Establishing restoration plantings to offset corporate
carbon emissions or to compensate for vegetated cleared elsewhere has broad ranging
benefits for the environment and for businesses and community groups that may partner in the
restoration efforts.


How we’ll achieve this
The Noosa Environment Strategy addresses many of the threats and impacts to biodiversity
and natural systems arising from the Climate Emergency. A range of initiatives are underway to
increase habitat, landscape connectivity, riparian buffers and ecosystem health.
Council will continue to build on this and improve vegetation and bushfire management
practices to address climate risks, as well as take-up opportunities for maximising carbon
drawdown through tree planting and ‘blue carbon’ restoration initiatives. This includes
increasing revegetation and ecosystems restoration around waterways and along connecting
habitat areas. Enhancing tree canopy cover in urban areas will be important for reducing urban
heat stress, increasing carbon drawdown, and reducing energy needed to keep internal and
external building spaces cool. A further initiative includes converting gardens to more drought
tolerant native gardens to reduce plant loss, and irrigation needs, increase habitat and food
for local wildlife. The development of a Coastal Foreshore Management Plan will provide
for a dedicated program of foredune restoration and management in partnership with local
bushcare groups. The Nature Conservancy (TNC) in partnership with Noosa Council continue
to investigate opportunities for seagrass restoration in the Noosa River.




                                                                                              Page 35

Section 36

          Noosa Shire Council




    Strategic Priorities
    The following strategic priorities are identified for this theme:
    5.1	Increase revegetation, ecosystems restoration and urban greening to increase
         carbon drawdown, reduce urban heating and support ecosystem and species
         resilience
    5.2	Optimise use and management of water resources through integrated water cycle
         management including for drinking water, recycled water, surface water and groundwater
    Specific actions for implementation through this Climate Change Response Plan are identified in the
    Summary of Actions.


    Targets
    Environment Strategy target: By 2030, half of all land in Noosa Shire is
    managed for its environmental values (% in 2020)
    By 2030, 50% of mapped riparian buffers along waterways have vegetation
    coverage (42% in 2018)
    By 2030, vegetation will be in place to increase canopy cover and shade
    to 45% of public open spaces in urban environments


    Metrics
    •      % urban canopy cover
    •      % change in estimated annual carbon drawdown by Noosa vegetation
    •      % of Noosa Shire managed for its environmental values
    •	% of mapped riparian buffers along waterways that have vegetation coverage (42% in 2018)
    •      No. Land for Wildlife properties and Voluntary Conservation Agreements
    •      Recycled water connections or uses in Noosa Shire


    Partnerships
    Extensive community effort is directed towards protecting, maintaining, and
    restoring our natural environments. Many environment groups are actively
    involved in caring for Noosa’s bushlands, wildlife, coasts and waterways,
    including hundreds of volunteers.
    There are important benefits in greater collaboration between property owners,
    governments, community groups, businesses and infrastructure providers - working together to
    improve the resilient of natural areas in the face of warmer and drier conditions.

Page 36

Section 37

                                                               Noosa Climate Change Response Plan




Theme 6:
Sustainable agriculture and food systems
Why this is important
Local agricultural systems in Noosa are generally small-scale but diverse. Cattle grazing is the
largest subsector in the shire and a variety of small to medium-scale horticultural crops are
also spread across the region including macadamia nuts, coffee, and a mix of various fruit and
vegetables. Short value chains for local food are growing with an increasing number of growers
marketing direct to the public through farmers markets or providing produce to local restaurants. In
2018/19 the local agricultural industry added $49.7 million to the local economy, or 2.2% of the total
gross regional product (GRP) while employing 1.4% of Noosa’s workforce (economy.id 2020).
Changing temperature and rainfall trends and increasing risks of extreme weather events are
creating significant hazards for Queensland’s agriculture sector that will escalate and exacerbate
existing risks that farm businesses already face. This will impact on food security for Queensland
and the nation.
Changing climate also brings opportunities. For example, vegetable growers producing summer
crops may have the additional option of planting earlier, and later, therefore extending the
production season. Runoff from higher intensity rainfall events may, with careful planning and
adequate infrastructure, provide opportunities for growers to capture more water for irrigation.
As a community, we can reduce emissions and adapt to climate change by supporting
sustainable regenerative agriculture in Noosa and by encouraging the availability and
consumption of fresh locally produced food.
Changes in climate conditions require constant adapting to remain productive and viable. Early
adoption of climate-smart agricultural practices will put enterprises in the best position to deal
with climate risks and extreme weather. This includes increasing the organic matter in soils to
increase the carbon taken up in the soils. This has added benefits of higher fertility levels, better
water retention and prolonged resistance to drought.
There is also considerable cost savings to be gained by implementing on-farm emission reduction
and there are benefits for income generation for farmers through carbon drawdown practices
such as restoring soil health, planting native trees, and managing livestock.


How we’ll achieve this
The Noosa Environment Strategy addresses the challenges and environmental threats relating
to agriculture in Noosa Shire, as well as opportunities for better managing agricultural areas to
ensure adaptive and sustainable food production that increases agricultural productivity and
protects the natural environment.
Council will investigate opportunities to encourage rural landholders to increase soil carbon
drawdown through sustainable agricultural practices and tree planting. Council will also continue
to support onground actions and education with landholders to improve their capacity to manage
climate risks. Providing support for local food producers to help promote and connect supply
chains to consumers is also a priority to help grow businesses and ensure fresh local food supply.

                                                                                                        Page 37

Section 38

          Noosa Shire Council




    Strategic priorities
    The following strategic priorities are identified for this theme:
    6.1	Support agri-businesses and landholders to create a sustainable and
         regenerative food system that includes consideration and preparation for
         climate change risks
    6.2	Promote sustainable, locally produced food and improve local food access
         for farmers, residents, visitors and vulnerable people
    6.3	Support agri-businesses and landholders to reduce their emissions through changes in
         farming practices and technology implementation, and to take up opportunities for income
         generation through carbon drawdown activities.
    Specific actions for implementation through this Climate Change Response Plan are identified in
    the Summary of Actions.


    Targets
    Environment Strategy target: By 2030, 80% of all grazing land achieves
    best practice management for agriculture
    By 2026, the knowledge and capacity of local food and agribusinesses to
    prepare for climate risks and take up carbon reduction opportunities has
    increased


    Metrics
    •	Number of farmers participating in on-ground actions through land
       management programs
    •	Number of local producers promoted or accredited as being
       ‘sustainable’ or an equivalent.


    Partnerships
    Council will continue to work with the Food and Agri-Business Network,
    Regenerative Agriculture Alliance, Country Noosa, Noosa Landcare and other
    organisations to improve support for agri-business and encourage take-up of
    sustainable agriculture.
    Strengthening regional partnerships across councils will provide important
    benefits to the broader agricultural industry through increased collaboration and sharing of
    knowledge and resources.
    The establishment and enhancement of industry networks will allow the continual advancement
    of knowledge and sharing of best practice to help move the sector towards a state of
    adaptability and sustainability.


Page 38

Section 39

                                                            Noosa Climate Change Response Plan




Theme 7: Resilient and adaptive
communities and built environments
Why this is important
Climate change will result in very real impacts on the physical environment, water resources,
health and human services, the local economy and communities. Homes, businesses and
community infrastructure will experience the effects of more extreme weather, bushfires, coastal
hazards, flooding, and heatwaves. These hazards put increased pressure on emergency
services and pose increased risks to people, including from increased vector borne diseases,
mental health, blackouts and power shortages. These impacts are likely to be felt most by those
already vulnerable such as the elderly and low-income earners.
We are already experiencing detrimental changes to our climate and built and natural
environments. These effects will worsen over time.
Adapting to a changing climate involves adjusting to short duration events such as cyclones,
floods and fires, as well as gradual changes such as sea level rise. Community resilience is
the ability to not only cope with the impacts but to adapt and recover. Increasing the resilience
of individuals, businesses and the community requires risk awareness, disaster preparedness,
careful planning and management to help minimise risks and recover and adapt more easily.
Increasing the resilience and adaptive capacity of our communities and the built environment
is about designing places, buildings and infrastructure to be more adaptive and sustainable,
creating more comfortable and safe homes and workplaces, and reduced emissions and
energy costs.


How we’ll achieve this
Council can support the community to increase resilience to climate change through building,
infrastructure and landscape design that is responsive to the subtropical climate, and that is
resource efficient for energy, water and materials, and minimises emissions. The Noosa Plan
2020 planning scheme (including planning scheme policy 5) sets standards for sustainable,
subtropical design. These standards will be built upon to ensure that design outcomes increase
the resilience and comfort of building occupants from climate risks, such as extreme heat.
The development of climate responsive design guidelines will help provide support to the
planning scheme, place making, asset management and infrastructure design. Localised
assessments of climate risk, such as flooding, inundation and urban heat risk, will also help
build understanding of appropriate design responses required for high-risk locations, including
along foreshore areas subject to sea level rise and inundation risks.
Council is responsible for its own capital works program which includes new buildings.
Buildings need to be designed and constructed to meet the 6 Star Green Building Standard
and national standards for carbon neutral buildings.




                                                                                                Page 39

Section 40

          Noosa Shire Council




    Council seeks to build awareness and preparedness for extreme weather events through disaster
    management planning and response, development requirements, and resilient infrastructure
    design and delivery. Individuals and households are encouraged to develop and maintain up
    to date emergency action plans and Council collaborates with the State government as part of
    the Get Ready program. Providing resilient community infrastructure and safe refuge spaces for
    extreme weather events that are accessible to all community members is an ongoing priority.
    Involving health and family violence experts in emergency planning and response coordination
    and ensuring adequate access to health services including mental health and family violence
    services is also critical.




    Strategic Priorities
    The following strategic priorities are identified for this theme:
    7.1	Create a resilient built environment for householders, businesses and
         vulnerable people, property and infrastructure
    7.2	Build Council and community awareness and preparedness for climate
         change and extreme weather events
    Specific actions for implementation through this Climate Change Response Plan
    are identified in the Summary of Actions.


