                                              Officer:          Duncan Thompson
                                              Direct Telephone: (07) 5449 5175
                                              Response Address: PO Box 141, Tewantin QLD 4565
                                              Email:            [email protected]
                                              Our Reference:    2007/2206
                                              Your Reference:
27 June 2008

Environmental Protection Agency
Contaminated Land Unit
GPO Box 2771
BRISBANE QLD 4001




Dear Sir

                                      Decision Notice
                                    Integrated Planning Act 1997

Your Department was a referral agency for the above application and provided a response to Council
in a letter dated 20 November 2007. On 25 June 2008, Council decided to approve the application in
full subject to conditions.

Details of the decision are as follows:

1        APPLICATION DETAILS

    Application No:                  2007/2206
    Street address:                  31 Orealla Crescent, Sunrise Beach
    Real property description:       Lot 187 RP 135362
    Planning Scheme:                 The Noosa Plan

2        DECISION DETAILS
The following type of approval has been issued:
        Development Permit for Material Change of Use - Detached House

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.

4        ASSESSMENT MANAGER CONDITIONS

1.       Development undertaken in accordance with this approval must generally comply with the
         approved plans of development. The approved plans are numbered, titled and dated:
          Plan         /     Rev.   Plan / Document Name                        Date
          Document No.
          DA.01              C      Site Plan – Bark Design Architects          02.05.08
          DA.02              C      Ground Floor – Bark Design Architects       02.05.08

                                                                                        Page 1 of 11
Full text of the other 10 pages

Page 2

                                                                                             2007/2206



      DA.03                C       First Floor – Bark Design Architects           02.05.08
      DA.04                C       Second Floor – Bark Design Architects          02.05.08
      DA.05                C       Roof Plan – Bark Design Architects             02.05.08
      DA.06                C       North Elevation         –   Bark      Design   02.05.08
                                   Architects
      DA.07                C       East Elevation – Bark Design Architects        02.05.08
      DA.08                C       West Elevation         –    Bark      Design   02.05.08
                                   Architects
      DA.09                C       South Elevation         –   Bark      Design   02.05.08
                                   Architects
      DA.10                C       Section A – Bark Design Architects             02.05.08
      DA.11                C       Section B – Bark Design Architects             02.05.08
      DA.12                C       Section C & D – Bark Design Architects         02.05.08

      and as may be amended by these conditions and annotations on the plans.
2.    The carport roof line shall not extend beyond the carport floor line.
3.    The carport shall remain unenclosed.
4.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
5.    A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to
      service the detached house. The tank is to be installed to ensure water from the tank can be
      used both:
      5.1.    For external use such as watering gardens, irrigation, ornamental ponds or water
              features, topping up swimming pools, outdoor cleaning; and
      5.2.    For use in flushing of toilets internal to the building.
6.    All hot water systems installed shall be either solar systems; electric heat pump systems; or
      gas systems (LPG or natural).
7.    The building height shall not exceed 8.0 metres above natural ground level and finished
      ground except where shown on approved plan numbered DA.09 revision C prepared by Bark
      Design Architects and dated May 2008.
8.    A verification survey of the building is to be carried out by a Licensed Surveyor and a
      certificate lodged with Council at completion of work confirming compliance with the
      maximum allowable building height as required by either the conditions of approval or the
      Planning Scheme.
9.    Existing trees on the site and within road reserves are to be retained, except where required to
      be removed due to building operations or the conduct of the approved use. In this regard, the
      removal of vegetation shall not extend beyond 3 metres of the building footprint of the
      Detached House.
10.   All other vegetation shall be protected from interference resulting from clearing or construction
      activities by:
      10.1.   Clearly marking vegetation to be retained with flagging tape;
      10.2.   Installing protective fencing around the drip line of the vegetation;

                                                                                        Page 2 of 11

Page 3

                                                                                           2007/2206



      10.3.   Stockpiling, storage and vehicle parking occurs in already cleared areas and does not
              cause interference with vegetation; and
      10.4.   Low impact construction techniques are used around vegetation to minimise
              interference with the vegetation.
11.   Cleared vegetation is to be suitably processed by one of the following methods and removed
      from the site:-
      11.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
              loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
              minimum of 10 metres between edges of heaps.
      11.2.   Disposal for firewood.
      11.3.   Disposal for landscaping purposes.
      11.4.   Transport to alternative site for breaking down materials provided that all necessary
              permits have been obtained to allow the alternate site to be used for this purpose.
      11.5.   The Applicant is advised that other methods may be considered provided full details of
              the method are submitted.
      11.6.   The applicant is advised that burning off is an unacceptable method of disposal.
12.   Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
      not constructed under overhead electricity transmission lines, or within any easements.
Currency
13.   The Development Permit for a material change of use lapses if the use has not happened by
      25 June 2012, unless an application to extend the currency is approved by Council.

