Decision Notice - 010.2007.00001017.001 [As Published] · 142007.1017
Form 6 - Decision Notice
INTEGRATED PLANNING ACT 1997, S3.5.15, IDAS DEVELOPMENT APPLICATION
File No: 2007/1017 Date of Decision: 8 October 2007
1. APPLICANT DETAILS
Name: Dynamic Cafes Pty Ltd
Postal address: PO Box 217
NOOSA HEADS QLD 4567
Phone no: 5442 4644 Fax no: 5442 4767
2. PROPERTY DESCRIPTION
Street address: 18 Douglas Street Sunshine Beach
Real property Lots 0, 1, 2 & 3 GTP 615
description:
3. OWNER DETAILS
Name: Dynamic Cafes Pty Ltd
Postal address: PO Box 217
NOOSA HEADS QLD 4567
4. REFERRAL AGENCIES
Referral Agency Address Basis
Nil
5. APPLICATION TYPE
Development Development Details Preliminary Development
Approval Permit
Operational Works Landscaping, Access and/or No Yes
Carparking, Site Civil Works,
Stormwater Drainage, Frontage
Works and Erosion and Sediment
Control
6. DECISION DETAILS
Council decided to approve the application and grant a Development Permit, subject to conditions.
7. APPLICABLE CODES
The developer must comply with the following codes for self-assessable development related to the development
approved under this Development Permit:-
Nil.
8. SUBMISSIONS
Not Applicable.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 7 pages
Page 2
NOOSA COUNCIL IDAS Development Application Decision Notice 2 of 8 9. CONDITIONS The approval is subject to conditions. Noosa Council’s conditions are attached. 10. FURTHER DEVELOPMENT PERMITS REQUIRED Type of Development Permit required Subject of the required Development Permit Nil 11. RIGHTS OF APPEAL Rights of appeal in relation to this application are attached. 12. ASSESSMENT MANAGER Name: Noosa Council Signature: Date: 8/10/07 AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc0806ac\@[email protected]
Page 3
NOOSA COUNCIL IDAS Development Application Decision Notice 3 of 8
Noosa Council Conditions
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
Landscaping
1. The site is to be landscaped in accordance with Council’s Policy on Landscaping Guidelines and the
approved Landscaping Plans which are titled and numbered Landscape Finishes Plan & Details (Finishes
Plan) LA1201 LA01 Sheet 1 Issue B, Landscape Finishes & Planting Plan & Details (Finishes and
Planting Plan) LA1201 LA02 Sheet 2 Issue B, Landscape Planting Plan, Details & Specification LA1201
LA03 Sheet 3 Issue B prepared by Landgraphics dated 17 July 2007 and may be amended by these
conditions and notations on the approved Landscaping Plans.
2. The landscaping plans referred to above are to be prepared and certified by a suitably qualified and
experienced Landscape Architect or Horticulturalist.
3. The landscape construction is to be implemented in accordance with the amended landscape plan,
planting schedule and horticultural industry best practices.
4. The existing Melaleuca species in the road reserve shall be retained along with the five existing species
along the site’s side (north eastern) boundary.
5. In relation to the front setback area to Douglas Street, the 2 x Pittosporum rhombifolium (White Holly)
species, 1 x Banksia aemula (Wallum Banksia) species and 3 x Arcontonphenix cuninghamia (Bungalow
Palm) species shall be a minimum of 100 Litre pot size.
6. In relation to the rear setback area to Douglas Lane, the 3 x Banksia aemula (Wallum Banksia) species
and Hymenoporum flavum (Native Frangipanni) species shall be a minimum of 100 Litre pot size.
7. In relation to the side setback areas to adjoining properties, the Hymenoporum flavum (Native
Frangipanni) shall be a minimum of 100 Litre pot size.
8. All Syzygium “Bush Christmas” species shall be replaced with Syzygium “Australe” to provide greater
screening opportunities on-site.
9. All Linospadix monostachya (Walking Stick Species) to the rear of the basement shall be replaced with
Backhousia Myrtifolia species, which will assist in screening basement walls.
10. Prior to the commencement of all works, all trees to be retained except where required to be removed due
to building operations and footpath construction must be protected with barricade fencing to prevent
damage from soil stockpiling and compaction of the root zone, parked cars and machinery
11. All native plant species located in group plantings shall not be subjected to any hedging maintenance
regimes.
12. All trees 45 litre and greater must be securely staked and tied to assist their growth during the
establishment period
13. The density of planting must achieve the set out requirements as detailed on the approved landscape
plan.
14. The applicant must ensure that all landscaping treatment does not unduly restrict/prevent access to
service meters within the site.
15. This Development Permit lapses if the development has not happened by 8 October 2009, unless
application to extend the currency is approved by Council.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc0806ac\@[email protected]
Page 4
NOOSA COUNCIL IDAS Development Application Decision Notice 4 of 8
Land Development
16. The development shall be carried out in accordance with Engineering drawings Nos 17108-OW1 dated
May 2007 by SCG Consulting Engineers and 07036-1A dated 25 May 2007 by Ian Bradford Plumbing
Consultant or as modified herein.