    Targets
    Environment Strategy target: By 2030, sustainable building outcomes
    are delivered through regulation, education and showcasing best
    practice design.
    Environment Strategy target: By 2030, community awareness, planning
    and preparedness for natural hazards and climate change is increased
    By 2026, 60% of people in Noosa have a very good understanding of climate change




Page 40

Section 41

                                                              Noosa Climate Change Response Plan




Metrics
•	% respondents that understand the topic of climate change and what
   it means for Noosa and themselves. (In 2019 almost four fifths of
   respondents (79%) either understood climate change reasonably well
   (41%) or had a very good understanding of climate change (38%).
•	% respondents aware of the level of risk posed by climate change
   and natural hazard events with respect to heatwaves, drought, flooding, beach erosion,
   stormtide, tropical diseases, extreme weather (2019 baseline available)
•	% respondents that are prepared for the risks of climate change and natural hazards
   with respect to heatwaves, drought, flooding, beach erosion, stormtide, tropical diseases,
   extreme weather (2019 baseline available)
•	% respondents that are prepared for a disaster or emergency and have an emergency plan.
   (In 2017 60% of respondents had a disaster management plan in place for a flood or fire,
   increasing to 66% in 2019).
•	Climate change and heat risks factored into land use planning.
•    Number of Council buildings that achieve a 5 Star or above under the Green Building
      Council of Australia rating scheme or equivalent.


Partnerships
Council will continue to work with representatives of the Local Government
Association of Queensland, other councils participating in the Queensland
Climate Resilient Councils initiative, State agencies, and key infrastructure
services delivery partners, such as Unity Water, SEQWater and electricity providers.




                                                                                                Page 41

Section 42

           Noosa Shire Council




    Theme 8:
    Zero waste and circular economy
    Why this is important
    Our current linear economic model of take-make-waste results in the excess use of resources,
    land and water pollution, and vast amount of waste going to landfill once products are no longer
    deemed necessary. In a circular economy, raw materials enter a cycle wherein their value is
    maintained throughout their life cycle.
    Around 79000 tonnes of waste is taken to the Noosa Landfill each year. Of this 48% is reused
    or recycled, whilst the rest (41,000 tonnes) is buried in the landfill. Material that is dumped into
    landfill is a lost resource and a source of carbon emissions.
    When organic matter (food, green waste, paper, etc) is sent to landfill, it is decomposed under
    anaerobic conditions. As the organic matter decomposes, it releases methane. Methane is 28
    times more potent as a greenhouse gas than carbon dioxide. Emissions from landfill comprise
    over 60% of Council’s corporate emissions and around 9% of the Noosa community emissions.
    The degradation of organic waste in landfills is a complex series of chemical and biological
    reactions. Landfill gas is currently extracted from the Noosa Landfill, and flared, converting the
    methane into carbon dioxide. Methane from landfill gas can also be used to generate electricity.
    Landfill conditions, weather conditions, age of the waste and gas extraction equipment
    productivity will all affect the methanogenic bacterial action and hence the resultant landfill gas
    that is captured.
    By moving from a take-make-waste system linear system to the circular economy, resources are
    used many times over, the nutrients from organic material are captured, land required for waste
    disposal is reduced, and the costs throughout the system overall are lower.


    How we’ll achieve this
    Council is responsible for the collection and processing of the community’s waste. The landfill
    operations and the landfill gas system is managed by Council in partnership with its contractor.
    A waste management plan is being developed to determine the most effective management
    methods for the collection and processing of waste and the management of the landfill.
    Council is also responsible for the generation of waste within its own operations and can
    increase demand for recycled products through its own procurement practices.
    Council has a role in influencing how the community reduces its waste generation and the
    amount of waste ending up in landfill through the provision of appropriate infrastructure such as
    bins and collection services and through providing and supporting community waste reduction
    education and behaviour change initiatives with businesses and households. As part of this,
    Council supports and promotes programs such as Plastic Free Noosa.




Page
 Page42
      42

Section 43

                                                                Noosa Climate Change Response Plan




Strategic Priorities
The following strategic priorities are identified for this theme:
8.1	Adopt circular economy principles to cut waste and pollution, keep
     products and materials in use and regenerate natural systems
8.2	Manage the landfill in accordance with best practice to minimise
     greenhouse gas emissions
8.3    Minimise organic matter going to landfill from community waste
Specific actions for implementation through this Climate Change Response Plan
are identified in the Summary of Actions.


Target
Environment Strategy target: By 2030, all green waste and food waste is
diverted from landfill


Metrics
•      % green waste and food waste diverted from landfill
•      Reduction in waste to landfill
•      Landfill gas emission reductions


Partnerships
Noosa Council partners with a number of community groups to educate the
community on how to reduce waste. Noosa Council has a waste education
program that is delivered to schools and the wider community.




                                                                                          Page 43

Section 44

Noosa Shire Council




  Summary of Actions


Page 44

Nevesersiiic Counc
           7                     :                            4
                  |           =                                    .
|                  |      '
  rr                      j             i
                                ae                    pt            )
                         ov  * 5    :
        LF            ae  8
et i            Of         Ab          ~st
Cee gael                                  as
  — j     F .    fe as Si nt   :    n       r      ~
  a}   | yy;           <a              > /     .               ~~
  i     a 5 i¢ |    :    . )  i     \ o    ~      >  f               ,
       ie             wr 2                  »» ;          -
  iia     ii       *_4e                   ,   af

    Ol       ae g                           :         y
                Da BS te   ~~                              .
  i               At                            .    7
         V4              (ts
    |   hy  Vii a                                 ae
      summary of Actions

Ae hye,    a             faa?  ,     a ~ ie               .             I
            6         ae              an        ee              ~~

Section 45

                                                                                                           Noosa Climate Change Response Plan


The following identifies strategic priorities and specific actions including relevant metrics for
measuring progress and timing for delivery.

Strategic Priorities            Specific actions                                                       Metrics                                              Timing
What are our priorities over    How will we achieve our strategic priorities or encourage positive     How will we measure effectiveness or success         (for
the 5 year life of this plan?   change?                                                                of risk mitigation or emissions reduction efforts?   commencement)

Theme 1 – Strong leadership and governance
1.1 Advocate to levels          • Advocate to other local governments is Queensland and                • Climate advocacy actions and the                   Ongoing
of government and                 Australia for them to declare a climate emergency/take climate         effectiveness of this advocacy
mobilise the community            action and adopt net zero emissions targets and policies in line
to drive decisive climate         with climate science
emergency action.               • Advocate to the Federal and State government to increase             • Climate advocacy actions and the                   Ongoing
                                  support for renewable energy, transitioning to a low carbon            effectiveness of this advocacy
                                  economy, and addressing climate risk impacts from coastal
                                  hazards, flooding, drought, heat risk, bushfires and biodiversity
                                  loss.
                                • Advocate for legislative change to allow for Council to facilitate   • Advocacy actions and effectiveness of this         Ongoing
                                  Environmental Upgrade Finance to enable eligible parties to            advocacy
                                  access low risk finance for building upgrades.
                                • Advocate to State government and transport providers to:             • Advocacy actions and effectiveness of this         Ongoing
                                 • improve and increase public transport services in Noosa               advocacy
                                   Shire including for the hinterland, and to explore and enable
                                   the replacement of diesel buses with electric/zero emissions
                                   buses in Noosa; and
                                 • Provide leadership direction and incentives regarding EV
                                   technologies and investment.
                                • Develop an education, advocacy and community mobilisation            • Plan developed and progress made                   2022/23
                                  plan to prepare advocacy positions on a wide ranging of
                                  state and federal issues and to educate and assist community
                                  groups, residents and others to become effective advocates.
                                • Develop an information tool kit to raise awareness and               • Information tool kit developed                     2021/22
                                  understanding of climate risks in the community, amongst             • % survey respondents that understand the
                                  industry sectors and within Council.                                   topic of climate change and what it means for
                                                                                                         Noosa Shire and themselves.
                                • Develop and promote an annual program of community- based            • Events and promotion activities                    2021/22 -
                                  climate education events for the broader Sunshine Coast region.                                                           ongoing
                                • Incorporate Indigenous knowledge systems, particularly for           • Projects involving Traditional Owners and          Ongoing
                                  land management and ecosystem resilience, and involve and              incorporating First Nations knowledge
                                  consider the needs of Traditional Owners.
1.2 Strengthen                  • Scope and develop a strategic approach to transitioning to           • Approach established and next steps                2021/22
partnerships with                 LED street lighting and adopt turtle friendly lighting for coastal     identified
governments and                   areas in partnership with infrastructure providers and state
stakeholders to take              government agencies.
urgent action to achieve a      • Develop collaborations with other local governments to address       • Collaborations with other local governments        2021/22 -
low carbon economy and            climate risks and help build a low carbon economy. This                and progress made                                  ongoing
resilient community               includes developing a regional climate action roadmap for
                                  the broader Sunshine Coast region, as well as collaborative
                                  community education and carbon reduction initiatives across
                                  local government areas in SEQ.
                                • Pursue opportunities for private-public partnerships to develop      • Collaborative private-public partnerships with     2021/22 -
                                  scalable pilot projects in Noosa that demonstrate solutions for        others and progress made                           ongoing
                                  climate resilience and/or radical emissions reduction.
1.3 Move Council from           • Continue to embed climate emergency responses across                 • Council and organisational policies that have      Ongoing
business-as-usual                 council and within key policy documents, procurement                   incorporated a climate response
operations to adopting            decisions, strategies and plans including in corporate and           • Strategies and plans that have incorporated
deep, systemic change             operational plans.                                                     climate response objectives and actions
and being a powerful            • Embed the climate change emergency into all staff roles and          • Climate change included in performance
influencer and example of         responsibilities and in performance planning.                          planning
climate action                  • Update Council’s climate governance road map based on                • Governance roadmap reviewed and up to              Ongoing
                                  findings of QLD Climate Resilient Councils (Q CRC) governance          date
                                  audit and Council’s risk assessment, with annual updates
                                  provided to the Audit & Risk Committee
                                • Establish a community reference group for climate change that        • Community reference group established and          2021/22
                                  periodically meets to provide information and advice to Council        progress made
                                  on climate issues, required actions, barriers and successes
                                  and ongoing program development.
                                • Continue to develop a web-based platform and dashboard to            • Website and dashboard developed and                2021/22 -
                                  provide information on climate resilience and sustainability for       updated                                            Ongoing
                                  households, businesses and farmers.
                                • Provide training and capacity building for council staff on          • Number of staff training and capacity              Ongoing
                                  embedding climate change within their roles, procedures and            building activities
                                  decisions.