5     REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger              Referral Status   Referral Agency           Referral Address

 Site in an area where         Concurrence       Environmental             Contaminated Land Unit
 management      advice                          Protection Agency         GPO        Box    2771
 has been given for                                                        BRISBANE QLD 4001
 unexploded ordnance

A copy of any referral agency conditions is attached.

6     APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
 Plan / Document No.       Rev.     Plan / Document Name                        Date
 DA.01                     C        Site Plan – Bark Design Architects          02.05.08
 DA.02                     C        Ground Floor – Bark Design Architects       02.05.08
 DA.03                     C        First Floor – Bark Design Architects        02.05.08
 DA.04                     C        Second Floor – Bark Design Architects       02.05.08
 DA.05                     C        Roof Plan – Bark Design Architects          02.05.08
 DA.06                     C        North Elevation         –   Bark   Design   02.05.08
                                    Architects
                                                                                       Page 3 of 11

Page 4

                                                                                            2007/2206



 DA.07                     C        East Elevation – Bark Design Architects      02.05.08
 DA.08                     C        West Elevation        –   Bark     Design    02.05.08
                                    Architects
 DA.09                     C        South Elevation       –    Bark    Design    02.05.08
                                    Architects
 DA.10                     C        Section A – Bark Design Architects           02.05.08
 DA.11                     C        Section B – Bark Design Architects           02.05.08
 DA.12                     C        Section C & D – Bark Design Architects       02.05.08

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.    The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
      Local Law No. 12, prevents a builder or building contractor carrying out building work on a
      building site in a way that makes or causes audible noise to be made from the building work:-
      1.1.    On a Sunday or public holiday, at any time; or
      1.2.    On a Saturday or a business day, before 7.00am or after 6.30pm.
      A maximum penalty of $1,500 applies to an offence under this legislation.
2.    Prior to the commencement of the development, a plumbing assessment must be obtained
      from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
      Act 2002 (as applicable).
3.    Fencing to the swimming pool and spa must comply with the Queensland Building Act 1975
      Chapter 8 and Part 4 of Building Regulation 2006 in all respects. Direct access from the
      dwelling to the pool and spa enclosure is not permitted.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the Act can
also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage or
the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES

Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable




                                                                                        Page 4 of 11

Page 5

                                                                                     2007/2206



10     FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required         Subject of the required Development Permit
 Development Permit for Building Works       All Building Works

11     SELF ASSESSABLE CODES

The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Detached House Driveways Code
12     SUBMISSIONS

Not applicable

13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).

15     OTHER DETAILS

Should you wish to obtain more information about Council’s decision electronic copies of Council’s
decision are available on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,




Duncan Thompson
ASSISTANT PLANNING OFFICER




                                                                                   Page 5 of 11

Page 6

                                        2007/2206



Referral Agency Conditions –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                      Page 6 of 11

Page 7

  2007/2206




Page 7 of 11


[OCR of page images]
2007/2206

 

IDAS C-6

Defence also recommends thal owners or occupiers of potentially affected land and workers and
contractors employed on the land need to be aware of the procedure if a suspect object is found.

As the EPA has no record of the site being further investigated or remediated, it is considered that
there remains a possibility of UXO being found on it.

4 Conditions
The following concurrence agency conditions are to be attached to any approval:

4.1 Prior to the commencement of any development-related excavation, earthworks or soil
disturbance, that part of the site to be so worked is to be subjected to investigation and,
where necessary, appropriate remedial action.

4.2. Any person employed to work on any part of the site where Condition 4.1 has not been
satisfied is to be forewarned in writing by the applicant.

This warning is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due caution. It is to state the
procedure to be followed by any person finding an object suspected of being explosive
ordnance or component thereof:

Do not disturb the object.

Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate dimensions and general appearance.

Note the route to its location.

Advise the Police as soon as possible.

eevee

4.3 Following investigation and any remedial action taken to satisfy Condition 4.1 above, the
applicant is to submit a report, prepared in accordance with current guidelines, to the EPA for
assessment. The EPA is to subsequently advise the Noosa Council and the applicant of its
assessment in regard to Condition 4.1 being satisfied.

4.4 No gravel, rock, sand or soil is to be removed from the balance part of site without written
EPA approval.

4.5 The applicant is to advise the owner and any occupier of the site of the above. responsibilities.

5 Additional comments or advice

Applicants may contact the EPA’s Contaminated Land Unit on (07) 3224 5644 or visit the Defence
website http://www,.defence.cov.au/uxo/ for the details of current UXO investigation and remedial
search contractors. The EPA accepts reports based on investigative and remedial work carried out
by these contractors.

Investigation and remedial action to satisfy Condition 4.1 typically involves sampling/search
programs with detection equipment unless the use of such equipment is:
* considered unwarranted by a UXO contractor due to the extent of any prior excavation or
carthworks or, conversely, of any filling proposed as part of the development program; or
© prevented or made impracticable by the presence of a structure, stockpile, natural barrier or
metal waste.

VER 2

Page 7 of 11

Page 8

  2007/2206




Page 8 of 11


[OCR of page images]
2007/2206

 

IDAS C-6
In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For
example, where the risk of exposure to any UXO that may exist is reduced by the presence of a
structure or natural barrier, issuance of the standard UXO warning (see Condition 4.2) may suffice
while the structure, stockpile or barrier remains in place. Where a structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any greater
risk to which workers might then be exposed, may need to be considered. Progressive assessment
will be necessary where such circumstances exist. Unless, at the completion of preliminary works,
there is evidence then available to the UXO contractor that any residual risk is negligible, the use of
detection equipment will typically be required to confirm the site’s status.

Where investigation, along with any subsequent remedial action and assessment; is to be
implemented by stages to satisfy Condition 4.1 and 4.3, a preliminary investigation report should be
submitted by the applicant to the EPA along with a management plan for the proposed work. Staged
investigation/remediation is most likely to be applicable where development of smaller, built-on lots
(which can present circumstances such as those discussed above) or broadhectare sites is proposed, In
such cases, the EPA’s assessment of the report and advice to Council in regard to approval of the
development will be dependent on agreement with the management plan.

Where Condition 4.1 is to be satisfied by a whole lot or broadhectare development stage being
subjected to investigation and any necessary remedial action, the EPA, based on the subsequent
investigation/remediation report’s findings and recommendation/s, may reassess the lot, or that portion
comprising the development stage, as being remediated or not needing remediation, and advise the
applicant and Council accordingly. Otherwise, any balance of land that has not been further
investigated wil! retain the risk assessment made by Defence. This is unless evidence obtained from
the investigated part/s can be used to refute Defence’s assessment in regard to all or part of the
balance. In the latter case, the EPA may reassess all of the balance or the applicable part/s as being
unaffected by UXO.

6 Additional information

This concurrence response applies only to contaminated land issues and does not remove the need to
obtain any further approval for this development which may be required by this or other legislation,
State and/or Commonweaith. Applicants are advised to check with all relevant statutory authorities.
Applicants should also comply with all relevant legislation.

The EPA has not provided a notification to native title parties for this application. The State’s
Native Title Work Procedures indicate that the responsibility for assessment of native title issues for
an IDAS application rests with the Assessment Manager. It is recommended that the Assessment
Manager determines whether native title notification is required for this application.

*End of response*
IDAS C-6 CLM

VER2

Page 8 of 11

Page 9

  2007/2206




Page 9 of 11


[OCR of page images]
11 J0 6 abeg

UNEXPLODED ORDNANCE (UXO) CONTRACTORS

Defence accredited UXO investigation and remedial search contractors are listed below.

The Environmental Protection Agency (QLD) accepts reports based on investigative and remedial work carried out by these contractors.

