Original source · versioned page text
2021-08-10 P&E Agenda - Item 7 - Attachment 1 - Climate Change Response Plan
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn Noosa Shire Council
• Provided a free solar advice hotline and The Noosa Council Environment Strategy
education programs for households and was also adopted in 2019 with outcomes and
businesses through the Australian Energy targets for both emission reduction and climate
Foundation adaptation. This includes the target that Noosa
• Partnered with ZEN Inc on a range of Council operations, and the Noosa community
initiatives including solar for business, the as a whole, reach net zero emissions by 2026.
electric vehicle expo and Race to Zero
school program. Through its participation in initiatives such as
the Queensland Climate Resilient Councils,
The installation of the solar systems has saved
Council over $500,000 in electricity costs since and the Cities Power Partnership, Council has
the program commenced in 2017. joined many other local governments across
Queensland and Australia in committing to a
In 2017 Council prepared a Climate Change
sustainable post-COVID economic recovery
Response Policy setting out our commitment
to proactively plan and prepare for climate that creates local jobs, supports industries
change, and to build knowledge and capacity and sectors that invest in a zero-carbon
as an organisation. future, and contributes to sustainable resilient
Council is also progressing the development communities.
and implementation of a Coastal Hazard Whilst this Plan sits under the Environment
Adaptation Plan for addressing increasing Strategy, it is recognised that this is a whole of
risks associated with coastal erosion, tidal
Council document and has implications for all
inundation and sea level rise for public
operations throughout Council.
and private assets, including critical public
infrastructure.
Environment Policy Framework
Sustainability Principles
Environment and Sustainability Policy
Strategy 10 years Links to: Social Strategy
Environment Strategy Economic strategy (local economic plan)
Transport Strategy
Climate Change
Noosa River Plan
Response Plan
Detailed Plans 5 years Links to: Corporate Plan
Planning Scheme
Coastal Foreshores Coastal Hazards
Other detailed plans
Management Plan Adapta�on Plan
Local Laws
Asset management plans
Bushland Reserves Flood Management
Strategic Plan Plan
Biodiversity Bushfire
Conserva�on Plan Management Plan
Koala Conserva�on Biosecurity Plan
Plan
Mary River Waste
management plans Management Plan
Annual plans and Operational Plans
programs
Page 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.