                                                                                                                                                                        Page 45

Section 46

            Noosa Shire Council



  Strategic Priorities            Specific actions                                                        Metrics                                              Timing
  What are our priorities over    How will we achieve our strategic priorities or encourage positive      How will we measure effectiveness or success         (for
  the 5 year life of this plan?   change?                                                                 of risk mitigation or emissions reduction efforts?   commencement)

  Theme 2 - Energy efficiency and renewable energy
  Targets:
  By 2026, all Council facilities will be powered by 100% renewable energy/net zero emissions energy
  By 2026 Noosa Council is powered by 100% renewable energy/net zero emissions energy
  By 2026 community awareness and empowerment to reduce emissions from stationary energy is increased
  2.1 Transition Noosa            • Renewable energy investigation (community focused) - Assess           • Local renewable energy projects commenced          Ongoing
  Council and Noosa Shire           opportunities and financial models within and outside the shire
  to 100% renewable energy          for community owned renewable energy projects, such as solar
  and ensure the transition         farms, micro grids and solar gardens.
  is inclusive of low income
                                  • Zero emissions pathways study (community focused) -                   • Pathway to zero identified including next          2021/22 -
  and vulnerable residents
  and businesses, including         to identify least cost emissions abatement opportunities for the        steps for implementation                           Ongoing
  strata tenants                    Noosa Shire community and the role council plays in this.

  2.2 Pursue energy               • Noosa Council 100% renewable energy study to determine                • Pathway to 100% identified including next          2021/22
  efficiency and renewable          the most effective way for council to achieve 100% renewable            steps for implementation
  energy measures within            energy for council facilities including leased facilities eg. power   • kW of renewable energy generated for
  Council and for Council           purchasing agreement (PPA), green power, etc.                           Council operations
  owned buildings
                                                                                                          • Number of Council facilities powered by
  Review under-utilised                                                                                     100% / net zero renewable energy
  Council buildings used for      • Continue to invest in energy efficiency and renewable energy          • Number of Council facilities powered by            Ongoing
  community purposes to             measures within Council and for Council owned buildings and             100%/net zero renewable energy
  help rationalise asset use        public lighting
  and reduce emissions                                                                                    • kW of renewable energy generated for
                                                                                                            Council operations
                                  • Trial the provision of energy audits for vulnerable households        • Number of households completing energy             2022/23
                                                                                                            audits
  2.3 Develop a climate           • Continue to partner with Australian Energy Foundation (AEF)           • % of households powered by renewable               Ongoing
  aware and empowered               and other services to enable residents and businesses to easily         energy
  community for reducing            access expert advice on energy efficiency, solar and other            • % of businesses powered by renewable
  climate risks and                 products, including low income households/rentals.                      energy
  emissions
                                                                                                          • % reduction in community energy use
                                                                                                          • kW of renewable energy within the Noosa
                                                                                                            community
                                                                                                          • Promotion activities completed
                                  • Continue to make available community alliance grants                  • Number of grants provided                          Ongoing
                                    for community groups delivering emission reduction and
                                    adaptation benefits
                                  • Trial an emissions reduction grant category to support                • Number of emissions reduction grants               2021/22
                                    households, businesses and community groups reduce                      provided and projects commenced
                                    emissions and increase energy efficiency.
                                  • Promote new technologies and tools that build capacity and            • Promotion activities completed                     Ongoing
                                    sustainable behaviour change.




Page 46

Section 47

                                                                                                         Noosa Climate Change Response Plan



Strategic Priorities            Specific actions                                                     Metrics                                              Timing
What are our priorities over    How will we achieve our strategic priorities or encourage positive   How will we measure effectiveness or success         (for
the 5 year life of this plan?   change?                                                              of risk mitigation or emissions reduction efforts?   commencement)

Theme 3 – Clean low emissions industries
Target:
By 2026, the number of businesses in the environmental industries sector has increased
By 2026, the energy efficiency and ecological sustainability of business in Noosa has increased
3.1 Through targeted            Through the development and implementation of the Economic           • No. of businesses in the environmental             Ongoing
initiatives, create an          Strategy:                                                              industries sector
environment that supports       • Explore opportunities and barriers to developing the
business development,             environmental industries sector.
innovation and investment
                                • Pursue and develop regional partnerships to drive low
shift to clean, green low
                                  emissions industry investment for the broader Sunshine Coast
emission industries and
                                  region and to support businesses and industries that are likely
technology
                                  to come under pressure from the need to decarbonize.
(also linked to Themes 1,
                                • Align economic activity and tourism promotion with the long-
2, 5, 6, 7)
                                  term vision for making Noosa the preferred destination for
                                  clean, green business investment, new clean tech business (eg,
                                  Firetech).
                                • Work with Tourism Noosa to investigate programs to offset travel
                                  emissions for visitors to Noosa.
3.2 Work with industry,         • Encourage business participation in emissions reduction,           • No. of businesses participating in emissions       Ongoing
business associations             sustainability and climate resilience programs (eg. ecoBiz,          reduction and climate resilience programs
and government                    EcoCheck) and actively promote businesses under the
                                                                                                     • No. of businesses participating in energy
agencies to facilitate            programs in partnership with Tourism Noosa and other
                                                                                                       efficiency and sustainability programs
emissions reduction and           networks.
environmental sustainability    • Consider the use of clean/low emissions industries, contractors    • Procurement policies and procedures                Ongoing
for local businesses              and goods/services through Council’s purchasing activities and       include consideration of clean/low emissions
also linked to Themes 1, 2,       property and facilities management. Use suppliers located in         industries, contractors and good/services
5, 6, 7)                          Noosa Shire where possible.




                                                                                                                                                                    Page 47

Section 48

            Noosa Shire Council




  Strategic Priorities            Specific actions                                                        Metrics                                              Timing
  What are our priorities over    How will we achieve our strategic priorities or encourage positive      How will we measure effectiveness or success         (for
  the 5 year life of this plan?   change?                                                                 of risk mitigation or emissions reduction efforts?   commencement)

  Theme 4 - Sustainable Transport
  Target:
  By 2026, electric vehicle charging stations will be installed at major Noosa destinations to support the transition to electric vehicles.
  By 2026, public transport services in Noosa have improved.
  4.1 Accelerate public           Through implementation of the Transport Strategy and Walking            • % modal shift to walking and cycling in key        Ongoing
  and active transport            and Cycling Plan:                                                         urban areas and in hinterland towns
  infrastructure investment       • Encourage a modal shift away from private car use towards             • % increase of children walking and riding to
  and community                     active transport modes and public transport through behaviour           school and using school buses
  usage through the                 change programs and improved pathways and connections                 • % increase in electric micro-mobility devices/
  implementation of               • Increasing public transport use through improved services and           e-wheeling devices (e-bikes, e-scooter,
  Council’s Transport               increased bus services to the hinterland                                e-skateboards etc.) in use by residents and
  Strategy and Walking and
                                  • Address the transport emissions of over 2 million visitors to           visitors
  Cycling Plan.
                                    Noosa per year through consultation with relevant stakeholders        • % increase in public transport use
  (also linked to Themes 5          to establish parking controls and public transport alternatives       • kms of sealed cycling and walking pathways
  relating to urban greening)     • Partner with government agencies and transport providers              • Number of staff that participate in walk/ cycle
                                    to explore and enable the replacement of diesel buses with              to work day
                                    electric/zero emissions buses in Noosa
                                  • Partner with transport providers to explore and enable the
                                                                                                          For other priority actions - Refer to Walking and
                                    uptake of electric bikes and personal mobility devices
                                                                                                          Cycling Plan (being developed)
                                  • Increase parking management controls in congested areas
                                    through timed and paid parking, with revenue to go towards
                                    sustainable transport
                                  • Expand the pathway network in urban and hinterland areas
                                  • Planting of shade trees along pathways to encourage waking
                                    and cycling
  4.2 Transition Council          • Commence a Council behaviour program that maximises                   • Behaviour program progressed                       2022/23
  and the community to              efficient use of non-electric vehicles and offsets their emissions.
  sustainable transport           • Consider cost benefit information when making decisions               • Policy developed and next steps identified         2022/23 -
  use and zero-emissions            on purchase of council fleet to support transition to lowest                                                               Ongoing
  vehicles                          emission vehicles.
                                  • Develop a roll out plan to incorporate electric vehicle charge        • Roll out program developed                         2021/22 -
                                    stations at major Noosa destinations in partnership with EV           • Number of EV charging stations in Noosa            ongoing
                                    providers and property owners                                           Shire for vehicles and e-bikes
                                                                                                          • % increase in electric vehicle ownership
                                  • Install electric bike and electric scooter chargers at key            • Number of electric bike and scooter chargers       2022/23:
                                    destinations in Noosa Shire.                                            in Noosa Shire                                     5 new chargers
                                  • Amend the Noosa Plan 2020 to include requirements for                 • EVs factored into development requirements         2021/22
                                    new multi-residential and non-residential developments for
                                    carparking areas to be ‘EV ready’.




Page 48

Section 49

                                                                                                           Noosa Climate Change Response Plan




Strategic Priorities            Specific actions                                                       Metrics                                              Timing
What are our priorities over    How will we achieve our strategic priorities or encourage positive     How will we measure effectiveness or success         (for
the 5 year life of this plan?   change?                                                                of risk mitigation or emissions reduction efforts?   commencement)