17. Roof and surface runoff connection to Council’s kerb and channel/drainage system shall be as shown on
drawing No. 07036-1A. Kerb adaptors shall be used in the kerb.
18. A footpath 1.5 metres wide shall be constructed across the full frontage of the development. The footpath
shall have a slip resistant surface. The alignment, of which, shall be determined on site with Council’s
Construction Technical Officer. The expansion joints in any footpath shall be “sawcut” not trowel jointed.
19. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily installed into the
first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each rain event.
These devices are to remain in place during the civil works and construction phases of the development.
The location and type of device to be installed shall be established at the “pre start” meeting with
Council’s Construction Technical Officer and shall be installed prior to the commencement of any works.
20. Council’s Construction Technical Officer – Mick Conroy (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting regarding the civil works.
21. The principal contractor must have all the appropriate insurance and public liability documentation to carry
out the works. The principal contractor is also responsible to ensure that any sub contractors also have
the appropriate insurance and public liability documentation.
22. Prior to the “pre start” meeting, the principal contractor must be provided with a copy of Council’s
signed approved drawings and conditions by the applicant.
23. Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the project.
(This person will be the contact for the project).
24. Council standards shall apply to these works unless otherwise modified herein.
25. The person acting on this permit shall ensure that its consultants and contractors take all reasonable care
during the construction of the engineering works to ensure that Council property, road pavements or
facilities (such as underground drainage, water supply, sewerage, footpaths, kerbing, landscaping, street
furniture etc.) are protected against any damage or interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants or
Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out the
engineering works, the Applicant and/or its Contractors shall forthwith notify the Manager Land
Development and shall forthwith rectify the damage to that property or facility at its cost and to the
satisfaction of the Manager Land Development.
All rectification works are to be completed prior to the commencement of the use or, alternatively, the
Applicant may request the Council to carry out the rectification work at the Applicant’s cost, such cost
being paid by the Applicant to the Council prior to the commencement of the use.
In the case of any emergency the Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the commencement of the use.
A management strategy to ensure no damage occurs to Council services shall be submitted to Council for
assessment prior to the pre-start meeting.
26. The development of the site shall be carried out in such a manner as to prevent dust and/or sand
nuisance to residents and/or tenants in the vicinity of the development.
27. Construction work and other associated activities are permitted only during the hours of 7.00 am and 6.00
pm Monday to Saturday. No work is permitted on Sundays or public holidays, except where extended
hours are approved by the Manager-Land Development or his nominee.
28. All signage, including that for safety during construction shall be in accordance with the Manual of Uniform
Traffic Control Devices and Traffic Infrastructure (Roads) Act.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc0806ac\@[email protected]
Page 5
NOOSA COUNCIL IDAS Development Application Decision Notice 5 of 8
29. Safe pedestrian access on Douglas Street and Douglas Lane shall be maintained at all times. Should
footpath / road closures be necessary to carry out construction works, Council’s Construction Technical
Officer (ph 0410 512 505) must be notified prior to the proposed closure.
30. Sediment and erosion control measures must be in place prior to works commencing. If such measures
are not in place or are not satisfactory, “on the spot “fines may be issued. Such fines can be issued if
sediments from the site are found to enter or have the potential to enter Council’s stormwater system or
natural waterways. Although the sediment and erosion control measures have been approved on drawing
No.17108-OW1, Council’s Manager – Land Development may request further controls to be installed
should approved measures be inefficient.
31. The owners of the subject property shall maintain the grease/oil arrestor pits/gross pollutant traps in
accordance with the manufacturers specifications.
32. The owners of the subject property shall inspect the grease/oil arrestor pits/gross pollutant traps on a
weekly basis and after each storm event.
The owners of the subject property shall enter into an ongoing maintenance contract with a Registered
Contractor to clean and maintain the grease/oil arrestor pits/gross pollutant traps on a regular three
monthly cycle and on a “On Call” basis in the case of an emergency.
The management and maintenance of the grease/oil arrestor pits/gross pollutant traps shall be included in
the Community Management Scheme for the completed development.
33. Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement of
satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil Engineer (RPEQ) for
design intent, and a Licensed Surveyor shall certify the cadastre and the location, level and type of all
services and structures. All of which shall be submitted to Council for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage structures,
finished ground levels and pavement surface levels. The data shall be submitted in the Asset Design and
As Constructed (ADAC) digital format. (Guidelines on the use of ADAC are available at
www.adac.com.au) and Council’s Planning Scheme Policy 5 – Engineering Design Standards – Roads,
Drainage and Earthworks.
Approval of works shall not be granted until all As Constructed information has been
supplied and accepted by Council.
34. A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be imposed
on construction works during the maintenance period, which is a minimum period of 12 months duration.
Such bond must be lodged by, and shall only be accepted from the Developer for the works.
35. The works to become Council assets will not be accepted "On Maintenance" until the landscaping is
completed.