 

 

BACTEC South East Asia Pty Ltd

Managing Director:
Timothy Pippett

Unit 1, 43 Stanley Street
PEAKHURST NSW 2210

Tel: (02) 9584 7500

Mobile: 0412 663 541

Fax: (02) 9584 7599

Email:

[email protected]

Website: http://www. bactec.com.au/

Manager, Explosive Ordnance Services:

Mark Latimer

Tel/Fax: (07) 5526 0881
Mobile: 0438 443 283

Email: [email protected]

 

G-tek Australia Pty Ltd

Chief Operating Officer:
Greg Guthrie

25 Applecross Avenue
CASTLE HILL NSW 2154

Tel: (02) 9680 7268
Mobile: 0418 977 424
Fax: (02) 9680 7403

Email:
[email protected]
Website:

http://www.g-tek.biz/

UXO Projects Manager:
Max Verrier

 

Tel: (07) 5493 8577
Mobile: 0418 776 203
Fax: (07) 5493 7405
Email:

mverrier@g-tek. biz

 

 

———_—
Milsearch Pty Ltd

Managing Director;
David Halmarick

Unit 5, Level |

30 Mawson Place
MAWSON ACT 2607
Mailing Address:

PO Box 687
MAWSON ACT 2607

Tel: (02) 6286 8299

Mobile: 0419 944 397

Fax: (02) 6286 8266

Email: [email protected]
Website: http://www.milsearch.com.au/

Queensland Operations Manager:
Paul Ingerton

Tel: (07) 3824 1669
Mobile: 0413 452698
Email: [email protected]

 

 

 

 

CSG Demining Consultants

(Offers all Consultancy & Investigation
services but does not undertake
Remediation)

Managing Director:

Carl Chirgwin

151 Golf Links Road
MAIDEN GULLY Vic 3551

Tel: (03) 54462408

Mobile: 0417-527264

Fax: (03) 54462481

Email: [email protected]
Website:
http://www.csedemining.com.au

 

 

This list is drawn from the Department of Defence National UXO Office’s panel of UXO investigation and remedial search companies that can be found on
http://www.defence.gov.au/uxo/

Version — 21/08/2007

 

9022/2002

Page 10

                                                                                              2007/2206



                                                 Appeal Rights
                                                INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




                                                               (5) If an application is processed under section
The following is an extract from the Integrated            6.1.28(2), appeal rights for submitters for the
Planning Act (Chapter 4).                                  application are available only for the aspects of the
                                                           development that would have required public
Division 8 - Appeals to court relating to
                                                           notification under the repealed Act.
development applications
Appeals by applicants                                          (6) If an application involves assessment
4.1.27.(1) An applicant for a development                  against a concurrence agency code, appeal rights
application may appeal to the court against any of         for submitters for the application are not available
the following-                                             against the part of the approval that represents the
(a) the refusal, or the refusal in part, of a              concurrence agency’s response for the code.
    development application;                               Appeals by advice agency submitters
(b) a matter stated in a development approval,             4.1.29.(1) An advice agency may, within the limits
    including any condition applying to the                of its jurisdiction, appeal to the court about the
    development, and the identification of a code          giving of a development approval for a
                         1
    under section 3.1.6;                                   development application if-
(c) the decision to give a preliminary approval            (a) the development application involves impact
    when a development permit was applied for;                 assessment; and
(d) the length of a currency period;                       (b) the advice agency told the applicant and the
(e) a deemed refusal.                                          assessment manager to treat its response to
                                                               the application as a submission for an appeal.
    (2) An appeal under subsection (1)(a) to (d)
must be started within 20 business days (the                   (2) The appeal must be started within 20
“applicant’s appeal period”) after the day the             business days after the day the decision notice or
decision notice or negotiated decision notice is           negotiated decision notice is given to the advice
given to the applicant.                                    agency as a submitter.
    (3) An appeal under subsection (1)(e) may be           Appeals for matters arising after approval given
started at any time after the last day a decision on       (co-respondents)
the matter should have been made.                          4.1.30.(1) For a development approval given for a
Appeals by submitters                                      development application, a person to whom any of
                                                           the following notices have been given may appeal
4.1.28.(1) A submitter for a development
                                                           to the court against the decision in the notice-
application may appeal to the court about-
                                                           (a) a notice giving a decision on a request for
(a) the giving of a development approval, including
                                                               extension of the currency period for an
    any conditions (or lack of conditions) or other
                                                               approval;
    provisions of the approval; or
                                                           (b) a notice giving a decision on a request to make
(b) the length of a currency period for the approval.
                                                               a minor change to an approval.
    (2) The appeal must be started within 20
                                                               (2) The appeal must be started within 20
business days (the “submitters appeal period”)
                                                                   business days after the day the notice of the
after the day the decision notice or negotiated
                                                                   decision is given to the person.
decision notice is given to the submitter.
                                                               (3) Subsection (1)(a) does not apply if the
    (3) If a person withdraws a submission before
                                                                   approval resulted from a development
the application is decided, the person may not
                                                                   application (superseded planning scheme)
appeal the decision.
                                                                   that was assessed as if it were an
    (4) If an application involves both impact                     application under a superseded planning
assessment and code assessment, appeal rights                      scheme.
for submitters are available only for the part of the
                                                               (4) Also, a person who has made a request
application involving impact assessment.
                                                                   mentioned in subsection (1) may appeal to
                                                                   the court against a deemed refusal of the
                                                                   request.