Theme 5 - Healthy and resilient natural systems and carbon sequestration
Target:
By 2030, half of all land in Noosa Shire is managed for its environmental values
By 2030, 50% of mapped riparian buffers along waterways have vegetation coverage
By 2030, vegetation will be in place to increase canopy cover and shade to 45% of public open spaces in urban environments
5.1 Increase revegetation,      • Develop an urban greening program for streets and public             • % urban canopy cover                               2021/22 -
ecosystems restoration            spaces that increases tree canopy cover, native vegetation and                                                            ongoing
and urban greening                biodiversity, as well as to increase carbon drawdown and reduce
to increase carbon                urban heating. Investigate how implementation could be funded
drawdown, reduce urban            through an alternative revenue source. eg Trees for Tourism. Work
heating and support               with Indigenous people and young people to assist with onground
ecosystem and species             planting to help build social capital.
resilience                      • Prepare a Climate Change Ecosystem Vulnerability and Carbon          • Change in estimated annual carbon                  2021/22
                                  Drawdown Assessment to help prioritise revegetation and                drawdown by Noosa vegetation
                                  restoration of high priority biodiversity, riparian and wetland
                                  areas vulnerable to climate threats and to assist with calculating
                                  carbon credits.
                                • Review the Noosa Plan Planning Scheme Policy No. 2                   • Whether action is completed
                                  Landscaping to update the plant species schedule for Council’s
                                  program of street tree replacement having regard to preferred
                                  species for shade, carbon drawdown and bushfire resilience.
                                Through implementation of the Environment Strategy:                    • % of Noosa shire managed for its                   Ongoing
                                • Continue to increase habitat, landscape connectivity, riparian         environmental values
                                  buffers, and ecosystem health and resilience through
                                                                                                       • % of mapped riparian buffers along
                                  partnerships with levels of government, landholders and
                                                                                                         waterways that have vegetation coverage
                                  community groups (NPA, Biosphere, SCEC, NDLC)
                                                                                                         (42% in 2018)
                                • Expand and promote Trees for Tourism in partnership with
                                  Tourism Noosa, Landcare and Land for Wildlife properties             • No. Land for Wildlife properties and Voluntary
                                • Continue to monitor groundwater systems and groundwater                Conservation Agreements
                                  dependent ecosystems and the impacts of climate change in
                                  partnership with University of Queensland
                                • Continue to improve coastal ecosystem resilience through the
                                  Coastal Connect bushcare project and related extension projects
                                  (linked to Coastal Hazards Adaptation Plan)
                                • Continue to implement the urban gardens for wildlife program to
                                  encourage planting of native plant species and enhance urban
                                  biodiversity, in partnership with NICA.
                                • Develop a Coastal Foreshore Management Plan for dune
                                  restoration and management in partnership with local bushcare
                                  groups.
5.2 Optimise use and            • Continue to participate with Unity Water in the development and      • Whether action is progressed                       Ongoing
management of water               implementation of a total water management plan for the Shire’s
resources through                 water use, supply and management.
integrated water cycle          • Increase connection and access to alternative water sources          • Recycled water connections or uses in Noosa        Ongoing
management including for          where suitable such as recycled water for irrigation eg. sports        Shire
drinking water, recycled          fields and agriculture.
water, surface water and        • Strengthen requirements for water sensitive urban design for         • Whether action is completed                        2021/22
groundwater                       small scale developments through amendments to the Noosa
                                  Plan 2020 planning scheme.




                                                                                                                                                                        Page 49

Section 50

            Noosa Shire Council



  Strategic Priorities            Specific actions                                                       Metrics                                              Timing
  What are our priorities over    How will we achieve our strategic priorities or encourage positive     How will we measure effectiveness or success         (for
  the 5 year life of this plan?   change?                                                                of risk mitigation or emissions reduction efforts?   commencement)

  Theme 6 - Sustainable agriculture and food systems
  Target:
  By 2030, 80% of all grazing land achieves best practice management for agriculture
  By 2026, the knowledge and capacity of local food and agribusinesses to prepare for climate risks and take up carbon reduction
  opportunities has increased
  6.1 Support agri-               • Continue providing support to Landcare and MRCCC’s rural             • Number of farmers participating in on-ground       Ongoing
  businesses and                    extension programs to encourage sustainable agriculture and            actions through land management programs
  landholders to create             land management, and increase awareness of climate risks
  a sustainable and                 (eg. Keep it in Kin Kin program).
  regenerative food system        • Promote platforms and programs for farmers to access climate         • Whether action is completed                        2021/22 -
  that includes consideration       projections, training, workshops, grants and guidance material                                                            ongoing
  and preparation for climate       for climate-ready farming.
  change risks
                                  • Work with Food and Agri-Business Network, Regenerative               • Whether action is completed                        Ongoing
                                    Agriculture Alliance and Country Noosa, and other
                                    organisations to improve support for agri-business and
                                    encourage take up of sustainable agriculture
  6.2 Promote sustainable,        Through development and implementation of the Economic                 • Number of local producers promoted or              Ongoing
  locally produced food and       Strategy:                                                                accredited as being ‘sustainable’ or an
  improve local food access       • Support and promote farmers’ markets, farm gates and local             equivalent.
  for farmers, residents,           food box programs.
  visitors and vulnerable         • Support and promote businesses that use sustainable,
  people.                           regenerative food production methods including organic,
                                    biodynamic and agro-ecological principles.
                                  • Continue to work with Eat Local Noosa, Slow Food Noosa,
                                    Tourism Noosa (eg. food and drink festival) and other
                                    organisations to promote local producers and connect supply
                                    chains to local consumers.
  6.3 Support agri-               • Investigate opportunities to encourage rural landowners to           • Whether action is completed                        2022/23
  businesses and                    sequester soil carbon and accrue carbon credits through
  landholders to reduce             restoring soil health and sustainable agricultural practices. (eg.
  their emissions through           Landcare Soil Health Cards, Carbon Farmers of Australia)
  changes in farming
  practices and technology
  implementation, and to
  take up the opportunities
  for income generation
  through carbon drawdown
  activities.




Page 50

Section 51

                                                                                                            Noosa Climate Change Response Plan



Strategic Priorities            Specific actions                                                        Metrics                                              Timing
What are our priorities over    How will we achieve our strategic priorities or encourage positive      How will we measure effectiveness or success         (for
the 5 year life of this plan?   change?                                                                 of risk mitigation or emissions reduction efforts?   commencement)

Theme 7 - Resilient and adaptive communities and built environments
Target:
By 2030, sustainable building outcomes are delivered through regulation, education and showcasing best practice design.
By 2030, community awareness, planning and preparedness for natural hazards and climate change is increased.
By 2026, 60% of people in Noosa have a very good understanding of climate change
7.1 Create a resilient          • Develop climate responsive design guidelines to support the           • Whether action is completed                        2021/22
built environment for             planning scheme, place making, asset management and
householders, businesses,         design to improve understanding of how infrastructure and
vulnerable people,                urban design measures can be used to increase climate
property and infrastructure       resilience within Noosa’s public areas, streetscapes and
                                  buildings.
                                • Develop locality-based Heat Risk Assessment and mapping               • Whether action is completed                        2021/22
                                  for urban areas to improve understand and help development
                                  responses to urban heat impacts in Noosa.
                                • Continue to update Noosa Plan 2020 planning scheme to                 • Climate change and heat risks factored into        2021/22-ongoing
                                  manage the impacts of climate change on buildings and public            land use planning
                                  spaces including heat mitigation requirements, as well as for         • Number of buildings that achieve a 5 star or
                                  flooding, inundation and bushfire risks.                                above under the Green Building Council of
                                                                                                          Australia rating scheme.
                                • Advocate through LGAQ and the State for state policy and              • Whether action is completed                        2022/23
                                  guidelines that provide a minimum standard for designing
                                  buildings to reduce emissions, improve sustainability and
                                  reduce urban heat risks.
                                • Prepare a Socio-economic impact hazard assessment of flooding         • Whether action is completed                        2022/23
                                  and inundation including survey of building stock vulnerability
                                  (floor heights, building types and materials) to provide a business
                                  case for risk mitigation. This will also inform wind vulnerability
                                  assessment by Geoscience Australia. Linked to Coastal Hazards
                                  Adaptation Plan.
                                • Prepare localised modelling and concept design of inundation          • Whether action is completed                        2021/22
                                  hazard reduction measures for Noosaville/Noosa Heads area
                                  (e.g. flood levy, landscape design, stormwater improvements).
                                  Linked to Coastal Hazards Adaptation Plan.
                                • Implement a monitoring program for coastal hazards for                • Whether action is completed                        Ongoing
                                  monitoring coastal erosion and inundation risks. Linked to
                                  Coastal Hazards Adaptation Plan. Linked to Coastal Hazards
                                  Adaptation Plan.
7.2 Build Council and           • Provide best available hazard information and update design           • Whether action is completed                        Ongoing
community awareness and           guidelines and capital works procedures for design, upgrade
preparedness for climate          and maintenance of infrastructure works and building assets,
change and extreme                e.g. new cyclone standards informed by the State’s severe wind
weather events                    assessment.
                                • Work with industry partners to conduct disaster management            • % respondents aware of the level of risk           Ongoing
                                  and climate change preparedness workshops with various                  posed by climate change and natural hazard
                                  sectors (ie. businesses, households, aged care, farmers).               events with respect to heatwaves, drought,
                                                                                                          flooding, beach erosion, stormtide, tropical
                                                                                                          diseases, extreme weather
                                                                                                        • % respondents that understand the topic of
                                                                                                          climate change and what it means for Noosa
                                                                                                          and themselves.
                                                                                                        • % respondents that are prepared for the
                                                                                                          risks of climate change and natural hazards
                                                                                                          with respect to heatwaves, drought, flooding,
                                                                                                          beach erosion, stormtide, tropical diseases,
                                                                                                          extreme weather
                                                                                                        • % respondents that are prepared for
                                                                                                          a disaster or emergency and have an
                                                                                                          emergency plan.




                                                                                                                                                                       Page 51

Section 52

            Noosa Shire Council



  Strategic Priorities            Specific actions                                                      Metrics                                              Timing
  What are our priorities over    How will we achieve our strategic priorities or encourage positive    How will we measure effectiveness or success         (for
  the 5 year life of this plan?   change?                                                               of risk mitigation or emissions reduction efforts?   commencement)

  Theme 8 - Zero waste and circular economy
  Target: By 2030, all green waste and food waste is diverted from landfill
  8.1 Adopt circular              Through development and implementation of the waste                   • Reduction in waste to landfill                     Ongoing
  economy principles to cut       management plan:
  waste and pollution, keep       • Ensure Council’s waste management program adheres to
  products and materials            circular economy principles for waste elimination, reuse and
  in use and regenerate             recycling and carbon reduction
  natural systems.                • Continue and expand the community waste education and
                                    behavioural change programs to build community awareness
                                    about emissions from waste and how to reduce them (eg
                                    methane emissions from food waste)
                                  • Explore opportunitites for circular economy approaches through
                                    Council’s purchasing activities, including the use of recycled
                                    material where feasible/appropriate
                                  • Investigate opportunities for local/regional processing of
                                    recycled materials
                                  • Investigate composting options for organic waste including end
                                    user opportunities, eg farms
                                  • Advocate to State and Federal governments for strict packaging
                                    and product stewardship standards and improved infrastructure/
                                    business opportunities for waste reuse.
  8.2 Manage the landfill         • Continue to install landfill gas wells and improve the quality of   • Landfill gas emission reductions                   Ongoing
  in accordance with best           the landfill cap to increase capture of landfill gas
  practice to minimise            • Continue to explore power generation from landfill gas
  greenhouse gas emissions
  8.3 Minimise organic            • Implement recommendations from the new waste management             • % green waste and food waste diverted from         Ongoing
  matter going to landfill          plan to minimise organic matter going to landfill                     landfill
  from community waste