36. These works are also to be in compliance with the relevant conditions of Development Permit No.
2004/5743.
37. Pursuant to Section 3.5.21(5) of the Integrated Planning Act 1997, the Relevant Period is two (2) years
from the day this permit takes effect during which time all conditions must have been complied with and
the Plan of Survey lodged with the Council for endorsement.
38. Notwithstanding that Council has checked the plans with due care, where it is found during construction
that variations from Council's standards exist, then Council standards shall apply
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc0806ac\@[email protected]
Page 6
NOOSA COUNCIL IDAS Development Application Decision Notice 6 of 8
Local Laws, Policies & State
Regulation Requirements
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
THE FOLLOWING ADVICES ARE FOR INFORMATION PURPOSES ONLY AND DO NOT FORM
CONDITIONS OF APPROVAL
1. Should any changes or modifications to the approved plans be required as a result of construction
constraints, a Change to an Existing Approval Application under the Integrated Planning Act must be
made. Amended plans clearly indicating the changes must be lodged with this application along with the
appropriate fees.
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc0806ac\@[email protected]
Page 7
NOOSA COUNCIL IDAS Development Application Decision Notice 7 of 8
Appeal Rights
INTEGRATED PLANNING ACT 1997, IDAS DEVELOPMENT APPLICATION
The following is an extract from the Integrated (6) If an application involves assessment against
Planning Act (Chapter 4). a concurrence agency code, appeal rights for
submitters for the application are not available
Division 8 - Appeals to court relating to against the part of the approval that represents the
development applications concurrence agency’s response for the code.
Appeals by applicants Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application 4.1.29.(1) An advice agency may, within the limits of
may appeal to the court against any of the following- its jurisdiction, appeal to the court about the giving of
(a) the refusal, or the refusal in part, of a a development approval for a development
development application; application if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code (b) the advice agency told the applicant and the
1
under section 3.1.6; assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for; (2) The appeal must be started within 20 business
(d) the length of a currency period; days after the day the decision notice or negotiated
decision notice is given to the advice agency as a
(e) a deemed refusal. submitter.
(2) An appeal under subsection (1)(a) to (d) must Appeals for matters arising after approval given
be started within 20 business days (the “applicant’s (co-respondents)
appeal period”) after the day the decision notice or
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
development application, a person to whom any of
(3) An appeal under subsection (1)(e) may be the following notices have been given may appeal to
started at any time after the last day a decision on the the court against the decision in the notice-
matter should have been made.
(a) a notice giving a decision on a request for
Appeals by submitters extension of the currency period for an approval;
4.1.28.(1) A submitter for a development application (b) a notice giving a decision on a request to make a
may appeal to the court about- minor change to an approval.
(a) the giving of a development approval, including (2) The appeal must be started within 20 business
any conditions (or lack of conditions) or other days after the day the notice of the decision is given
provisions of the approval; or to the person.
(b) the length of a currency period for the approval. (3) Subsection (1)(a) does not apply if the
approval resulted from a development application
(2) The appeal must be started within 20 business (superseded planning scheme) that was assessed as
days (the “submitters appeal period”) after the day if it were an application under a superseded planning
the decision notice or negotiated decision notice is scheme.
given to the submitter.
(4) Also, a person who has made a request
(3) If a person withdraws a submission before the mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the against a deemed refusal of the request.
decision.
(5) An appeal under subsection (4) may be
(4) If an application involves both impact started at any time after the last day the decision on
assessment and code assessment, appeal rights for the matter should have been made.
submitters are available only for the part of the
application involving impact assessment. Division 9 - Appeals to court about other matters
(5) If an application is processed under section Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the (no co-respondents)
application are available only for the aspects of the
development that would have required public 4.1.31.(1) A person to whom any of the following
notification under the repealed Act. notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override local planning
instrument)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc0806ac\@[email protected]
Page 8
NOOSA COUNCIL IDAS Development Application Decision Notice 8 of 8
2
(b) a notice under section 6.1.44 giving a decision to
change or cancel a condition of a development
approval.
(2) The appeal must be started within 20 business
days after the day the notice of the decision is given
to the person.
(3) Also, a person who has made a request
mentioned in subsection (1)(a) may appeal to the
court against a deemed refusal of the request.
(4) An appeal under subsection (3) may be
started at any time after the last day the decision on
the matter should have been made.
Appeals against decisions to change approval
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act may
appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
(2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of
the decision is to be given to the person.
(3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on the
matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to the
court against the decision or the conditions applied.
(2) The appeal must be started within 20 business
days after the day notice of the decision is given to
the applicant.
2
Section 6.1.44 (Conditions may be changed or cancelled by
assessment manager or concurrence agency in certain
circumstances)
AOP2 c:\docume~1\aop2\locals~1\temp\bcl technologies\easypdf 5\@bcl@bc0806ac\@[email protected]
Used in these records
Decision Notice - 010.2007.00001017.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 34 KB (small file)
- File type
No other editions are linked here.