1
     Section 3.1.6 (Preliminary approval may override
    local planning instrument)
                                                                                           Page 10 of 11

Page 11

                                                                                             2007/2206

     (5) An appeal under subsection (4) may be          For Building Works Only
         started at any time after the last day the     Rights of appeal conferred by Section 4.2.9 of the
         decision on the matter should have been        Integrated Planning Act 1997 as follows:
         made.
                                                        Division 3 – Appeals to tribunals relating to
                                                        development applications
Division 9 - Appeals to court about other
matters                                                 Appeals by applicants
Appeals for matters arising after approval given
(no co-respondents)
                                                        4.2.9(1) An applicant for a development application
4.1.31.(1) A person to whom any of the following        may appeal to the Building and Development
notices have been given may appeal to the court         Tribunal against any of the following-
against the decision in the notice-
                                                        (a) the refusal, or the refusal in part, of a
(a) a notice giving a decision on a request to              development application;
    change or cancel a condition of a development
    approval.                                           (b) a matter stated in a development approval,
                                    2                       including any condition applying to the
(b) a notice under section 6.1.44 giving a decision         development, and the identification of a code
    to change or cancel a condition of a                    under section 3.1.6;
                                                                                  3
    development approval.
                                                        (c) the decision to give a preliminary approval when a
    (2) The appeal must be started within 20                  development permit was applied for;
        business days after the day the notice of the
                                                        (d) the length of a period mentioned in section 3.5.21
        decision is given to the person.
                                                              currency period;
    (3) Also, a person who has made a request
                                                        (e) a deemed refusal.
        mentioned in subsection (1)(a) may appeal
        to the court against a deemed refusal of the       (2) An appeal under subsection (1)(a) to (d) must
        request.                                        be started within 20 business days (the “applicant’s
                                                        appeal period”) after the day the decision notice or
    (4) An appeal under subsection (3) may be           negotiated decision notice is given to the applicant.
        started at any time after the last day the
                                                            (3) An appeal under subsection (1)(e) may be
        decision on the matter should have been         started at any time after the last day a decision on the
        made.                                           matter should have been made.
Appeals against decisions to change approval            The Registrar for the Building and Development
conditions under the repealed Act                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a         http://www.localgovernment.qld.gov.au/
decision made on an application to change the
conditions attached to an approval given under
section 2.19(3)or section 4.4 of the repealed Act
may appeal to the court against-
(a) the decision; or
(b) a deemed refusal of the application.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice
of the decision is to be given to the person.
    (3) An appeal under subsection (1)(b) may be
started at any time after the last day a decision on
the matter should have been made.
Appeals against local laws
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions
applied under a local law about the use of premises
or the erection of a building or other structure
permitted by the planning scheme may appeal to
the court against the decision or the conditions
applied.
    (2) The appeal must be started within 20
business days after the day notice of the decision
is given to the applicant.


2
     Section 6.1.44 (Conditions may be changed or
                                                        3
    cancelled by assessment manager or concurrence           Section 3.1.6 (Preliminary approval may override
    agency in certain circumstances)                        local planning instrument)
                                                                                          Page 11 of 11

Used in these records

About this file

File size
294 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Concurrence Agency - EPA [As Published].pdf · 294 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.