Page 52

Section 53

Noosa Climate Change Response Plan




                          Page 53

Noosa Climate Change Response Plan

                         Page 53

Section 54

Noosa Shire Council




  Implementation, Monitoring and Review


Page 54

earn      mae          : SS    a     yay  SE        a 5825        ie,     Ty 3 Smee: Me.)
                                          NER    5                    Sane              ee       hs fis        ee or a       as Tee         = Seg       oon      ee      SRS
                                                                                                      MS x Sr a Sean mi    y AS - 4 =               %    Nt Ae    ae 43 Re    ;
                                                                                                                                                                ” a       Pa
                                                                                                                                                                            kedmay)
                                                           Sk           Smal ee           iy   =e ah           “      a} 4 Rt RY,         ES ‘ ie ate  fe   Ca    iad ae ©.
                                                                                                          TERPS) Say        aN         nas            Sth4s ; Be oe
                                          N. age ot} , oe   ee      : aged 1B & i  HEWN)   j    :  ae   2 , Va       , hy   fi       ,       ~        a i se a,  - Sore - YS A
                                                   Se                  Bit fh “slr         :  tea Soo n      Oe Drag  SR ae             ,          ee    Yo Bae ee Sh EE    ats
                                                                                           /      ae BOD)     aX    ies b Be 4 } BP ean ; ~ i.                         eo
                                                                                                                                     omy                 y %     i Bie  re ta A
                                                                                                                                                                 “aR       A!
  are   ee                                Dee Lh egieN    he           Meta              ae |  :  Bes"     POON    =    SS 0 BN Se                  ie   ae ap ioe         Ceo
                                                                                   ne     i      a ie  ~ Ly nt hts e é ae        pike Em Ns é —_¥ ‘ oe   =   7 eee a ws     :
                                          Beet “| \ cee          ae       Ny Mt es               Ve           es: Vee     AY a BAI         SSS      oa Se Ses Stee             :
         PE                               ee? sia!            a       ie Pu       gaia     |       z         ,.    en     Ogee seat         .           Re    Poe      oat ae
                                                                                                                                    c=                  We ¥     ae    poi)
                                                                                                                                                                  Y 7] RS      x
       si                                 Ss ig Ze Fees =e Pape          HEA) 4 ees Mpa?            wre      Sa       ee      eae         Pe       re. WA,       of aw       a
    = ae                                   ee) Ze ee a al                   Fe Hn Wace         a       ae        oe,       Dah) Prey     A   K        See          es     eee
                                          = Sty).   3 $5 Li   oe    ' Ba aN    Wie aaa       :   5   De    og re    aS ay    ree Ati      ~             SY    hae Mins  45 A ss
                                          :  ie elie            eae    eh Sam 4              ;            ws   a     rs  Suet x  xe ee         -       ia     cee   z  Coe    y
    eee                     as            Wee           =             ies                    =     eee a     eae:         5 Ra         fae < A das bx rohe            eae ts
     ne                                   1 OSES, Baia soy te               RP nN M  ae        aro. irae  ey Se sy ies    Ea  oe as 7  beg 7      RO       AF vy       yt eee nf
pee         es            3               UG                          | He            iat    aioe    ee         a       SS ae A CS: bye                                 aera
    ©        =                             if De           os Be     ea       Wy 3 aol re    a     Fe    -   Se <5           Shs ay  -    tees Cy % he                Bots eS
    ey                                     GE eS        =   beta    aah i,    i   aie             re. Pt eit is Bie    Pao en   ae Z       a ee es bog rit a    4     ee
     g                   ce                 eg            STE              eh    i         rae.         ese             ear         Le       anes a                  ek
     .                    a               ie                         | Mi                     Be         GS A           WE: AB WE                           Byer             .
                          o               4            ee                            ee      OS              a        aa     oma          Bee rer                         4: :
                                          Gis be Beet           i   ea    ME     Wh Se ‘ab   = 5	1	1	1	31	12	1948	818	64	29	47	ie
5	1	1	1	31	13	2054	834	53	38	47	Sede
5	1	1	1	31	14	2184	874	11	14	35	=
5	1	1	1	31	15	2324	892	22	11	9	és
5	1	1	1	31	16	2421	916	58	30	27	hits
5	1	1	1	31	17	2498	929	31	36	0	WP
5	1	1	1	31	18	2565	922	32	63	0	.
5	1	1	1	31	19	2769	986	38	38	23	en
5	1	1	1	31	20	2828	1008	119	47	14	PRL
5	1	1	1	31	21	3034	1049	22	28	17	yee
5	1	1	1	31	22	3079	1060	48	33	18	Tre
5	1	1	1	31	23	3203	1078	55	47	14	a)
5	1	1	1	31	24	3362	1120	88	46	29	Cs
4	1	1	1	32	0	295	492	3163	700	-1	
5	1	1	1	32	1	295	492	5	11	0	b
5	1	1	1	32	2	867	615	66	27	7	arn
5	1	1	1	32	3	954	633	47	28	16	Bey
5	1	1	1	32	4	1018	651	9	15	28	me
5	1	1	1	32	5	1043	651	100	41	35	ee
5	1	1	1	32	6	1158	677	52	54	40	ett
5	1	1	1	32	7	1243	692	66	35	32	St
5	1	1	1	32	8	1385	719	12	20	40	i
5	1	1	1	32	9	1410	722	27	50	49	Hii
5	1	1	1	32	10	1455	721	69	107	19	Mt
5	1	1	1	32	11	1539	745	84	65	32	mAh
5	1	1	1	32	12	1639	778	4	29	85	{
5	1	1	1	32	13	1658	763	18	48	37	i
5	1	1	1	32	14	1697	795	41	23	23	hs
5	1	1	1	32	15	1772	806	20	26	20	a
5	1	1	1	32	16	1801	812	19	32	36	Ss
5	1	1	1	32	17	1881	828	72	35	16	ee
5	1	1	1	32	18	1985	851	22	24	12	es
5	1	1	1	32	19	2068	851	45	49	6	nT
5	1	1	1	32	20	2191	894	3	3	34	¢
5	1	1	1	32	21	2437	944	63	40	18	Ah
5	1	1	1	32	22	2518	978	19	12	36	ae
5	1	1	1	32	23	2579	978	31	30	28	ed
5	1	1	1	32	24	2610	961	130	86	25	CHa
5	1	1	1	32	25	2773	1019	57	41	39	oa
5	1	1	1	32	26	2833	1032	46	50	30	vite
5	1	1	1	32	27	2912	1049	32	32	10	ae
5	1	1	1	32	28	2955	1065	45	29	23	CN
5	1	1	1	32	29	3010	1076	49	31	20	Le
5	1	1	1	32	30	3103	1091	42	47	33	ei?
5	1	1	1	32	31	3216	1121	67	28	12	re
5	1	1	1	32	32	3344	1145	37	47	42	bs
5	1	1	1	32	33	3414	1161	44	31	0	‘
4	1	1	1	33	0	599	536	2841	671	-1	
5	1	1	1	33	1	599	536	29	79	23	|
5	1	1	1	33	2	911	650	109	34	28	fai
5	1	1	1	33	3	1253	719	175	53	33	Tres
5	1	1	1	33	4	1509	795	1	7	20	A
5	1	1	1	33	5	1575	791	16	25	4	MANES
5	1	1	1	33	6	1621	804	94	39	0	Hik
5	1	1	1	33	7	1776	833	56	30	12	Uo
5	1	1	1	33	8	1878	829	30	58	25	eae
5	1	1	1	33	9	2058	902	25	21	20	poe
5	1	1	1	33	10	2184	937	3	4	26	ee
5	1	1	1	33	11	2458	986	109	29	48	es
5	1	1	1	33	12	2577	999	110	61	15	port
5	1	1	1	33	13	2699	999	17	61	31	oe
5	1	1	1	33	14	2764	1058	79	25	50	i
5	1	1	1	33	15	2868	1072	116	41	16	Ae
5	1	1	1	33	16	3012	1105	26	15	21	be
5	1	1	1	33	17	3260	1168	32	5	56	is
5	1	1	1	33	18	3437	1202	3	5	10	'
4	1	1	1	34	0	571	630	2857	615	-1	
5	1	1	1	34	1	571	630	57	55	31	a
5	1	1	1	34	2	960	694	69	36	23	eee
5	1	1	1	34	3	1041	690	420	146	32	=
5	1	1	1	34	4	1491	777	81	85	38	Vi
5	1	1	1	34	5	1657	809	37	63	34	i
5	1	1	1	34	6	1710	837	65	61	27	Bee
5	1	1	1	34	7	1866	872	45	65	0	e
5	1	1	1	34	8	2060	924	81	47	19	Oe
5	1	1	1	34	9	2219	959	63	38	0	SRA
5	1	1	1	34	10	2363	980	98	42	12	Bk
5	1	1	1	34	11	2490	1019	31	31	28	ie
5	1	1	1	34	12	2547	1014	42	62	21	cit
5	1	1	1	34	13	2654	1035	58	66	44	a
5	1	1	1	34	14	2740	1064	44	48	43	3:
5	1	1	1	34	15	2807	1068	143	82	21	Bie
5	1	1	1	34	16	2978	1092	46	73	29	de
5	1	1	1	34	17	3107	1157	60	51	43	a
5	1	1	1	34	18	3378	1162	50	83	37	Lo
4	1	1	1	35	0	889	718	2494	533	-1	
5	1	1	1	35	1	889	718	2	3	0	,
5	1	1	1	35	2	956	731	76	17	26	Fae,
5	1	1	1	35	3	1055	737	58	29	28	aren
5	1	1	1	35	4	1134	768	39	17	17	tr
5	1	1	1	35	5	1270	796	5	4	0	&
5	1	1	1	35	6	1325	802	12	19	5	Hy
5	1	1	1	35	7	1364	812	35	23	18	alte
5	1	1	1	35	8	1406	818	10	16	18	ty
5	1	1	1	35	9	1458	837	1	6	96	|
5	1	1	1	35	10	1562	853	2	4	7	uy
5	1	1	1	35	11	1596	866	48	14	19	a)
5	1	1	1	35	12	1697	881	62	23	10	Lees
5	1	1	1	35	13	1826	909	2	3	11	s
5	1	1	1	35	14	1956	946	96	24	19	Spot
5	1	1	1	35	15	2100	969	45	13	26	ean
5	1	1	1	35	16	2176	985	43	19	36	wr
5	1	1	1	35	17	2459	1051	15	14	43	lt
5	1	1	1	35	18	2517	1057	22	19	29	a
5	1	1	1	35	19	2569	1067	21	29	32	vi
5	1	1	1	35	20	2735	1103	40	25	29	ee
5	1	1	1	35	21	2834	1141	16	6	0	<<
5	1	1	1	35	22	3066	1187	52	20	13	Pry
5	1	1	1	35	23	3166	1194	7	8	0	”
5	1	1	1	35	24	3380	1248	3	3	0	:
4	1	1	1	36	0	871	718	2561	585	-1	
5	1	1	1	36	1	871	718	31	46	16	By.
5	1	1	1	36	2	929	737	99	53	37	eo
5	1	1	1	36	3	1189	784	67	98	48	Hl
5	1	1	1	36	4	1270	826	4	5	2	,
5	1	1	1	36	5	1316	810	49	50	28	ae
5	1	1	1	36	6	1472	831	20	65	44	|
5	1	1	1	36	7	1504	837	141	98	21	nae
5	1	1	1	36	8	1738	942	2	5	39	‘a
5	1	1	1	36	9	1864	945	14	26	9	aR
5	1	1	1	36	10	2004	959	70	63	20	nage
5	1	1	1	36	11	2065	948	75	90	0	Es
5	1	1	1	36	12	2191	1011	11	43	3	‘
5	1	1	1	36	13	2235	1025	107	35	3	Cree
5	1	1	1	36	14	2363	1034	17	50	51	of
5	1	1	1	36	15	2447	1076	33	27	5	ts
5	1	1	1	36	16	2501	1069	21	31	29	By
5	1	1	1	36	17	2567	1094	130	62	32	Bacal
5	1	1	1	36	18	2736	1109	45	57	8	Wee
5	1	1	1	36	19	2803	1148	21	32	0	“w
5	1	1	1	36	20	3009	1181	51	51	36	ater
5	1	1	1	36	21	3077	1185	52	43	23	oe
5	1	1	1	36	22	3193	1239	47	28	0	e
5	1	1	1	36	23	3389	1274	43	29	37	ve
4	1	1	1	37	0	590	698	2710	596	-1	
5	1	1	1	37	1	590	698	23	47	9	5
5	1	1	1	37	2	862	760	70	36	0	Sae7
5	1	1	1	37	3	954	773	99	53	34	ese
5	1	1	1	37	4	1068	802	81	52	42	Foto
5	1	1	1	37	5	1303	839	54	54	24	Hes
5	1	1	1	37	6	1375	873	74	49	29	ae
5	1	1	1	37	7	1460	884	58	44	11	eh
5	1	1	1	37	8	1552	916	76	20	12	ae
5	1	1	1	37	9	1670	960	4	4	31	’
5	1	1	1	37	10	1704	935	60	44	8	yf
5	1	1	1	37	11	1864	979	38	26	25	ae
5	1	1	1	37	12	1973	999	47	34	26	SAN
5	1	1	1	37	13	2055	1014	11	15	11	ae
5	1	1	1	37	14	2113	1030	51	33	6	PANS
5	1	1	1	37	15	2218	1063	38	25	15	A
5	1	1	1	37	16	2280	1074	48	24	35	Kt
5	1	1	1	37	17	2351	1077	27	38	0	S
5	1	1	1	37	18	2396	1111	9	4	61	j
5	1	1	1	37	19	2451	1088	75	76	24	“Fes
5	1	1	1	37	20	2571	1139	36	17	38	nf
5	1	1	1	37	21	2633	1136	39	43	24	ia
5	1	1	1	37	22	2688	1136	36	55	16	EF
5	1	1	1	37	23	2760	1170	41	33	30	en
5	1	1	1	37	24	2818	1187	48	29	8	eS
5	1	1	1	37	25	2925	1207	33	23	0	*
5	1	1	1	37	26	2977	1224	77	29	52	PEI
5	1	1	1	37	27	3180	1264	120	30	46	M3
4	1	1	1	38	0	577	752	2884	652	-1	
5	1	1	1	38	1	577	752	68	67	44	aS
5	1	1	1	38	2	862	815	25	25	66	&
5	1	1	1	38	3	967	815	80	80	35	ee,
5	1	1	1	38	4	1057	845	106	69	20	eae
5	1	1	1	38	5	1194	853	20	76	64	il
5	1	1	1	38	6	1303	879	72	78	0	i
5	1	1	1	38	7	1397	929	10	32	16	of
5	1	1	1	38	8	1496	939	48	45	17	A.
5	1	1	1	38	9	1592	966	17	38	0	.
5	1	1	1	38	10	1639	983	10	33	0	\.
5	1	1	1	38	11	1675	967	29	77	55	4),
5	1	1	1	38	12	1719	984	66	64	24	ve
5	1	1	1	38	13	1860	1027	24	35	29	fay
5	1	1	1	38	14	1934	1061	23	19	0	mc
5	1	1	1	38	15	1989	1049	23	40	14	a
5	1	1	1	38	16	2064	1077	19	17	47	he
5	1	1	1	38	17	2118	1070	29	66	0	UE
5	1	1	1	38	18	2188	1110	40	23	34	Pig
5	1	1	1	38	19	2249	1090	59	75	33	an
5	1	1	1	38	20	2348	1138	55	31	0	i.
5	1	1	1	38	21	2426	1157	32	32	51	ee
5	1	1	1	38	22	2499	1171	52	35	11	NR
5	1	1	1	38	23	2657	1196	54	41	41	a
5	1	1	1	38	24	2786	1222	46	57	27	Re
5	1	1	1	38	25	2896	1266	18	36	73	xv
5	1	1	1	38	26	2979	1269	33	36	32	hy
5	1	1	1	38	27	3136	1315	48	25	23	bs:
5	1	1	1	38	28	3309	1361	10	16	8	af
5	1	1	1	38	29	3353	1369	20	21	31	ths
5	1	1	1	38	30	3445	1374	16	30	58	4
4	1	1	1	39	0	554	780	2862	651	-1	
5	1	1	1	39	1	554	780	71	70	77	Q)
5	1	1	1	39	2	865	850	26	37	0	s
5	1	1	1	39	3	919	867	81	37	16	ie
5	1	1	1	39	4	1094	901	53	32	18	sat
5	1	1	1	39	5	1135	895	15	42	0	|
5	1	1	1	39	6	1167	919	18	14	30	oh
5	1	1	1	39	7	1253	958	80	15	33	a
5	1	1	1	39	8	1379	960	135	64	29	es,
5	1	1	1	39	9	1529	997	23	32	11	Yi
5	1	1	1	39	10	1580	1014	5	25	9	;
5	1	1	1	39	11	1623	1003	91	88	0	A
5	1	1	1	39	12	1725	1036	59	45	30	i
5	1	1	1	39	13	1903	1037	38	68	23	ee
5	1	1	1	39	14	1961	1090	45	35	40	he
5	1	1	1	39	15	2088	1128	11	9	2	E
5	1	1	1	39	16	2193	1147	10	14	0	f
5	1	1	1	39	17	2299	1163	11	7	0	-
5	1	1	1	39	18	2392	1197	5	16	10
                            —|—                   ee Sj ae) oy  . he - ae ext MAT    miei:   >   A            re Ra   : ~ x ae ae Riess         ‘. PA e ‘a M Je  4  Ke via 6.
                           a                  + pane ae es wo            9 ae ae . Mi] ig  ‘  ’ LS          r-    tens  a te yaks     po       =        iN . <i a5ee hes ae ‘ Bs
                              =               pea         ar —      ae       aah } i) a           %             As       i pe Hace mae        be     ee   wut          eA     nN
                         ‘oe                eee                  rar    Nie Ye        “had xe ee          on  re        ee Phe        Abs   Pal    ioe vex, pS S me S74. (3.8 ‘
              .            =>)              a i                     WK   oes     See SR                    0 Kags. Wr pin  mee ag eee Ly!             ki    ROE A Oe
                                           — a ud                        NAY ieee.    rr   ws :       7. Aas’         5      ; ee ete     DP eeon      oh So            aN
                         :                  cs tS aie               i  | i i
5	1	1	1	48	9	1617	1269	27	58	48	it
5	1	1	1	48	10	1691	1288	62	82	13	No
5	1	1	1	48	11	1966	1362	77	48	26	ae
5	1	1	1	48	12	2237	1384	41	89	25	(|
5	1	1	1	48	13	2307	1448	79	33	20	Le
5	1	1	1	48	14	2410	1456	117	57	4	LED.
5	1	1	1	48	15	2594	1483	44	68	23	“dl
5	1	1	1	48	16	2684	1498	39	46	60	&
5	1	1	1	48	17	2737	1532	44	44	12	£
5	1	1	1	48	18	2810	1550	247	74	40	oN
5	1	1	1	48	19	3097	1603	35	43	0	ea
5	1	1	1	48	20	3263	1655	190	61	9	SESE
4	1	1	1	49	0	903	1176	2539	566	-1	
5	1	1	1	49	1	903	1176	13	5	23	an
5	1	1	1	49	2	939	1187	22	9	12	nme
5	1	1	1	49	3	1019	1208	42	10	0	o-
5	1	1	1	49	4	1153	1216	13	27	36	sh.
5	1	1	1	49	5	1562	1310	2	7	78	\
5	1	1	1	49	6	1620	1338	2	5	73	|
5	1	1	1	49	7	1687	1328	31	40	72	nen
5	1	1	1	49	8	1738	1350	20	13	14	a
5	1	1	1	49	9	1774	1347	16	36	47	Be
5	1	1	1	49	10	1851	1385	79	12	19	bats
5	1	1	1	49	11	1993	1420	3	5	7	,
5	1	1	1	49	12	2014	1413	44	29	12	399
5	1	1	1	49	13	2267	1460	3	1	77	J
5	1	1	1	49	14	2314	1495	5	3	0	j
5	1	1	1	49	15	2379	1502	32	9	20	Ah
5	1	1	1	49	16	2440	1491	41	33	46	Pats
5	1	1	1	49	17	2500	1518	57	12	25	eink
5	1	1	1	49	18	2591	1533	25	22	28	Oy
5	1	1	1	49	19	2719	1560	9	14	0	¥
5	1	1	1	49	20	2745	1570	43	21	39	oy
5	1	1	1	49	21	2841	1580	52	37	49	Rs)
5	1	1	1	49	22	2907	1601	145	53	20	Nee
5	1	1	1	49	23	3074	1651	4	2	62	;
5	1	1	1	49	24	3145	1670	6	8	0	;
5	1	1	1	49	25	3159	1640	14	27	0	iB
5	1	1	1	49	26	3205	1665	10	24	36	5
5	1	1	1	49	27	3253	1676	3	5	2	«
5	1	1	1	49	28	3278	1676	36	34	13	tS
5	1	1	1	49	29	3352	1714	10	9	44	>
5	1	1	1	49	30	3396	1695	46	47	25	aE
4	1	1	1	50	0	909	1246	2524	565	-1	
5	1	1	1	50	1	909	1246	115	48	22	SS
5	1	1	1	50	2	1134	1281	86	65	20	aay
5	1	1	1	50	3	1438	1339	24	76	51	i
5	1	1	1	50	4	1475	1335	96	93	22	Nn
5	1	1	1	50	5	1587	1381	12	22	66	\
5	1	1	1	50	6	1614	1359	173	106	34	Is
5	1	1	1	50	7	2003	1467	20	35	33	RES
5	1	1	1	50	8	2046	1462	36	72	35	be
5	1	1	1	50	9	2169	1522	175	56	37	ae
5	1	1	1	50	10	2336	1518	25	71	18	F
5	1	1	1	50	11	2435	1562	30	48	37	Ds
5	1	1	1	50	12	2564	1597	50	30	42	ate
5	1	1	1	50	13	2703	1622	49	35	32	as
5	1	1	1	50	14	2782	1638	78	51	22	ANE
5	1	1	1	50	15	2982	1692	56	44	15	jo
5	1	1	1	50	16	3128	1711	202	82	25	a
5	1	1	1	50	17	3367	1761	66	50	58	Se
4	1	1	1	51	0	564	1206	2837	636	-1	
5	1	1	1	51	1	564	1206	64	55	88	O
5	1	1	1	51	2	862	1266	136	67	18	SS
5	1	1	1	51	3	1016	1297	144	96	46	Sat
5	1	1	1	51	4	1435	1388	4	66	75	|
5	1	1	1	51	5	1474	1397	90	84	34	Ha
5	1	1	1	51	6	1633	1427	155	74	5	me
5	1	1	1	51	7	1819	1476	48	33	90	3
5	1	1	1	51	8	2063	1537	99	37	12	ae
5	1	1	1	51	9	2427	1611	13	24	5	y
5	1	1	1	51	10	2572	1649	74	34	0	ra'&
5	1	1	1	51	11	2710	1654	67	78	22	ey
5	1	1	1	51	12	2797	1682	135	60	28	cae
5	1	1	1	51	13	2969	1727	8	36	0	:
5	1	1	1	51	14	3017	1736	307	94	16	CNG
5	1	1	1	51	15	3328	1799	73	43	38	Gs
4	1	1	1	52	0	862	1320	2568	567	-1	
5	1	1	1	52	1	862	1311	183	50	24	is
5	1	1	1	52	2	1071	1362	78	35	62	WH
5	1	1	1	52	3	1485	1446	208	64	10	HAO
5	1	1	1	52	4	1731	1500	53	38	13	i
5	1	1	1	52	5	1821	1541	115	24	44	=a
5	1	1	1	52	6	2151	1593	162	47	49	gle
5	1	1	1	52	7	2789	1679	39	78	0	RS
5	1	1	1	52	8	2903	1745	45	20	18	cat
5	1	1	1	52	9	2983	1770	18	36	14	ts
5	1	1	1	52	10	3048	1787	175	58	0	PAREN
5	1	1	1	52	11	3357	1821	47	70	0	Sea
4	1	1	1	53	0	553	1257	2857	665	-1	
5	1	1	1	53	1	553	1257	75	107	44	=)
5	1	1	1	53	2	862	1336	311	101	33	Fis
5	1	1	1	53	3	1277	1390	165	111	31	Nh
5	1	1	1	53	4	1473	1465	317	95	41	ees
5	1	1	1	53	5	1819	1548	8	12	0	&
5	1	1	1	53	6	1918	1563	193	86	3	Be
5	1	1	1	53	7	2130	1619	107	51	33	gene
5	1	1	1	53	8	2334	1680	41	19	0	“
5	1	1	1	53	9	2597	1718	265	81	28	Se
5	1	1	1	53	10	2928	1797	182	60	23	ire
5	1	1	1	53	11	3281	1875	56	41	31	ae
5	1	1	1	53	12	3352	1873	58	49	0	i
4	1	1	1	54	0	639	1339	2780	608	-1	
5	1	1	1	54	1	639	1339	11	8	8	-
5	1	1	1	54	2	1022	1413	30	24	16	+a
5	1	1	1	54	3	1084	1422	23	69	0	t
5	1	1	1	54	4	1124	1437	4	13	65	t
5	1	1	1	54	5	1143	1441	27	35	55	Mi
5	1	1	1	54	6	1199	1429	6	112	93	|
5	1	1	1	54	7	1252	1440	5	74	64	|
5	1	1	1	54	8	1350	1466	6	101	94	|
5	1	1	1	54	9	1431	1516	2	10	33	iA
5	1	1	1	54	10	1472	1488	50	72	0	iy
5	1	1	1	54	11	1619	1521	38	45	4	ss
5	1	1	1	54	12	1667	1547	74	28	16	pias,
5	1	1	1	54	13	1759	1564	26	55	18	‘3
5	1	1	1	54	14	1801	1583	1	3	55	>
5	1	1	1	54	15	1830	1597	29	19	15	ty
5	1	1	1	54	16	1863	1586	128	56	14	see
5	1	1	1	54	17	2055	1636	46	13	0	he,
5	1	1	1	54	18	2146	1669	17	7	22	2
5	1	1	1	54	19	2213	1680	4	2	58	J
5	1	1	1	54	20	2271	1699	4	5	12	;
5	1	1	1	54	21	2445	1737	29	7	16	RS
5	1	1	1	54	22	2623	1751	42	49	25	at
5	1	1	1	54	23	2688	1782	25	17	45	a
5	1	1	1	54	24	2761	1795	25	19	32	PA
5	1	1	1	54	25	2837	1815	3	4	39	i
5	1	1	1	54	26	2949	1830	137	47	25	ie
5	1	1	1	54	27	3099	1851	52	47	28	oN
5	1	1	1	54	28	3196	1878	13	16	50	ee.
5	1	1	1	54	29	3296	1910	57	20	43	a
5	1	1	1	54	30	3373	1929	46	18	66	=
4	1	1	1	55	0	930	1413	2466	544	-1	
5	1	1	1	55	1	930	1413	39	19	12	‘SS
5	1	1	1	55	2	1034	1440	3	8	0	‘
5	1	1	1	55	3	1079	1448	8	9	21	%
5	1	1	1	55	4	1144	1465	27	15	42	“i
5	1	1	1	55	5	1435	1524	2	7	34	]
5	1	1	1	55	6	1676	1574	18	7	0	“.
5	1	1	1	55	7	1816	1608	45	22	15	Te
5	1	1	1	55	8	2012	1653	3	6	56	;
5	1	1	1	55	9	2100	1670	3	1	25	»
5	1	1	1	55	10	2146	1680	49	20	14	Pe.
5	1	1	1	55	11	2264	1708	6	5	12	¢
5	1	1	1	55	12	2451	1733	39	33	16	art
5	1	1	1	55	13	2794	1817	39	12	41	a
5	1	1	1	55	14	2917	1853	4	5	27	;
5	1	1	1	55	15	2970	1837	18	36	51	if
5	1	1	1	55	16	3064	1879	94	31	16	Se
5	1	1	1	55	17	3202	1907	21	16	37	a
5	1	1	1	55	18	3338	1916	58	41	30	herd
4	1	1	1	56	0	290	1291	3110	684	-1	
5	1	1	1	56	1	290	1291	16	10	60	te
5	1	1	1	56	2	934	1430	87	33	22	ay
5	1	1	1	56	3	1071	1461	6	20	39	i
5	1	1	1	56	4	1126	1471	1	4	20	ae
5	1	1	1	56	5	1413	1533	24	22	34	Ni
5	1	1	1	56	6	1591	1591	28	6	0	o-
5	1	1	1	56	7	1634	1602	81	4	0	«.—
5	1	1	1	56	8	1785	1609	5	24	0	.
5	1	1	1	56	9	1928	1654	17	18	0	‘
5	1	1	1	56	10	2099	1682	3	3	40	:
5	1	1	1	56	11	2166	1695	4	3	68	4
5	1	1	1	56	12	2236	1699	18	28	15	ra
5	1	1	1	56	13	2376	1743	11	13	14	7
5	1	1	1	56	14	2498	1762	6	19	74	1
5	1	1	1	56	15	2624	1787	81	42	50	ONG
5	1	1	1	56	16	2815	1823	89	54	31	ANS
5	1	1	1	56	17	2943	1863	23	27	13	ei
5	1	1	1	56	18	3062	1894	5	4	18	¥
5	1	1	1	56	19	3075	1897	14	19	20	Pp
5	1	1	1	56	20	3102	1882	32	41	29	teen
5	1	1	1	56	21	3186	1924	56	21	31	+s
5	1	1	1	56	22	3272	1925	56	38	19	Le
5	1	1	1	56	23	3357	1950	43	25	18	a
4	1	1	1	57	0	565	1358	2885	662	-1	
5	1	1	1	57	1	565	1358	62	29	61	ct
5	1	1	1	57	2	862	1432	14	14	0	&
5	1	1	1	57	3	930	1457	30	16	44	a
5	1	1	1	57	4	976	1447	51	52	8	Fie:
5	1	1	1	57	5	1039	1458	38	73	23	uy
5	1	1	1	57	6	1143	1480	23	70	20	|
5	1	1	1	57	7	1224	1525	2	6	21	j
5	1	1	1	57	8	1403	1525	68	73	28	a
5	1	1	1	57	9	1522	1584	23	29	19	ee
5	1	1	1	57	10	1605	1601	48	11	29	a9
5	1	1	1	57	11	1752	1636	4	2	0	:
5	1	1	1	57	12	1858	1634	72	38	40	—
5	1	1	1	57	13	1997	1699	65	16	7	Ling
5	1	1	1	57	14	2369	1777	10	16	28	ie
5	1	1	1	57	15	2400	1754	18	32	8	:
5	1	1	1	57	16	2447	1803	9	12	32	PR
5	1	1	1	57	17	2665	1832	28	31	1	ee
5	1	1	1	57	18	2735	1830	92	64	24	aa
5	1	1	1	57	19	2843	1866	161	62	32	VE
5	1	1	1	57	20	3047	1864	47	80	8	Me
5	1	1	1	57	21	3132	1942	7	3	20	-
5	1	1	1	57	22	3169	1939	69	41	33	ae
5	1	1	1	57	23	3273	1950	113	70	6	roel
5	1	1	1	57	24	3399	1986	51	30	16	be!
4	1	1	1	58	0	564	1394	2870	661	-1	
5	1	1	1	58	1	564	1394	63	55	0	e
5	1	1	1	58	2	880	1474	26	20	10	3
5	1	1	1	58	3	973	1475	69	46	24	it
5	1	1	1	58	4	1084	1512	23	37	26	hI
5	1	1	1	58	5	1199	1531	16	56	68	|
5	1	1	1	58	6	1356	1569	8	26	0	.
5	1	1	1	58	7	1405	1589	108	35	27	Wg
5	1	1	1	58	8	1594	1645	5	2	0	°
5	1	1	1	58	9	1681	1665	7	2	0	E
5	1	1	1	58	10	1854	1703	7	6	0 es EEN i eS A a a ares
                                          =                 |          A      ny f Bee aoa,      oN ¥    ee     BAU       pe    “ay tale   + be ae i wires,         ee
                                          gest ae     BSH!                   eM     :    SSRs ee      ° li        ’     Oe  aA  oy “io   2 4  Rep   aa     Bd    Nee  ARES.  Re
    r   er                                iS 2S   ee +  |      de ae   Ae ae        Coe  ein   oe Pie                       ay       ar Pe   A  ia BD  SA  : % pa    8   RS <
   ire                     oe               ee Xe RMS a 2% sel       Teen             a Tae                       1        ha        fe. PUSS   ES a    ’   * Sees    AR ica
    ,   ¥                 Teed             iN     eee fos     eae =         f   aa a         aha                  at        a           ,   ac) eo        See, ae soe uJ aC
       ,                 Fe               s    Baa alae                  Wt fy —                       :        iy)           ON fF «He      ‘tisha      Ps hat,         e's
      2                                   See                        HE                          eae           ABR ais          oN   ON Ne Ripe a                      Soe
       ay                                  e     Pe           :    Y    \  ha   ne       Wy      gy            J   ;         fee |  *  Al pt.    , Pek    SS ,         Rati
        -                ©                  Fy Oe       Sed Ail}      tH         hh } i  by    ‘    ad :      .   /       a                A   Pt    Wid Y %)     .    te ti
                                          Ss may ri ee a         oO Tn          1  } vis vol. — Mi               4           5     : “a  a 6         :       ~ is   ye      Ae
                         Q)                —    we S      ~  SS Sate ao eens               n              ee       =e : ace   y . \    Nein) nen       Tt Sy ye Kea       F  yi}
                                                                                              Se if                      a:     aaa        Se           Beye        ak    hors
                                             ae tae    ake J fas  Mi) ) | MN | iN i {   S|  a        Pet + |    Wi 4        moe Va)      en   Lge       Ni te FNS    Fe
                                           ee Te :        at    m   Re ly        va     ’    rh    . R     hE a“       ,   >.        ety ; Re         “  a ¥3 Ps  ue va i
                         pe                   ‘eats fi                    ae  Mie
5	1	1	1	71	6	1643	2007	4	7	44	i
5	1	1	1	71	7	1710	2018	32	11	50	=
5	1	1	1	71	8	1889	2059	7	13	18	es
5	1	1	1	71	9	1924	2067	39	23	27	Oa
5	1	1	1	71	10	1997	2063	59	55	37	oe:
5	1	1	1	71	11	2082	2110	2	2	9	:
5	1	1	1	71	12	2267	2154	11	4	83	4
5	1	1	1	71	13	2303	2137	64	48	7	We
5	1	1	1	71	14	2378	2168	67	34	20	ho
5	1	1	1	71	15	2553	2207	51	39	13	ne
5	1	1	1	71	16	2606	2209	27	35	23	ca
5	1	1	1	71	17	2660	2242	8	3	19 ' . UR: Noss od Paaset g a ee ae Nh:
                         ‘ox               a"   ; j                                                 .   5       a ray    a" N  << at , aor   Sy iS    at     mea pb ah
                                               seh                          es 6            Sis        7  ——T        S ye  My   7 v3 Xf tm igen Ae wy uh  A Ps ASS ny ‘Saey y bes
                                           7   ret:                      —_              “—                       >  Ij ay     . ye     om, ss Se sae       a     oune) “A a
                          A               a      j                  { Ny |   Wt    {  eal      Pee:   ‘te   ag      pd.  . x    tye   ee eK
                                          yt   i         Hy             UN        un HY  i. M    a.  7       * BP   ee  4 . SOS       Lae N po? ee whee
                                            MULT               HH     HA Wi a         eee            ET ie SA                                        u
                         CD                Via       (}\    |   \   itu Pin          a            pe,           pity    ER
                                          oy i                        |    ye i               ene               gy)      i   * “a's
                          <.                  ub)       WI                  ee             Sie
        ,                 =                  WAR  iJ)                 at        ai       aR
                                              J , ; tthe  i  rae AY ‘i    a     =         -     a AG? ae          =
       f    eo            =               re   Uh
        ‘) yA                             aid i  e  wen
       Ys if e                            ¥    ,   Poh
                                                |, haga
              ri

Section 55

                                                              Noosa Climate Change Response Plan




Monitoring and evaluation
Monitoring and reporting on progress are critical to understanding the effectiveness of actions and to
ensure delivery of the ambitions and strategic priorities in this plan.
The scale and urgency of the climate emergency means that the Council and the community need
the evaluation of progress to be meaningful, transparent and timely.
A review of progress against the strategic priorities, actions, targets and metrics in this plan will
occur every second year to allow Council and the community to assess plan implementation and the
impact of action taken. Smaller interim annual reviews will also occur to help inform Council budget
processes.
The monitoring and evaluation framework for this CCRP has been designed to help Council and
other project partners to understand what is working and what is not. Our understanding of climate
change is evolving in terms of what makes people, communities and environments vulnerable to
climate impacts, and what to do about it. The monitoring and evaluation is about understanding
change – what has changed, how has it changed and by how much. Understanding how climate
actions are actually reducing vulnerability or reducing emissions or increasing capacity of people
and organization is complex. The process therefore needs to be elastic and inclusive to provide for
adaptability as things emerge and morph.




                                                                                                 Page 55

Section 56

          Noosa Shire Council




  Community reference forum
  Noosa Council will establish a climate change community reference group to strengthen
  accountability, transparency, and cooperation. Representatives of the group will be able to discuss
  and provide advice on climate change issues, on-ground action, barriers and successes, monitoring
  and evaluation, and ongoing program development. This group will be an important component of
  plan implementation given that many of the actions in the CCRP require a partnership approach
  across a range of sectors. This includes working with community groups that form part of the existing
  Zero Emissions Memorandum of Understanding.


  Resources and funding
  Potential funding sources will be actively pursued to enable ongoing implementation of the CCRP
  for both emissions reduction and climate resilience. This includes investigating opportunities for
  alternative revenue sources. This could include linking activities that occur locally and that derive
  revenue within the community with delivery of real on-ground actions, such as Trees for Tourism in
  the hinterland, other funding for urban greening projects, or funding for science-based programs that
  monitor long term environmental and climate risks.
  Council has been awarded grant funding for climate risk and resilience through a number of
  programs in recent years amounting to around $3 million in funding for Noosa Council and for
  cleantech business development. Some of these include:

   Grants                                  Funding source            Funding to council       Year
                                                                                              commenced
  Climate Risk Management Strategy         State government,         $210,000 in              2021
  grant – to develop a climate action      administered through      collaboration with
  roadmap for the broader Sunshine         LGAQ                      Sunshine Coast
  Coast region                                                       Regional Council
  Climate Resilience Alliances Pilot grant State government          $100,000 in              2021
  – to develop an alliance to accelerate funding, administered       collaboration with SEQ
  the delivery of on-ground climate        through LGAQ              councils
  transition and adaptation actions
  Regional Tourism Bushfire Recovery       AusTrade – Federal        $100,000                 2020/21
  grant – Firetech conference for          Government                $50,000
  bushfire resilience through technology   Additional contribution
  innovation                               from State government
  Firetech 2020 Program – incubator        AusIndustry – Federal     $100,000                 2020
  support, expert in residence             Government
  Queensland Bushfires Local Economic Qld Reconstruction             $1,894,503               2019
  Recovery Program – funding for new      Authority (QRA) - State
  fire tech laboratory including projects Government
  for environmental monitoring and data
  generation
  QCoast 2100 coastal hazard program       State government,         $490,000                 2016
  - to develop a Coastal Hazard            administered through
  Adaptation Plan for coastal erosion,     LGAQ
  tidal inundation and sea level rise

Page 56

Section 57

                                                               Noosa Climate Change Response Plan




DEFINITIONS
Adaptation: Regarding climate change, adaptation is the process of adjustment to actual or
expected climate and its effects. It seeks to moderate or avoid harm or take advantage of beneficial
opportunities.
Carbon drawdown: The removal of carbon from the atmosphere by capturing or storing it through
biological, chemical and physical processes. Also referred to as carbon sequestration.
Circular economy: A closed system in which reuse, recycling and disposal channels are in-build to
consumer and industrial products, to elimination.
Climate: Relates to the average weather over various timescales, including over a period of months up
to millions of years.
Climate Change: is any change in the climate lasting for several decades, including changes in
temperature, rainfall and wind patterns. It refers to the average weather conditions over a period of
30 years or longer. Climate change is different from weather. Weather refers to what you seen and feel
outside from day to day (e.g. sunny, rainy).
Hazard: the potential occurrence of a natural or human-induced event, trend or impact that
may cause damage, including loss to property, infrastructure, livelihoods, service provision, and
ecosystems.
Intergovernmental Panel on Climate Change: Established by the United Nations, the IPCC is the
leading international body for the assessment of climate change, with representatives from 195
countries.
Mitigation: A human intervention to reduce the sources or enhance the sinks of greenhouse gases.
Resilience: The capacity of social, economic, and environmental systems to cope with a hazardous
event, trend, or disturbance, responding or reorganising in ways that maintain their essential
function, identity, and structure, while also maintaining the capacity for adaptation, learning, and
transformation.
Risk: is the potential for consequences where something of value is at stake and where the
outcome is uncertain, recognising the diversity of values. Risk is often represented as probability
of occurrence of hazardous events (likelihood) multiplied by the impacts (or consequences) should
these events or trends occur.
Water sensitive urban design: A holistic approach to water management that integrates urban design
and planning with social and physical sciences in order to deliver water services and protect aquatic
environments in an urban setting




                                                                                                    Page 57

Section 58

Th ere | is      |

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.